Permit #2024050977
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00790-0030 |
| CONDITIONED SPACE: 2916 sqft |
| GARAGE: 626 sqft |
| OPENED PORCH (WITH ROOF) : 574 sqft |
| PATIO/DECK (NO ROOF) : 306 sqft |
| Total Square Footage: 4422 sqft |
| Block: 00790 |
| Subdivision: - |
| Job Phone: 386-338-1859 |
| Location Address: 34 BUD HOLLOW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/17/2024 |
| NOC: RECORDED |
| Applicant name: SOPHAN KES |
| Owner: SAR SAMATHA & KOLLINAK |
|
Address 33 BUFFALO BILL DRIVE PALM COAST, FL 32137 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
KES CONSTRUCTION, INC
| Status | Location Address | State License Number |
| ACTIVE |
42 OAKLEAF WAY PALM COAST, FL 32137 |
CBC1264797 (Exp: 08/31/2026) |
Sub Contractors
ROBERT JAMES BARROW JR
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2323 N STATE ST BUNNELL, FL 32110 |
UNIT 126 BUNNELL, FL 32110 |
CAC1817890 (Exp: 08/31/2026) | 386-627-5500 |
GIOVANNI DISARRO
| Status | Location Address | State License Number |
| INACTIVE |
107 BURROUGHS DRIVE PALM COAST, FL 32137 |
CFC1430761 (Exp: 08/31/2026) |
CHRISTOPHER I HALL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
60 COOPER LANE PALM COAST, FL 32137 |
EC13008029 (Exp: 08/31/2028) | 386-225-1937 |
PEDRO DANIEL CHINCHILLA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
324 COVENT GARDENS PL DELTONA, FL 32725 |
CCC1333997 (Exp: 08/31/2026) | 386-679-6228 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 03/10/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: Inspector Notes from Inspection 9500 in future have pep tank breaker labled Inspector Notes from Inspection 9500 in future have pep tank breaker labled IRR with a well. No cc | |||
| BLD - BUILDING FINAL | 02/28/2025 | FINAL APPROVED | JSTEWART |
| Note: 2/26/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 2/26/2025 2:55:02 PM *** 1. Pep tank system requires GFCI Protection. 2020 NEC 422.5. 2. Please seal wall Penetration interior and exterior at Irrigation. FBC R402 3. Spare bath missing toilet seat. 4. All Bathroom showers mixing valves are backwards for indicated Hot water flow. FPBC 607.4 5. Kitchen Island is 66 sq ft of working space, requires 4 outlets, and the 2 outlets installed need to be removed from location (saftey/exceeds 6" max overhang to outlet). listed pop ups will be needed to comply with 2020 NEC 210.52 | |||
| ROW - FINAL APRON (AFTER POUR) | 02/27/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW - STORMWATER FINAL | 02/27/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/26/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: in future have pep tank breaker labled | |||
| BLD - BUILDING FINAL | 02/26/2025 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 2/27/2025 8:17:29 AM *** Regarding #4, after review of Manufacturer spec Valves are fine the way they are installed. *** NOTES ADDED BY JSTEWART 2/26/2025 2:55:02 PM *** 1. Pep tank system requires GFCI Protection. 2020 NEC 422.5. 2. Please seal wall Penetration interior and exterior at Irrigation. FBC R402 3. Spare bath missing toilet seat. 4. All Bathroom showers mixing valves are backwards for indicated Hot water flow. FPBC 607.4 5. Kitchen Island is 66 sq ft of working space, requires 4 outlets, and the 2 outlets installed need to be removed from location (saftey/exceeds 6" max overhang to outlet). listed pop ups will be needed to comply with 2020 NEC 210.52 | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/21/2025 | APPROVED | PFLANAGAN |
| Note: 2/19/2025 - PREVIOUS INSPECTION NOTES 1) ALL SOD ALONG RIGHT AND LEFT SIDE NEEDS TO MATCH EXISTING GRADE OF THE ADJACENT PROPERTYS. SEC 300,03 F5. All disturbed areas of the site and the swale shall be stabilized with vegetation. The sod in the swale shall match the sod on the property. 2) NEED TO REMOVE ALL LANDSCAPING AND ROCK OUT OF THE RIGHT OF WAY. Sec 300.03 C-F. Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line). | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/19/2025 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/19/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) ALL SOD ALONG RIGHT AND LEFT SIDE NEEDS TO MATCH EXISTING GRADE OF THE ADJACENT PROPERTYS. SEC 300,03 F5. All disturbed areas of the site and the swale shall be stabilized with vegetation. The sod in the swale shall match the sod on the property. 2) NEED TO REMOVE ALL LANDSCAPING AND ROCK OUT OF THE RIGHT OF WAY. Sec 300.03 C-F. Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line). | |||
| ELECTRIC - EARLY POWER | 01/23/2025 | APPROVED | JSTEWART |
| Note: 1/22/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 1/22/2025 10:54:19 AM *** FBC [A]107.4 NOT READY - WORK INCOMPLETE 1. All wires that are not trimmed out require caps and encased in a holding box. Rear porch, garage, and bathrooms. 2. Breker panel is open with no cover, terminals exposed. NEC 230.62 / 110.27 Live parts guarded | |||
| ELECTRIC - EARLY POWER | 01/22/2025 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 1/22/2025 10:54:19 AM *** FBC [A]107.4 NOT READY - WORK INCOMPLETE 1. All wires that are not trimmed out require caps and encased in a holding box. Rear porch, garage, and bathrooms. 2. Breker panel is open with no cover, terminals exposed. NEC 230.62 / 110.27 Live parts guarded | |||
| ROW- PRE-APRON (PRE-POUR) | 01/21/2025 | APPROVED - AS NOTED | GBERTOLA |
| Note: 1/21/25= READY FOR PAVERS . ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/13/2025 - PREVIOUS INSPECTION NOTES ** 01/13/25 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| ROW- PAVER RESTRAINTS | 01/13/2025 | APPROVED | EMADISON |
| Note: ** 01/13/25 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE | |||
| ROW- PRE-APRON (PRE-POUR) | 01/13/2025 | PARTIALLY APPROVED | EMADISON |
| Note: ** 01/13/25 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| GRAVITY SEWER TEST | 11/15/2024 | APPROVED | MGIBSON |
| SEWER TIE IN | 11/15/2024 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 10/30/2024 | APPROVED | BVITALE |
| Note: 10/24/2024 8:23:59 AM- PREVIOUS INSPECTION NOTES stucco needs to be done first | |||
| LATH/BRICK/ WATER BARRIER | 10/25/2024 | APPROVED | FWILLIS |
| INSULATION | 10/23/2024 | APPROVED | JSTEWART |
| PEP TANK INSTALLATION REQUEST | 10/22/2024 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: stucco needs to be done first | |||
| WINDOW NAILING | 10/22/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 10/15/2024 12:16:24 PM *** 1. Please extend hood vent exhaust duct for fastening and seal. 2. Please add Nail plates to all romex running horizontal to the vertical screw path. (master, bedrooms) 3. Please fasten and secure romex in bed #3 closet. Will check at insulation | |||
| ALL ROUGH | 10/15/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 10/15/2024 12:16:24 PM *** 1. Please extend hood vent exhaust duct for fastening and seal. 2. Please add Nail plates to all romex running horizontal to the vertical screw path. (master, bedrooms) 3. Please fasten and secure romex in bed #3 closet. Will check at insulation | |||
| ELECTRIC TEMP POLE | 09/26/2024 | APPROVED | MCONTRYMAN |
| Note: 9/25/2024 - PREVIOUS INSPECTION NOTES Ground Rod not set, pole not grounded. | |||
| ELECTRIC TEMP POLE | 09/25/2024 | Disapproved - NO FEE | HCAMACHO |
| Note: Ground Rod not set, pole not grounded. | |||
| ROOF VALLEY & METAL | 09/18/2024 | APPROVED | KSANDOE |
| WALL SHEATHING | 09/16/2024 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/16/2024 | APPROVED | FWILLIS |
| DOWN CELL | 08/28/2024 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 08/26/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2250 MUST HAVE READABLE CLEAN APPROVED DRAWINGS FOR INSPECTORS IN CONSTRUCTION BOX AT NEXT INSPECTION. REPAIR SILT FENCING AT REAR LEFT SIDE. WILL CHECK THESE ITEMS AT NEXT INSPECTION TO CONTINUE TO MOVE FORWARD. | |||
| FOUND SURVEY APPROVED (OFFICE) | 07/30/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/24/2024 | APPROVED - AS NOTED | FWILLIS |
| Note: MUST HAVE READABLE CLEAN APPROVED DRAWINGS FOR INSPECTORS IN CONSTRUCTION BOX AT NEXT INSPECTION. REPAIR SILT FENCING AT REAR LEFT SIDE. WILL CHECK THESE ITEMS AT NEXT INSPECTION TO CONTINUE TO MOVE FORWARD. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/22/2024 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 07/19/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 07/16/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 01/10/2025 | 01/14/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/01/2024 | 11/01/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/01/2024 | 11/05/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ENGIN1 | COMPLETE | 11/01/2024 | 11/06/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/16/2024 | 10/17/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 10/16/2024 | 10/17/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) Please provide both driveway apron widths at edge of pavement | |||
| ZON | HOLD | 10/16/2024 | 10/16/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Provide all dimension to driveway a two car garage can not exceed 36' Also please note the the front of the house needs foundation plantings all that concrete will not allow for eight shrubs in the front. Provide all impervious SFR-3 max impervious is 70% Site plan: please provide the total impervious including driveways, walkways, patios, entry ways and mechanical pads on your site plan. Submit another landscape plan to match the proposed new plan. Walkways in the easement: please provide a 2ft encroachment agreement signed by all owners on the deed. Once approved electronically we will need the originals. | |||
| MECH | COMPLETE | 09/24/2024 | 09/26/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/30/2024 | 07/30/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/30/2024 | 07/30/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/15/2024 | 07/19/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/12/2024 | 06/13/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/12/2024 | 06/17/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/12/2024 | 06/13/2024 |
| Note: Released By: JPI | |||
| BADMIN | COMPLETE | 06/12/2024 | 06/17/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/12/2024 | 06/12/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/12/2024 | 06/12/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 05/20/2024 | 05/24/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide geotechnical investigation report in accordance with FBCB Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead. After the geotechnical report is approved by the City of Palm Coast, then the engineer must provide a signed and sealed letter certifying the entire process was completed in accordance with the engineer’s specifications. The engineer’s letter must include a certification statement in accordance with the Florida Administrative Code 61G15-18.011 (4). 2. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) | |||
| BLD | HOLD | 05/20/2024 | 05/23/2024 |
| Note: Held By: JPI 1. Based on a DBPR inquiry, connector plate #15638 is not an approved product. Please delete from the project approval table and/or provide a substitute. 107.2.4 | |||
| CUSVC | COMPLETE | 05/20/2024 | 05/22/2024 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 05/20/2024 | 05/28/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/20/2024 | 05/20/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/20/2024 | 05/22/2024 |
| LOCATE | COMPLETE | 05/20/2024 | 05/30/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/20/2024 | 05/23/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans show R4.1insulation on walls. Energy calcs say R5. Revise to match | |||
| SW1 | COMPLETE | 05/20/2024 | 05/20/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/20/2024 | 05/20/2024 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM 1. Site plan a/c pad does not match landscape and floor plan. 2. Site plan a/c pad encroaching 5' utility easement. 3. Floor plan states 3 car garage but it's a 2 car garage. | |||
| SWALE | COMPLETE | 05/20/2024 | 09/19/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 03/05/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/05/2025 |
| UTILITY PEP REINSPECTION | ¤40.00 | 03/05/2025 |
| SEWER CREDIT | (¤1,466.00) | 06/17/2024 |
| SEWER INSPECTION | ¤25.00 | 06/17/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 06/17/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 06/17/2024 |
| SITE PLAN 30 | ¤30.00 | 06/17/2024 |
| WATER- TURN ON | ¤25.00 | 06/17/2024 |
| ADJUSTMENT 10% | (¤207.74) | 06/17/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/17/2024 |
| INSPECTION - RESIDENTIAL | ¤1,595.00 | 06/17/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤452.40 | 06/17/2024 |
| CONNECTION FEES | ¤1,187.26 | 06/17/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 06/17/2024 |
| IMPACT FEE FIRE | ¤428.09 | 06/17/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/17/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/17/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 06/17/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/17/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 06/17/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/17/2024 |
| SURCHARGE FS 533.721 | ¤18.70 | 06/17/2024 |
| SURCHARGE - FS 468.631 | ¤28.05 | 06/17/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/17/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/17/2024 |
| SW ENG PRE APRON | ¤30.00 | 06/17/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/17/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/17/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,765.91 |