I want to search for...
Permit #2024050988
Permit Details
Status: INSPECT
| Parcel Id: 06-12-31-5825-00000-001A |
| Block: 00000 |
| Subdivision: 2111 - TOWN CENTER PHASE II |
| Job Phone: 407-466-1805 |
| Location Address: 890 CENTRAL AVE |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 07/15/2024 |
| NOC: RECORDED |
| Applicant name: ORLANDO ROBERT BOLLI |
| Owner: PC TOWN CENTER DEVELOPMENT II LLC |
|
Address 300 LAMBERT AVENUE FLAGLER BEACH, FL 32136 |
| Lot: 001A |
| Contracted Stated Job Value: ¤3,500,000.00 |
| Job Description: SITE WORK: PROMENADE MIXED USE DEVELOPMENT |
| Type: CN |
Contractor
RLH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
5700 DOT COM CT, STE 1070 OVIEDO, FL 32765 |
CGC1520671 (Exp: 08/31/2026) | 407-384-1908 |
Inspection History
| Type | Request Date | Result | Inspector |
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 05/12/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9105 Inspector Notes from Inspection 9100 Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 inspections done by previous inspector all 5 future establishments tested(Daniel present) only from riser pipe in each unit to GB1000-none of these units built out yet-just a shell-this inspection to be yet completed on each build out-CIA permit accoring to Patrick base now in parking area-no need for cstr ent. 5/6/2026 - PREVIOUS INSPECTION NOTES start placing different widths at along Bulldog and east center along central blvd continuing with 14ft and 5ft wide along Central ve store fronts | |||
| UC-CONSTRUCTION ENTRANCE | 05/12/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9100 Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 inspections done by previous inspector all 5 future establishments tested(Daniel present) only from riser pipe in each unit to GB1000-none of these units built out yet-just a shell-this inspection to be yet completed on each build out-CIA permit accoring to Patrick base now in parking area-no need for cstr ent. | |||
| U-GREASE INTERCEPTOR FLOW/DYE TESTED | 05/11/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 inspections done by previous inspector all 5 future establishments tested(Daniel present) only from riser pipe in each unit to GB1000-none of these units built out yet-just a shell-this inspection to be yet completed on each build out-CIA permit accoring to Patrick | |||
| UC-DRAINAGE STRUCT PLACMNT | 05/11/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: inspections done by previous inspector | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 05/11/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9113 inspections done by previous inspector | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 05/06/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: start placing different widths at along Bulldog and east center along central blvd | |||
| U-GRAVITY SEWER INSTALL/TESTING | 01/29/2026 | APPROVED | BWRIGHT |
| Note: 12/15/2025 - PREVIOUS INSPECTION NOTES | |||
| U-WATER SERVICE INSTALLATION | 01/07/2026 | APPROVED | BWRIGHT |
| U-GRAVITY SEWER INSTALL/TESTING | 12/15/2025 | CANCELLED BY APPLICANT | BWRIGHT |
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 11/13/2025 | APPROVED | JMUNSON |
| U-WATER MAIN DISINFECTION SAMPLING | 09/19/2025 | Disapproved - NO FEE | BWRIGHT |
| U-WATER MAIN DISINFECTION | 09/18/2025 | PARTIALLY APPROVED | BWRIGHT |
| Note: Chlorinating water main. | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 09/11/2025 | PARTIALLY APPROVED | BWRIGHT |
| Note: 6/27/2025 - PREVIOUS INSPECTION NOTES Installed the valve coming off Cental Ave. Today pressure tested water main at 155psi for 2 hrs | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 06/27/2025 | PARTIALLY APPROVED | BWRIGHT |
| Note: Installed the valve coming off Cental Ave. | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 07/30/2024 | FINAL APPROVED | BWRIGHT |
| PLAN - PRE-CON 386-986-3750 | 07/22/2024 | APPROVED | BWRIGHT |
| CLOSE OUT DOCUMENTS | |||
| MAINT BOND ACCEPTANCE (OFFICE) | |||
| BLD - SITE LIGHTING-POLE SET/FIXTURE | |||
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | |||
| UC-SUBSTANTIAL WALK-THRU | |||
| UC- PRELIMINARY AS-BUILTS | |||
| BLD - ADA SIGNAGE- INFOR/DIRECT | |||
| BLD- ADA VEHICULAR WAY | |||
| BLD- ADA SIGNAGECONTROL | |||
| BLD- ADA PARKING | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | |||
| GEOTECH-SITE PREP ENG CERTIFICATIO (OFFICE USE ONLY) | |||
| U-WATER MAIN DISINFECTION SAMPLING | |||
| Note: 9/19/2025 - PREVIOUS INSPECTION NOTES | |||
| U-WATER MAIN DISINFECTION | |||
| Note: 9/18/2025 - PREVIOUS INSPECTION NOTES Chlorinating water main. | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | |||
| Note: 9/11/2025 - PREVIOUS INSPECTION NOTES 6/27/2025 - PREVIOUS INSPECTION NOTES Installed the valve coming off Cental Ave. Today pressure tested water main at 155psi for 2 hrs | |||
| PROJECT CLOSE OUT MEETING (386-986-3750) | |||
| LDSC- LANDSCAPE FINAL | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | |||
| UC-FINAL SITE INSPECTION | |||
| U - UTILITY COMMERCIAL FINAL | |||
| LDSC-IRRIGATION FINAL | |||
| IRRIGATION AFFIDAVIT | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | |||
| Note: 5/12/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9105 Inspector Notes from Inspection 9100 Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 inspections done by previous inspector all 5 future establishments tested(Daniel present) only from riser pipe in each unit to GB1000-none of these units built out yet-just a shell-this inspection to be yet completed on each build out-CIA permit accoring to Patrick base now in parking area-no need for cstr ent. 5/6/2026 - PREVIOUS INSPECTION NOTES start placing different widths at along Bulldog and east center along central blvd continuing with 14ft and 5ft wide along Central ve store fronts | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | |||
| U-ROW FINAL | |||
| UROW- CURBING & GUTTER | |||
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | |||
| UC-MOT MAINTENANCE OF TRAFFIC |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 05/20/2024 | 05/23/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/20/2024 | 05/21/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 05/20/2024 | 05/20/2024 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| PLLA | COMPLETE | 05/20/2024 | 05/20/2024 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 05/20/2024 | 05/20/2024 |
| Note: Released By: GREG DEGLER - - GDEGLER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤44.50) | 07/15/2024 |
| ADMINISTRATIVE- SITE DEVELOP | ¤125.00 | 07/15/2024 |
| SITE INSPECTION | ¤880.00 | 07/15/2024 |
| SITE PLAN 30 | ¤30.00 | 07/15/2024 |
| CONTRACTOR CHANGE | ¤20.00 | |
| Fees | Total Due: ¤20.00 | Total Paid: ¤990.50 |