I want to search for...
Permit #2024051007
Permit Details
Status: COED
| Parcel Id: 07-11-31-7011-00080-0120 |
| CONDITIONED SPACE: 2306 sqft |
| GARAGE: 466 sqft |
| SCREEN PORCH (SOLID ROOF) : 142 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| Total Square Footage: 2946 sqft |
| Block: 00080 |
| Subdivision: - |
| Job Phone: 831-383-2883 |
| Location Address: 55 BECKNER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/31/2024 |
| NOC: RECORDED |
| Applicant name: EDWARD LEE DAUBERT JR |
| Owner: FLORIDA SUN PARTNERS II LLC |
|
Address PO BOX 770279 ORLANDO, FL 32877 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤252,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
BRITE BUILDING GROUP LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6751 FORUM DRIVE SUITE 210 ORLANDO, FL 32821 |
CBC1266303 (Exp: 08/31/2026) | 831-383-2883 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
CAC043953 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY , 0 |
CFC1432331 (Exp: 08/31/2026) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/19/2025 | FINAL APPROVED | JSTEWART |
| U-CROSS CONNECTION | 11/19/2025 | APPROVED | BWRIGHT |
| U -UTILITY RESIDENTIAL FINAL | 11/19/2025 | FINAL APPROVED | BWRIGHT |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/18/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/5/2025 - PREVIOUS INSPECTION NOTES 11-05-25 TPOLACEK*** FRONT SWALE HAS TOO MANY INCONSISTENCIES OF RUTS AND MUST BE REGRADED TO ALLOW DRAINAGE TO FLOW. | |||
| ROW - STORMWATER FINAL | 11/18/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 11/18/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/05/2025 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/05/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 11-05-25 TPOLACEK*** FRONT SWALE HAS TOO MANY INCONSISTENCIES OF RUTS AND MUST BE REGRADED TO ALLOW DRAINAGE TO FLOW. | |||
| ELECTRIC - EARLY POWER | 10/22/2025 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2200 Authorize release of email to FPL. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/16/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 10/16/25 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL __________________________________________________________________________________________________________________ 10/15/2025 - PREVIOUS INSPECTION NOTES ** 10/15/25 TOO MUCH WATER IN CULVERT PIPE ** FOOTERS WASHED IN NEED TO BE 6X6X18 INCHES REMOVE ROOTS FROM FOOTER END ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 10/15/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/15/25 TOO MUCH WATER IN CULVERT PIPE ** FOOTERS WASHED IN NEED TO BE 6X6X18 INCHES REMOVE ROOTS FROM FOOTER END ** SEE ATTACHED PHOTOS | |||
| GRAVITY SEWER TEST | 09/25/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 WATER LINES AT GARAGE WALL NEED HARD SLEEVE ON THEM, FBC-3303.5 SWALE BLOCKED BY PORTABLE | |||
| SEWER TIE IN | 09/25/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 WATER LINES AT GARAGE WALL NEED HARD SLEEVE ON THEM, FBC-3303.5 SWALE BLOCKED BY PORTABLE | |||
| INSULATION | 09/05/2025 | APPROVED | FWILLIS |
| ALL ROUGH | 08/29/2025 | APPROVED | JSTEWART |
| Note: 7/30/2025 - PREVIOUS INSPECTION NOTES 1. Please fasten SER cable at breaker panel (within 12" of entry) 2. No windows and doors installed (back order).....opening required to be blocked prior to insulation. | |||
| LATH/BRICK/ WATER BARRIER | 08/21/2025 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 07/30/2025 | CANCELLED BY APPLICANT | WEB |
| ALL ROUGH | 07/30/2025 | PARTIALLY APPROVED | JSTEWART |
| Note: 1. Please fasten SER cable at breaker panel (within 12" of entry) 2. No windows and doors installed (back order).....opening required to be blocked prior to insulation. | |||
| WALL SHEATHING | 07/17/2025 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/17/2025 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 07/17/2025 | APPROVED | FWILLIS |
| ELECTRIC-TUG | 06/26/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: Authorize release of email to FPL. | |||
| TIE BEAM / LINTEL | 05/30/2025 | APPROVED | HCAMACHO |
| MONOLITHIC SLAB | 05/22/2025 | APPROVED | FWILLIS |
| Note: 5/20/2025 - PREVIOUS INSPECTION NOTES 1. No ufer installed. NEC 250.52(3) 2. remove vegitation in footing at back wall. FBC R318.6.2 3. exposed plumbing (water supply) sitting on top of soil, needs to be buried. | |||
| MONOLITHIC SLAB | 05/20/2025 | Disapproved - NO FEE | JSTEWART |
| Note: 1. No ufer installed. NEC 250.52(3) 2. remove vegitation in footing at back wall. FBC R318.6.2 3. exposed plumbing (water supply) sitting on top of soil, needs to be buried. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/16/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: WATER LINES AT GARAGE WALL NEED HARD SLEEVE ON THEM, FBC-3303.5 SWALE BLOCKED BY PORTABLE | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/08/2025 | APPROVED | PFLANAGAN |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/16/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 02/21/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 09/03/2025 | 09/04/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/28/2025 | 08/29/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| ENGIN1 | COMPLETE | 05/23/2025 | 05/23/2025 |
| Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM The slab has 0 tolerance to be poured any higher as it is already 10"(.83') above lot 13. | |||
| ENGIN1 | COMPLETE | 05/06/2025 | 05/07/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/06/2025 | 05/06/2025 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/16/2025 | 04/16/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/15/2025 | 04/15/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit certification letter | |||
| BLD | COMPLETE | 11/22/2024 | 12/02/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/22/2024 | 12/02/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/01/2024 | 08/01/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/08/2024 | 07/15/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| MECH | COMPLETE | 07/08/2024 | 07/11/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/08/2024 | 07/15/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/08/2024 | 07/08/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/21/2024 | 09/19/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/20/2024 | 05/24/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/20/2024 | 05/23/2024 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 05/20/2024 | 05/23/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to remove the electrical estimate from electrical page. 2. Need correct outlet spacing in bed 2. NEC 2020 210.52 3. Range outlet needs to be GFCI protected. NEC 2020 210.8 | |||
| ENGIN1 | COMPLETE | 05/20/2024 | 05/21/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/20/2024 | 05/22/2024 |
| LOCATE | COMPLETE | 05/20/2024 | 05/31/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/20/2024 | 05/23/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on Energy Calcs needs to be Daytona Beach | |||
| SW1 | HOLD | 05/20/2024 | 05/21/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Min. FFE must be no less than 12" above the road centerline. Max. FFE must be no more than 22" above the road centerline. Additionally, the FFE must be within 10" of adjoining improved lots. To avoid being significantly lower, the structure FFE may exceed the road centerline tolerance in order to match the FFE of adjoining improved lots. The 10" tolerance shall never be exceeded | |||
| ZON | COMPLETE | 05/20/2024 | 05/21/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/20/2024 | 05/23/2024 |
| Note: Released By: JPI |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EXTENSION | ¤40.00 | 11/19/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 11/19/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 11/19/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 11/19/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 11/19/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 11/19/2025 |
| RSI REINSPECTION 1 | ¤35.00 | 11/19/2025 |
| SURCHARGE FS 533.721 | ¤13.74 | 07/31/2024 |
| SURCHARGE - FS 468.631 | ¤20.61 | 07/31/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/31/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/31/2024 |
| SW ENG PRE APRON | ¤30.00 | 07/31/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/31/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/31/2024 |
| SEWER CREDIT | (¤1,147.00) | 07/31/2024 |
| SEWER INSPECTION | ¤25.00 | 07/31/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 07/31/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 07/31/2024 |
| SITE PLAN 30 | ¤30.00 | 07/31/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 07/31/2024 |
| IMPACT FEE FIRE | ¤428.09 | 07/31/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/31/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/31/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 07/31/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/31/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 07/31/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/31/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/31/2024 |
| CONNECTION FEES | ¤1,187.26 | 07/31/2024 |
| INSPECTION - RESIDENTIAL | ¤1,166.00 | 07/31/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤330.72 | 07/31/2024 |
| WATER-METER | ¤514.49 | 07/31/2024 |
| WATER- TURN ON | ¤25.00 | 07/31/2024 |
| WATER- TURN ON | ¤25.00 | 07/31/2024 |
| ADJUSTMENT 10% | (¤152.67) | 07/31/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/31/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤23,228.89 |