I want to search for...

Permit #2024051007

Permit Details

Status: COED

Parcel Id: 07-11-31-7011-00080-0120
CONDITIONED SPACE: 2306 sqft
GARAGE: 466 sqft
SCREEN PORCH (SOLID ROOF) : 142 sqft
OPENED PORCH (WITH ROOF) : 32 sqft
Total Square Footage: 2946 sqft
Block: 00080
Subdivision: -
Job Phone: 831-383-2883
Location Address: 55 BECKNER LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/31/2024
NOC: RECORDED
Applicant name: EDWARD LEE DAUBERT JR
Owner: FLORIDA SUN PARTNERS II LLC

Address

PO BOX 770279

ORLANDO, FL 32877

Lot: 0120
Contracted Stated Job Value: ¤252,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

BRITE BUILDING GROUP LLC
Status Location Address State License Number Phone
ACTIVE

6751 FORUM DRIVE SUITE 210

ORLANDO, FL 32821

CBC1266303 (Exp: 08/31/2026) 831-383-2883

Sub Contractors

DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

, 0

CFC1432331 (Exp: 08/31/2026) 877-906-1113

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 11/19/2025 FINAL APPROVED JSTEWART
U-CROSS CONNECTION 11/19/2025 APPROVED BWRIGHT
U -UTILITY RESIDENTIAL FINAL 11/19/2025 FINAL APPROVED BWRIGHT
ROW FIELD SURVEY /GRADING CERTIFICATION 11/18/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/5/2025 - PREVIOUS INSPECTION NOTES 11-05-25 TPOLACEK*** FRONT SWALE HAS TOO MANY INCONSISTENCIES OF RUTS AND MUST BE REGRADED TO ALLOW DRAINAGE TO FLOW.
ROW - STORMWATER FINAL 11/18/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - FINAL APRON (AFTER POUR) 11/18/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/05/2025 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 11/05/2025 Disapproved - NO FEE TPOLACEK
Note: 11-05-25 TPOLACEK*** FRONT SWALE HAS TOO MANY INCONSISTENCIES OF RUTS AND MUST BE REGRADED TO ALLOW DRAINAGE TO FLOW.
ELECTRIC - EARLY POWER 10/22/2025 APPROVED JSTEWART
Note: Inspector Notes from Inspection 2200 Authorize release of email to FPL.
ROW- PRE-APRON (PRE-POUR) 10/16/2025 APPROVED - AS NOTED EMADISON
Note: ** 10/16/25 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL __________________________________________________________________________________________________________________ 10/15/2025 - PREVIOUS INSPECTION NOTES ** 10/15/25 TOO MUCH WATER IN CULVERT PIPE ** FOOTERS WASHED IN NEED TO BE 6X6X18 INCHES REMOVE ROOTS FROM FOOTER END ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 10/15/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/15/25 TOO MUCH WATER IN CULVERT PIPE ** FOOTERS WASHED IN NEED TO BE 6X6X18 INCHES REMOVE ROOTS FROM FOOTER END ** SEE ATTACHED PHOTOS
GRAVITY SEWER TEST 09/25/2025 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 WATER LINES AT GARAGE WALL NEED HARD SLEEVE ON THEM, FBC-3303.5 SWALE BLOCKED BY PORTABLE
SEWER TIE IN 09/25/2025 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 WATER LINES AT GARAGE WALL NEED HARD SLEEVE ON THEM, FBC-3303.5 SWALE BLOCKED BY PORTABLE
INSULATION 09/05/2025 APPROVED FWILLIS
ALL ROUGH 08/29/2025 APPROVED JSTEWART
Note: 7/30/2025 - PREVIOUS INSPECTION NOTES 1. Please fasten SER cable at breaker panel (within 12" of entry) 2. No windows and doors installed (back order).....opening required to be blocked prior to insulation.
LATH/BRICK/ WATER BARRIER 08/21/2025 APPROVED FWILLIS
LATH/BRICK/ WATER BARRIER 07/30/2025 CANCELLED BY APPLICANT WEB
ALL ROUGH 07/30/2025 PARTIALLY APPROVED JSTEWART
Note: 1. Please fasten SER cable at breaker panel (within 12" of entry) 2. No windows and doors installed (back order).....opening required to be blocked prior to insulation.
WALL SHEATHING 07/17/2025 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/17/2025 APPROVED FWILLIS
ROOF VALLEY & METAL 07/17/2025 APPROVED FWILLIS
ELECTRIC-TUG 06/26/2025 APPROVED - AS NOTED JSTEWART
Note: Authorize release of email to FPL.
TIE BEAM / LINTEL 05/30/2025 APPROVED HCAMACHO
MONOLITHIC SLAB 05/22/2025 APPROVED FWILLIS
Note: 5/20/2025 - PREVIOUS INSPECTION NOTES 1. No ufer installed. NEC 250.52(3) 2. remove vegitation in footing at back wall. FBC R318.6.2 3. exposed plumbing (water supply) sitting on top of soil, needs to be buried.
MONOLITHIC SLAB 05/20/2025 Disapproved - NO FEE JSTEWART
Note: 1. No ufer installed. NEC 250.52(3) 2. remove vegitation in footing at back wall. FBC R318.6.2 3. exposed plumbing (water supply) sitting on top of soil, needs to be buried.
PLUMBING 1ST ROUGH UNDERGROUND 05/16/2025 APPROVED - AS NOTED MGIBSON
Note: WATER LINES AT GARAGE WALL NEED HARD SLEEVE ON THEM, FBC-3303.5 SWALE BLOCKED BY PORTABLE
FOUND SURVEY APPROVED (OFFICE) 05/08/2025 APPROVED PFLANAGAN
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 04/16/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 02/21/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 09/03/2025 09/04/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 08/28/2025 08/29/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
ENGIN1 COMPLETE 05/23/2025 05/23/2025
Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM The slab has 0 tolerance to be poured any higher as it is already 10"(.83') above lot 13.
ENGIN1 COMPLETE 05/06/2025 05/07/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 05/06/2025 05/06/2025
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
BLD COMPLETE 04/16/2025 04/16/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD HOLD 04/15/2025 04/15/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit certification letter
BLD COMPLETE 11/22/2024 12/02/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 11/22/2024 12/02/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 08/01/2024 08/01/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 07/08/2024 07/15/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
MECH COMPLETE 07/08/2024 07/11/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 07/08/2024 07/15/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 07/08/2024 07/08/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 05/21/2024 09/19/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN COMPLETE 05/20/2024 05/24/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 05/20/2024 05/23/2024
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 05/20/2024 05/23/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to remove the electrical estimate from electrical page. 2. Need correct outlet spacing in bed 2. NEC 2020 210.52 3. Range outlet needs to be GFCI protected. NEC 2020 210.8
ENGIN1 COMPLETE 05/20/2024 05/21/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 05/20/2024 05/22/2024
LOCATE COMPLETE 05/20/2024 05/31/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 05/20/2024 05/23/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on Energy Calcs needs to be Daytona Beach
SW1 HOLD 05/20/2024 05/21/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Min. FFE must be no less than 12" above the road centerline. Max. FFE must be no more than 22" above the road centerline. Additionally, the FFE must be within 10" of adjoining improved lots. To avoid being significantly lower, the structure FFE may exceed the road centerline tolerance in order to match the FFE of adjoining improved lots. The 10" tolerance shall never be exceeded
ZON COMPLETE 05/20/2024 05/21/2024
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
BLD COMPLETE 05/20/2024 05/23/2024
Note: Released By: JPI

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EXTENSION ¤40.00 11/19/2025
PLAN REVIEW - REVISION ¤32.50 11/19/2025
PLAN REVIEW - REVISION ¤32.50 11/19/2025
CONTRACTOR CHANGE ¤20.00 11/19/2025
CONTRACTOR CHANGE ¤20.00 11/19/2025
CONTRACTOR CHANGE ¤20.00 11/19/2025
RSI REINSPECTION 1 ¤35.00 11/19/2025
SURCHARGE FS 533.721 ¤13.74 07/31/2024
SURCHARGE - FS 468.631 ¤20.61 07/31/2024
SW ENG - FOUNDATION SURVEY ¤20.00 07/31/2024
SW ENG INSPECTION 80 ¤80.00 07/31/2024
SW ENG PRE APRON ¤30.00 07/31/2024
SW ENG - REVIEW 20 ¤20.00 07/31/2024
SW ENG RES REVIEW 200 ¤200.00 07/31/2024
SEWER CREDIT (¤1,147.00) 07/31/2024
SEWER INSPECTION ¤25.00 07/31/2024
SEWER CAPITAL FACILITY ¤6,120.52 07/31/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 07/31/2024
SITE PLAN 30 ¤30.00 07/31/2024
FC IMPACT FEE EMS ¤62.00 07/31/2024
IMPACT FEE FIRE ¤428.09 07/31/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 07/31/2024
FC IMPACT FEE LIBRARY ¤268.00 07/31/2024
IMPACT FEE PARKS ¤1,800.99 07/31/2024
IMPACT FEE SCHOOL ¤5,450.00 07/31/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 07/31/2024
WATER -IRRIGATION INSPECTION ¤25.00 07/31/2024
WATER -IRRIGATION INSPECTION ¤25.00 07/31/2024
CONNECTION FEES ¤1,187.26 07/31/2024
INSPECTION - RESIDENTIAL ¤1,166.00 07/31/2024
PLAN REVIEW - RESIDENTIAL ¤330.72 07/31/2024
WATER-METER ¤514.49 07/31/2024
WATER- TURN ON ¤25.00 07/31/2024
WATER- TURN ON ¤25.00 07/31/2024
ADJUSTMENT 10% (¤152.67) 07/31/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/31/2024
Fees Total Due: ¤0.00 Total Paid: ¤23,228.89