I want to search for...

Permit #2024051079

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00850-0030
CONDITIONED SPACE: 1656 sqft
GARAGE: 399 sqft
OPENED PORCH (WITH ROOF) : 116 sqft
Total Square Footage: 2171 sqft
Block: 00850
Subdivision: 7059 -
Job Phone: 202-494-2019
Location Address: 15 SEA GARDEN PATH
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/28/2024
NOC: RECORDED
Applicant name: GARY ANDREW FISCHER
Owner: INB BFR 1, LLC

Address

3670 MAGUIRE BLVD

ORLANDO, FL 32803

Address

SUITE 220

ORLANDO, FL 32803

Lot: 0030
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INB HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD

ORLANDO, FL 32803

SUITE 210

ORLANDO, FL 32803

CGC048746 (Exp: 08/31/2026) 407-476-8195

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/19/2024 FINAL APPROVED BTAYLOR
Note: 12/18/2024 - PREVIOUS INSPECTION NOTES 12/13/2024 - PREVIOUS INSPECTION NOTES
BLD - BUILDING FINAL 12/18/2024 CANCELLED BY APPLICANT BTAYLOR
Note: 12/13/2024 - PREVIOUS INSPECTION NOTES
U-CROSS CONNECTION 12/13/2024 APPROVED BWRIGHT
BLD - BUILDING FINAL 12/13/2024 CANCELLED BY APPLICANT BTAYLOR
ROW - FINAL APRON (AFTER POUR) 12/13/2024 APPROVED FSLADISH
Note: 12/13/24 AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE
ROW - STORMWATER FINAL 12/13/2024 APPROVED FSLADISH
Note: 12/13/24 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U -UTILITY RESIDENTIAL FINAL 12/13/2024 FINAL APPROVED BWRIGHT
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/11/2024 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 12/11/2024 APPROVED FSLADISH
Note: 12/11/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- PRE-APRON (PRE-POUR) 11/22/2024 APPROVED FSLADISH
Note: 11/22/24 AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 11/21/2024 - PREVIOUS INSPECTION NOTES 11/21/24 RECEIVED TEXT FROM BILL CM TO PLEASE CANCEL THIS INSPECTION.
ROW- PRE-APRON (PRE-POUR) 11/21/2024 CANCELLED BY APPLICANT FSLADISH
Note: 11/21/24 RECEIVED TEXT FROM BILL CM TO PLEASE CANCEL THIS INSPECTION.
ELECTRIC - EARLY POWER 11/15/2024 APPROVED - AS NOTED KSANDOE
Note: Inspector Notes from Inspection 2200 9-30-24 1. Emailed FPL at 12:15.
GRAVITY SEWER TEST 11/04/2024 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 P-311.1 NEED PORTABLE RESTROOM BY NEXT INSPECTION
SEWER TIE IN 11/04/2024 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 P-311.1 NEED PORTABLE RESTROOM BY NEXT INSPECTION
PEP TANK INSTALLATION REQUEST 10/15/2024 APPROVED CBOWERMASTER
INSULATION 10/15/2024 APPROVED BTAYLOR
Note: 10/7/2024 - PREVIOUS INSPECTION NOTES
INSULATION 10/07/2024 CANCELLED BY APPLICANT PKNAPIK
LATH/BRICK/ WATER BARRIER 10/04/2024 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2420 10-2-24 1. Master bathroom exhaust fan not wired in. 2. Hole in the top of the electrical panel needs to be sealed.
ALL ROUGH 10/02/2024 APPROVED - AS NOTED BTAYLOR
Note: 10-2-24 1. Master bathroom exhaust fan not wired in. 2. Hole in the top of the electrical panel needs to be sealed.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/01/2024 APPROVED PKNAPIK
Note:
ELECTRIC-TUG 09/30/2024 APPROVED - AS NOTED BTAYLOR
Note: 9-30-24 1. Emailed FPL at 12:15.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/25/2024 Disapproved -FEE REQUIRED BTAYLOR
Note: 9/19/2024 - PREVIOUS INSPECTION NOTES 9/12/2024 - PREVIOUS INSPECTION NOTES 9-19-24 1. Over framing can not be made out of 2x4 it needs to be 2x6. 2. Over framing is not strapped at ridge board. 3. Ridge board is not strapped. 9-25-24 1. Nothing above has been resolved.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/19/2024 Disapproved -FEE REQUIRED BTAYLOR
Note: 9/12/2024 - PREVIOUS INSPECTION NOTES 9-19-24 1. Over framing can not be made out of 2x4 it needs to be 2x6. 2. Over framing is not strapped at ridge board. 3. Ridge board is not strapped.
ROOF VALLEY & METAL 09/17/2024 APPROVED BTAYLOR
WALL SHEATHING 09/12/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/12/2024 CANCELLED BY APPLICANT BTAYLOR
TIE BEAM / LINTEL 08/28/2024 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 08/23/2024 APPROVED TBAKER
MONOLITHIC SLAB 08/20/2024 APPROVED BTAYLOR
WATER METER INSTALLATION REQUEST 08/13/2024 APPROVED BVITALE
PLUMBING 1ST ROUGH UNDERGROUND 08/12/2024 APPROVED - AS NOTED MGIBSON
Note: P-311.1 NEED PORTABLE RESTROOM BY NEXT INSPECTION
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 08/08/2024 APPROVED CPISCITELLI

Review History

Department Status Date In Date Out
MECH COMPLETE 12/04/2024 12/09/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/23/2024 08/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/23/2024 08/23/2024
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
ENGIN1 HOLD 08/07/2024 08/08/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab.
ZON COMPLETE 08/07/2024 08/07/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 08/01/2024 08/07/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 06/04/2024 06/04/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 06/04/2024 06/05/2024
Note: Released By: JPI
BADMIN COMPLETE 06/04/2024 06/10/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/04/2024 06/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 06/04/2024 06/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SWALE COMPLETE 05/22/2024 09/20/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN HOLD 05/21/2024 05/29/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Geotechnical Report Not Accepted. Provide amended geotechnical report to include the information below. • Specifications for the preparation of the site prior to placement of compacted fill material. • Specifications for material to be used as compacted fill. • Test methods to be used to determine the maximum dry density and optimum moisture content of the material used as compacted fill. • The maximum allowable thickness of each lift of compacted fill material. • Field test method for determining the in-place dry density of the compacted fill. • Minimum acceptable in-place dry density expressed as a percentage of the maximum dry density determine in accordance with the third bullet above. • Number and frequency of field tests required to determine compliance with the sixth bullet above. Report needs to be digitally signed, sealed and verifiable per F.S. 471.025
BLD HOLD 05/21/2024 05/23/2024
Note: Held By: JPI 1. Based on a DBPR inquiry, underlayment #27076.7 is a recently expired product on the DBPR website. Please delete from the project approval table and/or provide a substitute. 107.2.4
CUSVC COMPLETE 05/21/2024 05/23/2024
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 05/21/2024 05/28/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/21/2024 05/22/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 05/21/2024 05/23/2024
LOCATE COMPLETE 05/21/2024 05/30/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 05/21/2024 05/24/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 05/21/2024 05/22/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 05/21/2024 05/22/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Lot number incorrect on site plan/survey within the lot boundary

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 12/13/2024
REINSPECTION RESIDENTIAL ¤40.00 12/13/2024
CONNECTION FEES ¤1,187.26 06/28/2024
FC IMPACT FEE EMS ¤62.00 06/28/2024
IMPACT FEE FIRE ¤428.09 06/28/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/28/2024
FC IMPACT FEE LIBRARY ¤268.00 06/28/2024
IMPACT FEE PARKS ¤1,800.99 06/28/2024
IMPACT FEE SCHOOL ¤5,450.00 06/28/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 06/28/2024
WATER -IRRIGATION INSPECTION ¤25.00 06/28/2024
SURCHARGE FS 533.721 ¤10.06 06/28/2024
SURCHARGE - FS 468.631 ¤15.08 06/28/2024
SW ENG - FOUNDATION SURVEY ¤20.00 06/28/2024
SW ENG INSPECTION 80 ¤80.00 06/28/2024
SW ENG PRE APRON ¤30.00 06/28/2024
SW ENG - REVIEW 20 ¤20.00 06/28/2024
SW ENG RES REVIEW 200 ¤200.00 06/28/2024
SEWER CREDIT (¤850.00) 06/28/2024
SEWER INSPECTION ¤25.00 06/28/2024
SEWER CAPITAL FACILITY ¤6,120.52 06/28/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 06/28/2024
SITE PLAN 30 ¤30.00 06/28/2024
WATER- TURN ON ¤25.00 06/28/2024
ADJUSTMENT 10% (¤111.72) 06/28/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/28/2024
INSPECTION - RESIDENTIAL ¤847.00 06/28/2024
PLAN REVIEW - RESIDENTIAL ¤240.24 06/28/2024
Fees Total Due: ¤0.00 Total Paid: ¤22,463.66