Permit #2024051238

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-0050
CONDITIONED SPACE: 2796 sqft
GARAGE: 682 sqft
OPENED PORCH (WITH ROOF) : 477 sqft
OPENED PORCH (WITH ROOF) : 54 sqft
Total Square Footage: 4009 sqft
Block: 00000
Subdivision: -
Job Phone: 386-236-4133
Location Address: 219 CONSERVATORY DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/21/2024
NOC: RECORDED
Applicant name: LEONARDO CIRO SANCLEMENTE
Owner: MHK OF VOLUSIA COUNTY INC

Address

2379 BEVILLE ROAD

DAYTONA BEACH, FL 32119

Lot: 0050
Contracted Stated Job Value: ¤336,228.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
Status Location Address State License Number Phone
ACTIVE

2379 BEVILLE RD

DAYTONA BEACH, FL 32119

CBC1262114 (Exp: 08/31/2026) 386-236-4133

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
EDWARD DOUGLAS TENNANT
Status Location Address State License Number Phone Fax
INACTIVE

3370 AGRICULTURAL CENTER DRIVE

ST. AUGUSTINE , FL 32092

CAC1813372 (Exp: 08/31/2026) (904)829-8898 (904)829-6587
HUGH MACDONALD
Status Location Address State License Number Phone
ACTIVE

10825 TOM FOLSOM ROAD, SUITE A

THONOTOSASSA, FL 33592

CCC1329562 (Exp: 08/31/2026) 813-986-4968
HARLEY M BRYAN
Status Location Address State License Number Phone
ACTIVE

5223 EDGEWOOD CT

ORMOND BEACH, FL 32174

LI26657 (Exp: 08/31/2028) 386-463-2700

Inspection History

Type Request Date Result Inspector
GAS FINAL 12/05/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2225 9/24/2024 - PREVIOUS INSPECTION NOTES ANNULAR SPACE AT COOK TOP NOT FIRE STOPED ALSO NEED TO SEAL TOP PLATE AT BATHROOM ''3'', BOND WIRE NEEDS TO BE RAN. ANOTHER GAS ROUGH REQUIRED WHEN A/G OR U/G TANK IS RAN FROM TANKS TO HOUSE CONNECTION.. BOND WIRE. BOND REQUIRED AT GAS FINAL INSPECTION, HOA DOENT ALLOW A/G TANKS. ANOTHER GAS PERMIT WILL BE REQUIRED FOR THIS, THIS WAS APPROVED ON 11/6/24 BOND WIRE WAS ATTACHED
BLD - BUILDING FINAL 12/05/2024 FINAL APPROVED MCONTRYMAN
Note: 12/4/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 12/4/2024 11:51:11 AM *** 1. No hot water at master bath Lav (left side), and master bath Tub. FBCR P2705.1 – 4 2. Need information on plumbing penetrating exterior wall By hose Bibb and main disconnect. (At a minimum needs a hard cap)
BLD - BUILDING FINAL 12/04/2024 Disapproved - NO FEE JSTEWART
Note: *** NOTES ADDED BY JSTEWART 12/4/2024 11:51:11 AM *** 1. No hot water at master bath Lav (left side), and master bath Tub. FBCR P2705.1 – 4 2. Need information on plumbing penetrating exterior wall By hose Bibb and main disconnect. (At a minimum needs a hard cap)
U-CROSS CONNECTION 11/27/2024 APPROVED DHANEY
ROW - STORMWATER FINAL 11/27/2024 APPROVED EMADISON
U -UTILITY RESIDENTIAL FINAL 11/27/2024 FINAL APPROVED DHANEY
GAS ROUGH 11/27/2024 APPROVED - AS NOTED MGIBSON
Note: 9/24/2024 - PREVIOUS INSPECTION NOTES ANNULAR SPACE AT COOK TOP NOT FIRE STOPED ALSO NEED TO SEAL TOP PLATE AT BATHROOM ''3'', BOND WIRE NEEDS TO BE RAN. ANOTHER GAS ROUGH REQUIRED WHEN A/G OR U/G TANK IS RAN FROM TANKS TO HOUSE CONNECTION.. BOND WIRE. BOND REQUIRED AT GAS FINAL INSPECTION, HOA DOENT ALLOW A/G TANKS. ANOTHER GAS PERMIT WILL BE REQUIRED FOR THIS
ROW - FINAL APRON (AFTER POUR) 11/26/2024 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/26/2024 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 11/26/2024 APPROVED PFLANAGAN
ELECTRIC - EARLY POWER 11/01/2024 APPROVED HCAMACHO
Note: Inspector Notes from Inspection 2200 Emailed FPL @ 12pm
GRAVITY SEWER TEST 10/18/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 7/12/2024 - PREVIOUS INSPECTION NOTES Please expose all tub and shower traps as well as all connections. COULD NOT FIND ANYTHING WRONG WITH FIRST ROUGH PLUMBING INSPECTION. THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 10/18/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 7/12/2024 - PREVIOUS INSPECTION NOTES Please expose all tub and shower traps as well as all connections. COULD NOT FIND ANYTHING WRONG WITH FIRST ROUGH PLUMBING INSPECTION. THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 10/18/2024 APPROVED - AS NOTED EMADISON
Note: ** 10/18/24 READY TO SET PAVERS ____________________________________________________________________________________________________________ 9/23/2024 - PREVIOUS INSPECTION NOTES ** 09/23/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
INSULATION 09/24/2024 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2420 1. Panel is required to be framed out per plans 2. Elec wiring must be properly phased NEC 210.5(C)(1) 3. Bedroom behind garage where elec feeding island needs to be sealed @ slab FBC R402.4.1.1 Check on insulation
GAS ROUGH 09/24/2024 PARTIALLY APPROVED MGIBSON
Note: ANNULAR SPACE AT COOK TOP NOT FIRE STOPED ALSO NEED TO SEAL TOP PLATE AT BATHROOM ''3'', BOND WIRE NEEDS TO BE RAN. ANOTHER GAS ROUGH REQUIRED WHEN A/G OR U/G TANK IS RAN FROM TANKS TO HOUSE CONNECTION.
ROW- PAVER RESTRAINTS 09/23/2024 APPROVED EMADISON
Note: ** 09/23/24 READY TO POUT PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC)
ROW- PRE-APRON (PRE-POUR) 09/23/2024 PARTIALLY APPROVED EMADISON
Note: ** 09/23/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ALL ROUGH 09/20/2024 APPROVED - AS NOTED MKRASKI
Note: 1. Panel is required to be framed out per plans 2. Elec wiring must be properly phased NEC 210.5(C)(1) 3. Bedroom behind garage where elec feeding island needs to be sealed @ slab FBC R402.4.1.1 Check on insulation
ELECTRIC-TUG 09/20/2024 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 12pm
LATH/BRICK/ WATER BARRIER 09/05/2024 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/27/2024 APPROVED FWILLIS
Note: 8/27/24 - ITEM CORRECTED 8/23/2024 - PREVIOUS INSPECTION NOTES TRUSS D2, IN GARAGE, IS BROKEN AND NOT REPAIRED ACCORDING TO THE ENGINEERING. 4' EACH SIDE OF THE BREAK, TWO ROWS OF NAILS 3" O.C. INSPECTION STOPPED, INCOMPLETE.
WALL SHEATHING 08/23/2024 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/23/2024 Disapproved - NO FEE FWILLIS
Note: TRUSS D2, IN GARAGE, IS BROKEN AND NOT REPAIRED ACCORDING TO THE ENGINEERING. 4' EACH SIDE OF THE BREAK, TWO ROWS OF NAILS 3" O.C. INSPECTION STOPPED, INCOMPLETE.
ROOF VALLEY & METAL 08/22/2024 APPROVED FWILLIS
ROOF SHEATHING 08/19/2024 APPROVED FWILLIS
TIE BEAM / LINTEL 08/06/2024 APPROVED FWILLIS
Note: 8/5/2024 - PREVIOUS INSPECTION NOTES
TIE BEAM / LINTEL 08/05/2024 CANCELLED BY APPLICANT FWILLIS
FOUND SURVEY APPROVED (OFFICE) 08/05/2024 APPROVED TBAKER
MONOLITHIC SLAB 07/23/2024 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 07/15/2024 APPROVED - AS NOTED MGIBSON
Note: 7/12/2024 - PREVIOUS INSPECTION NOTES Please expose all tub and shower traps as well as all connections. COULD NOT FIND ANYTHING WRONG WITH FIRST ROUGH PLUMBING INSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 07/12/2024 Disapproved - NO FEE JWALKER
Note: Please expose all tub and shower traps as well as all connections.
PLUMBING 1ST ROUGH UNDERGROUND 07/10/2024 CANCELLED BY APPLICANT WEB
WATER METER INSTALLATION REQUEST 07/10/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 08/05/2024 08/05/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/05/2024 08/05/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ELEC COMPLETE 06/11/2024 06/17/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 06/11/2024 06/13/2024
Note: Released By: JPI
SW1 COMPLETE 06/11/2024 06/18/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM According to the approved grading plans for this subdivision and these lots, drainage should be directed from the back of the property to the front. I understand that lot 4 is already constructed, and you must follow the elevations on the common boundary. On the side of the property adjacent to Lot 6, you can, however, drain from back to front. Also, I see that Lot 6 is currently being constructed by SWA (Stephenson, Wilcox & Associates) for which you may need to coordinate with them for the proposed elevations on the property line adjacent to Lot 6.
URB COMPLETE 05/24/2024 06/03/2024
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
BADMIN COMPLETE 05/23/2024 05/30/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 05/23/2024 05/30/2024
Note: Held By: JPI 1. Based on a DBPR inquiry, underlayment #22401 is a recently expired product on the DBPR website. Please delete from the project approval table and/or provide a substitute. 107.2.4
CUSVC COMPLETE 05/23/2024 05/28/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 05/23/2024 05/28/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in study. NEC 2020 210.52
ENGIN1 COMPLETE 05/23/2024 05/28/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS COMPLETE 05/23/2024 05/29/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
LOCATE COMPLETE 05/23/2024 05/30/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 05/23/2024 05/29/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 05/23/2024 06/04/2024
Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM According to the approved grading plans for this subdivision and these lots, drainage should be directed from the back of the property to the front. I understand that lot 4 is already constructed, and you must follow the elevations on the common boundary. On the side of the property adjacent to Lot 6, you can, however, drain from back to front. Also, I see that Lot 6 is currently being constructed by SWA (Stephenson, Wilcox & Associates) for which you may need to coordinate with them for the proposed elevations on the property line adjacent to Lot 6.
ZON COMPLETE 05/23/2024 05/24/2024
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 12/05/2024
FC IMPACT FEE EMS ¤62.00 06/21/2024
IMPACT FEE FIRE ¤428.09 06/21/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/21/2024
FC IMPACT FEE LIBRARY ¤268.00 06/21/2024
IMPACT FEE PARKS ¤1,800.99 06/21/2024
IMPACT FEE SCHOOL ¤5,450.00 06/21/2024
IMPACT FEE TRANSPORTATION ¤3,404.00 06/21/2024
SURCHARGE FS 533.721 ¤17.49 06/21/2024
SURCHARGE - FS 468.631 ¤26.24 06/21/2024
SW ENG - FOUNDATION SURVEY ¤20.00 06/21/2024
SW ENG INSPECTION 80 ¤80.00 06/21/2024
SW ENG PRE APRON ¤30.00 06/21/2024
SW ENG - REVIEW 20 ¤20.00 06/21/2024
SW ENG RES REVIEW 200 ¤200.00 06/21/2024
SEWER INSPECTION ¤25.00 06/21/2024
SITE PLAN 30 ¤30.00 06/21/2024
WATER-METER ¤514.49 06/21/2024
ADJUSTMENT 10% (¤194.33) 06/21/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/21/2024
INSPECTION - RESIDENTIAL ¤1,490.50 06/21/2024
PLAN REVIEW - RESIDENTIAL ¤422.76 06/21/2024
CONNECTION FEES ¤25.00 06/21/2024
Fees Total Due: ¤0.00 Total Paid: ¤14,388.23