I want to search for...
Permit #2024051238
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-0050 |
| CONDITIONED SPACE: 2796 sqft |
| GARAGE: 682 sqft |
| OPENED PORCH (WITH ROOF) : 477 sqft |
| OPENED PORCH (WITH ROOF) : 54 sqft |
| Total Square Footage: 4009 sqft |
| Block: 00000 |
| Subdivision: - |
| Job Phone: 386-236-4133 |
| Location Address: 219 CONSERVATORY DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/21/2024 |
| NOC: RECORDED |
| Applicant name: LEONARDO CIRO SANCLEMENTE |
| Owner: MHK OF VOLUSIA COUNTY INC |
|
Address 2379 BEVILLE ROAD DAYTONA BEACH, FL 32119 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤336,228.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2379 BEVILLE RD DAYTONA BEACH, FL 32119 |
CBC1262114 (Exp: 08/31/2026) | 386-236-4133 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
EDWARD DOUGLAS TENNANT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE ST. AUGUSTINE , FL 32092 |
CAC1813372 (Exp: 08/31/2026) | (904)829-8898 | (904)829-6587 |
HUGH MACDONALD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10825 TOM FOLSOM ROAD, SUITE A THONOTOSASSA, FL 33592 |
CCC1329562 (Exp: 08/31/2026) | 813-986-4968 |
HARLEY M BRYAN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
5223 EDGEWOOD CT ORMOND BEACH, FL 32174 |
LI26657 (Exp: 08/31/2028) | 386-463-2700 |
Inspection History
| Type | Request Date | Result | Inspector |
| GAS FINAL | 12/05/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2225 9/24/2024 - PREVIOUS INSPECTION NOTES ANNULAR SPACE AT COOK TOP NOT FIRE STOPED ALSO NEED TO SEAL TOP PLATE AT BATHROOM ''3'', BOND WIRE NEEDS TO BE RAN. ANOTHER GAS ROUGH REQUIRED WHEN A/G OR U/G TANK IS RAN FROM TANKS TO HOUSE CONNECTION.. BOND WIRE. BOND REQUIRED AT GAS FINAL INSPECTION, HOA DOENT ALLOW A/G TANKS. ANOTHER GAS PERMIT WILL BE REQUIRED FOR THIS, THIS WAS APPROVED ON 11/6/24 BOND WIRE WAS ATTACHED | |||
| BLD - BUILDING FINAL | 12/05/2024 | FINAL APPROVED | MCONTRYMAN |
| Note: 12/4/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 12/4/2024 11:51:11 AM *** 1. No hot water at master bath Lav (left side), and master bath Tub. FBCR P2705.1 – 4 2. Need information on plumbing penetrating exterior wall By hose Bibb and main disconnect. (At a minimum needs a hard cap) | |||
| BLD - BUILDING FINAL | 12/04/2024 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 12/4/2024 11:51:11 AM *** 1. No hot water at master bath Lav (left side), and master bath Tub. FBCR P2705.1 – 4 2. Need information on plumbing penetrating exterior wall By hose Bibb and main disconnect. (At a minimum needs a hard cap) | |||
| U-CROSS CONNECTION | 11/27/2024 | APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 11/27/2024 | APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 11/27/2024 | FINAL APPROVED | DHANEY |
| GAS ROUGH | 11/27/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: 9/24/2024 - PREVIOUS INSPECTION NOTES ANNULAR SPACE AT COOK TOP NOT FIRE STOPED ALSO NEED TO SEAL TOP PLATE AT BATHROOM ''3'', BOND WIRE NEEDS TO BE RAN. ANOTHER GAS ROUGH REQUIRED WHEN A/G OR U/G TANK IS RAN FROM TANKS TO HOUSE CONNECTION.. BOND WIRE. BOND REQUIRED AT GAS FINAL INSPECTION, HOA DOENT ALLOW A/G TANKS. ANOTHER GAS PERMIT WILL BE REQUIRED FOR THIS | |||
| ROW - FINAL APRON (AFTER POUR) | 11/26/2024 | APPROVED | PFLANAGAN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/26/2024 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/26/2024 | APPROVED | PFLANAGAN |
| ELECTRIC - EARLY POWER | 11/01/2024 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2200 Emailed FPL @ 12pm | |||
| GRAVITY SEWER TEST | 10/18/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 7/12/2024 - PREVIOUS INSPECTION NOTES Please expose all tub and shower traps as well as all connections. COULD NOT FIND ANYTHING WRONG WITH FIRST ROUGH PLUMBING INSPECTION. THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 10/18/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 7/12/2024 - PREVIOUS INSPECTION NOTES Please expose all tub and shower traps as well as all connections. COULD NOT FIND ANYTHING WRONG WITH FIRST ROUGH PLUMBING INSPECTION. THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 10/18/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 10/18/24 READY TO SET PAVERS ____________________________________________________________________________________________________________ 9/23/2024 - PREVIOUS INSPECTION NOTES ** 09/23/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| INSULATION | 09/24/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 1. Panel is required to be framed out per plans 2. Elec wiring must be properly phased NEC 210.5(C)(1) 3. Bedroom behind garage where elec feeding island needs to be sealed @ slab FBC R402.4.1.1 Check on insulation | |||
| GAS ROUGH | 09/24/2024 | PARTIALLY APPROVED | MGIBSON |
| Note: ANNULAR SPACE AT COOK TOP NOT FIRE STOPED ALSO NEED TO SEAL TOP PLATE AT BATHROOM ''3'', BOND WIRE NEEDS TO BE RAN. ANOTHER GAS ROUGH REQUIRED WHEN A/G OR U/G TANK IS RAN FROM TANKS TO HOUSE CONNECTION. | |||
| ROW- PAVER RESTRAINTS | 09/23/2024 | APPROVED | EMADISON |
| Note: ** 09/23/24 READY TO POUT PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) | |||
| ROW- PRE-APRON (PRE-POUR) | 09/23/2024 | PARTIALLY APPROVED | EMADISON |
| Note: ** 09/23/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| ALL ROUGH | 09/20/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Panel is required to be framed out per plans 2. Elec wiring must be properly phased NEC 210.5(C)(1) 3. Bedroom behind garage where elec feeding island needs to be sealed @ slab FBC R402.4.1.1 Check on insulation | |||
| ELECTRIC-TUG | 09/20/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 12pm | |||
| LATH/BRICK/ WATER BARRIER | 09/05/2024 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/27/2024 | APPROVED | FWILLIS |
| Note: 8/27/24 - ITEM CORRECTED 8/23/2024 - PREVIOUS INSPECTION NOTES TRUSS D2, IN GARAGE, IS BROKEN AND NOT REPAIRED ACCORDING TO THE ENGINEERING. 4' EACH SIDE OF THE BREAK, TWO ROWS OF NAILS 3" O.C. INSPECTION STOPPED, INCOMPLETE. | |||
| WALL SHEATHING | 08/23/2024 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/23/2024 | Disapproved - NO FEE | FWILLIS |
| Note: TRUSS D2, IN GARAGE, IS BROKEN AND NOT REPAIRED ACCORDING TO THE ENGINEERING. 4' EACH SIDE OF THE BREAK, TWO ROWS OF NAILS 3" O.C. INSPECTION STOPPED, INCOMPLETE. | |||
| ROOF VALLEY & METAL | 08/22/2024 | APPROVED | FWILLIS |
| ROOF SHEATHING | 08/19/2024 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 08/06/2024 | APPROVED | FWILLIS |
| Note: 8/5/2024 - PREVIOUS INSPECTION NOTES | |||
| TIE BEAM / LINTEL | 08/05/2024 | CANCELLED BY APPLICANT | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 08/05/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/23/2024 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/15/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: 7/12/2024 - PREVIOUS INSPECTION NOTES Please expose all tub and shower traps as well as all connections. COULD NOT FIND ANYTHING WRONG WITH FIRST ROUGH PLUMBING INSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/12/2024 | Disapproved - NO FEE | JWALKER |
| Note: Please expose all tub and shower traps as well as all connections. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/10/2024 | CANCELLED BY APPLICANT | WEB |
| WATER METER INSTALLATION REQUEST | 07/10/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 08/05/2024 | 08/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/05/2024 | 08/05/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/11/2024 | 06/17/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/11/2024 | 06/13/2024 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 06/11/2024 | 06/18/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM According to the approved grading plans for this subdivision and these lots, drainage should be directed from the back of the property to the front. I understand that lot 4 is already constructed, and you must follow the elevations on the common boundary. On the side of the property adjacent to Lot 6, you can, however, drain from back to front. Also, I see that Lot 6 is currently being constructed by SWA (Stephenson, Wilcox & Associates) for which you may need to coordinate with them for the proposed elevations on the property line adjacent to Lot 6. | |||
| URB | COMPLETE | 05/24/2024 | 06/03/2024 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/23/2024 | 05/30/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/23/2024 | 05/30/2024 |
| Note: Held By: JPI 1. Based on a DBPR inquiry, underlayment #22401 is a recently expired product on the DBPR website. Please delete from the project approval table and/or provide a substitute. 107.2.4 | |||
| CUSVC | COMPLETE | 05/23/2024 | 05/28/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 05/23/2024 | 05/28/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in study. NEC 2020 210.52 | |||
| ENGIN1 | COMPLETE | 05/23/2024 | 05/28/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 05/23/2024 | 05/29/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/23/2024 | 05/30/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/23/2024 | 05/29/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/23/2024 | 06/04/2024 |
| Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM According to the approved grading plans for this subdivision and these lots, drainage should be directed from the back of the property to the front. I understand that lot 4 is already constructed, and you must follow the elevations on the common boundary. On the side of the property adjacent to Lot 6, you can, however, drain from back to front. Also, I see that Lot 6 is currently being constructed by SWA (Stephenson, Wilcox & Associates) for which you may need to coordinate with them for the proposed elevations on the property line adjacent to Lot 6. | |||
| ZON | COMPLETE | 05/23/2024 | 05/24/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 12/05/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 06/21/2024 |
| IMPACT FEE FIRE | ¤428.09 | 06/21/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/21/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/21/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 06/21/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/21/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 06/21/2024 |
| SURCHARGE FS 533.721 | ¤17.49 | 06/21/2024 |
| SURCHARGE - FS 468.631 | ¤26.24 | 06/21/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/21/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/21/2024 |
| SW ENG PRE APRON | ¤30.00 | 06/21/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/21/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/21/2024 |
| SEWER INSPECTION | ¤25.00 | 06/21/2024 |
| SITE PLAN 30 | ¤30.00 | 06/21/2024 |
| WATER-METER | ¤514.49 | 06/21/2024 |
| ADJUSTMENT 10% | (¤194.33) | 06/21/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/21/2024 |
| INSPECTION - RESIDENTIAL | ¤1,490.50 | 06/21/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤422.76 | 06/21/2024 |
| CONNECTION FEES | ¤25.00 | 06/21/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,388.23 |