Permit #2024051251

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00010-0230
CONDITIONED SPACE: 1800 sqft
GARAGE: 410 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
Total Square Footage: 2246 sqft
Block: 00010
Subdivision: -
Job Phone: 689-250-2429
Location Address: 4 PHILOX LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/04/2024
NOC: RECORDED
Applicant name: RYAN M COURECH
Owner: A AND R-MERIDIAN REAL ESTATE DEVELOPMENT LLC

Address

688 N ORLANDO AVENUE

MAITLAND, FL 32751

Address

SUITE 207

MAITLAND, FL 32751

Lot: 0230
Contracted Stated Job Value: ¤208,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN
Original Permit #: 2024010999

Contractor

MCH CONSTRUCTION LLC
Status Location Address State License Number Phone
INACTIVE

668 N ORLANDO AVE, STE 207

MAITLAND, FL 32751

CBC1262898 (Exp: 08/31/2026) 407-602-8257

Sub Contractors

DANA SUE COOLEY
Status Location Address State License Number Phone
INACTIVE

PO BOX 1718

FLAGLER BEACH, FL 32136

CCC1333449 (Exp: 08/31/2026) 904-535-1680
DUSTIN ARCHER
Status Location Address State License Number Phone
ACTIVE

2785 WRIGHTS ROAD SUITE 1133

OVIEDO, FL 32765

CMC1251099 (Exp: 08/31/2026) 407-391-1145
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 05/28/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/27/2025 - PREVIOUS INSPECTION NOTES 05/27/25 TPOLACEK**** SEE PREVIOUS NOTES**** Inspector Notes from Inspection 9272 05/23/25 TPOLACEK** CULVERT HAS SEDIMENT THAT NEEDS TO BE REMOVED BEFORE ROW FINAL INSPECTION. APPROVING AFTER POUR AS NOTED. PIPE ELEVATION IS GOOD, CUTS ARE MADE, HOT PATCH COMPLETE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 05/27/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 05/27/25 TPOLACEK**** SEE PREVIOUS NOTES**** Inspector Notes from Inspection 9272 05/23/25 TPOLACEK** CULVERT HAS SEDIMENT THAT NEEDS TO BE REMOVED BEFORE ROW FINAL INSPECTION. APPROVING AFTER POUR AS NOTED. PIPE ELEVATION IS GOOD, CUTS ARE MADE, HOT PATCH COMPLETE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - FINAL APRON (AFTER POUR) 05/23/2025 APPROVED - AS NOTED TPOLACEK
Note: 05/23/25 TPOLACEK** CULVERT HAS SEDIMENT THAT NEEDS TO BE REMOVED BEFORE ROW FINAL INSPECTION. APPROVING AFTER POUR AS NOTED. PIPE ELEVATION IS GOOD, CUTS ARE MADE, HOT PATCH COMPLETE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
BLD - BUILDING FINAL 05/23/2025 APPROVED CVANSTRAHLEN
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/22/2025 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 05/22/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ELECTRIC - EARLY POWER 04/23/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/23/2025 8:42:28 AM *** 4/23/25: FPL emailed to release power. Surge Protector needs to be properly identified in the panel prior to Building Final. NEC 408.4 (A) 4/21/2025 - PREVIOUS INSPECTION NOTES 4/21/25: 1). Missing Surge Protector at Main Meter Panel as required. NEC-230.67(A)/(B)
ELECTRIC - EARLY POWER 04/21/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 4/21/2025 1:19:25 PM *** 4/21/25: 1). Missing Surge Protector at Main Meter Panel as required. NEC-230.67(A)/(B)
ROW- PRE-APRON (PRE-POUR) 04/17/2025 APPROVED - AS NOTED TPOLACEK
Note: 04/17/25 TPOLACEK*** PLEASE MAKE SURE TO BACKFILL AGAINST FORM BOARDS IN MITERED ENDS TO PREVENT OVER POUR. APPROVING AS NOTED AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR.
U - SEWER TIE IN 03/21/2025 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 SEC-24-162-C PROTECTION OF SWALE DRAINAGE, REMOVE ALL VEGITATION BEFOR BACKFILLING ON TO ''DWV'' AND WATER DISTRIBUTION LINES
U-CROSS CONNECTION 03/21/2025 APPROVED - AS NOTED LFITZGERALD
Note: no irr-nocc
GRAVITY SEWER TEST 03/21/2025 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 SEC-24-162-C PROTECTION OF SWALE DRAINAGE, REMOVE ALL VEGITATION BEFOR BACKFILLING ON TO ''DWV'' AND WATER DISTRIBUTION LINES
PEP TANK INSTALLATION REQUEST 03/07/2025 APPROVED CBOWERMASTER
INSULATION 02/21/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/21/2025 9:33:59 AM ***
LATH/BRICK/ WATER BARRIER 02/21/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/21/2025 9:34:15 AM ***
ALL ROUGH 02/18/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/18/2025 9:16:01 AM *** 2/14/2025 - PREVIOUS INSPECTION NOTES 2/14/25 1. Need new set of plans on site. No product approvals and 2 Energy calcs with different dates, which are not complete, and plans missing pages 8 and 9. FBC(A) 107.3.1 Inspector Notes from Inspection 2467 *** NOTES ADDED BY RSIMS 1/29/2025 10:50:41 AM *** 1/28/25: * Please fix (left side) and maintain your silt fence. FBC 3307.1
ALL ROUGH 02/14/2025 Disapproved - NO FEE MCONTRYMAN
Note: 2/14/25 1. Need new set of plans on site. No product approvals and 2 Energy calcs with different dates, which are not complete, and plans missing pages 8 and 9. FBC(A) 107.3.1 Inspector Notes from Inspection 2467 *** NOTES ADDED BY RSIMS 1/29/2025 10:50:41 AM *** 1/28/25: * Please fix (left side) and maintain your silt fence. FBC 3307.1
ROOF VALLEY & METAL 01/29/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 1/29/2025 10:50:41 AM *** 1/28/25: * Please fix (left side) and maintain your silt fence. FBC 3307.1
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/08/2025 APPROVED MKRASKI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/03/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 1/3/2025 10:45:04 AM *** 1/3/25: 1). Previously listed item 3 remains unresolved. Need all items resolved before approval can be given. 11/27/2024 - PREVIOUS INSPECTION NOTES 11/27/24: 1). Need to have many trusses cleaned of dirt to confirm no integrity loss. FBC [A]107.4 2). Engineer's letter will be required (once trusses are cleaned) to confirm that they have remained to original integrity due to the prolonged exposure to earth/weather (delivered 9/19/24 per pick ticket) and improper placement. (directly into soil). FBC [A]107.4 3). all (4) - 2-ply trusses are not connected as required per MiTek. Marked on MiTek. Highlighted on Truss plan. FBC [A]107.4 4). Please repair Silt fence along back right side. FBC 3307.1
WALL SHEATHING 01/03/2025 APPROVED RSIMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/27/2024 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 11/27/2024 9:55:38 AM *** 11/27/24: 1). Need to have many trusses cleaned of dirt to confirm no integrity loss. FBC [A]107.4 2). Engineer's letter will be required (once trusses are cleaned) to confirm that they have remained to original integrity due to the prolonged exposure to earth/weather (delivered 9/19/24 per pick ticket) and improper placement. (directly into soil). FBC [A]107.4 3). all (4) - 2-ply trusses are not connected as required per MiTek. Marked on MiTek. Highlighted on Truss plan. FBC [A]107.4 4). Please repair Silt fence along back right side. FBC 3307.1
FOUND SURVEY APPROVED (OFFICE) 11/18/2024 APPROVED JMYERS
TIE BEAM / LINTEL 11/08/2024 APPROVED RSIMS
Note: 11/5/2024 - PREVIOUS INSPECTION NOTES 11/5/24: 1). Dowel rods do not meet the minimum 3/4" clearance for fill as required. (FBC-R606.3.4) Locations marked on exterior with orange paint. Note: please have excess trash/debris at front of property cleaned up and placed in dumpster. (FBC[A] 110.5 Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 10/16/2024 10:23:37 AM *** 10/16/24: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. 10/15/2024 - PREVIOUS INSPECTION NOTES 10/15/24 Disapproved fee-required ( C Van-Strahlen ) #1 FBC [A] 105.7 -NEEDS PERMIT ON SITE #2 Need to do foothers on step none-load wall Back wall garage < Check Plans for info . 9/30/2024 - PREVIOUS INSPECTION NOTES 9/30/24: Previously listed items 2, 3 and 4 remain unresolved. Also, rain has caused some cave -in into footers particulary on the back right side. (highlighted area). Please check all footers for proper depth & width as required on plans as rain has caused some disfiguration. FBC[A] 107.4 Added at @ 12:16. Silt fence needs to be completed on right side. 9/17/2024 - PREVIOUS INSPECTION NOTES 9/17/24: 1). Please move portable out of the swale area and onto site property. 2). Entire garage slab needs to be re-tamped to meet compaction requirements. FBC[A] 107.4 3). Garage back side footer does not meet plan requirements for depth. Highlighted. FBC[A] 107.4 4). Right side of garage: Rebar does not have consistent 3" ground clearance as required. FBC R404.1.2.3.7.4
TIE BEAM / LINTEL 11/05/2024 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 11/5/2024 12:04:45 PM *** 11/5/24: 1). Dowel rods do not meet the minimum 3/4" clearance for fill as required. (FBC-R606.3.4) Locations marked on exterior with orange paint. Note: please have excess trash/debris at front of property cleaned up and placed in dumpster. (FBC[A] 110.5 Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 10/16/2024 10:23:37 AM *** 10/16/24: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. 10/15/2024 - PREVIOUS INSPECTION NOTES 10/15/24 Disapproved fee-required ( C Van-Strahlen ) #1 FBC [A] 105.7 -NEEDS PERMIT ON SITE #2 Need to do foothers on step none-load wall Back wall garage < Check Plans for info . 9/30/2024 - PREVIOUS INSPECTION NOTES 9/30/24: Previously listed items 2, 3 and 4 remain unresolved. Also, rain has caused some cave -in into footers particulary on the back right side. (highlighted area). Please check all footers for proper depth & width as required on plans as rain has caused some disfiguration. FBC[A] 107.4 Added at @ 12:16. Silt fence needs to be completed on right side. 9/17/2024 - PREVIOUS INSPECTION NOTES 9/17/24: 1). Please move portable out of the swale area and onto site property. 2). Entire garage slab needs to be re-tamped to meet compaction requirements. FBC[A] 107.4 3). Garage back side footer does not meet plan requirements for depth. Highlighted. FBC[A] 107.4 4). Right side of garage: Rebar does not have consistent 3" ground clearance as required. FBC R404.1.2.3.7.4
MONOLITHIC SLAB 10/16/2024 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 10/16/2024 10:23:37 AM *** 10/16/24: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. 10/15/2024 - PREVIOUS INSPECTION NOTES 10/15/24 Disapproved fee-required ( C Van-Strahlen ) #1 FBC [A] 105.7 -NEEDS PERMIT ON SITE #2 Need to do foothers on step none-load wall Back wall garage < Check Plans for info . 9/30/2024 - PREVIOUS INSPECTION NOTES 9/30/24: Previously listed items 2, 3 and 4 remain unresolved. Also, rain has caused some cave -in into footers particulary on the back right side. (highlighted area). Please check all footers for proper depth & width as required on plans as rain has caused some disfiguration. FBC[A] 107.4 Added at @ 12:16. Silt fence needs to be completed on right side. 9/17/2024 - PREVIOUS INSPECTION NOTES 9/17/24: 1). Please move portable out of the swale area and onto site property. 2). Entire garage slab needs to be re-tamped to meet compaction requirements. FBC[A] 107.4 3). Garage back side footer does not meet plan requirements for depth. Highlighted. FBC[A] 107.4 4). Right side of garage: Rebar does not have consistent 3" ground clearance as required. FBC R404.1.2.3.7.4
MONOLITHIC SLAB 10/15/2024 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: 10/15/24 Disapproved fee-required ( C Van-Strahlen ) #1 FBC [A] 105.7 -NEEDS PERMIT ON SITE #2 Need to do foothers on step none-load wall Back wall garage < Check Plans for info . 9/30/2024 - PREVIOUS INSPECTION NOTES 9/30/24: Previously listed items 2, 3 and 4 remain unresolved. Also, rain has caused some cave -in into footers particulary on the back right side. (highlighted area). Please check all footers for proper depth & width as required on plans as rain has caused some disfiguration. FBC[A] 107.4 Added at @ 12:16. Silt fence needs to be completed on right side. 9/17/2024 - PREVIOUS INSPECTION NOTES 9/17/24: 1). Please move portable out of the swale area and onto site property. 2). Entire garage slab needs to be re-tamped to meet compaction requirements. FBC[A] 107.4 3). Garage back side footer does not meet plan requirements for depth. Highlighted. FBC[A] 107.4 4). Right side of garage: Rebar does not have consistent 3" ground clearance as required. FBC R404.1.2.3.7.4
MONOLITHIC SLAB 09/30/2024 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 9/30/2024 12:15:28 PM *** 9/30/24: Previously listed items 2, 3 and 4 remain unresolved. Also, rain has caused some cave -in into footers particulary on the back right side. (highlighted area). Please check all footers for proper depth & width as required on plans as rain has caused some disfiguration. FBC[A] 107.4 9/17/2024 - PREVIOUS INSPECTION NOTES 9/17/24: 1). Please move portable out of the swale area and onto site property. 2). Entire garage slab needs to be re-tamped to meet compaction requirements. FBC[A] 107.4 3). Garage back side footer does not meet plan requirements for depth. Highlighted. FBC[A] 107.4 4). Right side of garage: Rebar does not have consistent 3" ground clearance as required. FBC R404.1.2.3.7.4
MONOLITHIC SLAB 09/17/2024 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 9/17/2024 12:16:02 PM *** 9/17/24: 1). Please move portable out of the swale area and onto site property. 2). Entire garage slab needs to be re-tamped to meet compaction requirements. FBC[A] 107.4 3). Garage back side footer does not meet plan requirements for depth. Highlighted. FBC[A] 107.4 4). Right side of garage: Rebar does not have consistent 3" ground clearance as required. FBC R404.1.2.3.7.4
PLUMBING 1ST ROUGH UNDERGROUND 08/29/2024 APPROVED - AS NOTED MGIBSON
Note: SEC-24-162-C PROTECTION OF SWALE DRAINAGE, REMOVE ALL VEGITATION BEFOR BACKFILLING ON TO ''DWV'' AND WATER DISTRIBUTION LINES
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 08/13/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 07/30/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 05/21/2025 05/23/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 05/15/2025 05/19/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Document uploaded needs to be named heatload and use drop down menu heatload
MECH COMPLETE 12/31/2024 01/07/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 12/17/2024 12/23/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 11/26/2024 12/02/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 11/19/2024 11/22/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/12/2024 11/18/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM
ZON COMPLETE 11/12/2024 11/12/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 08/13/2024 08/16/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 08/08/2024 08/13/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 07/17/2024 07/17/2024
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM INCORRECT ADDRESS ON NOC (4 RYECARR)
SWALE COMPLETE 05/28/2024 09/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
CUSVC COMPLETE 05/23/2024 05/28/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/23/2024 05/28/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 05/23/2024 05/31/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 COMPLETE 05/23/2024 05/28/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/23/2024 05/28/2024
Note: Released By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM
MECH COMPLETE 05/23/2024 05/29/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN COMPLETE 05/23/2024 05/29/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 05/28/2025
SW ENG REINSPECTION 20 ¤20.00 05/28/2025
PLAN REVIEW - REVISION ¤32.50 05/23/2025
PLAN REVIEW - REVISION ¤32.50 05/23/2025
REINSPECTION RESIDENTIAL ¤40.00 05/23/2025
REINSPECTION RESIDENTIAL ¤40.00 05/23/2025
REINSPECTION RESIDENTIAL ¤40.00 10/15/2024
CONNECTION FEES ¤1,187.26 06/04/2024
FC IMPACT FEE EMS ¤62.00 06/04/2024
IMPACT FEE FIRE ¤428.09 06/04/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/04/2024
FC IMPACT FEE LIBRARY ¤268.00 06/04/2024
IMPACT FEE PARKS ¤1,800.99 06/04/2024
IMPACT FEE SCHOOL ¤5,450.00 06/04/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 06/04/2024
WATER -IRRIGATION INSPECTION ¤25.00 06/04/2024
SURCHARGE FS 533.721 ¤3.43 06/04/2024
SURCHARGE - FS 468.631 ¤5.14 06/04/2024
SW ENG - FOUNDATION SURVEY ¤20.00 06/04/2024
SW ENG INSPECTION 80 ¤80.00 06/04/2024
SW ENG PRE APRON ¤30.00 06/04/2024
WATER- TURN ON ¤25.00 06/04/2024
ADJUSTMENT 50% (¤342.60) 06/04/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/04/2024
INSPECTION - RESIDENTIAL ¤572.00 06/04/2024
PLAN REVIEW - APPROVED MASTER ¤83.20 06/04/2024
SW ENG - REVIEW 20 ¤20.00 06/04/2024
SW ENG RES REVIEW 200 ¤200.00 06/04/2024
SEWER CREDIT (¤650.00) 06/04/2024
SEWER INSPECTION ¤25.00 06/04/2024
SEWER CAPITAL FACILITY ¤6,120.52 06/04/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 06/04/2024
SITE PLAN 30 ¤30.00 06/04/2024
Fees Total Due: ¤0.00 Total Paid: ¤22,141.67