I want to search for...

Permit #2024051252

Permit Details

Status: COED

Parcel Id: 07-11-31-7001-00120-0070
CONDITIONED SPACE: 1800 sqft
GARAGE: 410 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
Total Square Footage: 2246 sqft
Block: 00120
Subdivision: -
Job Phone: 689-250-2429
Location Address: 20 FIRTREE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/04/2024
NOC: RECORDED
Applicant name: RYAN M COURECH
Owner: A AND R MERIDIAN REAL ESTATE DEVELOPMENT LLC

Address

688 N ORLANDO AVENUE

MAITLAND, FL 32751

Address

SUITE 207

MAITLAND, FL 32751

Lot: 0070
Contracted Stated Job Value: ¤208,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN
Original Permit #: 2024010999

Contractor

MCH CONSTRUCTION LLC
Status Location Address State License Number Phone
INACTIVE

668 N ORLANDO AVE, STE 207

MAITLAND, FL 32751

CBC1262898 (Exp: 08/31/2026) 407-602-8257

Sub Contractors

DANA SUE COOLEY
Status Location Address State License Number Phone
INACTIVE

PO BOX 1718

FLAGLER BEACH, FL 32136

CCC1333449 (Exp: 08/31/2026) 904-535-1680
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DUSTIN ARCHER
Status Location Address State License Number Phone
ACTIVE

2785 WRIGHTS ROAD SUITE 1133

OVIEDO, FL 32765

CMC1251099 (Exp: 08/31/2026) 407-391-1145

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 04/21/2025 APPROVED FSLADISH
Note: 4/21/25 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 4/15/25 UPON WALKING PROPERTY WITH INSPECTOR FLANAGAN WHO INDICATED THAT THIS IS WHAT HE INSTUCTED GRADER TO DO DETERMINED DRAINAGE WILL WORK. YOU WILL NEED TO REESTABLISH BERM AREAS ON PROPERTY LINES THAT HAVE WASHOUTS BEFORE ROW FINAL PASSAGE. .Inspector Notes from Inspection 9463 4/15/25 AFTER REVIEWING INSPECTORS NOTE AND REVIEWING THE REVISED SITE PLAN, THE SURVEY CAPTURES THE REQUEST. APPROVING AS NOTED. ________________________________________________________________________________________________________________________ NOTE TO INSPECTOR MET WITH GRADER ON GRADING OF THIS LOT. GRADER CAN NOT MAKE COMMON SWALES DUE TO ADJACENT LOTS FLOWING TO THE BACK WILL NEED TO PUT 4:1 SLOPES TO RAISE LOT TO FLOW TO THE FRONT. ANY QUESTION CALL PARREN 4/15/25 UPON WALKING PROPERTY WITH INSPECTOR FLANAGAN WHO INDICATED THAT THIS IS WHAT HE INSTUCTED GRADER TO DO DETERMINED DRAINAGE WILL WORK. YOU WILL NEED TO REESTABLISH BERM AREAS ON PROPERTY LINES THAT HAVE WASHOUTS BEFORE ROW FINAL PASSAGE.
ROW - STORMWATER FINAL 04/21/2025 APPROVED - AS NOTED FSLADISH
Note: 4/21/25 WHILE WASHOUTS HAVE BEEN REPIARED AT THE TIME OF THIS INSPECTION AND COPC MINIMUM STANDARDS HAVE BEEN MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 4/15/25 UPON WALKING PROPERTY WITH INSPECTOR FLANAGAN WHO INDICATED THAT THIS IS WHAT HE INSTUCTED GRADER TO DO DETERMINED DRAINAGE WILL WORK. YOU WILL NEED TO REESTABLISH BERM AREAS ON PROPERTY LINES THAT HAVE WASHOUTS BEFORE ROW FINAL PASSAGE. .Inspector Notes from Inspection 9463 4/15/25 AFTER REVIEWING INSPECTORS NOTE AND REVIEWING THE REVISED SITE PLAN, THE SURVEY CAPTURES THE REQUEST. APPROVING AS NOTED. ________________________________________________________________________________________________________________________ NOTE TO INSPECTOR MET WITH GRADER ON GRADING OF THIS LOT. GRADER CAN NOT MAKE COMMON SWALES DUE TO ADJACENT LOTS FLOWING TO THE BACK WILL NEED TO PUT 4:1 SLOPES TO RAISE LOT TO FLOW TO THE FRONT. ANY QUESTION CALL PARREN 4/15/25 UPON WALKING PROPERTY WITH INSPECTOR FLANAGAN WHO INDICATED THAT THIS IS WHAT HE INSTUCTED GRADER TO DO DETERMINED DRAINAGE WILL WORK. YOU WILL NEED TO REESTABLISH BERM AREAS ON PROPERTY LINES THAT HAVE WASHOUTS BEFORE ROW FINAL PASSAGE.
BLD - BUILDING FINAL 04/17/2025 FINAL APPROVED HCAMACHO
BLD - BUILDING FINAL 04/16/2025 Disapproved - NO FEE HCAMACHO
Note: 1. Water Heater needs sservice disconnect or lockable breaker. NEC 422.31 &110.25 2. Dishwasher FBCR P2903.5 WATER HAMMER ARRESTOR REQUIRED
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/15/2025 APPROVED - AS NOTED FSLADISH
Note: 4/15/25 AFTER REVIEWING INSPECTORS NOTE AND REVIEWING THE REVISED SITE PLAN, THE SURVEY CAPTURES THE REQUEST. APPROVING AS NOTED. ________________________________________________________________________________________________________________________ NOTE TO INSPECTOR MET WITH GRADER ON GRADING OF THIS LOT. GRADER CAN NOT MAKE COMMON SWALES DUE TO ADJACENT LOTS FLOWING TO THE BACK WILL NEED TO PUT 4:1 SLOPES TO RAISE LOT TO FLOW TO THE FRONT. ANY QUESTION CALL PARREN
ROW FIELD SURVEY /GRADING CERTIFICATION 04/15/2025 APPROVED - AS NOTED FSLADISH
Note: 4/15/25 UPON WALKING PROPERTY WITH INSPECTOR FLANAGAN WHO INDICATED THAT THIS IS WHAT HE INSTUCTED GRADER TO DO DETERMINED DRAINAGE WILL WORK. YOU WILL NEED TO REESTABLISH BERM AREAS ON PROPERTY LINES THAT HAVE WASHOUTS BEFORE ROW FINAL PASSAGE. .Inspector Notes from Inspection 9463 4/15/25 AFTER REVIEWING INSPECTORS NOTE AND REVIEWING THE REVISED SITE PLAN, THE SURVEY CAPTURES THE REQUEST. APPROVING AS NOTED. ________________________________________________________________________________________________________________________ NOTE TO INSPECTOR MET WITH GRADER ON GRADING OF THIS LOT. GRADER CAN NOT MAKE COMMON SWALES DUE TO ADJACENT LOTS FLOWING TO THE BACK WILL NEED TO PUT 4:1 SLOPES TO RAISE LOT TO FLOW TO THE FRONT. ANY QUESTION CALL PARREN 4/15/25 UPON WALKING PROPERTY WITH INSPECTOR FLANAGAN WHO INDICATED THAT THIS IS WHAT HE INSTUCTED GRADER TO DO DETERMINED DRAINAGE WILL WORK. YOU WILL NEED TO REESTABLISH BERM AREAS ON PROPERTY LINES THAT HAVE WASHOUTS BEFORE ROW FINAL PASSAGE.
ROW- PROJECT STATUS 04/07/2025 Status Check PFLANAGAN
Note: MET WITH GRADER ON GRADING OF THIS LOT. GRADER CAN NOT MAKE COMMON SWALES DUE TO ADJACENT LOTS FLOWING TO THE BACK WILL NEED TO PUT 4:1 SLOPES TO RAISE LOT TO FLOW TO THE FRONT.
ROW- PRE-APRON (PRE-POUR) 03/28/2025 Disapproved - NO FEE EMADISON
Note: ** 03/27/25 AS NOTED IN TNE PREVIOUS INSPECTION ** BUILDER NEEDS TO DIG OUT FOOTERS UNDER MITERED ENDS OF THE CULVERT
ROW- PRE-APRON (PRE-POUR) 03/28/2025 APPROVED - AS NOTED EMADISON
Note: ** 03/28/25 CORRECTIONS MADE READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _______________________________________________________________________________________________________________ 3/28/2025 - PREVIOUS INSPECTION NOTES ** 03/27/25 AS NOTED IN TNE PREVIOUS INSPECTION ** BUILDER NEEDS TO DIG OUT FOOTERS UNDER MITERED ENDS OF THE CULVERT
ROW- PRE-APRON (PRE-POUR) 03/27/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 03/27/25 BUILDER NEEDS TO DIG OUT FOOTERS UNDER MITERED ENDS OF THE CULVERT ** NEED TO EITHER EXTEND FORM BOARDS OR BACKFILL AROUND THE FORM BOARDS IN THE ROW AT THE MITERED ENDS AS THE CONCRETE NEEDS TO BE CONTAINED WITHIN THE POUR AREA
ELECTRIC - EARLY POWER 03/27/2025 APPROVED CVANSTRAHLEN
Note: 2. Revise Energy Calcs. to meet installed equipment, it currently does not match. Do not wait until Final. FBC [A]107.4
ELECTRIC - EARLY POWER 03/26/2025 Disapproved - NO FEE HCAMACHO
Note: 1. Missing SPD at Service. NEC 230.67(B) SPD MUST BE LOCATED IN OR ADJACENT TO THE SERVICE EQUIPMENT OUTSIDE 2. Revise Energy Calcs. to meet installed equipment, it currently does not match. Do not wait until Final. FBC [A]107.4
LATH/BRICK/ WATER BARRIER 01/29/2025 APPROVED HCAMACHO
INSULATION 01/24/2025 APPROVED HCAMACHO
GRAVITY SEWER TEST 01/15/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U-CROSS CONNECTION 01/15/2025 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 1/15/2025 11:14:16 AM *** no irr-no crossconnection
U - SEWER TIE IN 01/15/2025 APPROVED - AS NOTED MGIBSON
Note: CITY UTILITIES ASSESETED WITH TAP
ALL ROUGH 01/13/2025 APPROVED - AS NOTED HCAMACHO
Note: 1. Missing Product approval sheet for windows and doors. *Need to check at Insulation*
ROOF VALLEY & METAL 01/09/2025 APPROVED HCAMACHO
ROW - DRAINAGE 12/31/2024 APPROVED - AS NOTED PFLANAGAN
Note: CORRECTION MADE IT IS YOUR RESPONSIBILITY TO CHECK ALL YOUR SEMIDENT CONTROL DEVICES EVERY 7 BUSINESS DAYS OR EVERY 1/2" OF RAIN. -------------------------------------------------------------------------------------------- 12/30/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM THE ROADSIDE SWALE. 2) OVER THE WEEKENDS RAIN NOW THE CULVERT PIPE IS CLOGED UP AGAIN ------------------------------------------------------------------- 12/27/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM THE ROADSIDE SWALE. -------------------------------------------------------------------- 12/26/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM THE ROADSIDE SWALE. AS STATED FROM LAST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT WE WILL BE OUT EVERY DAY TO INSPECT ENTILL CORRECTION IS MADE TO SITE. --------------------------------------------------------------------------------------- 12/17/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM THE ROADSIDE SWALE. 2) NEED TO CLEAN ALL DIRT FROM YOUR TEMO. CULVERT SO WATER CAN FLOW TO OUTFALL. YOU WILL HAVE INTILL 12/26/24 TO CORRECT ALL ISSUES IF NOT THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 12/30/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: STILL NEED TO DO THE FOLLOWING 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM THE ROADSIDE SWALE. 2) OVER THE WEEKENDS RAIN NOW THE CULVERT PIPE IS CLOGED UP AGAIN ------------------------------------------------------------------- 12/27/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM THE ROADSIDE SWALE. -------------------------------------------------------------------- 12/26/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM THE ROADSIDE SWALE. AS STATED FROM LAST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT WE WILL BE OUT EVERY DAY TO INSPECT ENTILL CORRECTION IS MADE TO SITE. --------------------------------------------------------------------------------------- 12/17/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM THE ROADSIDE SWALE. 2) NEED TO CLEAN ALL DIRT FROM YOUR TEMO. CULVERT SO WATER CAN FLOW TO OUTFALL. YOU WILL HAVE INTILL 12/26/24 TO CORRECT ALL ISSUES IF NOT THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 12/27/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: STILL NEED TO DO THE FOLLOWING 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM THE ROADSIDE SWALE. -------------------------------------------------------------------- 12/26/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM THE ROADSIDE SWALE. AS STATED FROM LAST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT WE WILL BE OUT EVERY DAY TO INSPECT ENTILL CORRECTION IS MADE TO SITE. --------------------------------------------------------------------------------------- 12/17/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM THE ROADSIDE SWALE. 2) NEED TO CLEAN ALL DIRT FROM YOUR TEMO. CULVERT SO WATER CAN FLOW TO OUTFALL. YOU WILL HAVE INTILL 12/26/24 TO CORRECT ALL ISSUES IF NOT THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 12/26/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: STILL NEED TO DO THE FOLLOWING 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM THE ROADSIDE SWALE. AS STATED FROM LAST INSPECTION THERE IS NOW A INSPECTION HOLD ON THIS PERMIT WE WILL BE OUT EVERY DAY TO INSPECT ENTILL CORRECTION IS MADE TO SITE. --------------------------------------------------------------------------------------- 12/17/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM THE ROADSIDE SWALE. 2) NEED TO CLEAN ALL DIRT FROM YOUR TEMO. CULVERT SO WATER CAN FLOW TO OUTFALL. YOU WILL HAVE INTILL 12/26/24 TO CORRECT ALL ISSUES IF NOT THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 12/17/2024 Disapproved - NO FEE PFLANAGAN
Note: 1) NEED TO REMOVE ALL DIRT AND SEDIMENT FROM THE ROADSIDE SWALE. 2) NEED TO CLEAN ALL DIRT FROM YOUR TEMO. CULVERT SO WATER CAN FLOW TO OUTFALL. YOU WILL HAVE INTILL 12/26/24 TO CORRECT ALL ISSUES IF NOT THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
WALL SHEATHING 12/05/2024 APPROVED HCAMACHO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/05/2024 APPROVED HCAMACHO
FOUND SURVEY APPROVED (OFFICE) 12/04/2024 APPROVED TBAKER
TIE BEAM / LINTEL 11/12/2024 APPROVED HCAMACHO
MONOLITHIC SLAB 10/18/2024 APPROVED HCAMACHO
PLUMBING 1ST ROUGH UNDERGROUND 09/27/2024 APPROVED MGIBSON
Note: 9/20/2024 - PREVIOUS INSPECTION NOTES MUST SUBMIT GEO.TECH REPORT BEFORE SCHEDUALING PIRST ROUGH PLUMBING
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 09/26/2024 APPROVED CPISCITELLI
PLUMBING 1ST ROUGH UNDERGROUND 09/20/2024 Disapproved - NO FEE MGIBSON
Note: MUST SUBMIT GEO.TECH REPORT BEFORE SCHEDUALING PIRST ROUGH PLUMBING
WATER METER INSTALLATION REQUEST 08/16/2024 APPROVED CBOWERMASTER
WILDLIFE CHECK - ENVIRONMENTAL 05/29/2024 APPROVED DRODRIGUEZ

Review History

Department Status Date In Date Out
MECH COMPLETE 12/31/2024 01/07/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 12/05/2024 12/10/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/03/2024 12/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/03/2024 12/04/2024
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
ZON COMPLETE 11/25/2024 11/25/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 HOLD 11/25/2024 12/03/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM According to COPC survey crew - FFE at lot 8 is incorrect
MECH COMPLETE 11/19/2024 11/22/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 HOLD 11/12/2024 11/19/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please provide FFE of house at Lt 6
ZON COMPLETE 11/12/2024 11/13/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 09/23/2024 09/26/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 09/23/2024 09/23/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 08/26/2024 09/03/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 05/28/2024 09/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN COMPLETE 05/23/2024 05/29/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 05/23/2024 05/28/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/23/2024 05/28/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 05/23/2024 05/31/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 COMPLETE 05/23/2024 05/28/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/23/2024 05/24/2024
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
MECH COMPLETE 05/23/2024 05/29/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLENV COMPLETE 05/23/2024 05/29/2024
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 05/29/24 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 30 ¤30.00 04/21/2025
SW ENG - REVIEW 20 ¤20.00 06/04/2024
SW ENG RES REVIEW 200 ¤200.00 06/04/2024
SEWER INSPECTION ¤25.00 06/04/2024
SEWER CAPITAL FACILITY ¤6,120.52 06/04/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 06/04/2024
SITE PLAN 30 ¤30.00 06/04/2024
WATER- TURN ON ¤25.00 06/04/2024
ADJUSTMENT 50% (¤342.60) 06/04/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/04/2024
INSPECTION - RESIDENTIAL ¤572.00 06/04/2024
PLAN REVIEW - APPROVED MASTER ¤83.20 06/04/2024
CONNECTION FEES ¤1,187.26 06/04/2024
FC IMPACT FEE EMS ¤62.00 06/04/2024
IMPACT FEE FIRE ¤428.09 06/04/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/04/2024
FC IMPACT FEE LIBRARY ¤268.00 06/04/2024
IMPACT FEE PARKS ¤1,800.99 06/04/2024
IMPACT FEE SCHOOL ¤5,450.00 06/04/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 06/04/2024
WATER -IRRIGATION INSPECTION ¤25.00 06/04/2024
SURCHARGE FS 533.721 ¤3.43 06/04/2024
SURCHARGE - FS 468.631 ¤5.14 06/04/2024
SW ENG - FOUNDATION SURVEY ¤20.00 06/04/2024
SW ENG INSPECTION 80 ¤80.00 06/04/2024
SW ENG PRE APRON ¤30.00 06/04/2024
Fees Total Due: ¤0.00 Total Paid: ¤22,584.17