Permit #2024051307
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00230-0130 |
| CONDITIONED SPACE: 1851 sqft |
| GARAGE: 411 sqft |
| OPENED PORCH (WITH ROOF) : 39 sqft |
| OPENED PORCH (WITH ROOF) : 74 sqft |
| Total Square Footage: 2375 sqft |
| Block: 00230 |
| Subdivision: - |
| Job Phone: 904-531-5923 |
| Location Address: 46 POPLAR DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/21/2024 |
| NOC: RECORDED |
| Applicant name: TAVARIS JEROME DAVIS |
| Owner: BRIGHTLAND HOMES OF FLORIDA LLC |
|
Address 15725 N DALLAS PARKWAY ADDISON, TX 75001 |
|
Address SUITE 300 ADDISON, TX 75001 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
BRIGHTLAND HOMES OF FLORIDA, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3505 EAST FRONTAGE RD ADDISON, TX 75001 |
STE 145 TAMPA, FL 33607 |
CBC1267320 (Exp: 08/31/2026) | 904-531-5923 |
Sub Contractors
OLIN MARSHALL CANNON
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1794 ROGERO RD #2 JACKSONVILLE, FL 32211 |
CFC1426140 (Exp: 08/31/2026) | 904-343-4344 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
GREGORY WILLIAM FARIS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC1822274 (Exp: 08/31/2026) | 407-333-2665 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/30/2025 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 07/30/2025 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 no irr-no cross connection | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/29/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/30/2025 - PREVIOUS INSPECTION NOTES THE ROADSIDE SWALE ON RIGHT SIDE IS NOT GRADED CORRECTLY PLEASE SEE DRAWING 300.C1 FOR THE RIGHT WAY TO GRADE SWALE. IM TAKING THE SURVEYORS WORD FOR THAT YOU HAVE THE 6" OFF THE BACK OF THE HOUSE BUT THE ROADSIDE SWALE NEEDS TO FIX BEFORE PASSING. ---------------------------------------------------------------------- 1/28/2025 - PREVIOUS INSPECTION NOTES 1) THE ROADSIDE SWALE IS NOT GRADED CORRECTLY. PLEASE SEE DRAWING 300.C.1 2) YOU DONT HAVE THE .60 FALL OFF THE BACK OF THE HOUSE THE FIRST 10'. Chapter 4, R401.3-Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’. | |||
| ROW - STORMWATER FINAL | 07/29/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 07/29/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U-CROSS CONNECTION | 01/30/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cross connection | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/30/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE ROADSIDE SWALE ON RIGHT SIDE IS NOT GRADED CORRECTLY PLEASE SEE DRAWING 300.C1 FOR THE RIGHT WAY TO GRADE SWALE. IM TAKING THE SURVEYORS WORD FOR THAT YOU HAVE THE 6" OFF THE BACK OF THE HOUSE BUT THE ROADSIDE SWALE NEEDS TO FIX BEFORE PASSING. ---------------------------------------------------------------------- 1/28/2025 - PREVIOUS INSPECTION NOTES 1) THE ROADSIDE SWALE IS NOT GRADED CORRECTLY. PLEASE SEE DRAWING 300.C.1 2) YOU DONT HAVE THE .60 FALL OFF THE BACK OF THE HOUSE THE FIRST 10'. Chapter 4, R401.3-Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/28/2025 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/28/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE ROADSIDE SWALE IS NOT GRADED CORRECTLY. PLEASE SEE DRAWING 300.C.1 2) YOU DONT HAVE THE .60 FALL OFF THE BACK OF THE HOUSE THE FIRST 10'. Chapter 4, R401.3-Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/20/2024 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| GRAVITY SEWER TEST | 12/10/2024 | Approval - Private Provider | PPROVIDER |
| Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 12/09/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC - EARLY POWER | 12/04/2024 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 11/06/2024 | APPROVED | CBOWERMASTER |
| INSULATION | 10/22/2024 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 10/18/2024 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/17/2024 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 10/16/2024 | Approval - Private Provider | PPROVIDER |
| ELECTRIC-TUG | 09/24/2024 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 09/17/2024 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 09/17/2024 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 09/16/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/14/2024 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/08/2024 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 08/07/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 06/28/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/11/2024 | 10/14/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/13/2024 | 09/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/13/2024 | 09/13/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/01/2024 | 08/07/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/12/2024 | 06/17/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in office. NEC 2020 210.52 | |||
| SWALE | COMPLETE | 05/28/2024 | 09/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/24/2024 | 06/03/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/24/2024 | 05/30/2024 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/24/2024 | 05/29/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 05/24/2024 | 06/03/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in office. NEC 2020 210.52 | |||
| ENGIN1 | COMPLETE | 05/24/2024 | 05/28/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/24/2024 | 05/30/2024 |
| LOCATE | COMPLETE | 05/24/2024 | 05/30/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/24/2024 | 05/31/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/24/2024 | 05/28/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/24/2024 | 05/28/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 07/09/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 07/09/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 07/09/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/09/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/21/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/21/2024 |
| SEWER CREDIT | (¤650.00) | 06/21/2024 |
| SEWER INSPECTION | ¤25.00 | 06/21/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 06/21/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 06/21/2024 |
| SITE PLAN 30 | ¤30.00 | 06/21/2024 |
| WATER- TURN ON | ¤25.00 | 06/21/2024 |
| ADJUSTMENT 10% | (¤29.60) | 06/21/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/21/2024 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 06/21/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤265.98 | 06/21/2024 |
| CONNECTION FEES | ¤1,187.26 | 06/21/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 06/21/2024 |
| IMPACT FEE FIRE | ¤428.09 | 06/21/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/21/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/21/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 06/21/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/21/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 06/21/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/21/2024 |
| SURCHARGE FS 533.721 | ¤4.91 | 06/21/2024 |
| SURCHARGE - FS 468.631 | ¤7.37 | 06/21/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/21/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/21/2024 |
| SW ENG PRE APRON | ¤30.00 | 06/21/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,136.66 |