I want to search for...

Permit #2024051307

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00230-0130
CONDITIONED SPACE: 1851 sqft
GARAGE: 411 sqft
OPENED PORCH (WITH ROOF) : 39 sqft
OPENED PORCH (WITH ROOF) : 74 sqft
Total Square Footage: 2375 sqft
Block: 00230
Subdivision: -
Job Phone: 904-531-5923
Location Address: 46 POPLAR DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/21/2024
NOC: RECORDED
Applicant name: TAVARIS JEROME DAVIS
Owner: BRIGHTLAND HOMES OF FLORIDA LLC

Address

15725 N DALLAS PARKWAY

ADDISON, TX 75001

Address

SUITE 300

ADDISON, TX 75001

Lot: 0130
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

BRIGHTLAND HOMES OF FLORIDA, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

3505 EAST FRONTAGE RD

ADDISON, TX 75001

STE 145

TAMPA, FL 33607

CBC1267320 (Exp: 08/31/2026) 904-531-5923

Sub Contractors

OLIN MARSHALL CANNON
Status Location Address State License Number Phone
INACTIVE

1794 ROGERO RD #2

JACKSONVILLE, FL 32211

CFC1426140 (Exp: 08/31/2026) 904-343-4344
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980
GREGORY WILLIAM FARIS
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC1822274 (Exp: 08/31/2026) 407-333-2665

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/30/2025 Approval - Private Provider PPROVIDER
U -UTILITY RESIDENTIAL FINAL 07/30/2025 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 no irr-no cross connection
ROW FIELD SURVEY /GRADING CERTIFICATION 07/29/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/30/2025 - PREVIOUS INSPECTION NOTES THE ROADSIDE SWALE ON RIGHT SIDE IS NOT GRADED CORRECTLY PLEASE SEE DRAWING 300.C1 FOR THE RIGHT WAY TO GRADE SWALE. IM TAKING THE SURVEYORS WORD FOR THAT YOU HAVE THE 6" OFF THE BACK OF THE HOUSE BUT THE ROADSIDE SWALE NEEDS TO FIX BEFORE PASSING. ---------------------------------------------------------------------- 1/28/2025 - PREVIOUS INSPECTION NOTES 1) THE ROADSIDE SWALE IS NOT GRADED CORRECTLY. PLEASE SEE DRAWING 300.C.1 2) YOU DONT HAVE THE .60 FALL OFF THE BACK OF THE HOUSE THE FIRST 10'. Chapter 4, R401.3-Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’.
ROW - STORMWATER FINAL 07/29/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - FINAL APRON (AFTER POUR) 07/29/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U-CROSS CONNECTION 01/30/2025 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cross connection
ROW FIELD SURVEY /GRADING CERTIFICATION 01/30/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: THE ROADSIDE SWALE ON RIGHT SIDE IS NOT GRADED CORRECTLY PLEASE SEE DRAWING 300.C1 FOR THE RIGHT WAY TO GRADE SWALE. IM TAKING THE SURVEYORS WORD FOR THAT YOU HAVE THE 6" OFF THE BACK OF THE HOUSE BUT THE ROADSIDE SWALE NEEDS TO FIX BEFORE PASSING. ---------------------------------------------------------------------- 1/28/2025 - PREVIOUS INSPECTION NOTES 1) THE ROADSIDE SWALE IS NOT GRADED CORRECTLY. PLEASE SEE DRAWING 300.C.1 2) YOU DONT HAVE THE .60 FALL OFF THE BACK OF THE HOUSE THE FIRST 10'. Chapter 4, R401.3-Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’.
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/28/2025 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 01/28/2025 Disapproved - NO FEE PFLANAGAN
Note: 1) THE ROADSIDE SWALE IS NOT GRADED CORRECTLY. PLEASE SEE DRAWING 300.C.1 2) YOU DONT HAVE THE .60 FALL OFF THE BACK OF THE HOUSE THE FIRST 10'. Chapter 4, R401.3-Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10’.
ROW- PRE-APRON (PRE-POUR) 12/20/2024 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
GRAVITY SEWER TEST 12/10/2024 Approval - Private Provider PPROVIDER
Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 12/09/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 12/04/2024 Approval - Private Provider PPROVIDER
PEP TANK INSTALLATION REQUEST 11/06/2024 APPROVED CBOWERMASTER
INSULATION 10/22/2024 Approval - Private Provider PPROVIDER
ALL ROUGH 10/18/2024 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/17/2024 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 10/16/2024 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 09/24/2024 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 09/17/2024 Approval - Private Provider PPROVIDER
WALL SHEATHING 09/17/2024 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 09/16/2024 APPROVED TBAKER
MONOLITHIC SLAB 08/14/2024 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 08/08/2024 Approval - Private Provider PPROVIDER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 08/07/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 06/28/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 10/11/2024 10/14/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/13/2024 09/16/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/13/2024 09/13/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 08/01/2024 08/07/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 06/12/2024 06/17/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in office. NEC 2020 210.52
SWALE COMPLETE 05/28/2024 09/24/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN COMPLETE 05/24/2024 06/03/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 05/24/2024 05/30/2024
Note: Released By: JPI
CUSVC COMPLETE 05/24/2024 05/29/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 05/24/2024 06/03/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in office. NEC 2020 210.52
ENGIN1 COMPLETE 05/24/2024 05/28/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 05/24/2024 05/30/2024
LOCATE COMPLETE 05/24/2024 05/30/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 05/24/2024 05/31/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 05/24/2024 05/28/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/24/2024 05/28/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 07/09/2025
CONTRACTOR CHANGE ¤20.00 07/09/2025
CONTRACTOR CHANGE ¤20.00 07/09/2025
SW ENG REINSPECTION 20 ¤20.00 07/09/2025
SW ENG - REVIEW 20 ¤20.00 06/21/2024
SW ENG RES REVIEW 200 ¤200.00 06/21/2024
SEWER CREDIT (¤650.00) 06/21/2024
SEWER INSPECTION ¤25.00 06/21/2024
SEWER CAPITAL FACILITY ¤6,120.52 06/21/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 06/21/2024
SITE PLAN 30 ¤30.00 06/21/2024
WATER- TURN ON ¤25.00 06/21/2024
ADJUSTMENT 10% (¤29.60) 06/21/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/21/2024
ADMINISTRATIVE - RESID PP ¤225.00 06/21/2024
PLAN REVIEW - RESIDENTIAL ¤265.98 06/21/2024
CONNECTION FEES ¤1,187.26 06/21/2024
FC IMPACT FEE EMS ¤62.00 06/21/2024
IMPACT FEE FIRE ¤428.09 06/21/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/21/2024
FC IMPACT FEE LIBRARY ¤268.00 06/21/2024
IMPACT FEE PARKS ¤1,800.99 06/21/2024
IMPACT FEE SCHOOL ¤5,450.00 06/21/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 06/21/2024
WATER -IRRIGATION INSPECTION ¤25.00 06/21/2024
SURCHARGE FS 533.721 ¤4.91 06/21/2024
SURCHARGE - FS 468.631 ¤7.37 06/21/2024
SW ENG - FOUNDATION SURVEY ¤20.00 06/21/2024
SW ENG INSPECTION 80 ¤80.00 06/21/2024
SW ENG PRE APRON ¤30.00 06/21/2024
Fees Total Due: ¤0.00 Total Paid: ¤22,136.66