I want to search for...

Permit #2024051403

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-2780
CONDITIONED SPACE: 2974 sqft
GARAGE: 752 sqft
OPENED PORCH (WITH ROOF) : 426 sqft
Total Square Footage: 4152 sqft
Block: 00000
Subdivision: -
Job Phone: 386-236-4133
Location Address: 490 SWEETGUM LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/03/2024
NOC: RECORDED
Applicant name: LEONARDO CIRO SANCLEMENTE
Owner: MHK OF VOLUSIA COUNTY INC

Address

2379 BEVILLE ROAD

DAYTONA BEACH, FL 32119

Lot: 2780
Contracted Stated Job Value: ¤334,756.00
Job Description: single family residence
Type: CN

Contractor

VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
Status Location Address State License Number Phone
ACTIVE

2379 BEVILLE RD

DAYTONA BEACH, FL 32119

CBC1262114 (Exp: 08/31/2026) 386-236-4133

Sub Contractors

EDWARD DOUGLAS TENNANT
Status Location Address State License Number Phone Fax
INACTIVE

3370 AGRICULTURAL CENTER DRIVE

ST. AUGUSTINE , FL 32092

CAC1813372 (Exp: 08/31/2026) (904)829-8898 (904)829-6587
STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
HUGH MACDONALD
Status Location Address State License Number Phone
ACTIVE

10825 TOM FOLSOM ROAD, SUITE A

THONOTOSASSA, FL 33592

CCC1329562 (Exp: 08/31/2026) 813-986-4968
HARLEY M BRYAN
Status Location Address State License Number Phone
ACTIVE

5223 EDGEWOOD CT

ORMOND BEACH, FL 32174

LI26657 (Exp: 08/31/2028) 386-463-2700

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/17/2024 FINAL APPROVED HCAMACHO
Note: 12/16/2024 - PREVIOUS INSPECTION NOTES 1. No Hot Water. 2. Missing hard caps on pipes not being used. Summer Kitchen, Future Bath in Garage 3. Seal Hole outside garage wall at cable lines. 4. Seal around Pipe going through the roof in garage ceiling. Vaccum system.FBC EC TABLE SEAL BUILDING ENVELOPE R402.4.1.1 5. Missing shower Head in Master Bath 6. Missing Attic cover in back bedroom closet.
BLD - BUILDING FINAL 12/16/2024 Disapproved - NO FEE HCAMACHO
Note: 1. No Hot Water. 2. Missing hard caps on pipes not being used. Summer Kitchen, Future Bath in Garage 3. Seal Hole outside garage wall at cable lines. 4. Seal around Pipe going through the roof in garage ceiling. Vaccum system.FBC EC TABLE SEAL BUILDING ENVELOPE R402.4.1.1 5. Missing shower Head in Master Bath 6. Missing Attic cover in back bedroom closet.
U -UTILITY RESIDENTIAL FINAL 12/13/2024 FINAL APPROVED LFITZGERALD
Note: 12/11/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 12/11/2024 11:39:52 AM *** check valve on meter assembly is upsidedown-realign so is accessible-turn it 180 degrees 12/10/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 12/10/2024 11:38:04 AM *** lower/cap sewer clean out-remove soils from water meter box to below meter assembly
GAS FINAL 12/12/2024 APPROVED - AS NOTED MGIBSON
Note: 10/21/2024 - PREVIOUS INSPECTION NOTES GAS FINAL WAS SCHEDUAL INCORRECTLY, GAS ROUGH WAS APPROVED ON 10/18/24 BY HUGO, ANOTHER GAS ROUGH WILL NEED TO BE SCHEDUALED WHEN CONNECTION TO STUB OUT IS CONNECTED BY GAS SOURCE. GAS FINAL IS TO BE SCHEDUALED WHEN ALL GAS APPLIANCES OR CONNECTE AND TIE IN PER ''HOA'' U/G TANK IS ALL THAT IS ALLOWED. ANOTHER GAS PERMIT IS REQUIRED
U -UTILITY RESIDENTIAL FINAL 12/11/2024 Disapproved - NO FEE LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 12/11/2024 11:39:52 AM *** check valve on meter assembly is upsidedown-realign so is accessible-turn it 180 degrees 12/10/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 12/10/2024 11:38:04 AM *** lower/cap sewer clean out-remove soils from water meter box to below meter assembly
U-CROSS CONNECTION 12/10/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 12/10/2024 11:37:01 AM *** master metered reclaim-no cross connection
ROW - FINAL APRON (AFTER POUR) 12/10/2024 APPROVED EMADISON
Note:
ROW - STORMWATER FINAL 12/10/2024 APPROVED EMADISON
Note:
U -UTILITY RESIDENTIAL FINAL 12/10/2024 Disapproved -FEE REQUIRED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 12/10/2024 11:38:04 AM *** lower/cap sewer clean out-remove soils from water meter box to below meter assembly
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/09/2024 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 12/09/2024 APPROVED - AS NOTED EMADISON
Note: ** 12/09/24 NEED TO LAY SOD ACROSS THE ENTIRE REAR PROPERTYLINE ON ALL EXPOSED BARE EARTH ** BOTH SIDES VACANTS NEED TO INSTALL 2 ROWS OF SOD ACROSS EDGE OF CURB DUE TO ACCESS IN AND OUT OF VACANTS THROUGH OUT CONSTRUCTION TO ASSIST IN EROSION CONTROL. CANNOT BE SEED AND STRAW ** REMOVE DUMPSTRER FROM THE VACANT BEFORE ROW STORMWATER FINAL
ELECTRIC - EARLY POWER 12/09/2024 APPROVED HCAMACHO
ROW- PRE-APRON (PRE-POUR) 11/15/2024 APPROVED PFLANAGAN
Note: CORRECTION MADE READY TO LAY PAVERS ------------------------------------------------------------------ 11/12/2024 - PREVIOUS INSPECTION NOTES THERE IS NO PAVER FOOTER AT THE EDGE OF THE PAVER BASE. NEED TO HAVE A FOOTER ALONG RIGHT SIDE SO PAVERS WILL NOT SINK. ------------------------------------------------------------------- 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
SEWER TIE IN 11/14/2024 APPROVED - AS NOTED MGIBSON
Note: 10/24/2024 - PREVIOUS INSPECTION NOTES TALKED TO PLUMBER NOT DONE YET. THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 11/14/2024 APPROVED - AS NOTED MGIBSON
Note: 10/24/2024 - PREVIOUS INSPECTION NOTES TALKED TO PLUMBER NOT DONE YET. THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 11/12/2024 Disapproved - NO FEE PFLANAGAN
Note: THERE IS NO PAVER FOOTER AT THE EDGE OF THE PAVER BASE. NEED TO HAVE A FOOTER ALONG RIGHT SIDE SO PAVERS WILL NOT SINK. ------------------------------------------------------------------- 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
INSULATION 10/30/2024 APPROVED JSTEWART
Note: 10/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 10/24/2024 10:06:04 AM *** Previous Note not rectified......Unable to approve until plan revision has been reviewed and approved. Inspection was completed and at the time of inspection Good. 4. Utility closet in garage is plumbed for toilet and sink, does not match plans. Revise plans accordingly. (submitted not approved yet) 10/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 10/22/2024 2:20:56 PM *** Previous Notes not fully rectified..... 2.Product Approval does not match on slider installed. Revise. (has not been submitted) 3. Missing bath fan and flex in bath in the garage. Calls for it on plans. (Not wired) 4. Utility closet in garage is plumbed for toilet and sink, does not match plans. Revise plans accordingly. (submitted not approved yet) Need completed prior to insulation approval Inspector Notes from Inspection 2420 1. Missing screws on windows right rear bedroom, marked. 2.Product Approval does not match on slider installed. Revise. 3. Missing bath fan and flex in bath in the garage. Calls for it on plans. 4. Utility closet in garage is plumbed for toilet and sink, does not match plans. Revise plans accordingly. Will check at insulation.
INSULATION 10/24/2024 Disapproved - NO FEE JSTEWART
Note: *** NOTES ADDED BY JSTEWART 10/24/2024 10:06:04 AM *** Previous Note not rectified......Unable to approve until plan revision has been reviewed and approved. Inspection was completed and at the time of inspection Good. 4. Utility closet in garage is plumbed for toilet and sink, does not match plans. Revise plans accordingly. (submitted not approved yet) 10/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 10/22/2024 2:20:56 PM *** Previous Notes not fully rectified..... 2.Product Approval does not match on slider installed. Revise. (has not been submitted) 3. Missing bath fan and flex in bath in the garage. Calls for it on plans. (Not wired) 4. Utility closet in garage is plumbed for toilet and sink, does not match plans. Revise plans accordingly. (submitted not approved yet) Need completed prior to insulation approval Inspector Notes from Inspection 2420 1. Missing screws on windows right rear bedroom, marked. 2.Product Approval does not match on slider installed. Revise. 3. Missing bath fan and flex in bath in the garage. Calls for it on plans. 4. Utility closet in garage is plumbed for toilet and sink, does not match plans. Revise plans accordingly. Will check at insulation.
SEWER TIE IN 10/24/2024 Disapproved - NO FEE MGIBSON
Note: TALKED TO PLUMBER NOT DONE YET
GRAVITY SEWER TEST 10/24/2024 Disapproved - NO FEE MGIBSON
Note: TALKED TO PLUMBER NOT DONE YET
INSULATION 10/22/2024 Disapproved - NO FEE JSTEWART
Note: *** NOTES ADDED BY JSTEWART 10/22/2024 2:20:56 PM *** Previous Notes not fully rectified..... 2.Product Approval does not match on slider installed. Revise. (has not been submitted) 3. Missing bath fan and flex in bath in the garage. Calls for it on plans. (Not wired) 4. Utility closet in garage is plumbed for toilet and sink, does not match plans. Revise plans accordingly. (submitted not approved yet) Need completed prior to insulation approval Inspector Notes from Inspection 2420 1. Missing screws on windows right rear bedroom, marked. 2.Product Approval does not match on slider installed. Revise. 3. Missing bath fan and flex in bath in the garage. Calls for it on plans. 4. Utility closet in garage is plumbed for toilet and sink, does not match plans. Revise plans accordingly. Will check at insulation.
GAS FINAL 10/21/2024 CANCELLED BY APPLICANT MGIBSON
Note: GAS FINAL WAS SCHEDUAL INCORRECTLY, GAS ROUGH WAS APPROVED ON 10/18/24 BY HUGO, ANOTHER GAS ROUGH WILL NEED TO BE SCHEDUALED WHEN CONNECTION TO STUB OUT IS CONNECTED BY GAS SOURCE. GAS FINAL IS TO BE SCHEDUALED WHEN ALL GAS APPLIANCES OR CONNECTE AND TIE IN
ROW- PAVER RESTRAINTS 10/21/2024 APPROVED EMADISON
Note: ** 10/21/24 READY TO POUR PAVER RESTRAINTS AND APRON ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (
ROW- PRE-APRON (PRE-POUR) 10/21/2024 PARTIALLY APPROVED EMADISON
Note: ** 10/21/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ELECTRIC-TUG 10/21/2024 APPROVED MCONTRYMAN
GAS ROUGH 10/18/2024 APPROVED HCAMACHO
LATH/BRICK/ WATER BARRIER 10/18/2024 APPROVED HCAMACHO
ALL ROUGH 10/18/2024 APPROVED - AS NOTED HCAMACHO
Note: 1. Missing screws on windows right rear bedroom, marked. 2.Product Approval does not match on slider installed. Revise. 3. Missing bath fan and flex in bath in the garage. Calls for it on plans. 4. Utility closet in garage is plumbed for toilet and sink, does not match plans. Revise plans accordingly. Will check at insulation.
WALL SHEATHING 09/17/2024 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/17/2024 APPROVED FWILLIS
ROOF VALLEY & METAL 09/16/2024 APPROVED FWILLIS
ROOF SHEATHING 09/09/2024 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 09/04/2024 APPROVED TBAKER
TIE BEAM / LINTEL 08/26/2024 APPROVED FWILLIS
MONOLITHIC SLAB 08/15/2024 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 08/08/2024 APPROVED JSTEWART
WATER METER INSTALLATION REQUEST 08/05/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 10/23/2024 10/28/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 10/21/2024 10/21/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Plans submitted are to be uploaded in individual sheets and with a digital signature. The file name is to be the plan sheet name. ONLY files that pertain to the revision are to be uploaded, do not upload a new complete set of plans unless they are all relevenat, a complete set of plans could subject you to a full plan review fee for a re-review.
BLD COMPLETE 10/21/2024 10/28/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 10/21/2024 10/21/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/28/2024 09/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/28/2024 08/28/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 07/30/2024 08/01/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/22/2024 07/22/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 07/22/2024 07/26/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON COMPLETE 07/22/2024 07/22/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN INFORMATION 07/08/2024 07/08/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Seals are not verifiable (only the truss can be) they appear to be copies.
BLD COMPLETE 07/08/2024 07/15/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/08/2024 07/10/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/18/2024 06/18/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 06/18/2024 06/24/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
SW1 COMPLETE 06/18/2024 07/01/2024
Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM
URB COMPLETE 05/29/2024 06/05/2024
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
BADMIN COMPLETE 05/28/2024 06/04/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 05/28/2024 05/30/2024
Note: Released By: JPI
CUSVC COMPLETE 05/28/2024 05/31/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 05/28/2024 06/03/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/28/2024 05/28/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS COMPLETE 05/28/2024 05/31/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
LOCATE COMPLETE 05/28/2024 05/31/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 05/28/2024 06/03/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
SW1 HOLD 05/28/2024 06/06/2024
Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM 1- According to the approved plans, the drainage from the landscape easement point should be divided into two drains at the rear and front of the property (almost a C drain since the majority of drainage goes to the rear of the property). 2- Could you please provide more detailed information regarding the proposed elevation of the property adjacent to Lot 277 since there are some existing low spots (25.7, 25.4). 3- There is an almost inch drop across the property adjacent to Lot 279 (26.34 to 26.25) in almost 70', which is insufficient and requires revision.
ZON HOLD 05/28/2024 05/29/2024
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Color sheet: provide the name of color

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/11/2024
CONTRACTOR CHANGE ¤20.00 10/22/2024
FC IMPACT FEE EMS ¤62.00 07/03/2024
IMPACT FEE FIRE ¤428.09 07/03/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 07/03/2024
FC IMPACT FEE LIBRARY ¤268.00 07/03/2024
IMPACT FEE PARKS ¤1,800.99 07/03/2024
IMPACT FEE SCHOOL ¤5,450.00 07/03/2024
IMPACT FEE TRANSPORTATION ¤3,404.00 07/03/2024
SURCHARGE FS 533.721 ¤18.35 07/03/2024
SURCHARGE - FS 468.631 ¤27.52 07/03/2024
SW ENG - FOUNDATION SURVEY ¤20.00 07/03/2024
SW ENG INSPECTION 80 ¤80.00 07/03/2024
SW ENG PRE APRON ¤30.00 07/03/2024
SW ENG - REVIEW 20 ¤20.00 07/03/2024
SW ENG RES REVIEW 200 ¤200.00 07/03/2024
SEWER INSPECTION ¤25.00 07/03/2024
SITE PLAN 30 ¤30.00 07/03/2024
WATER-METER ¤514.49 07/03/2024
ADJUSTMENT 10% (¤203.86) 07/03/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/03/2024
INSPECTION - RESIDENTIAL ¤1,564.75 07/03/2024
PLAN REVIEW - RESIDENTIAL ¤443.82 07/03/2024
CONNECTION FEES ¤25.00 07/03/2024
Fees Total Due: ¤0.00 Total Paid: ¤14,516.15