I want to search for...

Permit #2024051431

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-01250-0020
GARAGE: 470 sqft
CONDITIONED SPACE: 2530 sqft
OPENED PORCH (WITH ROOF) : 148 sqft
ENCLOSE EXISTING PORCH TO LIVING : 83 sqft
Total Square Footage: 3231 sqft
Block: 01250
Subdivision: 7034 -
Job Phone: 386-569-7882
Location Address: 12 EDGAR LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/20/2024
NOC: RECORDED
Applicant name: VLADIMIR V PEREPECHKIN
Owner: PFEIFFER FRANK J & VICTORIA H&W

Address

8 BRYANT STREET

BETHPAGE, NY 11714

Lot: 0020
Contracted Stated Job Value: ¤250,000.00
Job Description: Single Family Residence
Type: CN

Contractor

WISE CHOICE CUSTOM HOMES, INC.
Status Location Address State License Number Phone
ACTIVE

77 SOUTHLAKE DR

PALM COAST, FL 32137

CRC1328738 (Exp: 08/31/2026) 386-569-7882

Sub Contractors

ANDREW GONCALVES HOWARD
Status Location Address State License Number Phone
ACTIVE

2 RYALL LANE

PALM COAST, FL 32164

CCC1333989 (Exp: 08/31/2026) 386-347-0366
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
MAXIM BUDNIK
Status Location Address State License Number
ACTIVE

3 WAVECREST PL

PALM COAST, FL 32164

CAC1818445 (Exp: 08/31/2026)
MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/30/2025 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/30/2025 2:50:08 PM *** Previously listed item 4/21/2025 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-NEC-210.11-C4, PEP need a dedicated circuit with GFCI protected breaker , can't not be connected to GFCI outlet inside the garage #2-FBCR 314 & 315-ALL SMOKE/ CO2 DETECTORS OPERATIONAL . Missing smoke detector , mark on plans with green market , plans call for smoke detector #3-FBC-R . 302.6 seal all garage penetration , wall and ceiling ( low voltage wire AHU Plenum conduit )Around the unit box #4-FBCR 303.3-EXHAUST FAN OPERATIONAL. Missing 4 exhausted vent covert on sotfit and solid sotfit 3f on left 3 f on right
BLD - BUILDING FINAL 04/21/2025 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix items before next inspection #1-NEC-210.11-C4, PEP need a dedicated circuit with GFCI protected breaker , can't not be connected to GFCI outlet inside the garage #2-FBCR 314 & 315-ALL SMOKE/ CO2 DETECTORS OPERATIONAL . Missing smoke detector , mark on plans with green market , plans call for smoke detector #3-FBC-R . 302.6 seal all garage penetration , wall and ceiling ( low voltage wire AHU Plenum conduit )Around the unit box #4-FBCR 303.3-EXHAUST FAN OPERATIONAL. Missing 4 exhausted vent covert on sotfit and solid sotfit 3f on left 3 f on right
ROW - STORMWATER FINAL 04/16/2025 APPROVED EMADISON
Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved.
U -UTILITY RESIDENTIAL FINAL 04/10/2025 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 04/10/2025 Disapproved - NO FEE TPOLACEK
Note: 04/10/25 TPOLACEK*** AS STATED IN FIELD SURVEY NOTE THE BUILDER NEEDS TO SOD AT LEAST 3 MORE ROWS ACROSS THE REAR PROPERTY LINE TO COVER ALL BARE EARTH DISTURBED DURING CONSTRUCTION. Inspector Notes from Inspection 9465 ** 04/02/25 AREA ACROSS REAR PROPERTY LINE NEED TO SOD ALL BARE EARTH
U-CROSS CONNECTION 04/10/2025 APPROVED - AS NOTED LFITZGERALD
Note: potable irr with PVB-no cc
ROW - FINAL APRON (AFTER POUR) 04/10/2025 APPROVED TPOLACEK
Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 ** 04/02/25 AREA ACROSS REAR PROPERTY LINE NEED TO SOD ALL BARE EARTH
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/02/2025 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 04/02/2025 APPROVED - AS NOTED EMADISON
Note: ** 04/02/25 AREA ACROSS REAR PROPERTY LINE NEED TO SOD ALL BARE EARTH
ELECTRIC - EARLY POWER 03/14/2025 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 10:30am
ELECTRIC - EARLY POWER 03/13/2025 Disapproved - NO FEE MKRASKI
Note: 1. SPD @ metermain must be installed before early power can be released. NEC 230.67(B)
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/05/2025 Disapproved - NO FEE FSLADISH
Note: 3/5/25 YOUR LEFT SIDE REA STRUCTURE CORNER ON YOUR SITE PLAN SHOWS WATER MOVING FROM REAR TO FRONT ON THE LEFT SIDE DRAINAGE CONVEYANCE. ON YOUR SURVEY YOU ARE SHOWING A 27.05 GOING TO A 27.10 TO A 27.15 UPHILL TO A 27.55. THIS WILL NOT ALLO POSITIVE FORWARD DRAINAGE TO REACH THE FRONT SWALE. SEE PHOTO FOR REFERENCE.
ROW- PRE-APRON (PRE-POUR) 01/24/2025 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
GRAVITY SEWER TEST 01/15/2025 APPROVED MGIBSON
SEWER TIE IN 01/15/2025 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 12/26/2024 APPROVED CBOWERMASTER
INSULATION 12/13/2024 APPROVED PKNAPIK
Note: New baffles installed. 12/10/2024 - PREVIOUS INSPECTION NOTES 12/10/24 Previous notes still not rectified 12/9/24 1. Repair not made 12/6/2024 - PREVIOUS INSPECTION NOTES 12/6/24 1. Air baffles crushed on back left corner of house. Requires 1" clearance R402.2.3 (Eave Baffle) & R806.3 (Vent and Insulation Clearance 12/9/2024 - PREVIOUS INSPECTION NOTES 12/9/24 1. Repair not made 12/6/2024 - PREVIOUS INSPECTION NOTES 12/6/24 1. Air baffles crushed on back left corner of house. Requires 1" clearance R402.2.3 (Eave Baffle) & R806.3 (Vent and Insulation Clearance
INSULATION 12/10/2024 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 12/10/24 Previous notes still not rectified 12/9/24 1. Repair not made 12/6/2024 - PREVIOUS INSPECTION NOTES 12/6/24 1. Air baffles crushed on back left corner of house. Requires 1" clearance R402.2.3 (Eave Baffle) & R806.3 (Vent and Insulation Clearance 12/9/2024 - PREVIOUS INSPECTION NOTES 12/9/24 1. Repair not made 12/6/2024 - PREVIOUS INSPECTION NOTES 12/6/24 1. Air baffles crushed on back left corner of house. Requires 1" clearance R402.2.3 (Eave Baffle) & R806.3 (Vent and Insulation Clearance
INSULATION 12/09/2024 Disapproved - NO FEE MKRASKI
Note: 12/9/24 1. Repair not made 12/6/2024 - PREVIOUS INSPECTION NOTES 12/6/24 1. Air baffles crushed on back left corner of house. Requires 1" clearance R402.2.3 (Eave Baffle) & R806.3 (Vent and Insulation Clearance
INSULATION 12/06/2024 Disapproved - NO FEE MCONTRYMAN
Note: 12/6/24 1. Air baffles crushed on back left corner of house. Requires 1" clearance R402.2.3 (Eave Baffle) & R806.3 (Vent and Insulation Clearance
ALL ROUGH 12/03/2024 APPROVED CVANSTRAHLEN
LATH/BRICK/ WATER BARRIER 12/02/2024 APPROVED PKNAPIK
ALL ROUGH 11/26/2024 Disapproved -FEE REQUIRED PKNAPIK
Note: 11/26/2024 1. Notes 3 and 5 not satisfied from previous inspection. 2. HVAC layout needs to be reviewed by office. 11/20/2024 - PREVIOUS INSPECTION NOTES 11/20/2024 1. HVAC layout does not match plans. FBC [A]107.4 2. Missing gaskets on boots/registers. FBC EC TABLE R402.4.1.1 3. 5FT head. FBCR P2503.7 4. Kitchen island outlets need to be facing out to sides. 5. Missing anchors in two front windows and pool bath door.
ALL ROUGH 11/20/2024 Disapproved - NO FEE PKNAPIK
Note: 11/20/2024 1. HVAC layout does not match plans. FBC [A]107.4 2. Missing gaskets on boots/registers. FBC EC TABLE R402.4.1.1 3. 5FT head. FBCR P2503.7 4. Kitchen island outlets need to be facing out to sides. 5. Missing anchors in two front windows and pool bath door.
ROOF VALLEY & METAL 11/08/2024 APPROVED PKNAPIK
WALL SHEATHING 11/01/2024 APPROVED JSTEWART
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/22/2024 APPROVED PKNAPIK
Note: 10/18/2024 - PREVIOUS INSPECTION NOTES 10/18/2024 1. Truss package not at site. FBC [A]107.3.1
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/18/2024 Disapproved - NO FEE PKNAPIK
Note: 10/18/2024 1. Truss package not at site. FBC [A]107.3.1
TIE BEAM / LINTEL 08/29/2024 APPROVED RSIMS
Note: Inspector Notes from Inspection 2250 7/23/2024 - PREVIOUS INSPECTION NOTES 07-23-2024 1. Plans are not in order. Please organize. 2. Sheet 5/8 detail is blurry and unable to read. 3. Rebar not proper clearance. See highlighted area on drawings. 07-24-2024 Above issue has not been resolved. Sheet 5/8 detail is blurry and unable to read. Check at next inspection.
FOUND SURVEY APPROVED (OFFICE) 08/16/2024 APPROVED TBAKER
MONOLITHIC SLAB 07/24/2024 APPROVED - AS NOTED AGAETANO
Note: 7/23/2024 - PREVIOUS INSPECTION NOTES 07-23-2024 1. Plans are not in order. Please organize. 2. Sheet 5/8 detail is blurry and unable to read. 3. Rebar not proper clearance. See highlighted area on drawings. 07-24-2024 Above issue has not been resolved. Sheet 5/8 detail is blurry and unable to read. Check at next inspection.
MONOLITHIC SLAB 07/23/2024 Disapproved - NO FEE AGAETANO
Note: 07-23-2024 1. Plans are not in order. Please organize. 2. Sheet 5/8 detail is blurry and unable to read. 3. Rebar not proper clearance. See highlighted area on drawings.
PLUMBING 1ST ROUGH UNDERGROUND 07/19/2024 APPROVED MGIBSON
Note: 7/17/2024 - PREVIOUS INSPECTION NOTES FBC 3307.1 PROTECTION OF PROPERTY, MUST HAVE SILT FENCE INSTALLED BEFORE SLAB INSPECTION IS SCHEDUALED, FBC{A} NEED STAMPED APPROVED SET OF PLANS ON SITE FOR INSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 07/17/2024 Disapproved -FEE REQUIRED MGIBSON
Note: FBC 3307.1 PROTECTION OF PROPERTY, MUST HAVE SILT FENCE INSTALLED BEFORE SLAB INSPECTION IS SCHEDUALED, FBC{A} NEED STAMPED APPROVED SET OF PLANS ON SITE FOR INSPECTION
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 07/16/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 07/08/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 11/25/2024 12/02/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 11/13/2024 11/19/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 11/05/2024 11/05/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/15/2024 08/16/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/15/2024 08/15/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD CANCEL 08/09/2024 08/15/2024
ZON HOLD 08/09/2024 08/09/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Foundation survey missing the setback from the front entry to the front property line
ENGIN1 COMPLETE 08/09/2024 08/09/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 08/05/2024 08/05/2024
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please provide the setback from porch to property line
BADMIN INFORMATION 08/01/2024 08/01/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM If this is a foundation survey for review by the zoning and engineering departments, please rename your file to foundation survey and upload under foundation survey. (this is not a foundation plan)
ENGIN1 COMPLETE 07/31/2024 07/31/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 07/31/2024 08/01/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 07/10/2024 07/16/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 07/09/2024 07/09/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please name your file correctly. Also, be sure to upload to the correct document type (geo tech report or geo tech certification)
BADMIN INFORMATION 06/24/2024 06/24/2024
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM NOC needs to be notarized and signed by Homeowner.
ZON COMPLETE 06/18/2024 06/18/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Repeat comment: Top band on left side must wrap the corner
BLD COMPLETE 06/14/2024 06/14/2024
Note: Released By: JPI
BLD HOLD 06/13/2024 06/13/2024
Note: Held By: JPI 1. Product approval number is missing for the Plastpro door. Please cure. 107.2.4
ZON HOLD 06/06/2024 06/06/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Repeat comment: Top band on left side must wrap the corner
ELEC COMPLETE 06/06/2024 06/11/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Range outlet needs to be GFCI protected. NEC 2020 210.8
BLD HOLD 06/06/2024 06/07/2024
Note: Held By: JPI 1. Based on a DBPR inquiry, products 12197 (should this be 2197?), 17987 (should this be 7987), FLi58 (we think this should be FL158) are recently expired products on the DBPR website. Please delete from the project approval table and/or provide a substitute. 107.2.4
BADMIN COMPLETE 05/29/2024 06/06/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 05/29/2024 06/05/2024
Note: Held By: JPI 1. Based on a DBPR inquiry, products 15322, 38740, and 5638 are recently expired products on the DBPR website. Please delete from the project approval table and/or provide a substitute. 107.2.4
CUSVC COMPLETE 05/29/2024 05/31/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 05/29/2024 06/04/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Range outlet needs to be GFCI protected. NEC 2020 210.8
ENGIN1 COMPLETE 05/29/2024 05/29/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 05/29/2024 06/04/2024
LOCATE COMPLETE 05/29/2024 05/31/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 05/29/2024 06/04/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 05/29/2024 05/29/2024
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
ZON HOLD 05/29/2024 05/29/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Incorrect lot square footage of lot on site plan/survey Top band on left side must wrap the corner This house backs to a golf course so additional plantings required along the rear foundation
SWALE COMPLETE 05/29/2024 09/25/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 05/02/2025
REINSPECTION RESIDENTIAL ¤40.00 05/02/2025
REINSPECTION RESIDENTIAL ¤40.00 05/02/2025
REINSPECTION RESIDENTIAL ¤40.00 05/02/2025
CONNECTION FEES ¤1,187.26 06/20/2024
FC IMPACT FEE EMS ¤62.00 06/20/2024
IMPACT FEE FIRE ¤428.09 06/20/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/20/2024
FC IMPACT FEE LIBRARY ¤268.00 06/20/2024
IMPACT FEE PARKS ¤1,800.99 06/20/2024
IMPACT FEE SCHOOL ¤5,450.00 06/20/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 06/20/2024
WATER -IRRIGATION INSPECTION ¤25.00 06/20/2024
SURCHARGE FS 533.721 ¤15.04 06/20/2024
SURCHARGE - FS 468.631 ¤22.56 06/20/2024
SW ENG - FOUNDATION SURVEY ¤20.00 06/20/2024
SW ENG INSPECTION 80 ¤80.00 06/20/2024
SW ENG PRE APRON ¤30.00 06/20/2024
SW ENG - REVIEW 20 ¤20.00 06/20/2024
SW ENG RES REVIEW 200 ¤200.00 06/20/2024
SEWER CREDIT (¤1,771.00) 06/20/2024
SEWER INSPECTION ¤25.00 06/20/2024
SEWER CAPITAL FACILITY ¤6,120.52 06/20/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 06/20/2024
SITE PLAN 30 ¤30.00 06/20/2024
WATER- TURN ON ¤25.00 06/20/2024
ADJUSTMENT 10% (¤167.15) 06/20/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/20/2024
INSPECTION - RESIDENTIAL ¤1,278.75 06/20/2024
PLAN REVIEW - RESIDENTIAL ¤362.70 06/20/2024
Fees Total Due: ¤0.00 Total Paid: ¤22,133.90