I want to search for...
Permit #2024051502
Permit Details
Status: INSPECT
| Parcel Id: 05-12-31-0650-000A0-0013 |
| Block: 000A0 |
| Subdivision: 650 - |
| Job Phone: 706-678-2890 |
| Location Address: 746 TOWN CENTER BLVD |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 08/16/2024 |
| NOC: Unknown |
| Applicant name: KARL CHRISTOPHER BERG JR |
| Owner: HP-232090 PALM COAST QOZB LLC |
|
Address 101 S NEW YORK AVENUE WINTER PARK, FL 32789 |
|
Address SUITE 211 WINTER PARK, FL 32789 |
| Lot: 0013 |
| Job Description: MASTER SITE WORK: POINTE GRAND AT TOWN CENTER |
| Type: CN |
Contractor
BARNETT CONTRACTING, INC.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 627 WASHINGTON, GA 30673 |
CUC1223712 (Exp: 08/31/2026) | 706-678-2890 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-ROW FINAL | 06/16/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: traffic stripping needs to be corrected along Town Center Blvd now that there are entrances off TC BLVD.(and thermoed) | |||
| FDEP WATERMAIN CLEARANCE | 05/20/2026 | APPROVED | BWRIGHT |
| POTABLE WATERMAIN FLUSHED AND CHLORINATED | 05/20/2026 | APPROVED | BWRIGHT |
| POTABLE WATERMAIN BACTERIOLOGICAL SAMPLING | 05/20/2026 | APPROVED | BWRIGHT |
| WATERMAIN FLUSH & PRESSURE TESTED | 05/20/2026 | APPROVED | BWRIGHT |
| UROW-SUBSTANTIAL WALK-THRU | 05/20/2026 | CANCELLED BY APPLICANT | BWRIGHT |
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 05/20/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 4/13/2026 - PREVIOUS INSPECTION NOTES 3/19/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9114 all was installed before i was to now check and verify no constructed ponds-existing water body aprox 50-60% of sidewalks installed-some turn down and others regular 5ft 3/6/2026 - PREVIOUS INSPECTION NOTES 03-06-26 TPOLACEK*** PARTIALY APPROVING POUR FOR CONCRETE CURBING AT THE NORTH ENTRANCE ON TOWN CENTER BLVD some small sections at south side of project SO NO CONTACT OR SCHEDULING FOR REPLACING MISC SIEWALK PANELS DAMAGED DURING CONSTRUCTION ALONG CITY row/town center blvd-AS SUCH NO SIDEWALK CLOSED SIGNAGE OR TEMP ACCESS PROVIDED SINCE THIS IS ONLY SIDEWALK TO AND FRO-SO TODAY 2 ELDERLY(70YEAR OLDS PLUS) RODE THEIR BIKES THRU THE WORK AREA THAT HAD NOTHING TO INDICATE A WORK ZONE(CONES,CAUTION TAPE ETC-WHICH WAS INSTALLED AFTER THIS INCIDENT) RODE THRU WET CONCRETE AND THE WOMAN FELL OVER IN THE WET CONCRETE LANDING ON HER LEFT SIDE POSSIBLY LANDING ON FORM BOARDS BUT NOT THE REBAR THAT IS USED TO SHORE UP THE FORM BOARDS-COOPER WAS INFORMED OF HIS AND HIS COMPANY RESPONSIBILITY TO THIS COUPLE WITH REGARDS TO DAMAGE TO THEIR BIKES AND ANY PERSONAL INJURIES-I INFORMED MY STAFF-IRENE VIA LEFT MESSAGE WHICH WAS GIVEN TO TIM WISELY WHO INDICATED THAT I WAS HANDLING IT CORRECTLY THAT IT WAS BETWEEN THE GC AND THE AFFECTED COUPLE AND I INFORMED THIS COUPLE WITH GC PRESENT THAT IF THERE IS ANY PROBLEMS IN DEALING WITH THIS GC TO CONTACT ME SO WE CAN MAKE SURE THEY ARE ACCOMINDATED AS BEST ASI CAN HELP-THEY SENT ME PICS AND A TEXT OF WHAT HAPPENED WHICH IS IN A SUB FOLDER LABLED "SIDEWALK INCIDENT" IN MY PROJECT FOLDER -I NOW INFORMED THE GC-COOPER TO PLACE SIDEWALK CLOSED SIGNAGE AND CONSTRUCT TEMP ACCESS THRU THE GRASS ROW FOR ALL FUTURE SIDEWALK REPAIRS | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 05/20/2026 | APPROVED | BHAINES |
| U-GRAVITY SEWER INSTALL/TESTING | 05/20/2026 | APPROVED | BHAINES |
| U-WATER MAIN DISINFECTION SAMPLING | 05/20/2026 | APPROVED | BHAINES |
| UC-SUBSTANTIAL WALK-THRU | 05/20/2026 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: this is for Larry at end of all phases-i added U SUBSTANTIAL FOR bRICE TO ACKNOWLEDGE | |||
| UC-ASPHALT PRE PLACEMENT | 05/11/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 4/13/2026 - PREVIOUS INSPECTION NOTES 3/19/2026 - PREVIOUS INSPECTION NOTES 3/3/2026 - PREVIOUS INSPECTION NOTES north area(ph 1/3) -adding approx 1inchbase from all the traffic rutting up limerock base-wettting and rolling in main entarnce and all areas from entrance northward next small section south of previous asphalt placement(phase1) decel lane-twn ctr blvd and stage 4 and 5 | |||
| UC-ASPHALT PRE PLACEMENT | 04/13/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 3/19/2026 - PREVIOUS INSPECTION NOTES 3/3/2026 - PREVIOUS INSPECTION NOTES north area(ph 1/3) -adding approx 1inchbase from all the traffic rutting up limerock base-wettting and rolling in main entarnce and all areas from entrance northward next small section south of previous asphalt placement(phase1) | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 04/13/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 3/19/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9114 all was installed before i was to now check and verify no constructed ponds-existing water body aprox 50-60% of sidewalks installed-some turn down and others regular 5ft 3/6/2026 - PREVIOUS INSPECTION NOTES 03-06-26 TPOLACEK*** PARTIALY APPROVING POUR FOR CONCRETE CURBING AT THE NORTH ENTRANCE ON TOWN CENTER BLVD some small sections at south side of project | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 03/19/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9114 all was installed before i was to now check and verify no constructed ponds-existing water body aprox 50-60% of sidewalks installed-some turn down and others regular 5ft 3/6/2026 - PREVIOUS INSPECTION NOTES 03-06-26 TPOLACEK*** PARTIALY APPROVING POUR FOR CONCRETE CURBING AT THE NORTH ENTRANCE ON TOWN CENTER BLVD | |||
| UROW- CURBING & GUTTER | 03/19/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 3/9/2026 - PREVIOUS INSPECTION NOTES main entrance apron area-D AND F curbing about 70%curbing-F AND D curb throughout site | |||
| UROW-RETENT/DETENT STABILI | 03/19/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9114 all was installed before i was to now check and verify no constructed ponds-existing water body | |||
| UC-ASPHALT PRE PLACEMENT | 03/19/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 3/3/2026 - PREVIOUS INSPECTION NOTES north area(ph 1/3) -adding approx 1inchbase from all the traffic rutting up limerock base-wettting and rolling in main entarnce and all areas from entrance northward | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 03/19/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: all was installed before i was to now check and verify | |||
| UROW-RETENT/DETENT STABILI | 03/11/2026 | CANCELLED BY APPLICANT | WEB |
| UROW-RETENT/DETENT STABILI | 03/09/2026 | CANCELLED BY APPLICANT | WEB |
| UROW- CURBING & GUTTER | 03/09/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: main entrance apron area | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 03/06/2026 | PARTIALLY APPROVED | TPOLACEK |
| Note: 03-06-26 TPOLACEK*** PARTIALY APPROVING POUR FOR CONCRETE CURBING AT THE NORTH ENTRANCE ON TOWN CENTER BLVD | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 03/03/2026 | PARTIALLY APPROVED | JMYERS |
| Note: 3/3/26 SOME SILT FENCE NOT TRENCHED IN AND INLETS MISSING PROTECTION, PLEASE REPLACE. 6/11/2025 - PREVIOUS INSPECTION NOTES 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION IN ONE MONTH. | |||
| UC-ASPHALT PRE PLACEMENT | 03/03/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: north area(ph 1/3) -adding approx 1inch from all the traffic rutting up limerock base-wettting and rolling in | |||
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | 02/20/2026 | APPROVED | RMARTIN |
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 01/29/2026 | APPROVED | RMARTIN |
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 06/10/2025 | PARTIALLY APPROVED | JMYERS |
| Note: 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION IN ONE MONTH. | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 06/03/2025 | CANCELLED BY INSPECTOR | JMYERS |
| Note: 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 ALL EROSION CONTROL MEASURES AND INLET PROTECTIONS ARE INSTALLED AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH 4/2/2025 - PREVIOUS INSPECTION NOTES 4/2/25 ALL EROSION CONTROL MEASURES AND INLET PROTECTIONS ARE INSTALLED AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 A FEW PANELS OF SILT FENCE NEED REPAIR ALONG TOWN CENTER BLVD. FOLLOW UP INSPECTION IN ONE MONTH Inspector Notes from Inspection 9210 2/4/25 SILT FENCE NEEDED BY CANALS, OTHER INSTALLED SILT FENCE IN GOOD CONDITION. FOLLOW UP INSPECTION IN ONE MONTH | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 05/06/2025 | PARTIALLY APPROVED | JMYERS |
| Note: 5/6/25 ALL EROSION CONTROL MEASURES AND INLET PROTECTIONS ARE INSTALLED AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH 4/2/2025 - PREVIOUS INSPECTION NOTES 4/2/25 ALL EROSION CONTROL MEASURES AND INLET PROTECTIONS ARE INSTALLED AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 A FEW PANELS OF SILT FENCE NEED REPAIR ALONG TOWN CENTER BLVD. FOLLOW UP INSPECTION IN ONE MONTH Inspector Notes from Inspection 9210 2/4/25 SILT FENCE NEEDED BY CANALS, OTHER INSTALLED SILT FENCE IN GOOD CONDITION. FOLLOW UP INSPECTION IN ONE MONTH | |||
| UC-DRAINAGE STRUCT PLACMNT | 04/17/2025 | APPROVED | BWRIGHT |
| SEWER MAIN | 04/17/2025 | APPROVED | BWRIGHT |
| U-PUMP STATION PRE-INSTALLATION | 04/17/2025 | APPROVED | BWRIGHT |
| U-PUMP STATION START-UP | 04/17/2025 | APPROVED | BWRIGHT |
| UC-CONSTRUCTION ENTRANCE | 04/17/2025 | APPROVED | BWRIGHT |
| UC-MOT MAINTENANCE OF TRAFFIC | 04/17/2025 | APPROVED | BWRIGHT |
| U-REUSE MAIN INSTALL/TESTING | 04/17/2025 | APPROVED | BWRIGHT |
| U-SEWER FORCE MAIN INSTALL/TESTING | 04/17/2025 | APPROVED | BWRIGHT |
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 04/02/2025 | PARTIALLY APPROVED | JMYERS |
| Note: 4/2/25 ALL EROSION CONTROL MEASURES AND INLET PROTECTIONS ARE INSTALLED AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 A FEW PANELS OF SILT FENCE NEED REPAIR ALONG TOWN CENTER BLVD. FOLLOW UP INSPECTION IN ONE MONTH Inspector Notes from Inspection 9210 2/4/25 SILT FENCE NEEDED BY CANALS, OTHER INSTALLED SILT FENCE IN GOOD CONDITION. FOLLOW UP INSPECTION IN ONE MONTH | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 03/05/2025 | PARTIALLY APPROVED | JMYERS |
| Note: 3/5/25 A FEW PANELS OF SILT FENCE NEED REPAIR ALONG TOWN CENTER BLVD. FOLLOW UP INSPECTION IN ONE MONTH Inspector Notes from Inspection 9210 2/4/25 SILT FENCE NEEDED BY CANALS, OTHER INSTALLED SILT FENCE IN GOOD CONDITION. FOLLOW UP INSPECTION IN ONE MONTH | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 02/04/2025 | APPROVED - AS NOTED | JMYERS |
| Note: 2/4/25 SILT FENCE NEEDED BY CANALS, OTHER INSTALLED SILT FENCE IN GOOD CONDITION. FOLLOW UP INSPECTION IN ONE MONTH | |||
| PLAN - PRE-CON 386-986-3750 | 08/19/2024 | APPROVED | BWRIGHT |
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | |||
| IRRIGATION AFFIDAVIT | |||
| LDSC-IRRIGATION FINAL | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | |||
| LDSC- LANDSCAPE FINAL | |||
| BLD - SITE LIGHTING-POLE SET/FIXTURE | |||
| MAINT BOND ACCEPTANCE (OFFICE) | |||
| CLOSE OUT DOCUMENTS | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | |||
| BLD- ADA PARKING | |||
| BLD- ADA SIGNAGECONTROL | |||
| BLD- ADA SIGNAGECONTROL | |||
| BLD- ADA VEHICULAR WAY | |||
| PROJECT CLOSE OUT MEETING (386-986-3750) | |||
| UC-ASPHALT PRE PLACEMENT | |||
| Note: 5/13/2026 - PREVIOUS INSPECTION NOTES 4/13/2026 - PREVIOUS INSPECTION NOTES 3/19/2026 - PREVIOUS INSPECTION NOTES 3/3/2026 - PREVIOUS INSPECTION NOTES north area(ph 1/3) -adding approx 1inchbase from all the traffic rutting up limerock base-wettting and rolling in main entarnce and all areas from entrance northward next small section south of previous asphalt placement(phase1) decel lane-twn ctr blvd and stage 4 and 5 | |||
| UC-SUBSTANTIAL WALK-THRU | |||
| Note: 5/20/2026 - PREVIOUS INSPECTION NOTES this is for Larry at end of all phases-i added U SUBSTANTIAL FOR bRICE TO ACKNOWLEDGE | |||
| UC- PRELIMINARY AS-BUILTS | |||
| UC-FINAL SITE INSPECTION | |||
| U - UTILITY COMMERCIAL FINAL | |||
| UROW-SUBSTANTIAL WALK-THRU | |||
| Note: 5/20/2026 - PREVIOUS INSPECTION NOTES | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | |||
| Note: 3/3/2026 2:33:38 PM- PREVIOUS INSPECTION NOTES 3/3/26 SOME SILT FENCE NOT TRENCHED IN AND INLETS MISSING PROTECTION, PLEASE REPLACE. 6/11/2025 - PREVIOUS INSPECTION NOTES 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION IN ONE MONTH. | |||
| ROW -TURBIDITY BARRER | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | |||
| Note: 5/20/2026 - PREVIOUS INSPECTION NOTES 4/13/2026 - PREVIOUS INSPECTION NOTES 3/19/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9114 all was installed before i was to now check and verify no constructed ponds-existing water body aprox 50-60% of sidewalks installed-some turn down and others regular 5ft 3/6/2026 - PREVIOUS INSPECTION NOTES 03-06-26 TPOLACEK*** PARTIALY APPROVING POUR FOR CONCRETE CURBING AT THE NORTH ENTRANCE ON TOWN CENTER BLVD some small sections at south side of project SO NO CONTACT OR SCHEDULING FOR REPLACING MISC SIEWALK PANELS DAMAGED DURING CONSTRUCTION ALONG CITY row/town center blvd-AS SUCH NO SIDEWALK CLOSED SIGNAGE OR TEMP ACCESS PROVIDED SINCE THIS IS ONLY SIDEWALK TO AND FRO-SO TODAY 2 ELDERLY(70YEAR OLDS PLUS) RODE THEIR BIKES THRU THE WORK AREA THAT HAD NOTHING TO INDICATE A WORK ZONE(CONES,CAUTION TAPE ETC-WHICH WAS INSTALLED AFTER THIS INCIDENT) RODE THRU WET CONCRETE AND THE WOMAN FELL OVER IN THE WET CONCRETE LANDING ON HER LEFT SIDE POSSIBLY LANDING ON FORM BOARDS BUT NOT THE REBAR THAT IS USED TO SHORE UP THE FORM BOARDS-COOPER WAS INFORMED OF HIS AND HIS COMPANY RESPONSIBILITY TO THIS COUPLE WITH REGARDS TO DAMAGE TO THEIR BIKES AND ANY PERSONAL INJURIES-I INFORMED MY STAFF-IRENE VIA LEFT MESSAGE WHICH WAS GIVEN TO TIM WISELY WHO INDICATED THAT I WAS HANDLING IT CORRECTLY THAT IT WAS BETWEEN THE GC AND THE AFFECTED COUPLE AND I INFORMED THIS COUPLE WITH GC PRESENT THAT IF THERE IS ANY PROBLEMS IN DEALING WITH THIS GC TO CONTACT ME SO WE CAN MAKE SURE THEY ARE ACCOMINDATED AS BEST ASI CAN HELP-THEY SENT ME PICS AND A TEXT OF WHAT HAPPENED WHICH IS IN A SUB FOLDER LABLED "SIDEWALK INCIDENT" IN MY PROJECT FOLDER -I NOW INFORMED THE GC-COOPER TO PLACE SIDEWALK CLOSED SIGNAGE AND CONSTRUCT TEMP ACCESS THRU THE GRASS ROW FOR ALL FUTURE SIDEWALK REPAIRS | |||
| AS-BUILT- WATERMAIN | |||
| FIRE HYDRANT LOCATION AND FLOW TEST | |||
| UROW- CURBING & GUTTER | |||
| Note: 3/19/2026 - PREVIOUS INSPECTION NOTES 3/9/2026 - PREVIOUS INSPECTION NOTES main entrance apron area-D AND F curbing about 70%curbing-F AND D curb throughout site | |||
| UROW - FINAL DRAINAGE | |||
| U-ROW FINAL | |||
| Note: 6/16/2026 - PREVIOUS INSPECTION NOTES traffic stripping needs to be corrected along Town Center Blvd now that there are entrances off TC BLVD.(and thermoed) | |||
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 05/30/2024 | 06/04/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/30/2024 | 06/03/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 05/30/2024 | 05/30/2024 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| PLLA | COMPLETE | 05/30/2024 | 05/30/2024 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 05/30/2024 | 05/30/2024 |
| Note: Released By: GREG DEGLER - - GDEGLER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤12.50) | 08/16/2024 |
| ADMINISTRATIVE- SITE DEVELOP | ¤125.00 | 08/16/2024 |
| SITE PLAN 30 | ¤30.00 | 08/16/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤142.50 |