I want to search for...

Permit #2024051502

Permit Details

Status: INSPECT

Parcel Id: 05-12-31-0650-000A0-0013
Block: 000A0
Subdivision: 650 -
Job Phone: 706-678-2890
Location Address: 746 TOWN CENTER BLVD
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 08/16/2024
NOC: Unknown
Applicant name: KARL CHRISTOPHER BERG JR
Owner: HP-232090 PALM COAST QOZB LLC

Address

101 S NEW YORK AVENUE

WINTER PARK, FL 32789

Address

SUITE 211

WINTER PARK, FL 32789

Lot: 0013
Job Description: MASTER SITE WORK: POINTE GRAND AT TOWN CENTER
Type: CN

Contractor

BARNETT CONTRACTING, INC.
Status Location Address State License Number Phone
ACTIVE

PO BOX 627

WASHINGTON, GA 30673

CUC1223712 (Exp: 08/31/2026) 706-678-2890

Inspection History

Type Request Date Result Inspector
U-ROW FINAL 06/16/2026 PARTIALLY APPROVED LFITZGERALD
Note: traffic stripping needs to be corrected along Town Center Blvd now that there are entrances off TC BLVD.(and thermoed)
FDEP WATERMAIN CLEARANCE 05/20/2026 APPROVED BWRIGHT
POTABLE WATERMAIN FLUSHED AND CHLORINATED 05/20/2026 APPROVED BWRIGHT
POTABLE WATERMAIN BACTERIOLOGICAL SAMPLING 05/20/2026 APPROVED BWRIGHT
WATERMAIN FLUSH & PRESSURE TESTED 05/20/2026 APPROVED BWRIGHT
UROW-SUBSTANTIAL WALK-THRU 05/20/2026 CANCELLED BY APPLICANT BWRIGHT
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 05/20/2026 PARTIALLY APPROVED LFITZGERALD
Note: 4/13/2026 - PREVIOUS INSPECTION NOTES 3/19/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9114 all was installed before i was to now check and verify no constructed ponds-existing water body aprox 50-60% of sidewalks installed-some turn down and others regular 5ft 3/6/2026 - PREVIOUS INSPECTION NOTES 03-06-26 TPOLACEK*** PARTIALY APPROVING POUR FOR CONCRETE CURBING AT THE NORTH ENTRANCE ON TOWN CENTER BLVD some small sections at south side of project SO NO CONTACT OR SCHEDULING FOR REPLACING MISC SIEWALK PANELS DAMAGED DURING CONSTRUCTION ALONG CITY row/town center blvd-AS SUCH NO SIDEWALK CLOSED SIGNAGE OR TEMP ACCESS PROVIDED SINCE THIS IS ONLY SIDEWALK TO AND FRO-SO TODAY 2 ELDERLY(70YEAR OLDS PLUS) RODE THEIR BIKES THRU THE WORK AREA THAT HAD NOTHING TO INDICATE A WORK ZONE(CONES,CAUTION TAPE ETC-WHICH WAS INSTALLED AFTER THIS INCIDENT) RODE THRU WET CONCRETE AND THE WOMAN FELL OVER IN THE WET CONCRETE LANDING ON HER LEFT SIDE POSSIBLY LANDING ON FORM BOARDS BUT NOT THE REBAR THAT IS USED TO SHORE UP THE FORM BOARDS-COOPER WAS INFORMED OF HIS AND HIS COMPANY RESPONSIBILITY TO THIS COUPLE WITH REGARDS TO DAMAGE TO THEIR BIKES AND ANY PERSONAL INJURIES-I INFORMED MY STAFF-IRENE VIA LEFT MESSAGE WHICH WAS GIVEN TO TIM WISELY WHO INDICATED THAT I WAS HANDLING IT CORRECTLY THAT IT WAS BETWEEN THE GC AND THE AFFECTED COUPLE AND I INFORMED THIS COUPLE WITH GC PRESENT THAT IF THERE IS ANY PROBLEMS IN DEALING WITH THIS GC TO CONTACT ME SO WE CAN MAKE SURE THEY ARE ACCOMINDATED AS BEST ASI CAN HELP-THEY SENT ME PICS AND A TEXT OF WHAT HAPPENED WHICH IS IN A SUB FOLDER LABLED "SIDEWALK INCIDENT" IN MY PROJECT FOLDER -I NOW INFORMED THE GC-COOPER TO PLACE SIDEWALK CLOSED SIGNAGE AND CONSTRUCT TEMP ACCESS THRU THE GRASS ROW FOR ALL FUTURE SIDEWALK REPAIRS
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 05/20/2026 APPROVED BHAINES
U-GRAVITY SEWER INSTALL/TESTING 05/20/2026 APPROVED BHAINES
U-WATER MAIN DISINFECTION SAMPLING 05/20/2026 APPROVED BHAINES
UC-SUBSTANTIAL WALK-THRU 05/20/2026 CANCELLED BY APPLICANT LFITZGERALD
Note: this is for Larry at end of all phases-i added U SUBSTANTIAL FOR bRICE TO ACKNOWLEDGE
UC-ASPHALT PRE PLACEMENT 05/11/2026 PARTIALLY APPROVED LFITZGERALD
Note: 4/13/2026 - PREVIOUS INSPECTION NOTES 3/19/2026 - PREVIOUS INSPECTION NOTES 3/3/2026 - PREVIOUS INSPECTION NOTES north area(ph 1/3) -adding approx 1inchbase from all the traffic rutting up limerock base-wettting and rolling in main entarnce and all areas from entrance northward next small section south of previous asphalt placement(phase1) decel lane-twn ctr blvd and stage 4 and 5
UC-ASPHALT PRE PLACEMENT 04/13/2026 PARTIALLY APPROVED LFITZGERALD
Note: 3/19/2026 - PREVIOUS INSPECTION NOTES 3/3/2026 - PREVIOUS INSPECTION NOTES north area(ph 1/3) -adding approx 1inchbase from all the traffic rutting up limerock base-wettting and rolling in main entarnce and all areas from entrance northward next small section south of previous asphalt placement(phase1)
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 04/13/2026 PARTIALLY APPROVED LFITZGERALD
Note: 3/19/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9114 all was installed before i was to now check and verify no constructed ponds-existing water body aprox 50-60% of sidewalks installed-some turn down and others regular 5ft 3/6/2026 - PREVIOUS INSPECTION NOTES 03-06-26 TPOLACEK*** PARTIALY APPROVING POUR FOR CONCRETE CURBING AT THE NORTH ENTRANCE ON TOWN CENTER BLVD some small sections at south side of project
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 03/19/2026 PARTIALLY APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9114 all was installed before i was to now check and verify no constructed ponds-existing water body aprox 50-60% of sidewalks installed-some turn down and others regular 5ft 3/6/2026 - PREVIOUS INSPECTION NOTES 03-06-26 TPOLACEK*** PARTIALY APPROVING POUR FOR CONCRETE CURBING AT THE NORTH ENTRANCE ON TOWN CENTER BLVD
UROW- CURBING & GUTTER 03/19/2026 PARTIALLY APPROVED LFITZGERALD
Note: 3/9/2026 - PREVIOUS INSPECTION NOTES main entrance apron area-D AND F curbing about 70%curbing-F AND D curb throughout site
UROW-RETENT/DETENT STABILI 03/19/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9114 all was installed before i was to now check and verify no constructed ponds-existing water body
UC-ASPHALT PRE PLACEMENT 03/19/2026 PARTIALLY APPROVED LFITZGERALD
Note: 3/3/2026 - PREVIOUS INSPECTION NOTES north area(ph 1/3) -adding approx 1inchbase from all the traffic rutting up limerock base-wettting and rolling in main entarnce and all areas from entrance northward
UC-DRAINAGE PIPE PLACEMENT/LAMPING 03/19/2026 APPROVED - AS NOTED LFITZGERALD
Note: all was installed before i was to now check and verify
UROW-RETENT/DETENT STABILI 03/11/2026 CANCELLED BY APPLICANT WEB
UROW-RETENT/DETENT STABILI 03/09/2026 CANCELLED BY APPLICANT WEB
UROW- CURBING & GUTTER 03/09/2026 PARTIALLY APPROVED LFITZGERALD
Note: main entrance apron area
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 03/06/2026 PARTIALLY APPROVED TPOLACEK
Note: 03-06-26 TPOLACEK*** PARTIALY APPROVING POUR FOR CONCRETE CURBING AT THE NORTH ENTRANCE ON TOWN CENTER BLVD
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 03/03/2026 PARTIALLY APPROVED JMYERS
Note: 3/3/26 SOME SILT FENCE NOT TRENCHED IN AND INLETS MISSING PROTECTION, PLEASE REPLACE. 6/11/2025 - PREVIOUS INSPECTION NOTES 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION IN ONE MONTH.
UC-ASPHALT PRE PLACEMENT 03/03/2026 PARTIALLY APPROVED LFITZGERALD
Note: north area(ph 1/3) -adding approx 1inch from all the traffic rutting up limerock base-wettting and rolling in
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION 02/20/2026 APPROVED RMARTIN
BLD - UNDERGROUND SITE LIGHTING CONDUITS 01/29/2026 APPROVED RMARTIN
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 06/10/2025 PARTIALLY APPROVED JMYERS
Note: 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION IN ONE MONTH.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 06/03/2025 CANCELLED BY INSPECTOR JMYERS
Note: 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 ALL EROSION CONTROL MEASURES AND INLET PROTECTIONS ARE INSTALLED AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH 4/2/2025 - PREVIOUS INSPECTION NOTES 4/2/25 ALL EROSION CONTROL MEASURES AND INLET PROTECTIONS ARE INSTALLED AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 A FEW PANELS OF SILT FENCE NEED REPAIR ALONG TOWN CENTER BLVD. FOLLOW UP INSPECTION IN ONE MONTH Inspector Notes from Inspection 9210 2/4/25 SILT FENCE NEEDED BY CANALS, OTHER INSTALLED SILT FENCE IN GOOD CONDITION. FOLLOW UP INSPECTION IN ONE MONTH
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 05/06/2025 PARTIALLY APPROVED JMYERS
Note: 5/6/25 ALL EROSION CONTROL MEASURES AND INLET PROTECTIONS ARE INSTALLED AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH 4/2/2025 - PREVIOUS INSPECTION NOTES 4/2/25 ALL EROSION CONTROL MEASURES AND INLET PROTECTIONS ARE INSTALLED AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 A FEW PANELS OF SILT FENCE NEED REPAIR ALONG TOWN CENTER BLVD. FOLLOW UP INSPECTION IN ONE MONTH Inspector Notes from Inspection 9210 2/4/25 SILT FENCE NEEDED BY CANALS, OTHER INSTALLED SILT FENCE IN GOOD CONDITION. FOLLOW UP INSPECTION IN ONE MONTH
UC-DRAINAGE STRUCT PLACMNT 04/17/2025 APPROVED BWRIGHT
SEWER MAIN 04/17/2025 APPROVED BWRIGHT
U-PUMP STATION PRE-INSTALLATION 04/17/2025 APPROVED BWRIGHT
U-PUMP STATION START-UP 04/17/2025 APPROVED BWRIGHT
UC-CONSTRUCTION ENTRANCE 04/17/2025 APPROVED BWRIGHT
UC-MOT MAINTENANCE OF TRAFFIC 04/17/2025 APPROVED BWRIGHT
U-REUSE MAIN INSTALL/TESTING 04/17/2025 APPROVED BWRIGHT
U-SEWER FORCE MAIN INSTALL/TESTING 04/17/2025 APPROVED BWRIGHT
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 04/02/2025 PARTIALLY APPROVED JMYERS
Note: 4/2/25 ALL EROSION CONTROL MEASURES AND INLET PROTECTIONS ARE INSTALLED AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 A FEW PANELS OF SILT FENCE NEED REPAIR ALONG TOWN CENTER BLVD. FOLLOW UP INSPECTION IN ONE MONTH Inspector Notes from Inspection 9210 2/4/25 SILT FENCE NEEDED BY CANALS, OTHER INSTALLED SILT FENCE IN GOOD CONDITION. FOLLOW UP INSPECTION IN ONE MONTH
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 03/05/2025 PARTIALLY APPROVED JMYERS
Note: 3/5/25 A FEW PANELS OF SILT FENCE NEED REPAIR ALONG TOWN CENTER BLVD. FOLLOW UP INSPECTION IN ONE MONTH Inspector Notes from Inspection 9210 2/4/25 SILT FENCE NEEDED BY CANALS, OTHER INSTALLED SILT FENCE IN GOOD CONDITION. FOLLOW UP INSPECTION IN ONE MONTH
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/04/2025 APPROVED - AS NOTED JMYERS
Note: 2/4/25 SILT FENCE NEEDED BY CANALS, OTHER INSTALLED SILT FENCE IN GOOD CONDITION. FOLLOW UP INSPECTION IN ONE MONTH
PLAN - PRE-CON 386-986-3750 08/19/2024 APPROVED BWRIGHT
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY
IRRIGATION AFFIDAVIT
LDSC-IRRIGATION FINAL
LDSC- LANDSCAPE / IRRIGATION AS-BUILT
LDSC- LANDSCAPE FINAL
BLD - SITE LIGHTING-POLE SET/FIXTURE
MAINT BOND ACCEPTANCE (OFFICE)
CLOSE OUT DOCUMENTS
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS
BLD- ADA PARKING
BLD- ADA SIGNAGECONTROL
BLD- ADA SIGNAGECONTROL
BLD- ADA VEHICULAR WAY
PROJECT CLOSE OUT MEETING (386-986-3750)
UC-ASPHALT PRE PLACEMENT
Note: 5/13/2026 - PREVIOUS INSPECTION NOTES 4/13/2026 - PREVIOUS INSPECTION NOTES 3/19/2026 - PREVIOUS INSPECTION NOTES 3/3/2026 - PREVIOUS INSPECTION NOTES north area(ph 1/3) -adding approx 1inchbase from all the traffic rutting up limerock base-wettting and rolling in main entarnce and all areas from entrance northward next small section south of previous asphalt placement(phase1) decel lane-twn ctr blvd and stage 4 and 5
UC-SUBSTANTIAL WALK-THRU
Note: 5/20/2026 - PREVIOUS INSPECTION NOTES this is for Larry at end of all phases-i added U SUBSTANTIAL FOR bRICE TO ACKNOWLEDGE
UC- PRELIMINARY AS-BUILTS
UC-FINAL SITE INSPECTION
U - UTILITY COMMERCIAL FINAL
UROW-SUBSTANTIAL WALK-THRU
Note: 5/20/2026 - PREVIOUS INSPECTION NOTES
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE
Note: 3/3/2026 2:33:38 PM- PREVIOUS INSPECTION NOTES 3/3/26 SOME SILT FENCE NOT TRENCHED IN AND INLETS MISSING PROTECTION, PLEASE REPLACE. 6/11/2025 - PREVIOUS INSPECTION NOTES 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION IN ONE MONTH.
ROW -TURBIDITY BARRER
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL)
Note: 5/20/2026 - PREVIOUS INSPECTION NOTES 4/13/2026 - PREVIOUS INSPECTION NOTES 3/19/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9114 all was installed before i was to now check and verify no constructed ponds-existing water body aprox 50-60% of sidewalks installed-some turn down and others regular 5ft 3/6/2026 - PREVIOUS INSPECTION NOTES 03-06-26 TPOLACEK*** PARTIALY APPROVING POUR FOR CONCRETE CURBING AT THE NORTH ENTRANCE ON TOWN CENTER BLVD some small sections at south side of project SO NO CONTACT OR SCHEDULING FOR REPLACING MISC SIEWALK PANELS DAMAGED DURING CONSTRUCTION ALONG CITY row/town center blvd-AS SUCH NO SIDEWALK CLOSED SIGNAGE OR TEMP ACCESS PROVIDED SINCE THIS IS ONLY SIDEWALK TO AND FRO-SO TODAY 2 ELDERLY(70YEAR OLDS PLUS) RODE THEIR BIKES THRU THE WORK AREA THAT HAD NOTHING TO INDICATE A WORK ZONE(CONES,CAUTION TAPE ETC-WHICH WAS INSTALLED AFTER THIS INCIDENT) RODE THRU WET CONCRETE AND THE WOMAN FELL OVER IN THE WET CONCRETE LANDING ON HER LEFT SIDE POSSIBLY LANDING ON FORM BOARDS BUT NOT THE REBAR THAT IS USED TO SHORE UP THE FORM BOARDS-COOPER WAS INFORMED OF HIS AND HIS COMPANY RESPONSIBILITY TO THIS COUPLE WITH REGARDS TO DAMAGE TO THEIR BIKES AND ANY PERSONAL INJURIES-I INFORMED MY STAFF-IRENE VIA LEFT MESSAGE WHICH WAS GIVEN TO TIM WISELY WHO INDICATED THAT I WAS HANDLING IT CORRECTLY THAT IT WAS BETWEEN THE GC AND THE AFFECTED COUPLE AND I INFORMED THIS COUPLE WITH GC PRESENT THAT IF THERE IS ANY PROBLEMS IN DEALING WITH THIS GC TO CONTACT ME SO WE CAN MAKE SURE THEY ARE ACCOMINDATED AS BEST ASI CAN HELP-THEY SENT ME PICS AND A TEXT OF WHAT HAPPENED WHICH IS IN A SUB FOLDER LABLED "SIDEWALK INCIDENT" IN MY PROJECT FOLDER -I NOW INFORMED THE GC-COOPER TO PLACE SIDEWALK CLOSED SIGNAGE AND CONSTRUCT TEMP ACCESS THRU THE GRASS ROW FOR ALL FUTURE SIDEWALK REPAIRS
AS-BUILT- WATERMAIN
FIRE HYDRANT LOCATION AND FLOW TEST
UROW- CURBING & GUTTER
Note: 3/19/2026 - PREVIOUS INSPECTION NOTES 3/9/2026 - PREVIOUS INSPECTION NOTES main entrance apron area-D AND F curbing about 70%curbing-F AND D curb throughout site
UROW - FINAL DRAINAGE
U-ROW FINAL
Note: 6/16/2026 - PREVIOUS INSPECTION NOTES traffic stripping needs to be corrected along Town Center Blvd now that there are entrances off TC BLVD.(and thermoed)
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING)

Review History

Department Status Date In Date Out
BLD COMPLETE 05/30/2024 06/04/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 05/30/2024 06/03/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 05/30/2024 05/30/2024
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLLA COMPLETE 05/30/2024 05/30/2024
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
UD1 COMPLETE 05/30/2024 05/30/2024
Note: Released By: GREG DEGLER - - GDEGLER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤12.50) 08/16/2024
ADMINISTRATIVE- SITE DEVELOP ¤125.00 08/16/2024
SITE PLAN 30 ¤30.00 08/16/2024
Fees Total Due: ¤0.00 Total Paid: ¤142.50