Permit #2024060081

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00170-0010
CONDITIONED SPACE: 1574 sqft
GARAGE: 402 sqft
OPENED PORCH (WITH ROOF) : 33 sqft
OPENED PORCH (WITH ROOF) : 62 sqft
Total Square Footage: 2071 sqft
Block: 00170
Subdivision: -
Job Phone: 904-531-5923
Location Address: 164 ULATURN TRL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/21/2024
NOC: RECORDED
Applicant name: TAVARIS JEROME DAVIS
Owner: BRIGHTLAND HOMES OF FLORIDA LLC

Address

15725 N DALLAS PARKWAY SUITE 300

ADDISON, TX 75001

Lot: 0010
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

BRIGHTLAND HOMES OF FLORIDA, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

3505 EAST FRONTAGE RD

ADDISON, TX 75001

STE 145

TAMPA, FL 33607

CBC1267320 (Exp: 08/31/2026) 904-531-5923

Sub Contractors

DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
OLIN MARSHALL CANNON
Status Location Address State License Number Phone
INACTIVE

1794 ROGERO RD #2

JACKSONVILLE, FL 32211

CFC1426140 (Exp: 08/31/2026) 904-343-4344
LARRY LAVON TURNAGE
Status Location Address State License Number Phone
CANCEL

531 CODISCO WAY

SANFORD, FL 32771

CMC1249777 (Exp: 08/31/2024) 407-333-2665

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/29/2025 Approval - Private Provider PPROVIDER
ROW - STORMWATER FINAL 03/25/2025 APPROVED FSLADISH
Note: 3/25/25 CORRECTION REQUIRED COMPLETED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________ 2/10/2025 - PREVIOUS INSPECTION NOTES 2/10/25 YOU WILL NEED TO REPAIR AND FILL IN AREA AROUND WATER METER. YOU WILL NEED TO PICK UP ALL TRASH AND DERIS ON SITE, IN SWALE, IN REAR OF PROPERTY LINE AND LEFT SIDE SLOPE BEFORE ROW FINAL PASSAGE. Trash in Vacant Sec 300.03 F4 Sec 300.03 F4 The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Inspector Notes from Inspection 9465 1/22/25 UPON WALKING PROPERTY DRAINAGE WILL WORK GENERALLY AS INDICATED ON FINAL SURVEY. THERE ARE A COUPLE LOW AREAS WHERE THE BERM HAS WASHED OUT A BIT DUE TO LAST NIGHTS RAIN THAT WILL NEED TO BE CORRECTED BERFORE ROW FINAL. SWALE IS FULL AT THE TIME OF THE INSPECTION, WILL NEED TO MAKE SURE IT PERCULATES AND DRAINS IN A TIMELY MANNER. ALL OTHER MINIMUM CITY REQUIREMENTS WERE MET AT THIS TIME. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE CORRECTIONS ARE MADE AND POSITIVE NON ADVERSE DRAINAGE IS ACHIEVED BEFORE ROW FINAL. APPROVING AS NOTED.
U -UTILITY RESIDENTIAL FINAL 03/25/2025 APPROVED BWRIGHT
ROW - FINAL APRON (AFTER POUR) 02/10/2025 APPROVED FSLADISH
Note: 2/10/25 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ___________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 1/22/25 UPON WALKING PROPERTY DRAINAGE WILL WORK GENERALLY AS INDICATED ON FINAL SURVEY. THERE ARE A COUPLE LOW AREAS WHERE THE BERM HAS WASHED OUT A BIT DUE TO LAST NIGHTS RAIN THAT WILL NEED TO BE CORRECTED BERFORE ROW FINAL. SWALE IS FULL AT THE TIME OF THE INSPECTION, WILL NEED TO MAKE SURE IT PERCULATES AND DRAINS IN A TIMELY MANNER. ALL OTHER MINIMUM CITY REQUIREMENTS WERE MET AT THIS TIME. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE CORRECTIONS ARE MADE AND POSITIVE NON ADVERSE DRAINAGE IS ACHIEVED BEFORE ROW FINAL. APPROVING AS NOTED.
U-CROSS CONNECTION 02/10/2025 APPROVED BWRIGHT
ROW - STORMWATER FINAL 02/10/2025 Disapproved - NO FEE FSLADISH
Note: 2/10/25 YOU WILL NEED TO REPAIR AND FILL IN AREA AROUND WATER METER. YOU WILL NEED TO PICK UP ALL TRASH AND DERIS ON SITE, IN SWALE, IN REAR OF PROPERTY LINE AND LEFT SIDE SLOPE BEFORE ROW FINAL PASSAGE. Trash in Vacant Sec 300.03 F4 Sec 300.03 F4 The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Inspector Notes from Inspection 9465 1/22/25 UPON WALKING PROPERTY DRAINAGE WILL WORK GENERALLY AS INDICATED ON FINAL SURVEY. THERE ARE A COUPLE LOW AREAS WHERE THE BERM HAS WASHED OUT A BIT DUE TO LAST NIGHTS RAIN THAT WILL NEED TO BE CORRECTED BERFORE ROW FINAL. SWALE IS FULL AT THE TIME OF THE INSPECTION, WILL NEED TO MAKE SURE IT PERCULATES AND DRAINS IN A TIMELY MANNER. ALL OTHER MINIMUM CITY REQUIREMENTS WERE MET AT THIS TIME. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE CORRECTIONS ARE MADE AND POSITIVE NON ADVERSE DRAINAGE IS ACHIEVED BEFORE ROW FINAL. APPROVING AS NOTED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/22/2025 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 01/22/2025 APPROVED - AS NOTED FSLADISH
Note: 1/22/25 UPON WALKING PROPERTY DRAINAGE WILL WORK GENERALLY AS INDICATED ON FINAL SURVEY. THERE ARE A COUPLE LOW AREAS WHERE THE BERM HAS WASHED OUT A BIT DUE TO LAST NIGHTS RAIN THAT WILL NEED TO BE CORRECTED BERFORE ROW FINAL. SWALE IS FULL AT THE TIME OF THE INSPECTION, WILL NEED TO MAKE SURE IT PERCULATES AND DRAINS IN A TIMELY MANNER. ALL OTHER MINIMUM CITY REQUIREMENTS WERE MET AT THIS TIME. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE CORRECTIONS ARE MADE AND POSITIVE NON ADVERSE DRAINAGE IS ACHIEVED BEFORE ROW FINAL. APPROVING AS NOTED.
GRAVITY SEWER TEST 12/27/2024 Approval - Private Provider PPROVIDER
Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 12/27/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 12/04/2024 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 12/03/2024 APPROVED FSLADISH
Note: 12/3/24 AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR.
INSULATION 10/28/2024 Approval - Private Provider PPROVIDER
Note: 10/23/2024 4:22:57 PM- PREVIOUS INSPECTION NOTES 10/21/2024 8:32:31 AM- PREVIOUS INSPECTION NOTES
INSULATION 10/23/2024 Disapproved- Private Provider PPROVIDER
Note: 10/21/2024 8:32:31 AM- PREVIOUS INSPECTION NOTES
INSULATION 10/18/2024 Disapproved- Private Provider PPROVIDER
INSULATION 10/16/2024 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 10/07/2024 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 10/07/2024 Approval - Private Provider PPROVIDER
ALL ROUGH 10/07/2024 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 10/03/2024 APPROVED CBOWERMASTER
ROOF VALLEY & METAL 09/26/2024 Approval - Private Provider PPROVIDER
WALL SHEATHING 09/25/2024 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/25/2024 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 09/23/2024 APPROVED JMYERS
MONOLITHIC SLAB 09/12/2024 Approval - Private Provider PPROVIDER
FOOTER 09/09/2024 CANCELLED BY APPLICANT WEB
PLUMBING 1ST ROUGH UNDERGROUND 09/09/2024 Approval - Private Provider PPROVIDER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 08/30/2024 APPROVED AWATERS

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 09/23/2024 09/23/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM
ZON COMPLETE 09/23/2024 09/23/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 08/26/2024 08/30/2024
Note: Released By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM
BLD COMPLETE 06/10/2024 06/13/2024
Note: Released By: JPI
BADMIN COMPLETE 06/10/2024 06/17/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Completion and Submittal of a Geotech Report and Identification of Subsurface Conditions Geotech reports are intended to identify subsurface conditions typically including classification of soils, soil compressibility or expansiveness, the elevation of the ground water table, evaluation of soil strength and adequacy of the soils and other whether other unsuitable subsurface conditions exist that must be mitigated in order for the soil to support the structure. The geotech engineer will determine the methods used to complete this process. 2. Geotechnical Report Not Accepted. Provide amended geotechnical report to include the information below. • Specifications for the preparation of the site prior to placement of compacted fill material. • Specifications for material to be used as compacted fill. • Test methods to be used to determine the maximum dry density and optimum moisture content of the material used as compacted fill. • The maximum allowable thickness of each lift of compacted fill material. • Field test method for determining the in-place dry density of the compacted fill. • Minimum acceptable in-place dry density expressed as a percentage of the maximum dry density determine in accordance with the third bullet above. • Number and frequency of field tests required to determine compliance with the sixth bullet above.
BADMIN HOLD 06/04/2024 06/10/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Completion and Submittal of a Geotech Report and Identification of Subsurface Conditions Geotech reports are intended to identify subsurface conditions typically including classification of soils, soil compressibility or expansiveness, the elevation of the ground water table, evaluation of soil strength and adequacy of the soils and other whether other unsuitable subsurface conditions exist that must be mitigated in order for the soil to support the structure. The geotech engineer will determine the methods used to complete this process. 2. Geotechnical Report Not Accepted. Provide amended geotechnical report to include the information below. • Specifications for the preparation of the site prior to placement of compacted fill material. • Specifications for material to be used as compacted fill. • Test methods to be used to determine the maximum dry density and optimum moisture content of the material used as compacted fill. • The maximum allowable thickness of each lift of compacted fill material. • Field test method for determining the in-place dry density of the compacted fill. • Minimum acceptable in-place dry density expressed as a percentage of the maximum dry density determine in accordance with the third bullet above. • Number and frequency of field tests required to determine compliance with the sixth bullet above.
BLD HOLD 06/04/2024 06/06/2024
Note: Held By: JPI 1. Based on a DBPR inquiry, product 15957 is a recently expired product on the DBPR website. Please delete from the project approval table and/or provide a substitute. 107.2.4
CUSVC COMPLETE 06/04/2024 06/05/2024
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 06/04/2024 06/10/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/04/2024 06/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 06/04/2024 06/10/2024
LOCATE COMPLETE 06/04/2024 06/05/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 06/04/2024 06/10/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 06/04/2024 06/04/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON COMPLETE 06/04/2024 06/04/2024
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
SWALE COMPLETE 06/04/2024 09/24/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 07/30/2025
CONTRACTOR CHANGE ¤20.00 07/30/2025
FC IMPACT FEE EMS ¤62.00 06/21/2024
IMPACT FEE FIRE ¤428.09 06/21/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/21/2024
FC IMPACT FEE LIBRARY ¤268.00 06/21/2024
IMPACT FEE PARKS ¤1,800.99 06/21/2024
IMPACT FEE SCHOOL ¤5,450.00 06/21/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 06/21/2024
WATER -IRRIGATION INSPECTION ¤25.00 06/21/2024
SURCHARGE FS 533.721 ¤4.58 06/21/2024
SURCHARGE - FS 468.631 ¤6.87 06/21/2024
SW ENG - FOUNDATION SURVEY ¤20.00 06/21/2024
SW ENG INSPECTION 80 ¤80.00 06/21/2024
SW ENG PRE APRON ¤30.00 06/21/2024
SW ENG - REVIEW 20 ¤20.00 06/21/2024
SW ENG RES REVIEW 200 ¤200.00 06/21/2024
SEWER CREDIT (¤850.00) 06/21/2024
SEWER INSPECTION ¤25.00 06/21/2024
SEWER CAPITAL FACILITY ¤6,120.52 06/21/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 06/21/2024
SITE PLAN 30 ¤30.00 06/21/2024
WATER- TURN ON ¤25.00 06/21/2024
ADJUSTMENT 10% (¤25.85) 06/21/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/21/2024
ADMINISTRATIVE - RESID PP ¤225.00 06/21/2024
PLAN REVIEW - RESIDENTIAL ¤228.54 06/21/2024
CONNECTION FEES ¤1,187.26 06/21/2024
Fees Total Due: ¤0.00 Total Paid: ¤21,862.14