Permit #2024060118
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7004-00250-0260 |
| Block: 00250 |
| Subdivision: - |
| Job Phone: 386-627-8289 |
| Location Address: 26 COLD SPRING CT |
| Type: SW - SEAWALL |
| Issue Date: 06/20/2024 |
| NOC: RECORDED |
| Applicant name: ROBERT E WILLIAMS |
| Owner: FOX ANN ALEXANDRA |
|
Address 12625 MILBURN LANE BOWIE, MD 20715 |
| Lot: 0260 |
| Contracted Stated Job Value: ¤22,500.00 |
| Job Description: SEAWALL |
| Type: CN |
Contractor
ELITE MARINE CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
14 UTILITY DR SUITE9 PALM COAST, FL 32137 |
SCC131152486 (Exp: 08/31/2026) | 386-627-8289 |
Inspection History
| Type | Request Date | Result | Inspector |
| SEAWALL FINAL | 05/08/2025 | FINAL APPROVED | HCAMACHO |
| ROW - STORMWATER FINAL | 05/01/2025 | APPROVED | FSLADISH |
| Note: 5/1/25 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL INSPECTION | 05/01/2025 | APPROVED | FSLADISH |
| Note: 5/1/25 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - DRAINAGE | 12/27/2024 | APPROVED | PFLANAGAN |
| Note: ALL CORRECTED AT THIS TIME IT'S YOUR RESPONSIBILITY THIS STAYS UP TO CITY STANDARDS. -------------------------------------------------------------------------- 12/26/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO REMOVE TRAILER FROM THE RIGHT OF WAY WITH NO WORKERS ON SITE -------------------------------------------------------------------------- 12/23/2024 - PREVIOUS INSPECTION NOTES 12/20/2024 - PREVIOUS INSPECTION NOTES ** 12/20/24 CORRECTIONS ARE STILL REQUIRED 1) NEED TO REMOVE ALL LUMBER AND CONSTRUCTION DEBRIS FROM THE RIGHT OF WAY. 2) NEED TO REMOVE TRAILER OUT OF RIGHT OF WAY EVERY DAY. YOU WILL HAVE 7DAY TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT ** FOLLOW UP INSPECTION ON 12/23/24 ____________________________________________________________________________________________________________________ 12/19/2024 - PREVIOUS INSPECTION NOTES ** 12/19/24 CORRECTIONS ARE STILL REQUIRED 1) NEED TO REMOVE ALL LUMBER AND CONSTRUCTION DEBRIS FROM THE RIGHT OF WAY. 2) NEED TO REMOVE TRAILER OUT OF RIGHT OF WAY EVERY DAY. YOU WILL HAVE 7DAY TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT ____________________________________________________________________________________________________________________ 12/12/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL LUMBER AND CONSTRUCTION DEBRIS FROM THE RIGHT OF WAY. 2) NEED TO REMOVE TRAILER OUT OF RIGHT OF WAY EVERY DAY. YOU WILL HAVE 7DAY TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT | |||
| ROW - DRAINAGE | 12/26/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO REMOVE TRAILER FROM THE RIGHT OF WAY WITH NO WORKERS ON SITE -------------------------------------------------------------------------- 12/23/2024 - PREVIOUS INSPECTION NOTES 12/20/2024 - PREVIOUS INSPECTION NOTES ** 12/20/24 CORRECTIONS ARE STILL REQUIRED 1) NEED TO REMOVE ALL LUMBER AND CONSTRUCTION DEBRIS FROM THE RIGHT OF WAY. 2) NEED TO REMOVE TRAILER OUT OF RIGHT OF WAY EVERY DAY. YOU WILL HAVE 7DAY TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT ** FOLLOW UP INSPECTION ON 12/23/24 ____________________________________________________________________________________________________________________ 12/19/2024 - PREVIOUS INSPECTION NOTES ** 12/19/24 CORRECTIONS ARE STILL REQUIRED 1) NEED TO REMOVE ALL LUMBER AND CONSTRUCTION DEBRIS FROM THE RIGHT OF WAY. 2) NEED TO REMOVE TRAILER OUT OF RIGHT OF WAY EVERY DAY. YOU WILL HAVE 7DAY TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT ____________________________________________________________________________________________________________________ 12/12/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL LUMBER AND CONSTRUCTION DEBRIS FROM THE RIGHT OF WAY. 2) NEED TO REMOVE TRAILER OUT OF RIGHT OF WAY EVERY DAY. YOU WILL HAVE 7DAY TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT | |||
| ROW - DRAINAGE | 12/23/2024 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: 12/20/2024 - PREVIOUS INSPECTION NOTES ** 12/20/24 CORRECTIONS ARE STILL REQUIRED 1) NEED TO REMOVE ALL LUMBER AND CONSTRUCTION DEBRIS FROM THE RIGHT OF WAY. 2) NEED TO REMOVE TRAILER OUT OF RIGHT OF WAY EVERY DAY. YOU WILL HAVE 7DAY TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT ** FOLLOW UP INSPECTION ON 12/23/24 ____________________________________________________________________________________________________________________ 12/19/2024 - PREVIOUS INSPECTION NOTES ** 12/19/24 CORRECTIONS ARE STILL REQUIRED 1) NEED TO REMOVE ALL LUMBER AND CONSTRUCTION DEBRIS FROM THE RIGHT OF WAY. 2) NEED TO REMOVE TRAILER OUT OF RIGHT OF WAY EVERY DAY. YOU WILL HAVE 7DAY TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT ____________________________________________________________________________________________________________________ 12/12/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL LUMBER AND CONSTRUCTION DEBRIS FROM THE RIGHT OF WAY. 2) NEED TO REMOVE TRAILER OUT OF RIGHT OF WAY EVERY DAY. YOU WILL HAVE 7DAY TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT | |||
| ROW - DRAINAGE | 12/20/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/20/24 CORRECTIONS ARE STILL REQUIRED 1) NEED TO REMOVE ALL LUMBER AND CONSTRUCTION DEBRIS FROM THE RIGHT OF WAY. 2) NEED TO REMOVE TRAILER OUT OF RIGHT OF WAY EVERY DAY. YOU WILL HAVE 7DAY TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT ** FOLLOW UP INSPECTION ON 12/23/24 ____________________________________________________________________________________________________________________ 12/19/2024 - PREVIOUS INSPECTION NOTES ** 12/19/24 CORRECTIONS ARE STILL REQUIRED 1) NEED TO REMOVE ALL LUMBER AND CONSTRUCTION DEBRIS FROM THE RIGHT OF WAY. 2) NEED TO REMOVE TRAILER OUT OF RIGHT OF WAY EVERY DAY. YOU WILL HAVE 7DAY TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT ____________________________________________________________________________________________________________________ 12/12/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL LUMBER AND CONSTRUCTION DEBRIS FROM THE RIGHT OF WAY. 2) NEED TO REMOVE TRAILER OUT OF RIGHT OF WAY EVERY DAY. YOU WILL HAVE 7DAY TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT | |||
| ROW - DRAINAGE | 12/19/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/19/24 CORRECTIONS ARE STILL REQUIRED 1) NEED TO REMOVE ALL LUMBER AND CONSTRUCTION DEBRIS FROM THE RIGHT OF WAY. 2) NEED TO REMOVE TRAILER OUT OF RIGHT OF WAY EVERY DAY. YOU WILL HAVE 7DAY TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT ____________________________________________________________________________________________________________________ 12/12/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL LUMBER AND CONSTRUCTION DEBRIS FROM THE RIGHT OF WAY. 2) NEED TO REMOVE TRAILER OUT OF RIGHT OF WAY EVERY DAY. YOU WILL HAVE 7DAY TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT | |||
| SEAWALL DEADMAN CAP | 12/13/2024 | APPROVED | HCAMACHO |
| ROW - DRAINAGE | 12/12/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED TO REMOVE ALL LUMBER AND CONSTRUCTION DEBRIS FROM THE RIGHT OF WAY. 2) NEED TO REMOVE TRAILER OUT OF RIGHT OF WAY EVERY DAY. YOU WILL HAVE 7DAY TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT | |||
| ROW -TURBIDITY BARRER | 11/14/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 11/14/24 TURBIDITY BARRIER TO REMAIN IN PLACE THROUGH OUT THE SEAWALL PROJECT. |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 11/13/2024 | 11/13/2024 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM NOC NOT RECORDED | |||
| ZON | COMPLETE | 06/11/2024 | 06/11/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please provide color of proposed seawall on plans (site plan is fine). Please submit correct site plan for this lot. There is no house on this lot and it's lot 26. | |||
| SW1 | COMPLETE | 06/11/2024 | 06/17/2024 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE COLOR OF PANELS | |||
| ENGIN1 | COMPLETE | 06/04/2024 | 06/04/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/04/2024 | 06/10/2024 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE COLOR OF PANELS | |||
| ZON | HOLD | 06/04/2024 | 06/04/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please provide color of proposed seawall on plans (site plan is fine). Please submit correct site plan for this lot. There is no house on this lot and it's lot 26. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/13/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/13/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/20/2024 |
| SITE PLAN 15 | ¤15.00 | 06/20/2024 |
| ADJUSTMENT 10% | (¤12.58) | 06/20/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/20/2024 |
| INSPECTION - RESIDENTIAL | ¤63.25 | 06/20/2024 |
| PLAN REVIEW - MISC 32.50 | ¤32.50 | 06/20/2024 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/20/2024 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/20/2024 |
| SW ENG REVIEW- 40 | ¤40.00 | 06/20/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/20/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤252.17 |