I want to search for...
Permit #2024060164
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00230-0080 |
| CONDITIONED SPACE: 1298 sqft |
| CONDITIONED SPACE: 1298 sqft |
| GARAGE: 262 sqft |
| GARAGE: 262 sqft |
| OPENED PORCH (WITH ROOF) : 27 sqft |
| OPENED PORCH (WITH ROOF) : 27 sqft |
| OPENED PORCH (WITH ROOF) : 50 sqft |
| OPENED PORCH (WITH ROOF) : 50 sqft |
| Total Square Footage: 3274 sqft |
| Block: 00230 |
| Subdivision: 7030 - |
| Job Phone: 863-647-5815 |
| Location Address: 26 RAINSTONE LN |
| Type: DU - DUPLEX |
| Issue Date: 06/28/2024 |
| NOC: RECORDED |
| Applicant name: MARK ALLAN HULBERT |
| Owner: HULBERT HOMES INC |
|
Address 5116 S LAKELAND DRIVE LAKELAND, FL 33813 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤315,000.00 |
| Job Description: Duplex |
| Type: CN |
| Original Permit #: 2024050541 |
Contractor
HULBERT HOMES INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 6254 LAKELAND, FL 33813 |
CRC1331304 (Exp: 08/31/2026) | 863-647-5815 |
Sub Contractors
KYLE RODBOURN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1325 W HWY 100 BUNNELL, FL 32110 |
CAC1821358 (Exp: 08/31/2026) | 386-586-9039 |
ANTONIO VINCENZO DAHM
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 RYBAR LANE PALM COAST, FL 32164 |
CFC1429951 (Exp: 08/31/2026) | 386-237-5692 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
DANIEL JOSEPH SCHWARZKOPF
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4601 E MOODY BLVD D6 PALM COAST, FL 32164 |
EC13010351 (Exp: 08/31/2026) | 386-313-6211 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/10/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| BLD - BUILDING FINAL | 03/07/2025 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: Please fix items befoire next inspection each unit need the own insulation certificated #5- missing insulation certificate please make sure insulation over attic space is fire proved rated A and B Document listing intumescent paint for foam insulationis not with permit documents on side R.807.1 | |||
| ROW - FINAL APRON (AFTER POUR) | 03/07/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++ 2/27/2025 - PREVIOUS INSPECTION NOTES 02/27/25 TPOLACEK*** RIGHT SIDE DRIVEWAY APRON WING IS CRACKED BUILDER NEEDS TO MAKE A SOLID REPAIR BEFORE AFTER POUR CAN BE APPROVED. | |||
| BLD - BUILDING FINAL | 03/05/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: *** NOTES ADDED BY CVANSTRAHLEN 3/5/2025 10:35:06 AM *** missing Letter A for A side Please fix items before call for next inspection Unit A and B #1-Several outlet , bedrooms , hallway , owners bedroom , leaving room space electrical outletsand faceplate are loose #2-not hot water A and B #3-AC exterior unit model number do not match E-cals model number A and B #4- missing final termited treadment label in electrical panel A and B #5- missing insulation certificate please make sure insulation over attic space is fire proved rated A and B #6-NEC 2020 422.5- Pep tank require GFCI protection A and B Unit B #7- Seal up soffit penetrations for electrical mast ( higt voltage conduit , soffit ) | |||
| ROW - FINAL INSPECTION | 02/27/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 02/27/2025 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 potable irrigation with PVB-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 02/27/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 02/27/25 TPOLACEK*** RIGHT SIDE DRIVEWAY APRON WING IS CRACKED BUILDER NEEDS TO MAKE A SOLID REPAIR BEFORE AFTER POUR CAN BE APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/26/2025 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/26/2025 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/25/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** Chapter 4, R401.3- Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) ** NEED THE CULVERT ELEVATION OF RIGHT SIDE ADJACENT PROPERTY ** "7) The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including culverts, inlets, swales, weirs, etc., both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the property or in Reserved Parcels adjacent to the property. Section 300.01 B(7) V-15" | |||
| U-CROSS CONNECTION | 02/25/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: potable irrigation with PVB-no cross connection | |||
| FIREWALL FINAL | 02/25/2025 | APPROVED | CVANSTRAHLEN |
| ELECTRIC - EARLY POWER | 01/24/2025 | APPROVED | CVANSTRAHLEN |
| ROW- PRE-APRON (PRE-POUR) | 01/17/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR | |||
| GRAVITY SEWER TEST | 12/04/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION, C/M TO SCHEDUAL GRAVITY SEWER FOR 12/4/24 BOTH WERE APPROVED ON 12/3/24 | |||
| SEWER TIE IN | 12/03/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION, C/M TO SCHEDUAL GRAVITY SEWER FOR 12/4/24 | |||
| PEP TANK INSTALLATION REQUEST | 11/14/2024 | APPROVED | CBOWERMASTER |
| Note: 11/5/2024 7:51:59 AM- PREVIOUS INSPECTION NOTES stucco needs to be complete first | |||
| PEP TANK INSTALLATION REQUEST | 11/04/2024 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: stucco needs to be complete first | |||
| INSULATION | 11/04/2024 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: 11/04/24 Need to have original on hand for next inspection #1 need prodduct FL approval documetns for Windows and Doors (can't be hand writing Product approval on sheet ) | |||
| LATH/BRICK/ WATER BARRIER | 11/04/2024 | APPROVED | CVANSTRAHLEN |
| INSULATION | 11/01/2024 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Inspector Notes from Inspection 2420 11/01/24 check next inspection #1 need prodduct FL approval documetns for Windows and Doors #2FBC [A]107.3-NEEDS APPROVED PLANS, INCLUDING ENERGY CALCULATIONS, ON SITE #3NEC 331.30-SECURING & SUPPORTING (romex 12" Secured on electrical panel #4 conduit protection on firewall garage wall need to be 24" passing each side #5 Need fire rate foam on garage wall on ledger on openings | |||
| FIREWALL FINAL | 10/30/2024 | CANCELLED BY APPLICANT | CVANSTRAHLEN |
| Note: 10/15/2024 - PREVIOUS INSPECTION NOTES 10/15/24 Disapproved -fee required ( C Van-Strahlen ) #1 FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE #2 FBC [A] 105.7 -NEEDS PERMIT ON SITE | |||
| ALL ROUGH | 10/30/2024 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: 10/30/24 check next inspection #1-NEC 331.30-SECURING & SUPPORTING (romex 12" Secured on electrical panel #2- Exterior door Fl Number do not match #3-FBCR P2605.1-PIPE SUPPORT ( Need support on air-vent Pipes ) | |||
| ALL ROUGH | 10/16/2024 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: 10/16/24 PLEASE HAVE ALL THIS FIX FOR NEXT INSPECTION . THANK YOU #1-FBC [A]107.3.1 NEEDS APPROVED PLANS ON SITE (FULL SET OF PLANS ) #2-FBC 3307.1 NEEDS SILT FENCE PROPERLY INSTALLED #3-FBCR P2605.1-PIPE SUPPORTON VERTICAL LINES (PIPES FOR AIR-VENTS ) #4-FBCM1601.4.1-DUCT WORK NOT SEALED AT JOINTS .NEED 2 POINTS OF ATTACHEMENTS (BATH FANS) #5-NEC 331.30- SECURING & SUPPORTING ( ELECTRICAL PANEL ) #6 NEED PRODUCT APPROVEL SHEET 10/15/2024 - PREVIOUS INSPECTION NOTES 10/15/24 Disapproved -fee required ( C Van-Strahlen ) #1 FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE #2 FBC [A] 105.7 -NEEDS PERMIT ON SITE | |||
| ALL ROUGH | 10/15/2024 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: 10/15/24 Disapproved -fee required ( C Van-Strahlen ) #1 FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE #2 FBC [A] 105.7 -NEEDS PERMIT ON SITE | |||
| FIREWALL FINAL | 10/15/2024 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: 10/15/24 Disapproved -fee required ( C Van-Strahlen ) #1 FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE #2 FBC [A] 105.7 -NEEDS PERMIT ON SITE | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/20/2024 | APPROVED | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 9/20/2024 1:48:09 PM *** prior notes resolved Inspector Notes from Inspection 2443 *** NOTES ADDED BY RSIMS 9/16/2024 8:57:32 AM *** 9/16/24: 1). Please provide a new set of approved plans as existing are wet/damaged. FBC 107.2.1 | |||
| ROOF VALLEY & METAL | 09/20/2024 | APPROVED | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 9/20/2024 1:47:13 PM *** prior notes resolved Inspector Notes from Inspection 2443 *** NOTES ADDED BY RSIMS 9/16/2024 8:57:32 AM *** 9/16/24: 1). Please provide a new set of approved plans as existing are wet/damaged. FBC 107.2.1 9/9/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 9/9/2024 10:19:37 AM *** No fee added because there were two inspections and the fee was added to the roof sheathing braces downcells 1. Must pass Roof sheathing braces ties downcells prior 2. Missing Drip edge 3. Need to make sure all decking is covered with underlayment | |||
| ELECTRIC TEMP POLE | 09/20/2024 | APPROVED | LMILLER |
| FIREWALL DRYWALL NAILING | 09/16/2024 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/16/2024 8:57:32 AM *** 9/16/24: 1). Please provide a new set of approved plans as existing are wet/damaged. FBC 107.2.1 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/09/2024 | Disapproved -FEE REQUIRED | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 9/9/2024 10:20:11 AM *** no change from prior notes (see note below) 9/5/2024 - PREVIOUS INSPECTION NOTES Roof complete covered. Next time call me for a virtual if rain is pending. Installers do not speak english. Please reschedule with superintendent on site. | |||
| ROOF VALLEY & METAL | 09/09/2024 | Disapproved - NO FEE | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 9/9/2024 10:19:37 AM *** No fee added because there were two inspections and the fee was added to the roof sheathing braces downcells 1. Must pass Roof sheathing braces ties downcells prior 2. Missing Drip edge 3. Need to make sure all decking is covered with underlayment | |||
| WALL SHEATHING | 09/05/2024 | APPROVED - AS NOTED | AWATERS |
| Note: Rip bottom of right side unit. Maintain 2" from slab and exterior siding per FBCR 318.7 Check at all rough | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/05/2024 | Disapproved -FEE REQUIRED | AWATERS |
| Note: Roof complete covered. Next time call me for a virtual if rain is pending. Installers do not speak english. Please reschedule with superintendent on site. | |||
| FIREWALL FRAMING | 09/04/2024 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 09/04/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 08/22/2024 | APPROVED | AGAETANO |
| MONOLITHIC SLAB | 08/13/2024 | APPROVED | AGAETANO |
| Note: 8/9/2024 - PREVIOUS INSPECTION NOTES 8/8/2024 - PREVIOUS INSPECTION NOTES 08-09-2024 1. Job box not posted. 2. Address not posted. 3. Slab not proper thichness. See highlighted areas. Please have multiple lines set up for reinspection. | |||
| MONOLITHIC SLAB | 08/09/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 8/8/2024 - PREVIOUS INSPECTION NOTES 08-09-2024 1. Job box not posted. 2. Address not posted. 3. Slab not proper thichness. See highlighted areas. Please have multiple lines set up for reinspection. | |||
| MONOLITHIC SLAB | 08/08/2024 | CANCELLED BY APPLICANT | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/06/2024 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 08/05/2024 | APPROVED | CPISCITELLI |
| WATER METER INSTALLATION REQUEST | 07/17/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | HOLD | 03/06/2025 | 03/06/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| MECH | COMPLETE | 03/06/2025 | 03/06/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | CANCEL | 03/05/2025 | 03/06/2025 |
| BLD | COMPLETE | 11/27/2024 | 12/02/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/17/2024 | 09/18/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/17/2024 | 09/17/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/04/2024 | 09/04/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/04/2024 | 09/04/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 09/03/2024 | 09/04/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab. | |||
| ZON | COMPLETE | 09/03/2024 | 09/03/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/05/2024 | 08/05/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/02/2024 | 08/02/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/24/2024 | 06/25/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 06/24/2024 | 06/27/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with FBCB Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead. | |||
| SWALE | COMPLETE | 06/12/2024 | 10/01/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 06/11/2024 | 06/11/2024 |
| Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM SUBMIT COMPLETED SITE SPECIFIC MASTER BUILDING PERMIT FORM & AFFIDAVIT. | |||
| CUSVC | COMPLETE | 06/11/2024 | 06/12/2024 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/11/2024 | 06/12/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/11/2024 | 06/24/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/11/2024 | 06/17/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/11/2024 | 06/14/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | HOLD | 06/11/2024 | 06/12/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a color sheet for review | |||
| BADMIN | HOLD | 06/11/2024 | 06/17/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with FBCB Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead. | |||
| BADMIN | HOLD | 06/05/2024 | 06/05/2024 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM SUBMIT COMPLETED SITE SPECIFIC MASTER BUILDING PERMIT FORM & AFFIDAVIT. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 03/07/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/07/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/07/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/07/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/07/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/07/2025 |
| UTILITY PEP REINSPECTION | ¤40.00 | 03/07/2025 |
| SURCHARGE FS 533.721 | ¤18.40 | 06/28/2024 |
| SURCHARGE - FS 468.631 | ¤27.60 | 06/28/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/28/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/28/2024 |
| SW ENG PRE APRON | ¤30.00 | 06/28/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/28/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/28/2024 |
| WORK WITHOUT PERMIT | ¤920.02 | 06/28/2024 |
| SITE PLAN 30 | ¤30.00 | 06/28/2024 |
| ADJUSTMENT 10% | (¤102.23) | 06/28/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/28/2024 |
| INSPECTION - RESIDENTIAL | ¤866.25 | 06/28/2024 |
| PLAN REVIEW - APPROVED MASTER | ¤126.00 | 06/28/2024 |
| FC IMPACT FEE EMS | ¤124.00 | 06/28/2024 |
| IMPACT FEE FIRE | ¤856.18 | 06/28/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 06/28/2024 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 06/28/2024 |
| IMPACT FEE PARKS | ¤3,600.18 | 06/28/2024 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 06/28/2024 |
| IMPACT FEE TRANSPORTATION | ¤2,890.00 | 06/28/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/27/2024 |
| CONNECTION FEES | ¤2,374.52 | 06/27/2024 |
| WATER- TURN ON | ¤50.00 | 06/27/2024 |
| SEWER CREDIT | (¤223.28) | 06/27/2024 |
| SEWER INSPECTION | ¤25.00 | 06/27/2024 |
| SEWER CAPITAL FACILITY | ¤12,241.04 | 06/27/2024 |
| WATER CAPITAL FACILITY FEE | ¤8,702.28 | 06/27/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤45,075.46 |