I want to search for...

Permit #2024060287

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00100-0120
CONDITIONED SPACE: 2376 sqft
GARAGE: 776 sqft
OPENED PORCH (WITH ROOF) : 76 sqft
PATIO/DECK (NO ROOF) : 474 sqft
OPENED PORCH (WITH ROOF) : 162 sqft
Total Square Footage: 3864 sqft
Block: 00100
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 407-808-8155
Location Address: 111 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/27/2024
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0120
Contracted Stated Job Value: ¤300,000.00
Job Description: Single Family Residence
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 07/21/2025 APPROVED FSLADISH
Note: 7/21/25 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. __________________________________________________________________________________________________________________________ ***INSPECTORS NOTE. RIGHT SIDE RETENTION POND SLOPE NEED TO BE REPAIRED IN ONE AREA AND ENTIRE BANK WHERE THERE ARE BARE AREAS SODDED BEFORE ROW FINAL PASSAGE.***
U -UTILITY RESIDENTIAL FINAL 07/21/2025 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9035 remove soils from meter box-contact customer-service@palmcoastgov.com to have box raised flush to grade contact city to raise reclaim meter box
BLD - BUILDING FINAL 07/10/2025 APPROVED BTAYLOR
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/09/2025 APPROVED FSLADISH
Note: 7/8/2025 - PREVIOUS INSPECTION NOTES 7/1/2025 - PREVIOUS INSPECTION NOTES 7/1/25 Nothing has changed. Your final survey shows your right side property from roughly middle to front corner line approximately 1 foot higher than prposed on your site plan. We consider anything greater than 5 tenths to be a signifigant deviation. you will need to explain in written statement for review why this is differing. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns 6/30/2025 - PREVIOUS INSPECTION NOTES 6/30/25 Your final survey shows your right side property from roughly middle to front corner line approximately 1 foot higher than prposed on your site plan. We consider anything greater than 5 tenths to be a signifigant deviation. you will need to explain in written statement for review why this is differing. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns
ROW FIELD SURVEY /GRADING CERTIFICATION 07/09/2025 APPROVED FSLADISH
Note: 7/9/25 UPON WALKING PROPERTY DRAINAGE WILL WORK. . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ***INSPECTORS NOTE. RIGHT SIDE RETENTION POND SLOPE NEED TO BE REPAIRED IN ONE AREA AND ENTIRE BANK WHERE THERE ARE BARE AREAS SODDED BEFORE ROW FINAL PASSAGE.***
ROW - FINAL APRON (AFTER POUR) 07/09/2025 APPROVED FSLADISH
Note: 7/9/25 . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/08/2025 CANCELLED BY APPLICANT FSLADISH
Note: 7/1/2025 - PREVIOUS INSPECTION NOTES 7/1/25 Nothing has changed. Your final survey shows your right side property from roughly middle to front corner line approximately 1 foot higher than prposed on your site plan. We consider anything greater than 5 tenths to be a signifigant deviation. you will need to explain in written statement for review why this is differing. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns 6/30/2025 - PREVIOUS INSPECTION NOTES 6/30/25 Your final survey shows your right side property from roughly middle to front corner line approximately 1 foot higher than prposed on your site plan. We consider anything greater than 5 tenths to be a signifigant deviation. you will need to explain in written statement for review why this is differing. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/01/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 7/1/25 Nothing has changed. Your final survey shows your right side property from roughly middle to front corner line approximately 1 foot higher than prposed on your site plan. We consider anything greater than 5 tenths to be a signifigant deviation. you will need to explain in written statement for review why this is differing. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns 6/30/2025 - PREVIOUS INSPECTION NOTES 6/30/25 Your final survey shows your right side property from roughly middle to front corner line approximately 1 foot higher than prposed on your site plan. We consider anything greater than 5 tenths to be a signifigant deviation. you will need to explain in written statement for review why this is differing. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/30/2025 Disapproved - NO FEE FSLADISH
Note: 6/30/25 Your final survey shows your right side property from roughly middle to front corner line approximately 1 foot higher than prposed on your site plan. We consider anything greater than 5 tenths to be a signifigant deviation. you will need to explain in written statement for review why this is differing. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns
U-CROSS CONNECTION 06/17/2025 APPROVED - AS NOTED LFITZGERALD
Note: remove soils from meter box-contact customer-service@palmcoastgov.com to have box raised flush to grade
ROW- PRE-APRON (PRE-POUR) 05/27/2025 APPROVED FSLADISH
Note: 5/27/25 YOU ARE APPROVED TO LAY PAVERS AS OF THIS INSPECTION. ______________________________________________________________________________________________________________________ 5/16/2025 - PREVIOUS INSPECTION NOTES 5/16/25AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ELECTRIC - EARLY POWER 05/20/2025 APPROVED - AS NOTED BTAYLOR
Note: 5-20-25 1. Emailed FPL at 10:00.
ROW- PAVER RESTRAINTS 05/16/2025 APPROVED FSLADISH
Note: 5/16/25 AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW- PRE-APRON (PRE-POUR) 05/16/2025 PARTIALLY APPROVED FSLADISH
Note: 5/16/25AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
TIE BEAM / LINTEL 05/15/2025 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 02/04/2025 APPROVED BTAYLOR
INSULATION 01/23/2025 APPROVED BTAYLOR
ALL ROUGH 12/09/2024 APPROVED BTAYLOR
ROOF VALLEY & METAL 12/03/2024 APPROVED MKRASKI
WALL SHEATHING 11/14/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/07/2024 APPROVED BTAYLOR
Note: 11/6/2024 - PREVIOUS INSPECTION NOTES
ROOF SHEATHING 11/06/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/06/2024 CANCELLED BY APPLICANT BTAYLOR
GRAVITY SEWER TEST 09/12/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 09/12/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
FOUND SURVEY APPROVED (OFFICE) 09/04/2024 APPROVED TBAKER
ELECTRIC-TUG 08/23/2024 APPROVED RMARTIN
TIE BEAM / LINTEL 08/16/2024 APPROVED BTAYLOR
Note: 8/15/2024 - PREVIOUS INSPECTION NOTES
TIE BEAM / LINTEL 08/15/2024 CANCELLED BY APPLICANT BTAYLOR
MONOLITHIC SLAB 08/01/2024 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 07/30/2024 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 07/16/2024 APPROVED CBOWERMASTER
FOOTER 07/15/2024 APPROVED BTAYLOR

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 07/01/2025 07/07/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM This permit was approved before new standards were implemented.
SW1 COMPLETE 07/01/2025 07/07/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 07/01/2025 07/01/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN INFORMATION 06/25/2025 06/25/2025
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Unable to process final survey because of expired NOC.
ENGIN1 COMPLETE 09/04/2024 09/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/04/2024 09/04/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 06/26/2024 06/26/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Lot square footage is incorrect on site plan Site plan needs to show all width's of the driveway
ELEC COMPLETE 06/26/2024 06/27/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Dryer needs to be GFCI protected. NEC 2020 210.8 2. Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67 230.85
URB COMPLETE 06/10/2024 06/12/2024
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
BADMIN COMPLETE 06/07/2024 06/13/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 06/07/2024 06/07/2024
Note: Released By: JPI
CUSVC COMPLETE 06/07/2024 06/11/2024
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 06/07/2024 06/13/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Dryer needs to be GFCI protected. NEC 2020 210.8 2. Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67 230.85
ENGIN1 COMPLETE 06/07/2024 06/07/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 06/07/2024 06/13/2024
LOCATE COMPLETE 06/07/2024 06/11/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 06/07/2024 06/13/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 06/07/2024 06/14/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON HOLD 06/07/2024 06/10/2024
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Lot square footage is incorrect on site plan Site plan needs to show all width's of the driveway

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤514.49 06/27/2024
WATER-METER ¤427.42 06/27/2024
ADJUSTMENT 10% (¤175.97) 06/27/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/27/2024
INSPECTION - RESIDENTIAL ¤1,347.50 06/27/2024
PLAN REVIEW - RESIDENTIAL ¤382.20 06/27/2024
CONNECTION FEES ¤25.00 06/27/2024
FC IMPACT FEE EMS ¤62.00 06/27/2024
IMPACT FEE FIRE ¤428.09 06/27/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/27/2024
FC IMPACT FEE LIBRARY ¤268.00 06/27/2024
IMPACT FEE PARKS ¤1,800.99 06/27/2024
IMPACT FEE SCHOOL ¤5,450.00 06/27/2024
IMPACT FEE TRANSPORTATION ¤3,404.00 06/27/2024
WATER -IRRIGATION INSPECTION ¤25.00 06/27/2024
SURCHARGE FS 533.721 ¤15.84 06/27/2024
SURCHARGE - FS 468.631 ¤23.76 06/27/2024
SW ENG - FOUNDATION SURVEY ¤20.00 06/27/2024
SW ENG INSPECTION 80 ¤80.00 06/27/2024
SW ENG PRE APRON ¤30.00 06/27/2024
SW ENG - REVIEW 20 ¤20.00 06/27/2024
SW ENG RES REVIEW 200 ¤200.00 06/27/2024
SEWER INSPECTION ¤25.00 06/27/2024
SEWER CAPITAL FACILITY ¤2,227.35 06/27/2024
WATER CAPITAL FACILITY FEE ¤1,748.87 06/27/2024
SITE PLAN 30 ¤30.00 06/27/2024
Fees Total Due: ¤0.00 Total Paid: ¤18,627.54