I want to search for...
Permit #2024060287
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00100-0120 |
| CONDITIONED SPACE: 2376 sqft |
| GARAGE: 776 sqft |
| OPENED PORCH (WITH ROOF) : 76 sqft |
| PATIO/DECK (NO ROOF) : 474 sqft |
| OPENED PORCH (WITH ROOF) : 162 sqft |
| Total Square Footage: 3864 sqft |
| Block: 00100 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 407-808-8155 |
| Location Address: 111 NEW LEATHERWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/27/2024 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 07/21/2025 | APPROVED | FSLADISH |
| Note: 7/21/25 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. __________________________________________________________________________________________________________________________ ***INSPECTORS NOTE. RIGHT SIDE RETENTION POND SLOPE NEED TO BE REPAIRED IN ONE AREA AND ENTIRE BANK WHERE THERE ARE BARE AREAS SODDED BEFORE ROW FINAL PASSAGE.*** | |||
| U -UTILITY RESIDENTIAL FINAL | 07/21/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 remove soils from meter box-contact customer-service@palmcoastgov.com to have box raised flush to grade contact city to raise reclaim meter box | |||
| BLD - BUILDING FINAL | 07/10/2025 | APPROVED | BTAYLOR |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/09/2025 | APPROVED | FSLADISH |
| Note: 7/8/2025 - PREVIOUS INSPECTION NOTES 7/1/2025 - PREVIOUS INSPECTION NOTES 7/1/25 Nothing has changed. Your final survey shows your right side property from roughly middle to front corner line approximately 1 foot higher than prposed on your site plan. We consider anything greater than 5 tenths to be a signifigant deviation. you will need to explain in written statement for review why this is differing. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns 6/30/2025 - PREVIOUS INSPECTION NOTES 6/30/25 Your final survey shows your right side property from roughly middle to front corner line approximately 1 foot higher than prposed on your site plan. We consider anything greater than 5 tenths to be a signifigant deviation. you will need to explain in written statement for review why this is differing. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/09/2025 | APPROVED | FSLADISH |
| Note: 7/9/25 UPON WALKING PROPERTY DRAINAGE WILL WORK. . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ***INSPECTORS NOTE. RIGHT SIDE RETENTION POND SLOPE NEED TO BE REPAIRED IN ONE AREA AND ENTIRE BANK WHERE THERE ARE BARE AREAS SODDED BEFORE ROW FINAL PASSAGE.*** | |||
| ROW - FINAL APRON (AFTER POUR) | 07/09/2025 | APPROVED | FSLADISH |
| Note: 7/9/25 . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/08/2025 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 7/1/2025 - PREVIOUS INSPECTION NOTES 7/1/25 Nothing has changed. Your final survey shows your right side property from roughly middle to front corner line approximately 1 foot higher than prposed on your site plan. We consider anything greater than 5 tenths to be a signifigant deviation. you will need to explain in written statement for review why this is differing. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns 6/30/2025 - PREVIOUS INSPECTION NOTES 6/30/25 Your final survey shows your right side property from roughly middle to front corner line approximately 1 foot higher than prposed on your site plan. We consider anything greater than 5 tenths to be a signifigant deviation. you will need to explain in written statement for review why this is differing. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/01/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 7/1/25 Nothing has changed. Your final survey shows your right side property from roughly middle to front corner line approximately 1 foot higher than prposed on your site plan. We consider anything greater than 5 tenths to be a signifigant deviation. you will need to explain in written statement for review why this is differing. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns 6/30/2025 - PREVIOUS INSPECTION NOTES 6/30/25 Your final survey shows your right side property from roughly middle to front corner line approximately 1 foot higher than prposed on your site plan. We consider anything greater than 5 tenths to be a signifigant deviation. you will need to explain in written statement for review why this is differing. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/30/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 6/30/25 Your final survey shows your right side property from roughly middle to front corner line approximately 1 foot higher than prposed on your site plan. We consider anything greater than 5 tenths to be a signifigant deviation. you will need to explain in written statement for review why this is differing. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns | |||
| U-CROSS CONNECTION | 06/17/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: remove soils from meter box-contact customer-service@palmcoastgov.com to have box raised flush to grade | |||
| ROW- PRE-APRON (PRE-POUR) | 05/27/2025 | APPROVED | FSLADISH |
| Note: 5/27/25 YOU ARE APPROVED TO LAY PAVERS AS OF THIS INSPECTION. ______________________________________________________________________________________________________________________ 5/16/2025 - PREVIOUS INSPECTION NOTES 5/16/25AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ELECTRIC - EARLY POWER | 05/20/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 5-20-25 1. Emailed FPL at 10:00. | |||
| ROW- PAVER RESTRAINTS | 05/16/2025 | APPROVED | FSLADISH |
| Note: 5/16/25 AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 05/16/2025 | PARTIALLY APPROVED | FSLADISH |
| Note: 5/16/25AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| TIE BEAM / LINTEL | 05/15/2025 | APPROVED | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 02/04/2025 | APPROVED | BTAYLOR |
| INSULATION | 01/23/2025 | APPROVED | BTAYLOR |
| ALL ROUGH | 12/09/2024 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 12/03/2024 | APPROVED | MKRASKI |
| WALL SHEATHING | 11/14/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/07/2024 | APPROVED | BTAYLOR |
| Note: 11/6/2024 - PREVIOUS INSPECTION NOTES | |||
| ROOF SHEATHING | 11/06/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/06/2024 | CANCELLED BY APPLICANT | BTAYLOR |
| GRAVITY SEWER TEST | 09/12/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 09/12/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/04/2024 | APPROVED | TBAKER |
| ELECTRIC-TUG | 08/23/2024 | APPROVED | RMARTIN |
| TIE BEAM / LINTEL | 08/16/2024 | APPROVED | BTAYLOR |
| Note: 8/15/2024 - PREVIOUS INSPECTION NOTES | |||
| TIE BEAM / LINTEL | 08/15/2024 | CANCELLED BY APPLICANT | BTAYLOR |
| MONOLITHIC SLAB | 08/01/2024 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/30/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 07/16/2024 | APPROVED | CBOWERMASTER |
| FOOTER | 07/15/2024 | APPROVED | BTAYLOR |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 07/01/2025 | 07/07/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM This permit was approved before new standards were implemented. | |||
| SW1 | COMPLETE | 07/01/2025 | 07/07/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/01/2025 | 07/01/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/25/2025 | 06/25/2025 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Unable to process final survey because of expired NOC. | |||
| ENGIN1 | COMPLETE | 09/04/2024 | 09/04/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/04/2024 | 09/04/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/26/2024 | 06/26/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Lot square footage is incorrect on site plan Site plan needs to show all width's of the driveway | |||
| ELEC | COMPLETE | 06/26/2024 | 06/27/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Dryer needs to be GFCI protected. NEC 2020 210.8 2. Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67 230.85 | |||
| URB | COMPLETE | 06/10/2024 | 06/12/2024 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 06/07/2024 | 06/13/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/07/2024 | 06/07/2024 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 06/07/2024 | 06/11/2024 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 06/07/2024 | 06/13/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Dryer needs to be GFCI protected. NEC 2020 210.8 2. Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67 230.85 | |||
| ENGIN1 | COMPLETE | 06/07/2024 | 06/07/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/07/2024 | 06/13/2024 |
| LOCATE | COMPLETE | 06/07/2024 | 06/11/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/07/2024 | 06/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/07/2024 | 06/14/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/07/2024 | 06/10/2024 |
| Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Lot square footage is incorrect on site plan Site plan needs to show all width's of the driveway |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤514.49 | 06/27/2024 |
| WATER-METER | ¤427.42 | 06/27/2024 |
| ADJUSTMENT 10% | (¤175.97) | 06/27/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/27/2024 |
| INSPECTION - RESIDENTIAL | ¤1,347.50 | 06/27/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤382.20 | 06/27/2024 |
| CONNECTION FEES | ¤25.00 | 06/27/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 06/27/2024 |
| IMPACT FEE FIRE | ¤428.09 | 06/27/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/27/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/27/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 06/27/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/27/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 06/27/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/27/2024 |
| SURCHARGE FS 533.721 | ¤15.84 | 06/27/2024 |
| SURCHARGE - FS 468.631 | ¤23.76 | 06/27/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/27/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/27/2024 |
| SW ENG PRE APRON | ¤30.00 | 06/27/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/27/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/27/2024 |
| SEWER INSPECTION | ¤25.00 | 06/27/2024 |
| SEWER CAPITAL FACILITY | ¤2,227.35 | 06/27/2024 |
| WATER CAPITAL FACILITY FEE | ¤1,748.87 | 06/27/2024 |
| SITE PLAN 30 | ¤30.00 | 06/27/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,627.54 |