I want to search for...
Permit #2024060288
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00150-0100 |
| CONDITIONED SPACE: 1981 sqft |
| GARAGE: 578 sqft |
| OPENED PORCH (WITH ROOF) : 264 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| Total Square Footage: 2883 sqft |
| Block: 00150 |
| Subdivision: - |
| Job Phone: 386-569-7882 |
| Location Address: 15 FLANDERS LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/09/2024 |
| NOC: RECORDED |
| Applicant name: VLADIMIR V PEREPECHKIN |
| Owner: MAULEN THEODORE J |
|
Address 689 HIGHLAND AVENUE PEEKSKILL, NY 10566 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
WISE CHOICE CUSTOM HOMES, INC.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
77 SOUTHLAKE DR PALM COAST, FL 32137 |
CRC1328738 (Exp: 08/31/2026) | 386-569-7882 |
Sub Contractors
ANDREW GONCALVES HOWARD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2 RYALL LANE PALM COAST, FL 32164 |
CCC1333989 (Exp: 08/31/2026) | 386-347-0366 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
MAXIM BUDNIK
| Status | Location Address | State License Number |
| ACTIVE |
3 WAVECREST PL PALM COAST, FL 32164 |
CAC1818445 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/29/2026 | FINAL APPROVED | HCAMACHO |
| Note: 1/28/2026 - PREVIOUS INSPECTION NOTES 1. Smoke alarm in master is not working. 2. The alarms outside the bedrooms need to be Smoke/Carbon alarms. FBC R315.1 3. Master bath fan not working & remove plastic. 4. Guest bath Fan not working & remove plastic. 5. Pool bath fan remove plastic. 6. The chase the has the A/C lines in the garage, the metal on top is cutting into the copper lines. | |||
| BLD - BUILDING FINAL | 01/28/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Smoke alarm in master is not working. 2. The alarms outside the bedrooms need to be Smoke/Carbon alarms. FBC R315.1 3. Master bath fan not working & remove plastic. 4. Guest bath Fan not working & remove plastic. 5. Pool bath fan remove plastic. 6. The chase the has the A/C lines in the garage, the metal on top is cutting into the copper lines. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/23/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 01/23/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 01/23/2026 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 No CC, IRR using potable water, PVB in place | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/22/2026 | APPROVED - AS NOTED | TPOLACEK |
| Note: 01-22-26 TPOLACEK*** INSPECTOR WENT OUT TO RECHECK CULVERT ELEVATION AND FOUND THAT ONLY THE LEFT SIDE IS OUT OF TOLERENCE BY .04 AND INSPECTOR WILL APPROVE AS NOTED. 1/8/2026 - PREVIOUS INSPECTION NOTES 01-08-26 TPOLACEK*** NOTES FROM INSPECTION ON 12-1-25 HAVE NOT BEEN ADDRESSED. PLEASE SEE PREVIOUS NOTES AND PHOTO ATTACHED TO PERMIT THAT SHOWS ALL AREAS THAT NEED TO BE CORRECTED. 12/1/2025 - PREVIOUS INSPECTION NOTES 12-1-25 TPOLACEK*** FINAL SURVEY INDICATES CULVERT IS OUT OF TOLERANCE, THERE IS NOT THE REQUIRED 4" FALL OFF THE STRUCTURE, THE BACK SIDE OF PATIO IS SHOWING HIGHER THAN FFE, FRONT SWALE IS GRADED IN THE WRONG DIRECTION ACCORDING TO THE SWALE PLAN DIAGRAM. SWALE MUST FLOW IN THE DIRECTION SHOWN WITH A MINIMUM OF .10 FALL IN THE RIGHT DIRECTION. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/22/2026 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9463 01-22-26 TPOLACEK*** INSPECTOR WENT OUT TO RECHECK CULVERT ELEVATION AND FOUND THAT ONLY THE LEFT SIDE IS OUT OF TOLERENCE BY .04 AND INSPECTOR WILL APPROVE AS NOTED. 1/8/2026 - PREVIOUS INSPECTION NOTES 01-08-26 TPOLACEK*** NOTES FROM INSPECTION ON 12-1-25 HAVE NOT BEEN ADDRESSED. PLEASE SEE PREVIOUS NOTES AND PHOTO ATTACHED TO PERMIT THAT SHOWS ALL AREAS THAT NEED TO BE CORRECTED. 12/1/2025 - PREVIOUS INSPECTION NOTES 12-1-25 TPOLACEK*** FINAL SURVEY INDICATES CULVERT IS OUT OF TOLERANCE, THERE IS NOT THE REQUIRED 4" FALL OFF THE STRUCTURE, THE BACK SIDE OF PATIO IS SHOWING HIGHER THAN FFE, FRONT SWALE IS GRADED IN THE WRONG DIRECTION ACCORDING TO THE SWALE PLAN DIAGRAM. SWALE MUST FLOW IN THE DIRECTION SHOWN WITH A MINIMUM OF .10 FALL IN THE RIGHT DIRECTION. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/08/2026 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 01-08-26 TPOLACEK*** NOTES FROM INSPECTION ON 12-1-25 HAVE NOT BEEN ADDRESSED. PLEASE SEE PREVIOUS NOTES AND PHOTO ATTACHED TO PERMIT THAT SHOWS ALL AREAS THAT NEED TO BE CORRECTED. 12/1/2025 - PREVIOUS INSPECTION NOTES 12-1-25 TPOLACEK*** FINAL SURVEY INDICATES CULVERT IS OUT OF TOLERANCE, THERE IS NOT THE REQUIRED 4" FALL OFF THE STRUCTURE, THE BACK SIDE OF PATIO IS SHOWING HIGHER THAN FFE, FRONT SWALE IS GRADED IN THE WRONG DIRECTION ACCORDING TO THE SWALE PLAN DIAGRAM. SWALE MUST FLOW IN THE DIRECTION SHOWN WITH A MINIMUM OF .10 FALL IN THE RIGHT DIRECTION. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/01/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 12-1-25 TPOLACEK*** FINAL SURVEY INDICATES CULVERT IS OUT OF TOLERANCE, THERE IS NOT THE REQUIRED 4" FALL OFF THE STRUCTURE, THE BACK SIDE OF PATIO IS SHOWING HIGHER THAN FFE, FRONT SWALE IS GRADED IN THE WRONG DIRECTION ACCORDING TO THE SWALE PLAN DIAGRAM. SWALE MUST FLOW IN THE DIRECTION SHOWN WITH A MINIMUM OF .10 FALL IN THE RIGHT DIRECTION. | |||
| U-CROSS CONNECTION | 10/14/2025 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, IRR using potable water, PVB in place | |||
| ELECTRIC - EARLY POWER | 10/08/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: Authorize release of email 10/7/2025 - PREVIOUS INSPECTION NOTES 1. The outlet in the lanai ceiling and the outlet in the soffit by the garage need to have covers and the the receptacle needs to be "WR". NEC 406.9 | |||
| ELECTRIC - EARLY POWER | 10/07/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. The outlet in the lanai ceiling and the outlet in the soffit by the garage need to have covers and the the receptacle needs to be "WR". NEC 406.9 | |||
| ROW- PRE-APRON (PRE-POUR) | 07/02/2025 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. ---------------------------------------------------------------------------- 7/1/2025 - PREVIOUS INSPECTION NOTES NEED TO HAVE A MINIMUM OF 6" IN THE RIGHT OF WAY NEEDS TO FIX SO ALL AREAS IN THE RIGHT OF WAY HAVE MINIMUM OF CONCRETE | |||
| ROW- PRE-APRON (PRE-POUR) | 07/01/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO HAVE A MINIMUM OF 6" IN THE RIGHT OF WAY NEEDS TO FIX SO ALL AREAS IN THE RIGHT OF WAY HAVE MINIMUM OF CONCRETE | |||
| GRAVITY SEWER TEST | 06/10/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 10/9/2024 - PREVIOUS INSPECTION NOTES DUE TO RAIN NEED TO UNCOVER FROM CAVE IN. WATER LINES ARE IN FOOTER AREA NEED TO BE HARD SLEEVED OR RE-ROUTED OUT OF FOOTER AREA, ALSO FBC-3307.1 SILT FENCE NEEDS INSTALLED BEFORE SLAB INSPECTION THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 06/10/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 10/9/2024 - PREVIOUS INSPECTION NOTES DUE TO RAIN NEED TO UNCOVER FROM CAVE IN. WATER LINES ARE IN FOOTER AREA NEED TO BE HARD SLEEVED OR RE-ROUTED OUT OF FOOTER AREA, ALSO FBC-3307.1 SILT FENCE NEEDS INSTALLED BEFORE SLAB INSPECTION THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 06/05/2025 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2320 Will check previuos notes at next insection. Inspector Notes from Inspection 2420 1. A/C boots are missing gasket. MISSING GASKETS ON BOOT/ REGISTER R402.4.1.1 2. Electric service in the plans show underground serice. The Service installed is overhead. Please revise the plans according. 3. No product Approval sheet for Windows or doors in the box. Please make sure it is on site. *Will check at insualtion.* *Note - Energy Calcs show R6 on block wall. What is installed is R5 please revise Calcs to show R5 prior to insulation inspection.* | |||
| LATH/BRICK/ WATER BARRIER | 05/16/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: Will check previuos notes at next insection. Inspector Notes from Inspection 2420 1. A/C boots are missing gasket. MISSING GASKETS ON BOOT/ REGISTER R402.4.1.1 2. Electric service in the plans show underground serice. The Service installed is overhead. Please revise the plans according. 3. No product Approval sheet for Windows or doors in the box. Please make sure it is on site. *Will check at insualtion.* *Note - Energy Calcs show R6 on block wall. What is installed is R5 please revise Calcs to show R5 prior to insulation inspection.* | |||
| ALL ROUGH | 05/09/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. A/C boots are missing gasket. MISSING GASKETS ON BOOT/ REGISTER R402.4.1.1 2. Electric service in the plans show underground serice. The Service installed is overhead. Please revise the plans according. 3. No product Approval sheet for Windows or doors in the box. Please make sure it is on site. *Will check at insualtion.* *Note - Energy Calcs show R6 on block wall. What is installed is R5 please revise Calcs to show R5 prior to insulation inspection.* | |||
| ROOF VALLEY & METAL | 03/18/2025 | APPROVED | HCAMACHO |
| WALL SHEATHING | 02/21/2025 | APPROVED | HCAMACHO |
| Note: | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/20/2025 | APPROVED | HCAMACHO |
| Note: | |||
| WALL SHEATHING | 02/20/2025 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2340 1. An Exterior door was added off the bathroom in the rear Porch. Need Revision for this door.FBC [A]107.4 2. Need a dumpster on site. FBC 3302.2 Will check at next inspection. | |||
| ROW - DRAINAGE | 01/22/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 01/22/25 YOUR CULVERT IS ABOUT 50% BLOCKED BUILDER NEEDS TO MAKE SURE IT REMAINS OPEN SO THAT STORMWATER WILL FLOW THROUGH TO OUTFALL ** ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/15/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. --------------------------------------------------------------------------------------------------- ** 10/28/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ___________________________________________________________________________________________________________________ 10/25/2024 - PREVIOUS INSPECTION NOTES ** 10/25/24 BUILDER STILL NEEDS TO REMOVE THE MUD AND SEDIMENT FROM THE ROADWAY ** FOLLOW UP ON 10/28/24 ____________________________________________________________________________________________________________________ 10/23/2024 - PREVIOUS INSPECTION NOTES ** 10/23/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE IMMEDIATELY AS YOUR TEMPORARY CULVERT PIPE IS COMPLETELY BLOCKED CAUSING WATER TO ENTER THE ROADWAY AS WELL AS SEDIMENT IS NOW ERODING INTO THE ROADWAY CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS,AND MOTORIST ** SSE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/25/24 | |||
| ROW - DRAINAGE | 01/15/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. --------------------------------------------------------------------------------------------------- ** 10/28/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ___________________________________________________________________________________________________________________ 10/25/2024 - PREVIOUS INSPECTION NOTES ** 10/25/24 BUILDER STILL NEEDS TO REMOVE THE MUD AND SEDIMENT FROM THE ROADWAY ** FOLLOW UP ON 10/28/24 ____________________________________________________________________________________________________________________ 10/23/2024 - PREVIOUS INSPECTION NOTES ** 10/23/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE IMMEDIATELY AS YOUR TEMPORARY CULVERT PIPE IS COMPLETELY BLOCKED CAUSING WATER TO ENTER THE ROADWAY AS WELL AS SEDIMENT IS NOW ERODING INTO THE ROADWAY CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS,AND MOTORIST ** SSE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/25/24 | |||
| TIE BEAM / LINTEL | 12/13/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. An Exterior door was added off the bathroom in the rear Porch. Need Revision for this door.FBC [A]107.4 2. Need a dumpster on site. FBC 3302.2 Will check at next inspection. | |||
| TIE BEAM / LINTEL | 12/10/2024 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. An Exterior door was added off the bathroom in the rear Porch. Need Revision for this door.FBC [A]107.4 2. Missing one dowel on the side of the doo markedr.FBCR 606.3.4, FBC [A]107.4 3. Dowel on the other side of the same door is against the block marked.FBCR 606.3.4 4. Two dowels in the front of the house are to close to the block marked.FBCR 606.3.4 5. one dowel on the garage side is up against the block marked.FBCR 606.3.4 | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/15/2024 | APPROVED | JMYERS |
| ROW - DRAINAGE | 10/28/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 10/28/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ___________________________________________________________________________________________________________________ 10/25/2024 - PREVIOUS INSPECTION NOTES ** 10/25/24 BUILDER STILL NEEDS TO REMOVE THE MUD AND SEDIMENT FROM THE ROADWAY ** FOLLOW UP ON 10/28/24 ____________________________________________________________________________________________________________________ 10/23/2024 - PREVIOUS INSPECTION NOTES ** 10/23/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE IMMEDIATELY AS YOUR TEMPORARY CULVERT PIPE IS COMPLETELY BLOCKED CAUSING WATER TO ENTER THE ROADWAY AS WELL AS SEDIMENT IS NOW ERODING INTO THE ROADWAY CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS,AND MOTORIST ** SSE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/25/24 | |||
| ROW - DRAINAGE | 10/25/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 10/25/24 BUILDER STILL NEEDS TO REMOVE THE MUD AND SEDIMENT FROM THE ROADWAY ** FOLLOW UP ON 10/28/24 ____________________________________________________________________________________________________________________ 10/23/2024 - PREVIOUS INSPECTION NOTES ** 10/23/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE IMMEDIATELY AS YOUR TEMPORARY CULVERT PIPE IS COMPLETELY BLOCKED CAUSING WATER TO ENTER THE ROADWAY AS WELL AS SEDIMENT IS NOW ERODING INTO THE ROADWAY CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS,AND MOTORIST ** SSE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/25/24 | |||
| ROW - DRAINAGE | 10/23/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/23/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE IMMEDIATELY AS YOUR TEMPORARY CULVERT PIPE IS COMPLETELY BLOCKED CAUSING WATER TO ENTER THE ROADWAY AS WELL AS SEDIMENT IS NOW ERODING INTO THE ROADWAY CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS,AND MOTORIST ** SSE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/25/24 | |||
| MONOLITHIC SLAB | 10/22/2024 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: *** NOTES ADDED BY MCONTRYMAN 10/22/2024 10:57:04 AM *** Swale also needs to be cleaned out by next inspection 10/22/24 1. Missing 2 #5 vertical dowels (marked on foundation plan) 2. Missing 2 HB locations (marked on foundation plans) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/18/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: 10/9/2024 - PREVIOUS INSPECTION NOTES DUE TO RAIN NEED TO UNCOVER FROM CAVE IN. WATER LINES ARE IN FOOTER AREA NEED TO BE HARD SLEEVED OR RE-ROUTED OUT OF FOOTER AREA, ALSO FBC-3307.1 SILT FENCE NEEDS INSTALLED BEFORE SLAB INSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/09/2024 | Disapproved - NO FEE | MGIBSON |
| Note: DUE TO RAIN NEED TO UNCOVER FROM CAVE IN | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 10/08/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 08/15/2024 | APPROVED | BVITALE |
| WILDLIFE CHECK - ENVIRONMENTAL | 06/17/2024 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 11/19/2025 | 11/20/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/02/2025 | 06/02/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/15/2025 | 05/19/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/15/2025 | 05/19/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 05/15/2025 | 05/19/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Plans seem to be the same. Bubble changes. | |||
| BLD | COMPLETE | 12/19/2024 | 12/27/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/12/2024 | 11/15/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/12/2024 | 11/12/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/03/2024 | 10/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/29/2024 | 08/01/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/29/2024 | 07/29/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/28/2024 | 07/08/2024 |
| Note: Released By: JPI | |||
| BLD | HOLD | 06/21/2024 | 06/24/2024 |
| Note: Held By: JPI 1. Based on an internet inquiry, FL 38740 and 15638 are not current product approval numbers. Please cure. 107.2.4 | |||
| ZON | COMPLETE | 06/21/2024 | 06/21/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. RELABEL BATHROOMS 2 & 3 ON FLOOR PLAN 2. INCLUDE SETBACK FROM REAR PROPERTY LINE TO PROPOSED COVERED LANAI | |||
| ELEC | COMPLETE | 06/21/2024 | 06/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in garage need to be GFCI protected. NEC 2020 210.8 2. Need correct outlet spacing in bed 3. NEC 2020 210.52 3. Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67 230.85 | |||
| SW1 | COMPLETE | 06/21/2024 | 06/28/2024 |
| Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 06/10/2024 | 06/17/2024 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 06/17/24 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. | |||
| BADMIN | COMPLETE | 06/07/2024 | 06/13/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/07/2024 | 06/07/2024 |
| Note: Held By: JPI 1. Based on a DBPR inquiry, products 38740 and 15638 are recently expired products on the DBPR website. Please delete from the project approval table and/or provide a substitute. 107.2.4 | |||
| CUSVC | COMPLETE | 06/07/2024 | 06/11/2024 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 06/07/2024 | 06/13/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in garage need to be GFCI protected. NEC 2020 210.8 2. Need correct outlet spacing in bed 3. NEC 2020 210.52 3. Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67 230.85 | |||
| ENGIN1 | COMPLETE | 06/07/2024 | 06/07/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/07/2024 | 06/13/2024 |
| LOCATE | COMPLETE | 06/07/2024 | 06/11/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/07/2024 | 06/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/07/2024 | 06/14/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | HOLD | 06/07/2024 | 06/10/2024 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. RELABEL BATHROOMS 2 & 3 ON FLOOR PLAN 2. INCLUDE SETBACK FROM REAR PROPERTY LINE TO PROPOSED COVERED LANAI | |||
| SWALE | COMPLETE | 06/07/2024 | 09/25/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/30/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 01/30/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 01/30/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/30/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/30/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/30/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/30/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/30/2026 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/30/2026 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/09/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/09/2024 |
| SEWER INSPECTION | ¤25.00 | 07/09/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 07/09/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 07/09/2024 |
| SITE PLAN 30 | ¤30.00 | 07/09/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/09/2024 |
| SW ENG PRE APRON | ¤30.00 | 07/09/2024 |
| SURCHARGE FS 533.721 | ¤12.57 | 07/09/2024 |
| SURCHARGE - FS 468.631 | ¤18.85 | 07/09/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/09/2024 |
| WATER- TURN ON | ¤25.00 | 07/09/2024 |
| ADJUSTMENT 10% | (¤139.61) | 07/09/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/09/2024 |
| INSPECTION - RESIDENTIAL | ¤1,064.25 | 07/09/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤301.86 | 07/09/2024 |
| CONNECTION FEES | ¤1,187.26 | 07/09/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 07/09/2024 |
| IMPACT FEE FIRE | ¤428.09 | 07/09/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/09/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/09/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 07/09/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/09/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 07/09/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/09/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤23,723.42 |