Permit #2024060301

Permit Details

Status: COED

Parcel Id: 21-10-30-0000-02020-0010
COMMERCIAL SQUARE FOOTAGE: 2500 sqft
Total Square Footage: 2500 sqft
Block: 02020
Subdivision: -
Job Phone: 386-795-3234
Location Address: 11100 US HWY 1 N
Type: BC - BUILDING COMMERCIAL
Issue Date: 01/31/2025
NOC: RECORDED
Applicant name: CHARLES ANDREW COLEMAN
Owner: PALM COAST SELF STORAGE LLC

Address

220 RIVERSIDE BLVD

NEW YORK, NY 10069

Address

APT 46C

NEW YORK, NY 10069

Lot: 0010
Contracted Stated Job Value: ¤206,208.00
Job Description: BUILDING 1 - SELF STORAGE
Type: CN

Contractor

COLEMAN GOODEMOTE CONSTRUCTION COMPANY INC
Status Location Address State License Number Phone Fax
ACTIVE

619 N. BEACH ST.

DAYTONA BEACH, FL 32114

CGC057396 (Exp: 08/31/2026) 386-257-3570 386-253-6692

Sub Contractors

SHAUN HAFFNER
Status Location Address State License Number Phone Fax
ACTIVE

70 N PERROTT DR

ORMOND BEACH, FL 32174

EC13010602 (Exp: 08/31/2026) 386-333-9781 386-265-1989
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688

Inspection History

Type Request Date Result Inspector
EXTERIOR ARCHITECTURAL FEATURES 10/27/2025 APPROVED DRODRIGUEZ
U - UTILITY COMMERCIAL FINAL 10/27/2025 FINAL APPROVED BWRIGHT
Note: 9/23/2025 - PREVIOUS INSPECTION NOTES
U - UTILITY COMMERCIAL FINAL 09/23/2025 CANCELLED BY APPLICANT BWRIGHT
BUILDING FINAL 09/23/2025 APPROVED FWILLIS
FIRE FINAL 09/23/2025 APPROVED RMARTIN
ELECTRIC - EARLY POWER 09/23/2025 APPROVED RMARTIN
PLUMBING 1ST ROUGH 09/11/2025 APPROVED MGIBSON
PLUMBING 2ND ROUGH 09/11/2025 APPROVED MGIBSON
GRAVITY SEWER 09/11/2025 APPROVED MGIBSON
BLD - SEWER TIE IN 09/11/2025 APPROVED MGIBSON
HVAC ROUGH 09/11/2025 CANCELLED BY INSPECTOR CPISCITELLI
HVAC FINAL 09/11/2025 CANCELLED BY INSPECTOR CPISCITELLI
TIE BEAM 09/11/2025 CANCELLED BY INSPECTOR FWILLIS
ROOF IN PROGRESS 09/11/2025 APPROVED FWILLIS
Note: 8/11/2025 - PREVIOUS INSPECTION NOTES 6/10/2025 - PREVIOUS INSPECTION NOTES
ABOVE CEILING 09/11/2025 CANCELLED BY INSPECTOR CPISCITELLI
INSULATION 09/11/2025 APPROVED FWILLIS
Note: 6/10/2025 - PREVIOUS INSPECTION NOTES
STOREFRONT 09/11/2025 APPROVED FWILLIS
ELECTRIC FINAL 08/15/2025 APPROVED MKRASKI
ROOF IN PROGRESS 08/11/2025 PARTIALLY APPROVED FWILLIS
Note: 6/10/2025 - PREVIOUS INSPECTION NOTES
ELECTRIC 1ST ROUGH 07/16/2025 APPROVED - AS NOTED MKRASKI
Note: Ufer looked at durinf elec. underground inspection
ELECTRIC 2ND ROUGH 07/16/2025 APPROVED MKRASKI
ROOF IN PROGRESS 06/10/2025 PARTIALLY APPROVED FWILLIS
INSULATION 06/10/2025 PARTIALLY APPROVED FWILLIS
INSULATION 06/09/2025 APPROVED FWILLIS
Note: 6/5/2025 - PREVIOUS INSPECTION NOTES 6/5/25 - BUILDING #1 6/4/2025 - PREVIOUS INSPECTION NOTES
ROOF SHEATHING / BRACE / TIE DOWN 06/09/2025 APPROVED FWILLIS
INSULATION 06/05/2025 PARTIALLY APPROVED FWILLIS
Note: 6/5/25 - BUILDING #1 6/4/2025 - PREVIOUS INSPECTION NOTES
INSULATION 06/04/2025 CANCELLED BY APPLICANT FWILLIS
FRAMING 06/02/2025 APPROVED FWILLIS
Note: BUILDING #1 FRAME
LINTEL 04/01/2025 APPROVED FWILLIS
LINTEL 03/21/2025 APPROVED FWILLIS
Note: FIRST LIFT
FOUNDATION SURVEY - OFFICE USE ONLY 02/27/2025 APPROVED DLEAP
MONOLITHIC SLAB 02/12/2025 APPROVED FWILLIS
Note: Front Left Building
FOOTER 02/12/2025 APPROVED FWILLIS
Note: Front left Building
ELECTRIC UNDERGROUND 02/12/2025 APPROVED MKRASKI
Note: UFER GROUND APPROVED

Review History

Department Status Date In Date Out
PLENG COMPLETE 02/26/2025 02/27/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
BLD COMPLETE 02/03/2025 02/11/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 01/09/2025 01/23/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 10/15/2024 10/15/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Outside units
FI1 COMPLETE 09/05/2024 09/12/2024
Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM
ELEC HOLD 09/05/2024 09/16/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need emergency lighting in electric room. NEC 2020 110.26 2. Submit electrical legend 3. Need to show location and what type of lighting controls for the hallway lights and units. 4. Your engineer letter needs to tell us what plan sheets to refer to instead of just electrical drawings. Be more specific. 2nd REQUEST
BLD HOLD 09/05/2024 09/16/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 2. Submit Pre-Engineered Steel Frame Building plans for storage units and RV carports FBC[A] 107.3 3rd REQUEST
PLUM COMPLETE 09/05/2024 09/16/2024
Note: Released By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM No plumbing in building 1
GAS CANCEL 07/31/2024 08/12/2024
ELEC HOLD 07/31/2024 08/12/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need emergency lighting in electric room. NEC 2020 110.26 2. Submit electrical legend 3. Need to show location and what type of lighting controls for the hallway lights and units.
FI1 HOLD 07/31/2024 08/12/2024
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM The last review asked for a response letter, the response letter was not supplied. Please supply the response letter as requested prior for a review. Please provide a written response to each comment below in a response letter, provide clouded response changes on plan sheets and add page locations for each response. 1. Plans submitted online must be digitally signed and sealed for review. http://docs.palmcoastgov.com/departments/building/online/digital-signatures.pdf 2. There are several pages with the wrong code years, please insure code years are current on all plan pages. Please include the following code versions the plan sheets anywhere they appear on the plans… FBC 8th edition (2023) FFPC 8th edition (2023) Florida Fire Prevention Code with the Florida specific NFPA 1 and 101 NFPA 10, (2018) edition, Standard for Portable Fire Extinguishers NFPA 13, (2019) edition, Standard for the Installation of Sprinkler Systems in Low-Rise Residential Occupancies NFPA 72, (2019) edition, National Fire Alarm and Signaling Code NFPA 70, (2020) edition, National Electrical Code 3. Please provide Classification of hazard of occupancy per FFPC 101, 42.1.2 4. Please provide engineering basis of design for fire sprinkler systems and fire alarm systems as part of these submitted plans. A Florida licensed professional engineer is responsible to establish design concepts established through the Responsibility Rules adopted by the Florida Board of Professional Engineers. F.S. 633.102 (19). Layout of risers, cross mains, branch lines, sprinkler heads, sizing of pipe, hanger locations, and hydraulic calculations in accordance with the design concepts established by the engineer are provided by the licensed fire protection contractor under separate building permit for installation of fire sprinkler and fire alarm systems. 5. Please provide information on the Knox access box for rapid entry access of fire department into the building per NFPA 1, 18.2.2.1 and AHJ And place the following note on the cover sheet. Please select FLAGLER COUNTY DEPT. of EMERGENCY MANAGEMENT, for jurisdiction or agency even though it is going in the city. This way it will get it keyed correctly. https://www.knoxbox.com/Products/Commercial-KnoxBoxes And place the following note on the cover sheet: Please call Fire Marshal, Randy Holmes at: 386-986-2303 for proper placement and verification of proper placement for the Knox Box and placement of the Property access keys. 6. Provide Fire Extinguishers located so that the maximum travel distances does not exceed 75 ft. (including the exterior for the portions of the building with storage accessed only from the exterior) per FFPC 1, 13.6.3.2.1.2.2
BLD HOLD 07/31/2024 08/14/2024
Note: Held By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING, FLORIDA BUILDING CODE-ACCESSIBILITY, FLORIDA STATUTES (F.S.), FLORIDA ADMINISTRATIVE CODE (FAC) AND AUTHORITY HAVING JURISDICTION (AHJ). 1. Repeat Comment - Plans shall be under the 2023 code cycle. Remove all references to FBC 2020 code cycle. 2. Submit Pre-Engineered Steel Frame Building plans for storage units and RV carports FBC[A] 107.3
PLUM HOLD 07/31/2024 08/14/2024
Note: Held By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-PLUMBING, FLORIDA BUILDING CODE-ACCESSIBILITY, FLORIDA STATUTES (F.S.), FLORIDA ADMINISTRATIVE CODE (FAC) AND AUTHORITY HAVING JURISDICTION (AHJ). 1. Show distance from most remote storage unit to the restrooms. FBCP 403.2
ARCHR COMPLETE 06/07/2024 06/24/2024
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
BLD HOLD 06/07/2024 06/25/2024
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING, FLORIDA BUILDING CODE-ACCESSIBILITY, FLORIDA STATUTES (F.S.), FLORIDA ADMINISTRATIVE CODE (FAC) AND AUTHORITY HAVING JURISDICTION (AHJ). INCOMPLETE AND INCORRECT PLAN SUBMITTAL PROVIDED – BUILDING PLAN REVIEW NOT COMPLETED. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS MISSING AND / OR INCOMPLETE AND ARE REQUIRED SUBMITTAL DOCUMENTS PER SECTION 107 OF THE FLORIDA BUILDING CODE-BUILDING. . 1. Architectural plan sheets not signed and sealed with a verifiable digital signature - not eligible for plan review. 2. Plan sheets for all building types have been uploaded as a single set of co-mingled plan sheets. Plans must be separated for each building and provided with separate cover sheet and separate index of plan sheets. 3. Architectural plan sheets to be uploaded as individual files - cannot be grouped and uploaded in a single set. 4. Structural plan sheets for all building types have been uploaded as a single set of co-mingled plan sheets. Plan sheets must be separated for each building and provided with separate cover sheet and separate index of plan sheets. 5. City of Palm Coast Product Approval Worksheet not provided. 6. Structural plan sheets all reference the incorrect Florida Building Codes and ASCE -7 and will not be reviewed or accepted for submittal until revied to comply with the current Florida Building Code and current referenced standards.
DSD COMPLETE 06/07/2024 06/24/2024
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
ELEC HOLD 06/07/2024 06/24/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electrical plans.
FI1 HOLD 06/07/2024 06/24/2024
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM Please provide a written response to each comment below in a response letter, provide clouded response changes on plan sheets and add page locations for each response. 1. Plans submitted online must be digitally signed and sealed for review. http://docs.palmcoastgov.com/departments/building/online/digital-signatures.pdf 2. There are several pages with the wrong code years, please insure code years are current on all plan pages. Please include the following code versions the plan sheets anywhere they appear on the plans… FBC 8th edition (2023) FFPC 8th edition (2023) Florida Fire Prevention Code with the Florida specific NFPA 1 and 101 NFPA 10, (2018) edition, Standard for Portable Fire Extinguishers NFPA 13, (2019) edition, Standard for the Installation of Sprinkler Systems in Low-Rise Residential Occupancies NFPA 72, (2019) edition, National Fire Alarm and Signaling Code NFPA 70, (2020) edition, National Electrical Code 3. Please provide Classification of hazard of occupancy per FFPC 101, 42.1.2 4. Please provide engineering basis of design for fire sprinkler systems and fire alarm systems as part of these submitted plans. A Florida licensed professional engineer is responsible to establish design concepts established through the Responsibility Rules adopted by the Florida Board of Professional Engineers. F.S. 633.102 (19). Layout of risers, cross mains, branch lines, sprinkler heads, sizing of pipe, hanger locations, and hydraulic calculations in accordance with the design concepts established by the engineer are provided by the licensed fire protection contractor under separate building permit for installation of fire sprinkler and fire alarm systems. 5. Please provide information on the Knox access box for rapid entry access of fire department into the building per NFPA 1, 18.2.2.1 and AHJ And place the following note on the cover sheet. Please select FLAGLER COUNTY DEPT. of EMERGENCY MANAGEMENT, for jurisdiction or agency even though it is going in the city. This way it will get it keyed correctly. https://www.knoxbox.com/Products/Commercial-KnoxBoxes And place the following note on the cover sheet: Please call Fire Marshal, Randy Holmes at: 386-986-2303 for proper placement and verification of proper placement for the Knox Box and placement of the Property access keys. 6. Provide Fire Extinguishers located so that the maximum travel distances does not exceed 75 ft. (including the exterior for the portions of the building with storage accessed only from the exterior) per FFPC 1, 13.6.3.2.1.2.2
GAS HOLD 06/07/2024 06/18/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Plumbing plans. If no gas on plans then gas review will be canceled
MECH COMPLETE 06/07/2024 06/24/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLUM HOLD 06/07/2024 06/25/2024
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM SEE BUILDING PLAN REVIEW HOLD COMMENTS
UD1 COMPLETE 06/07/2024 06/10/2024
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
IMPACT FEE TRANSPORTATION ¤1,222.50 08/28/2025
IMPACT FEE FIRE ¤1,725.00 08/28/2025
FC IMPACT FEE LAW ENFORCEMENT ¤2.50 01/31/2025
SURCHARGE FS 533.721 ¤16.79 01/31/2025
SURCHARGE - FS 468.631 ¤25.19 01/31/2025
SITE PLAN 30 ¤30.00 01/31/2025
ADJUSTMENT 10% (¤186.56) 01/31/2025
ADMINISTRATIVE - COMMERCIAL ¤75.00 01/31/2025
INSPECTION COMMERCIAL ¤1,449.00 01/31/2025
INSPECTION - FIRE COMMERCIAL ¤51.75 01/31/2025
PLAN REVIEW - COMMERCIAL ¤289.80 01/31/2025
FC IMPACT FEE EMS ¤15.00 01/31/2025
Fees Total Due: ¤0.00 Total Paid: ¤4,715.97