Permit #2024060326
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00010-0260 |
| CONDITIONED SPACE: 2080 sqft |
| GARAGE: 402 sqft |
| OPENED PORCH (WITH ROOF) : 182 sqft |
| OPENED PORCH (WITH ROOF) : 88 sqft |
| Total Square Footage: 2752 sqft |
| Block: 00010 |
| Subdivision: - |
| Job Phone: 904-531-5923 |
| Location Address: 5 PRINCESS CHRISTINE PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/25/2024 |
| NOC: RECORDED |
| Applicant name: TAVARIS JEROME DAVIS |
| Owner: BRIGHTLAND HOMES OF FLORIDA LLC |
|
Address 15725 N DALLAS PARKWAY SUITE 300 ADDISON, TX 75001 |
| Lot: 0260 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BRIGHTLAND HOMES OF FLORIDA, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3505 EAST FRONTAGE RD ADDISON, TX 75001 |
STE 145 TAMPA, FL 33607 |
CBC1267320 (Exp: 08/31/2026) | 904-531-5923 |
Sub Contractors
LARRY LAVON TURNAGE
| Status | Location Address | State License Number | Phone |
| CANCEL |
531 CODISCO WAY SANFORD, FL 32771 |
CMC1249777 (Exp: 08/31/2024) | 407-333-2665 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
OLIN MARSHALL CANNON
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1794 ROGERO RD #2 JACKSONVILLE, FL 32211 |
CFC1426140 (Exp: 08/31/2026) | 904-343-4344 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 04/11/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 04/11/25 TPOLACEK*** AREA MENTIONED IN PREVIOUS INSPECTION WAS CORRECTED. CULVERT STILL HAS SEDIMENT IN BEYOND THE OPEN END THAT SHOULD BE REMOVED. I AM APPROVING AS NOTED AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/4/2025 - PREVIOUS INSPECTION NOTES 4/4/2025- Facing the house, on the right side adjacent to the chain linked fence there is sod placed impeding the stormwater flow. Please lower the sod so positve fall can achieved going to the front of the house. COPC Technical Manual 300.03C.b and 300.01D.5 3/4/2025 - PREVIOUS INSPECTION NOTES 3/4/25 YOU ARE RQUIRED TO CLEAN OUT THE CULVERT PIPE AND PICK UP ALL TRASH AND DEBRIS ON ENTIRE PROPERTY INCLUDING THE REAR. STORMWATER FINAL INSPECTION Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage | |||
| ROW - STORMWATER FINAL | 04/04/2025 | Disapproved - NO FEE | GBERTOLA |
| Note: 4/4/2025- Facing the house, on the right side adjacent to the chain linked fence there is sod placed impeding the stormwater flow. Please lower the sod so positve fall can achieved going to the front of the house. COPC Technical Manual 300.03C.b and 300.01D.5 3/4/2025 - PREVIOUS INSPECTION NOTES 3/4/25 YOU ARE RQUIRED TO CLEAN OUT THE CULVERT PIPE AND PICK UP ALL TRASH AND DEBRIS ON ENTIRE PROPERTY INCLUDING THE REAR. STORMWATER FINAL INSPECTION Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage | |||
| ROW - STORMWATER FINAL | 03/27/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 3/4/2025 - PREVIOUS INSPECTION NOTES 3/4/25 YOU ARE RQUIRED TO CLEAN OUT THE CULVERT PIPE AND PICK UP ALL TRASH AND DEBRIS ON ENTIRE PROPERTY INCLUDING THE REAR. STORMWATER FINAL INSPECTION Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage | |||
| BLD - BUILDING FINAL | 03/25/2025 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 03/21/2025 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 n irrgation-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 03/04/2025 | APPROVED | FSLADISH |
| Note: 3/4/25 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT IS NOT CLEAR YOU BE HELD UP ON YOUR ROW FINAL. HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 03/04/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 3/4/25 YOU ARE RQUIRED TO CLEAN OUT THE CULVERT PIPE AND PICK UP ALL TRASH AND DEBRIS ON ENTIRE PROPERTY INCLUDING THE REAR. STORMWATER FINAL INSPECTION Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/03/2025 | APPROVED | FSLADISH |
| Note: 3/3/25 DRAINAGE DISCUSSED WAS UTILIZED AND IS REFLECTED IN THE SURVEY ELEVATIONS AT THE TIME OF THIS INSPECTION. ___________________________________________________________________________________________________________________________ NOTE INSPECTOR MET WITH NICK AND GRADER ON SITE ON 1/30/25 TO DISCUSS GRADING OF LEFT SIDE OF LOT. I AM LETTING THEM TO SPLIT DRAINAGE TO ALLOW WATER TO GO TO DITCH ALONG BELLE TERRE. ANY QUESTION CALL PARREN | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/03/2025 | APPROVED | FSLADISH |
| Note: 3/3/25 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U-CROSS CONNECTION | 03/03/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: n irrgation-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 02/04/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. | |||
| ROW- PROJECT STATUS | 01/30/2025 | Status Check | PFLANAGAN |
| Note: NOTE INSPECTOR MET WITH NICK AND GRADER ON SITE ON 1/30/25 TO DISCUSS GRADING OF LEFT SIDE OF LOT. I AM LETTING THEM TO SPLIT DRAINAGE TO ALLOW WATER TO GO TO DITCH ALONG BELLE TERRE. ANY QUESTION CALL PARREN | |||
| ROW- PRE-APRON (PRE-POUR) | 01/23/2025 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC - EARLY POWER | 01/03/2025 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 12/10/2024 | Approval - Private Provider | PPROVIDER |
| Note: 12/9/2024 4:08:18 PM- PREVIOUS INSPECTION NOTES | |||
| SEWER TIE IN | 12/09/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: 12/5/2024 - PREVIOUS INSPECTION NOTES. THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 12/05/2024 | CANCELLED BY APPLICANT | MGIBSON |
| GRAVITY SEWER TEST | 12/05/2024 | CANCELLED BY APPLICANT | PPROVIDER |
| Note: Inspector Notes from Inspection 2095 12/5/2024 - PREVIOUS INSPECTION NOTES. THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 11/25/2024 | Approval - Private Provider | PPROVIDER |
| Note: 11/21/2024 9:41:39 AM- PREVIOUS INSPECTION NOTES 11/13/2024 3:53:28 PM- PREVIOUS INSPECTION NOTES | |||
| INSULATION | 11/20/2024 | Disapproved- Private Provider | PPROVIDER |
| Note: 11/13/2024 3:53:28 PM- PREVIOUS INSPECTION NOTES | |||
| INSULATION | 11/13/2024 | Disapproved- Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 11/12/2024 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 11/12/2024 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 11/07/2024 | Approval - Private Provider | PPROVIDER |
| Note: 10/28/2024 4:53:42 PM- PREVIOUS INSPECTION NOTES | |||
| WALL SHEATHING | 10/28/2024 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/28/2024 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 10/28/2024 | Disapproved- Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 10/25/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/02/2024 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/30/2024 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 09/26/2024 | APPROVED | CPISCITELLI |
| ROW - DRAINAGE | 09/23/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE IT IS YOUR RESPONSIBILITY TO CHECK ALL YOUR SEMIDENT CONTROL DEVICES EVERY 7 BUSINESS DAYS OR EVERY 1/2" OF RAIN ------------------------------------------------------------------------------ 9/20/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) SILT FENCE ALONG LEFT SIDE IS INSTALLED INCORRECTLY. 2) NEED TO KEEP SWALE CLEAN OF DIRT AND SEDIMENT AT ALL TIMES OR PUT IN AN TEMP. CULVERT SO YOU CAN GAIN ACCESS TO YOUR PROJECT. IF YOU CHOOSE TO PUT IN AN TEMP. CULVERT THE CULVERT NEEDS TO BE OPEN AT ALL TIMES A FREE FROM ANY SAND OR SEDIMENT. WILL BE BACK EVERYDAY TILL CORRECTION ARE MADE THERE IS AN INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------------------------ 9/13/2024 - PREVIOUS INSPECTION NOTES ALL THE FOLLOWING NEEDS TO BE DONE TO PASS THIS DRAINAGE INSPECTION. 1) SILT FENCE ALONG LEFT SIDE IS INSTALLED INCORRECTLY. 2) PORTER JOHN NEED TO BE MOVE OUT OF THE RIGHT OF WAY AND PLACED ON YOUR LOT. 3) NEED TO KEEP SWALE CLEAN OF DIRT AND SEDIMENT AT ALL TIMES OR PUT IN AN TEMP. CULVERT SO YOU CAN GAIN ACCESS TO YOUR PROJECT. IF YOU CHOOSE TO PUT IN AN TEMP. CULVERT THE CULVERT NEEDS TO BE OPEN AT ALL TIMES A FREE FROM ANY SAND OR SEDIMENT. NEXT INSPECTION WILL BE ON 9/20/24 YOU WILL HAVE TILL THEN TO CORRECT ALL LISTED ABOVE OR THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 09/20/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO DO THE FOLLOWING 1) SILT FENCE ALONG LEFT SIDE IS INSTALLED INCORRECTLY. 2) NEED TO KEEP SWALE CLEAN OF DIRT AND SEDIMENT AT ALL TIMES OR PUT IN AN TEMP. CULVERT SO YOU CAN GAIN ACCESS TO YOUR PROJECT. IF YOU CHOOSE TO PUT IN AN TEMP. CULVERT THE CULVERT NEEDS TO BE OPEN AT ALL TIMES A FREE FROM ANY SAND OR SEDIMENT. WILL BE BACK EVERYDAY TILL CORRECTION ARE MADE THERE IS AN INSPECTION HOLD ON THIS PERMIT. ------------------------------------------------------------------------------------------------ 9/13/2024 - PREVIOUS INSPECTION NOTES ALL THE FOLLOWING NEEDS TO BE DONE TO PASS THIS DRAINAGE INSPECTION. 1) SILT FENCE ALONG LEFT SIDE IS INSTALLED INCORRECTLY. 2) PORTER JOHN NEED TO BE MOVE OUT OF THE RIGHT OF WAY AND PLACED ON YOUR LOT. 3) NEED TO KEEP SWALE CLEAN OF DIRT AND SEDIMENT AT ALL TIMES OR PUT IN AN TEMP. CULVERT SO YOU CAN GAIN ACCESS TO YOUR PROJECT. IF YOU CHOOSE TO PUT IN AN TEMP. CULVERT THE CULVERT NEEDS TO BE OPEN AT ALL TIMES A FREE FROM ANY SAND OR SEDIMENT. NEXT INSPECTION WILL BE ON 9/20/24 YOU WILL HAVE TILL THEN TO CORRECT ALL LISTED ABOVE OR THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 09/13/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: ALL THE FOLLOWING NEEDS TO BE DONE TO PASS THIS DRAINAGE INSPECTION. 1) SILT FENCE ALONG LEFT SIDE IS INSTALLED INCORRECTLY. 2) PORTER JOHN NEED TO BE MOVE OUT OF THE RIGHT OF WAY AND PLACED ON YOUR LOT. 3) NEED TO KEEP SWALE CLEAN OF DIRT AND SEDIMENT AT ALL TIMES OR PUT IN AN TEMP. CULVERT SO YOU CAN GAIN ACCESS TO YOUR PROJECT. IF YOU CHOOSE TO PUT IN AN TEMP. CULVERT THE CULVERT NEEDS TO BE OPEN AT ALL TIMES A FREE FROM ANY SAND OR SEDIMENT. NEXT INSPECTION WILL BE ON 9/20/24 YOU WILL HAVE TILL THEN TO CORRECT ALL LISTED ABOVE OR THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. | |||
| ROW- PROJECT STATUS | 09/13/2024 | APPROVED | PFLANAGAN |
| Note: SILT FENCE IN PLACE AT THIS TIME. PUTTING IN FOR A DRAINAGE INSPECTION DO TO SILT FENCE IS NOT INSTALLED CORRECTLY ON THE LEFT SIDE. ALSO PORTER JOHN IN THE RIGHT OF WAY. --------------------------------------------------------------------- The complainant at 4 Christine Pl requesting that silt fencing be placed around the perimeter of the construction site so dirt does not come onto her property MH | |||
| WATER METER INSTALLATION REQUEST | 08/16/2024 | APPROVED | CBOWERMASTER |
| ROW- PROJECT STATUS | 08/14/2024 | CANCELLED BY INSPECTOR | GBERTOLA |
| Note: The complainant at 4 Christine Pl requesting that silt fencing be placed around the perimeter of the construction site so dirt does not come onto her property MH |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/24/2024 | 10/25/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/24/2024 | 10/24/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/23/2024 | 09/26/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/03/2024 | 09/05/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Both reports need to be digitally signed and sealed. | |||
| SW1 | COMPLETE | 06/18/2024 | 06/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please adjust FFE to be no more than 1.83' above center of road. | |||
| ENGIN1 | COMPLETE | 06/18/2024 | 06/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/18/2024 | 06/18/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/13/2024 | 06/13/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 06/07/2024 | 06/13/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/07/2024 | 06/07/2024 |
| Note: Held By: JPI 1. Based on a DBPR inquiry, product 15957 is a recently expired product on the DBPR website. Please delete from the project approval table and/or provide a substitute. 107.2.4 | |||
| CUSVC | COMPLETE | 06/07/2024 | 06/11/2024 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 06/07/2024 | 06/13/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/07/2024 | 06/07/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/07/2024 | 06/13/2024 |
| LOCATE | COMPLETE | 06/07/2024 | 06/13/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/07/2024 | 06/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/07/2024 | 06/07/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please adjust FFE to be no more than 1.83' above center of road. | |||
| ZON | COMPLETE | 06/07/2024 | 06/07/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/07/2024 | 09/26/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 05/05/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 05/05/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/05/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/05/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/05/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/05/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/05/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/05/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/25/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/25/2024 |
| SEWER CREDIT | (¤1,147.00) | 06/25/2024 |
| SEWER INSPECTION | ¤25.00 | 06/25/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 06/25/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 06/25/2024 |
| SITE PLAN 30 | ¤30.00 | 06/25/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/25/2024 |
| SW ENG PRE APRON | ¤30.00 | 06/25/2024 |
| WATER- TURN ON | ¤25.00 | 06/25/2024 |
| ADJUSTMENT 10% | (¤33.26) | 06/25/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/25/2024 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 06/25/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤302.64 | 06/25/2024 |
| CONNECTION FEES | ¤1,187.26 | 06/25/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 06/25/2024 |
| IMPACT FEE FIRE | ¤428.09 | 06/25/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/25/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/25/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 06/25/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/25/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 06/25/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/25/2024 |
| SURCHARGE FS 533.721 | ¤5.24 | 06/25/2024 |
| SURCHARGE - FS 468.631 | ¤7.87 | 06/25/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/25/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,753.49 |