I want to search for...
Permit #2024060369
Permit Details
Status: COED
| Parcel Id: 07-11-31-7031-00150-0080 |
| GARAGE: 935 sqft |
| CONDITIONED SPACE: 2735 sqft |
| ENCLOSE EXISTING PORCH TO LIVING : 120 sqft |
| OPENED PORCH (WITH ROOF) : 300 sqft |
| Total Square Footage: 4090 sqft |
| Block: 00150 |
| Subdivision: - |
| Job Phone: 904-888-6443 |
| Location Address: 76 RICKENBACKER DR |
| Type: DU - DUPLEX |
| Issue Date: 06/24/2024 |
| NOC: RECORDED |
| Applicant name: AMIR BENTOV |
| Owner: AIHD LLC |
|
Address 1 FARRADAY LANE PALM COAST, FL 32137 |
|
Address STE 2A PALM COAST, FL 32137 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
MAVEN HOMES LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2800 N 6TH ST UNIT 790 , |
CRC1333741 (Exp: 08/31/2026) | 904-667-4330 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 05/12/2025 | FINAL APPROVED | LFITZGERALD |
| Note: 5/9/2025 - PREVIOUS INSPECTION NOTES house power wire not connected to pep panels=no powervto tanks 5/8/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 5/8/2025 2:07:59 PM *** N0 electric to Pep tanks . 5/6/2025 - PREVIOUS INSPECTION NOTES already noted -no change-re-align water meter so readable 5/5/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 9035 no irr-no cross connection lower both sewer clean outs so flush/realign water meter so it can be read | |||
| U -UTILITY RESIDENTIAL FINAL | 05/09/2025 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: house power wire not connected to pep panels=no powervto tanks 5/8/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 5/8/2025 2:07:59 PM *** N0 electric to Pep tanks . 5/6/2025 - PREVIOUS INSPECTION NOTES already noted -no change-re-align water meter so readable 5/5/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 9035 no irr-no cross connection lower both sewer clean outs so flush/realign water meter so it can be read | |||
| U -UTILITY RESIDENTIAL FINAL | 05/08/2025 | Disapproved - NO FEE | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 5/8/2025 2:07:59 PM *** N0 electric to Pep tanks . 5/6/2025 - PREVIOUS INSPECTION NOTES already noted -no change-re-align water meter so readable 5/5/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 9035 no irr-no cross connection lower both sewer clean outs so flush/realign water meter so it can be read | |||
| BLD - BUILDING FINAL | 05/07/2025 | Approval - Private Provider | PPROVIDER |
| Note: 5/6/2025 4:04:05 PM- PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 05/06/2025 | Disapproved- Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 05/06/2025 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: already noted -no change-re-align water meter so readable 5/5/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 9035 no irr-no cross connection lower both sewer clean outs so flush/realign water meter so it can be read | |||
| U -UTILITY RESIDENTIAL FINAL | 05/05/2025 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 9035 no irr-no cross connection lower both sewer clean outs so flush/realign water meter so it can be read | |||
| ROW - FINAL INSPECTION | 04/08/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 04/08/2025 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 9035 no irr-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 04/08/2025 | CANCELLED BY APPLICANT | WEB |
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 9035 no irr-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 04/04/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/03/2025 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/03/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U-CROSS CONNECTION | 04/01/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cross connection | |||
| ELECTRIC - EARLY POWER | 02/18/2025 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 12/18/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 12/17/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT FROM ERICA ASKING TO CANCEL INSPECTION AND THEY WILL RESCHEDULE FOR TOMORROW Inspector Notes from Inspection 9470 11/18/24 TPOLACEK*** SPOKE WITH BUILDER ABOUT SILT FENCE. THE NEIGHBOR TO THE LEFT OF THE BUILD CONTINUES TO RIP DOWN THE SILT FENCE EVERY TIME THEY INSTALL A NEW ONE. THEY HAVE DOCUMENTATION SHOWING THE FENCE BEING INSTALLED AND TORN DOWN THE NEXT DAY. BUILDER IS CLOSE TO FINAL GRADE AND WILL KEEP LOOSE DEBRIS CLEANED UP SO THERE IS NO NEED FOR SILT FENCE AT THIS STAGE OF CONSTRUCTION. APPROVING THIS DRAINAGE AS NOTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/18/2024 - PREVIOUS INSPECTION NOTES 11/18/24 TPOLACEK** BUILDER MUST REESTABLISH SILT FENCE AND CLEAN UP ALL LOOSE DEBRIS ON CONSTRUCTION SITE. NEXT INSPECTION IS FRIDAY 11/22/24 Please , Can you check the silt fence, we have a report is down on the left side.per gbertola | |||
| ROW- PRE-APRON (PRE-POUR) | 12/17/2024 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: RECIEVED TEXT FROM ERICA ASKING TO CANCEL INSPECTION AND THEY WILL RESCHEDULE FOR TOMORROW Inspector Notes from Inspection 9470 11/18/24 TPOLACEK*** SPOKE WITH BUILDER ABOUT SILT FENCE. THE NEIGHBOR TO THE LEFT OF THE BUILD CONTINUES TO RIP DOWN THE SILT FENCE EVERY TIME THEY INSTALL A NEW ONE. THEY HAVE DOCUMENTATION SHOWING THE FENCE BEING INSTALLED AND TORN DOWN THE NEXT DAY. BUILDER IS CLOSE TO FINAL GRADE AND WILL KEEP LOOSE DEBRIS CLEANED UP SO THERE IS NO NEED FOR SILT FENCE AT THIS STAGE OF CONSTRUCTION. APPROVING THIS DRAINAGE AS NOTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/18/2024 - PREVIOUS INSPECTION NOTES 11/18/24 TPOLACEK** BUILDER MUST REESTABLISH SILT FENCE AND CLEAN UP ALL LOOSE DEBRIS ON CONSTRUCTION SITE. NEXT INSPECTION IS FRIDAY 11/22/24 Please , Can you check the silt fence, we have a report is down on the left side.per gbertola | |||
| GRAVITY SEWER TEST | 12/06/2024 | Approval - Private Provider | PPROVIDER |
| Note: 12/5/2024 1:31:07 PM- PREVIOUS INSPECTION NOTES | |||
| SEWER TIE IN | 12/04/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 12/04/2024 | CANCELLED BY APPLICANT | PPROVIDER |
| Note: Inspector Notes from Inspection 9450 THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 12/04/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROW - DRAINAGE | 11/22/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 11/18/24 TPOLACEK*** SPOKE WITH BUILDER ABOUT SILT FENCE. THE NEIGHBOR TO THE LEFT OF THE BUILD CONTINUES TO RIP DOWN THE SILT FENCE EVERY TIME THEY INSTALL A NEW ONE. THEY HAVE DOCUMENTATION SHOWING THE FENCE BEING INSTALLED AND TORN DOWN THE NEXT DAY. BUILDER IS CLOSE TO FINAL GRADE AND WILL KEEP LOOSE DEBRIS CLEANED UP SO THERE IS NO NEED FOR SILT FENCE AT THIS STAGE OF CONSTRUCTION. APPROVING THIS DRAINAGE AS NOTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/18/2024 - PREVIOUS INSPECTION NOTES 11/18/24 TPOLACEK** BUILDER MUST REESTABLISH SILT FENCE AND CLEAN UP ALL LOOSE DEBRIS ON CONSTRUCTION SITE. NEXT INSPECTION IS FRIDAY 11/22/24 Please , Can you check the silt fence, we have a report is down on the left side.per gbertola | |||
| ROW - DRAINAGE | 11/18/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 11/18/24 TPOLACEK** BUILDER MUST REESTABLISH SILT FENCE AND CLEAN UP ALL LOOSE DEBRIS ON CONSTRUCTION SITE. NEXT INSPECTION IS FRIDAY 11/22/24 Please , Can you check the silt fence, we have a report is down on the left side.per gbertola | |||
| PEP TANK INSTALLATION REQUEST | 11/13/2024 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 11/12/2024 | Approval - Private Provider | PPROVIDER |
| INSULATION | 11/06/2024 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 11/01/2024 | Approval - Private Provider | PPROVIDER |
| FIREWALL FRAMING | 10/15/2024 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 10/15/2024 | Approval - Private Provider | PPROVIDER |
| FIREWALL FINAL | 10/15/2024 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 09/23/2024 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 09/20/2024 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/20/2024 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 09/12/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 08/21/2024 | Approval - Private Provider | PPROVIDER |
| Note: 8/19/2024 4:12:21 PM- PREVIOUS INSPECTION NOTES 8/12/2024 9:00:27 AM- PREVIOUS INSPECTION NOTES | |||
| TIE BEAM / LINTEL | 08/19/2024 | Disapproved- Private Provider | PPROVIDER |
| Note: 8/12/2024 9:00:27 AM- PREVIOUS INSPECTION NOTES | |||
| TIE BEAM / LINTEL | 08/12/2024 | CANCELLED BY APPLICANT | BBEMBRY |
| MONOLITHIC SLAB | 07/29/2024 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/24/2024 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 07/22/2024 | APPROVED | CPISCITELLI |
| WATER METER INSTALLATION REQUEST | 07/08/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 04/04/2025 | 04/04/2025 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Given sheet name A.1 / Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator | |||
| ENGIN1 | COMPLETE | 09/12/2024 | 09/12/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/12/2024 | 09/12/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 07/15/2024 | 07/15/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please rename your file to geotech certification | |||
| BLD | COMPLETE | 07/15/2024 | 07/22/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/17/2024 | 06/24/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit Electrical load calculations 2. Submit a duplex riser diagram that includes all wire sizes and breaker sizes. Also must include the surge protectors and outside disconnects. NEC 2020 230.67, 230.85 | |||
| BADMIN | COMPLETE | 06/10/2024 | 06/17/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/10/2024 | 06/13/2024 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 06/10/2024 | 06/12/2024 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 06/10/2024 | 06/17/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit Electrical load calculations 2. Submit a duplex riser diagram that includes all wire sizes and breaker sizes. Also must include the surge protectors and outside disconnects. NEC 2020 230.67, 230.85 | |||
| ENGIN1 | COMPLETE | 06/10/2024 | 06/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/10/2024 | 06/14/2024 |
| LOCATE | COMPLETE | 06/10/2024 | 06/13/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/10/2024 | 06/14/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/10/2024 | 06/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/10/2024 | 06/11/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/10/2024 | 09/26/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/12/2025 |
| REINSPECTION FEE | ¤40.00 | 05/07/2025 |
| REINSPECTION FEE | ¤40.00 | 05/07/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 05/07/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/07/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/07/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/24/2024 |
| SW ENG PRE APRON | ¤30.00 | 06/24/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/24/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/24/2024 |
| SEWER CREDIT | (¤2,016.00) | 06/24/2024 |
| SEWER INSPECTION | ¤25.00 | 06/24/2024 |
| SEWER CAPITAL FACILITY | ¤12,241.04 | 06/24/2024 |
| WATER CAPITAL FACILITY FEE | ¤8,702.28 | 06/24/2024 |
| SITE PLAN 30 | ¤30.00 | 06/24/2024 |
| FC IMPACT FEE EMS | ¤124.00 | 06/24/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 06/24/2024 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 06/24/2024 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 06/24/2024 |
| WATER- TURN ON | ¤50.00 | 06/24/2024 |
| ADJUSTMENT 10% | (¤193.97) | 06/24/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/24/2024 |
| INSPECTION - RESIDENTIAL | ¤1,487.75 | 06/24/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤421.98 | 06/24/2024 |
| CONNECTION FEES | ¤2,374.52 | 06/24/2024 |
| SURCHARGE FS 533.721 | ¤17.46 | 06/24/2024 |
| SURCHARGE - FS 468.631 | ¤26.19 | 06/24/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/24/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤24,872.25 |