I want to search for...

Permit #2024060369

Permit Details

Status: COED

Parcel Id: 07-11-31-7031-00150-0080
GARAGE: 935 sqft
CONDITIONED SPACE: 2735 sqft
ENCLOSE EXISTING PORCH TO LIVING : 120 sqft
OPENED PORCH (WITH ROOF) : 300 sqft
Total Square Footage: 4090 sqft
Block: 00150
Subdivision: -
Job Phone: 904-888-6443
Location Address: 76 RICKENBACKER DR
Type: DU - DUPLEX
Issue Date: 06/24/2024
NOC: RECORDED
Applicant name: AMIR BENTOV
Owner: AIHD LLC

Address

1 FARRADAY LANE

PALM COAST, FL 32137

Address

STE 2A

PALM COAST, FL 32137

Lot: 0080
Contracted Stated Job Value: ¤350,000.00
Job Description: Duplex
Type: CN

Contractor

MAVEN HOMES LLC
Status Location Address State License Number Phone
ACTIVE

2800 N 6TH ST UNIT 790

,

CRC1333741 (Exp: 08/31/2026) 904-667-4330

Sub Contractors

ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 05/12/2025 FINAL APPROVED LFITZGERALD
Note: 5/9/2025 - PREVIOUS INSPECTION NOTES house power wire not connected to pep panels=no powervto tanks 5/8/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 5/8/2025 2:07:59 PM *** N0 electric to Pep tanks . 5/6/2025 - PREVIOUS INSPECTION NOTES already noted -no change-re-align water meter so readable 5/5/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 9035 no irr-no cross connection lower both sewer clean outs so flush/realign water meter so it can be read
U -UTILITY RESIDENTIAL FINAL 05/09/2025 Disapproved -FEE REQUIRED LFITZGERALD
Note: house power wire not connected to pep panels=no powervto tanks 5/8/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 5/8/2025 2:07:59 PM *** N0 electric to Pep tanks . 5/6/2025 - PREVIOUS INSPECTION NOTES already noted -no change-re-align water meter so readable 5/5/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 9035 no irr-no cross connection lower both sewer clean outs so flush/realign water meter so it can be read
U -UTILITY RESIDENTIAL FINAL 05/08/2025 Disapproved - NO FEE DHANEY
Note: *** NOTES ADDED BY DHANEY 5/8/2025 2:07:59 PM *** N0 electric to Pep tanks . 5/6/2025 - PREVIOUS INSPECTION NOTES already noted -no change-re-align water meter so readable 5/5/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 9035 no irr-no cross connection lower both sewer clean outs so flush/realign water meter so it can be read
BLD - BUILDING FINAL 05/07/2025 Approval - Private Provider PPROVIDER
Note: 5/6/2025 4:04:05 PM- PREVIOUS INSPECTION NOTES
BLD - BUILDING FINAL 05/06/2025 Disapproved- Private Provider PPROVIDER
U -UTILITY RESIDENTIAL FINAL 05/06/2025 Disapproved -FEE REQUIRED LFITZGERALD
Note: already noted -no change-re-align water meter so readable 5/5/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 9035 no irr-no cross connection lower both sewer clean outs so flush/realign water meter so it can be read
U -UTILITY RESIDENTIAL FINAL 05/05/2025 Disapproved -FEE REQUIRED LFITZGERALD
Note: New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 9035 no irr-no cross connection lower both sewer clean outs so flush/realign water meter so it can be read
ROW - FINAL INSPECTION 04/08/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 04/08/2025 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 9035 no irr-no cross connection
U -UTILITY RESIDENTIAL FINAL 04/08/2025 CANCELLED BY APPLICANT WEB
Note: New inspection due to canceled inspection Inspector Notes from Inspection 9035 no irr-no cross connection
ROW - FINAL APRON (AFTER POUR) 04/04/2025 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR.
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/03/2025 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 04/03/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U-CROSS CONNECTION 04/01/2025 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cross connection
ELECTRIC - EARLY POWER 02/18/2025 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 12/18/2024 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 12/17/2024 - PREVIOUS INSPECTION NOTES RECIEVED TEXT FROM ERICA ASKING TO CANCEL INSPECTION AND THEY WILL RESCHEDULE FOR TOMORROW Inspector Notes from Inspection 9470 11/18/24 TPOLACEK*** SPOKE WITH BUILDER ABOUT SILT FENCE. THE NEIGHBOR TO THE LEFT OF THE BUILD CONTINUES TO RIP DOWN THE SILT FENCE EVERY TIME THEY INSTALL A NEW ONE. THEY HAVE DOCUMENTATION SHOWING THE FENCE BEING INSTALLED AND TORN DOWN THE NEXT DAY. BUILDER IS CLOSE TO FINAL GRADE AND WILL KEEP LOOSE DEBRIS CLEANED UP SO THERE IS NO NEED FOR SILT FENCE AT THIS STAGE OF CONSTRUCTION. APPROVING THIS DRAINAGE AS NOTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/18/2024 - PREVIOUS INSPECTION NOTES 11/18/24 TPOLACEK** BUILDER MUST REESTABLISH SILT FENCE AND CLEAN UP ALL LOOSE DEBRIS ON CONSTRUCTION SITE. NEXT INSPECTION IS FRIDAY 11/22/24 Please , Can you check the silt fence, we have a report is down on the left side.per gbertola
ROW- PRE-APRON (PRE-POUR) 12/17/2024 CANCELLED BY APPLICANT TPOLACEK
Note: RECIEVED TEXT FROM ERICA ASKING TO CANCEL INSPECTION AND THEY WILL RESCHEDULE FOR TOMORROW Inspector Notes from Inspection 9470 11/18/24 TPOLACEK*** SPOKE WITH BUILDER ABOUT SILT FENCE. THE NEIGHBOR TO THE LEFT OF THE BUILD CONTINUES TO RIP DOWN THE SILT FENCE EVERY TIME THEY INSTALL A NEW ONE. THEY HAVE DOCUMENTATION SHOWING THE FENCE BEING INSTALLED AND TORN DOWN THE NEXT DAY. BUILDER IS CLOSE TO FINAL GRADE AND WILL KEEP LOOSE DEBRIS CLEANED UP SO THERE IS NO NEED FOR SILT FENCE AT THIS STAGE OF CONSTRUCTION. APPROVING THIS DRAINAGE AS NOTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/18/2024 - PREVIOUS INSPECTION NOTES 11/18/24 TPOLACEK** BUILDER MUST REESTABLISH SILT FENCE AND CLEAN UP ALL LOOSE DEBRIS ON CONSTRUCTION SITE. NEXT INSPECTION IS FRIDAY 11/22/24 Please , Can you check the silt fence, we have a report is down on the left side.per gbertola
GRAVITY SEWER TEST 12/06/2024 Approval - Private Provider PPROVIDER
Note: 12/5/2024 1:31:07 PM- PREVIOUS INSPECTION NOTES
SEWER TIE IN 12/04/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 12/04/2024 CANCELLED BY APPLICANT PPROVIDER
Note: Inspector Notes from Inspection 9450 THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 12/04/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW - DRAINAGE 11/22/2024 APPROVED - AS NOTED TPOLACEK
Note: 11/18/24 TPOLACEK*** SPOKE WITH BUILDER ABOUT SILT FENCE. THE NEIGHBOR TO THE LEFT OF THE BUILD CONTINUES TO RIP DOWN THE SILT FENCE EVERY TIME THEY INSTALL A NEW ONE. THEY HAVE DOCUMENTATION SHOWING THE FENCE BEING INSTALLED AND TORN DOWN THE NEXT DAY. BUILDER IS CLOSE TO FINAL GRADE AND WILL KEEP LOOSE DEBRIS CLEANED UP SO THERE IS NO NEED FOR SILT FENCE AT THIS STAGE OF CONSTRUCTION. APPROVING THIS DRAINAGE AS NOTED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/18/2024 - PREVIOUS INSPECTION NOTES 11/18/24 TPOLACEK** BUILDER MUST REESTABLISH SILT FENCE AND CLEAN UP ALL LOOSE DEBRIS ON CONSTRUCTION SITE. NEXT INSPECTION IS FRIDAY 11/22/24 Please , Can you check the silt fence, we have a report is down on the left side.per gbertola
ROW - DRAINAGE 11/18/2024 Disapproved - NO FEE TPOLACEK
Note: 11/18/24 TPOLACEK** BUILDER MUST REESTABLISH SILT FENCE AND CLEAN UP ALL LOOSE DEBRIS ON CONSTRUCTION SITE. NEXT INSPECTION IS FRIDAY 11/22/24 Please , Can you check the silt fence, we have a report is down on the left side.per gbertola
PEP TANK INSTALLATION REQUEST 11/13/2024 APPROVED CBOWERMASTER
LATH/BRICK/ WATER BARRIER 11/12/2024 Approval - Private Provider PPROVIDER
INSULATION 11/06/2024 Approval - Private Provider PPROVIDER
ALL ROUGH 11/01/2024 Approval - Private Provider PPROVIDER
FIREWALL FRAMING 10/15/2024 Approval - Private Provider PPROVIDER
FIREWALL DRYWALL NAILING 10/15/2024 Approval - Private Provider PPROVIDER
FIREWALL FINAL 10/15/2024 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 09/23/2024 Approval - Private Provider PPROVIDER
WALL SHEATHING 09/20/2024 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/20/2024 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 09/12/2024 APPROVED TBAKER
TIE BEAM / LINTEL 08/21/2024 Approval - Private Provider PPROVIDER
Note: 8/19/2024 4:12:21 PM- PREVIOUS INSPECTION NOTES 8/12/2024 9:00:27 AM- PREVIOUS INSPECTION NOTES
TIE BEAM / LINTEL 08/19/2024 Disapproved- Private Provider PPROVIDER
Note: 8/12/2024 9:00:27 AM- PREVIOUS INSPECTION NOTES
TIE BEAM / LINTEL 08/12/2024 CANCELLED BY APPLICANT BBEMBRY
MONOLITHIC SLAB 07/29/2024 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 07/24/2024 Approval - Private Provider PPROVIDER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 07/22/2024 APPROVED CPISCITELLI
WATER METER INSTALLATION REQUEST 07/08/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BADMIN INFORMATION 04/04/2025 04/04/2025
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Given sheet name A.1 / Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator
ENGIN1 COMPLETE 09/12/2024 09/12/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/12/2024 09/12/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BADMIN INFORMATION 07/15/2024 07/15/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please rename your file to geotech certification
BLD COMPLETE 07/15/2024 07/22/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 06/17/2024 06/24/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit Electrical load calculations 2. Submit a duplex riser diagram that includes all wire sizes and breaker sizes. Also must include the surge protectors and outside disconnects. NEC 2020 230.67, 230.85
BADMIN COMPLETE 06/10/2024 06/17/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 06/10/2024 06/13/2024
Note: Released By: JPI
CUSVC COMPLETE 06/10/2024 06/12/2024
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 06/10/2024 06/17/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit Electrical load calculations 2. Submit a duplex riser diagram that includes all wire sizes and breaker sizes. Also must include the surge protectors and outside disconnects. NEC 2020 230.67, 230.85
ENGIN1 COMPLETE 06/10/2024 06/10/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 06/10/2024 06/14/2024
LOCATE COMPLETE 06/10/2024 06/13/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 06/10/2024 06/14/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 06/10/2024 06/10/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/10/2024 06/11/2024
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
SWALE COMPLETE 06/10/2024 09/26/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 05/12/2025
REINSPECTION FEE ¤40.00 05/07/2025
REINSPECTION FEE ¤40.00 05/07/2025
CONTRACTOR CHANGE ¤20.00 05/07/2025
SW ENG - INSPECTION 20 ¤20.00 05/07/2025
SW ENG - INSPECTION 20 ¤20.00 05/07/2025
SW ENG INSPECTION 80 ¤80.00 06/24/2024
SW ENG PRE APRON ¤30.00 06/24/2024
SW ENG - REVIEW 20 ¤20.00 06/24/2024
SW ENG RES REVIEW 200 ¤200.00 06/24/2024
SEWER CREDIT (¤2,016.00) 06/24/2024
SEWER INSPECTION ¤25.00 06/24/2024
SEWER CAPITAL FACILITY ¤12,241.04 06/24/2024
WATER CAPITAL FACILITY FEE ¤8,702.28 06/24/2024
SITE PLAN 30 ¤30.00 06/24/2024
FC IMPACT FEE EMS ¤124.00 06/24/2024
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 06/24/2024
FC IMPACT FEE LIBRARY ¤536.00 06/24/2024
WATER -IRRIGATION INSPECTION ¤50.00 06/24/2024
WATER- TURN ON ¤50.00 06/24/2024
ADJUSTMENT 10% (¤193.97) 06/24/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/24/2024
INSPECTION - RESIDENTIAL ¤1,487.75 06/24/2024
PLAN REVIEW - RESIDENTIAL ¤421.98 06/24/2024
CONNECTION FEES ¤2,374.52 06/24/2024
SURCHARGE FS 533.721 ¤17.46 06/24/2024
SURCHARGE - FS 468.631 ¤26.19 06/24/2024
SW ENG - FOUNDATION SURVEY ¤20.00 06/24/2024
Fees Total Due: ¤0.00 Total Paid: ¤24,872.25