Status: COED
| Parcel Id: 07-11-31-7030-00040-0180 |
| CONDITIONED SPACE: 1800 sqft |
| GARAGE: 510 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| Total Square Footage: 2346 sqft |
| Block: 00040 |
| Subdivision: 7030 - |
| Job Phone: 689-250-2429 |
| Location Address: 17 RAEMOND LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/17/2024 |
| NOC: RECORDED |
| Applicant name: RYAN M COURECH |
| Owner: A AND R-MERIDIAN REAL ESTATE DEVELOPMENT LLC |
|
Address 688 N ORLANDO AVENUE MAITLAND, FL 32751 |
|
Address SUITE 207 MAITLAND, FL 32751 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤208,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
| Original Permit #: 2024010999 |
Contractor
MCH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
668 N ORLANDO AVE, STE 207 MAITLAND, FL 32751 |
CBC1262898 (Exp: 08/31/2026) | 407-602-8257 |
Sub Contractors
DUSTIN ARCHER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2785 WRIGHTS ROAD SUITE 1133 OVIEDO, FL 32765 |
CMC1251099 (Exp: 08/31/2026) | 407-391-1145 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
DANA SUE COOLEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1718 FLAGLER BEACH, FL 32136 |
CCC1333449 (Exp: 08/31/2026) | 904-535-1680 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/25/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| ROW - FINAL APRON (AFTER POUR) | 04/23/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 04/22/25 TPOLACEK*** INSPECTOR HAD MET ON SITE WITH GRADER AND HAD THE FRONT AREA OF BERM LOWERED AS IT WAS TOO HIGH. LEFT SIDE PROPERTY IS NOW APPROVED AND WILL WORK AS INDICATED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 04/23/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 04/23/25 TPOLACEK*** PORTA POTTY AND DEBRIS REMAIN IN DRIVEWAY. I WILL APPROVE AS NOTED. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 04/22/25 TPOLACEK*** INSPECTOR HAD MET ON SITE WITH GRADER AND HAD THE FRONT AREA OF BERM LOWERED AS IT WAS TOO HIGH. LEFT SIDE PROPERTY IS NOW APPROVED AND WILL WORK AS INDICATED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| BLD - BUILDING FINAL | 04/23/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-refrigerator faceplate outlet is brockend #2-not water on hot water lines on any faucet in the house #3-6. Heat strips not marked for AH FBCR M1303.1 #4-missing dead bolds on garage door jam #5- house is not cleand , not construcction debris have to be in the property for final inspection #6- Need a GFCI outlet on hallway , in front of bathroom door #7-boot for hight voltage counduict roofing area is not install per DBPR specifications | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/22/2025 | APPROVED | TPOLACEK |
| Note: 4/16/2025 - PREVIOUS INSPECTION NOTES 04/16/25 TPOLACEK**** APPROVED SITE PLAN CALLS FOR A COMMON SWALE ALONG LEFT SIDE PROPERTY LINE. FINAL SURVEY INDICATES A BERM ALONG PROPERTY LINE. INSPECTOR WENT INTO FIELD AND UPON WALKING SITE CONFIRMED A BERM THAT DOES NOT MEET COPC REQUIREMENTS. ALL BERMS MUST HAVE A 4-1 SLOPE ALONG IMPROVED LOTS AND AN A MIMIMUM OF .20 TIP TO TOE "V" SWALE. PLEASE REMOVE BERM AND CREATE THE COMMON SWALE AS APPROVED IN SITE PLAN. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/22/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 04/22/25 TPOLACEK*** INSPECTOR HAD MET ON SITE WITH GRADER AND HAD THE FRONT AREA OF BERM LOWERED AS IT WAS TOO HIGH. LEFT SIDE PROPERTY IS NOW APPROVED AND WILL WORK AS INDICATED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/16/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 04/16/25 TPOLACEK**** APPROVED SITE PLAN CALLS FOR A COMMON SWALE ALONG LEFT SIDE PROPERTY LINE. FINAL SURVEY INDICATES A BERM ALONG PROPERTY LINE. INSPECTOR WENT INTO FIELD AND UPON WALKING SITE CONFIRMED A BERM THAT DOES NOT MEET COPC REQUIREMENTS. ALL BERMS MUST HAVE A 4-1 SLOPE ALONG IMPROVED LOTS AND AN A MIMIMUM OF .20 TIP TO TOE "V" SWALE. PLEASE REMOVE BERM AND CREATE THE COMMON SWALE AS APPROVED IN SITE PLAN. | |||
| ELECTRIC - EARLY POWER | 04/04/2025 | APPROVED | CVANSTRAHLEN |
| ELECTRIC - EARLY POWER | 04/03/2025 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: door is lock FBC[A] 110.5-ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 03/26/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. | |||
| U - SEWER TIE IN | 02/27/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 WATER SERVICE NOT RAN YET | |||
| U-CROSS CONNECTION | 02/27/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cross connection | |||
| GRAVITY SEWER TEST | 02/27/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 WATER SERVICE NOT RAN YET | |||
| PEP TANK INSTALLATION REQUEST | 02/13/2025 | APPROVED | CBOWERMASTER |
| INSULATION | 02/10/2025 | APPROVED | CVANSTRAHLEN |
| LATH/BRICK/ WATER BARRIER | 02/04/2025 | APPROVED | CVANSTRAHLEN |
| Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 1/30/2025 3:23:53 PM *** Please remove Transition duct used for bath Exhaust, and install approved duct and Fasten and seal. M1502.4.3 Transition duct. M1502.4.1 Material and size. | |||
| ALL ROUGH | 01/30/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 1/30/2025 3:23:53 PM *** Please remove Transition duct used for bath Exhaust, and install approved duct and Fasten and seal. M1502.4.3 Transition duct. M1502.4.1 Material and size. | |||
| ROOF VALLEY & METAL | 01/14/2025 | APPROVED | CVANSTRAHLEN |
| Note: missing engineering on H17. mark on mitek pack with highligter | |||
| WALL SHEATHING | 12/31/2024 | APPROVED | CVANSTRAHLEN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/31/2024 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please fix items for next inspection missinf engineering on H11A , Mark on mitek pack with highligter missing engineering on H17. mark on mitek pack with highligter | |||
| TIE BEAM / LINTEL | 12/03/2024 | APPROVED | CVANSTRAHLEN |
| TIE BEAM / LINTEL | 12/02/2024 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: 3 points mark on plan need to be fix need tie beam on and one moved , left side of the house , mark on plans beam need to moved to center corner by garage and entrance front porch mark on plans | |||
| TIE BEAM / LINTEL | 11/26/2024 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: need tie beam on one , left side of the house , mark on plans beam need to moved to center corner by garage and entrance front porch mark on plans | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/26/2024 | APPROVED | JMYERS |
| MONOLITHIC SLAB | 10/31/2024 | APPROVED | CVANSTRAHLEN |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/24/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: WATER SERVICE NOT RAN YET | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 09/30/2024 | APPROVED | CPISCITELLI |
| WATER METER INSTALLATION REQUEST | 09/19/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 04/17/2025 | 04/17/2025 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM NO ATTACHMENTS | |||
| MECH | COMPLETE | 12/20/2024 | 12/23/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/05/2024 | 12/10/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/05/2024 | 12/09/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/19/2024 | 11/26/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/19/2024 | 11/19/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/24/2024 | 09/30/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/04/2024 | 09/04/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/26/2024 | 09/03/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 08/08/2024 | 08/08/2024 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM letter states Palm Bay | |||
| SW1 | COMPLETE | 07/10/2024 | 07/16/2024 |
| Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/25/2024 | 07/02/2024 |
| Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM Please include the inverts of adjacent developed property (Lot 17). | |||
| SW1 | HOLD | 06/18/2024 | 06/25/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Please upload revised site plan refelcting previous comment, see below: Please callout adjacent lot 17 as improved and include the existing FFE. | |||
| MECH | COMPLETE | 06/18/2024 | 06/24/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide duct alyout signed by ac contractor | |||
| BADMIN | COMPLETE | 06/11/2024 | 06/17/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 06/11/2024 | 06/12/2024 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/11/2024 | 06/11/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/11/2024 | 06/13/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/11/2024 | 06/11/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please indicate FFE of house on adjacent lot. | |||
| ZON | COMPLETE | 06/11/2024 | 06/12/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/11/2024 | 06/17/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide duct alyout signed by ac contractor | |||
| SWALE | COMPLETE | 06/11/2024 | 09/27/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/25/2025 |
| CONNECTION FEES | ¤1,187.26 | 07/17/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 07/17/2024 |
| IMPACT FEE FIRE | ¤428.09 | 07/17/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/17/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/17/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 07/17/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/17/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 07/17/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/17/2024 |
| SURCHARGE FS 533.721 | ¤5.41 | 07/17/2024 |
| SURCHARGE - FS 468.631 | ¤8.12 | 07/17/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/17/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/17/2024 |
| SW ENG PRE APRON | ¤30.00 | 07/17/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/17/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/17/2024 |
| SEWER CREDIT | (¤1,147.00) | 07/17/2024 |
| SEWER INSPECTION | ¤25.00 | 07/17/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 07/17/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 07/17/2024 |
| SITE PLAN 30 | ¤30.00 | 07/17/2024 |
| WATER- TURN ON | ¤25.00 | 07/17/2024 |
| ADJUSTMENT 50% | (¤541.05) | 07/17/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/17/2024 |
| INSPECTION - RESIDENTIAL | ¤918.50 | 07/17/2024 |
| PLAN REVIEW - APPROVED MASTER | ¤133.60 | 07/17/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,650.58 |