I want to search for...

Permit #2024060977

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00690-0210
CONDITIONED SPACE: 2735 sqft
GARAGE: 935 sqft
OPENED PORCH (WITH ROOF) : 120 sqft
PATIO/DECK (NO ROOF) : 300 sqft
Total Square Footage: 4090 sqft
Block: 00690
Subdivision: -
Job Phone: 904-888-6443
Location Address: 6 SETON PL
Type: DU - DUPLEX
Issue Date: 07/08/2024
NOC: RECORDED
Applicant name: AMIR BENTOV
Owner: 3DRE LLC

Address

820 S EDENBRIDGE WAY

ST AUGUSTINE, FL 32092

Lot: 0210
Contracted Stated Job Value: ¤350,000.00
Job Description: Duplex
Type: CN

Contractor

MAVEN HOMES LLC
Status Location Address State License Number Phone
ACTIVE

2800 N 6TH ST UNIT 790

,

CRC1333741 (Exp: 08/31/2026) 904-667-4330

Sub Contractors

GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/23/2025 Approval - Private Provider PPROVIDER
Note: 7/22/2025 2:25:27 PM- PREVIOUS INSPECTION NOTES
BLD - BUILDING FINAL 07/22/2025 Disapproved- Private Provider PPROVIDER
BLD - BUILDING FINAL 07/21/2025 CANCELLED BY APPLICANT WEB
U -UTILITY RESIDENTIAL FINAL 07/15/2025 FINAL APPROVED BWRIGHT
ROW - FINAL INSPECTION 06/03/2025 APPROVED FSLADISH
Note: 6/3/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________ 5/27/2025 - PREVIOUS INSPECTION NOTES 5/27/25 NO CHANGES AT THE TIME OF THIS INSPECTION. PLEASE READ PREVIOUS INSPECTORS NOTE FROM 4/8/25. YOU NEED TO REMOVE ALL TRASH AND CONSTUCTUION DEBIS FRON REAR RESERVED PARCEL AND HOME SITE. YOU NEED TO SEED AND STRAW REAR PROPERTY LINE WHERER IT IS BARE DIRT. STORMWATER FINAL INSPECTION Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage. PLEASE SEE PHOTO FOR REFERENCE.
ROW - FINAL INSPECTION 05/27/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 5/27/25 NO CHANGES AT THE TIME OF THIS INSPECTION. PLEASE READ PREVIOUS INSPECTORS NOTE FROM 4/8/25. YOU NEED TO REMOVE ALL TRASH AND CONSTUCTUION DEBIS FRON REAR RESERVED PARCEL AND HOME SITE. YOU NEED TO SEED AND STRAW REAR PROPERTY LINE WHERER IT IS BARE DIRT. STORMWATER FINAL INSPECTION Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage. PLEASE SEE PHOTO FOR REFERENCE.
U-CROSS CONNECTION 05/27/2025 APPROVED DHANEY
ELECTRIC - EARLY POWER 04/09/2025 Approval - Private Provider PPROVIDER
ROW - FINAL APRON (AFTER POUR) 04/08/2025 APPROVED EMADISON
Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/08/2025 APPROVED EMADISON
Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 04/08/2025 APPROVED - AS NOTED EMADISON
Note: ** 04/08/25 BEFORE THE ROW STORMWATER FINAL IS APPROVED NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM THE REAR RESERVED PARCEL ** NEED TO SEED AND STRAW ALL BARE EARTH ACROSSS THE REAR PROPERTY LINE
ROW- PRE-APRON (PRE-POUR) 03/17/2025 APPROVED FSLADISH
Note: 3/17/25 PIPE ELEVATIONS GOOD AT THIS TIME. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
SEWER TIE IN 03/07/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 03/06/2025 Approval - Private Provider PPROVIDER
INSULATION 02/04/2025 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 01/29/2025 Approval - Private Provider PPROVIDER
ALL ROUGH 01/24/2025 Approval - Private Provider PPROVIDER
Note: 1/23/2025 7:33:56 AM- PREVIOUS INSPECTION NOTES 1/21/2025 4:19:13 PM- PREVIOUS INSPECTION NOTES
ALL ROUGH 01/22/2025 CANCELLED BY APPLICANT PPROVIDER
Note: 1/21/2025 4:19:13 PM- PREVIOUS INSPECTION NOTES
ALL ROUGH 01/21/2025 Disapproved- Private Provider PPROVIDER
FIREWALL FINAL 11/12/2024 Approval - Private Provider PPROVIDER
FIREWALL FRAMING 10/30/2024 Approval - Private Provider PPROVIDER
FIREWALL DRYWALL NAILING 10/30/2024 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 10/25/2024 Approval - Private Provider PPROVIDER
Note: 10/23/2024 2:40:40 PM- PREVIOUS INSPECTION NOTES
ROOF VALLEY & METAL 10/23/2024 CANCELLED BY APPLICANT PPROVIDER
WALL SHEATHING 10/18/2024 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/18/2024 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 09/09/2024 Approval - Private Provider PPROVIDER
Note: 9/5/2024 2:56:43 PM- PREVIOUS INSPECTION NOTES 9/3/2024 8:12:39 AM- PREVIOUS INSPECTION NOTES
TIE BEAM / LINTEL 09/05/2024 Disapproved- Private Provider PPROVIDER
Note: 9/3/2024 8:12:39 AM- PREVIOUS INSPECTION NOTES
TIE BEAM / LINTEL 08/30/2024 Disapproved- Private Provider MRAMOS
FOUND SURVEY APPROVED (OFFICE) 08/23/2024 APPROVED TBAKER
MONOLITHIC SLAB 08/20/2024 Approval - Private Provider PPROVIDER
Note: 8/19/2024 4:13:52 PM- PREVIOUS INSPECTION NOTES
MONOLITHIC SLAB 08/19/2024 Disapproved- Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 08/13/2024 Approval - Private Provider PPROVIDER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 08/12/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 07/22/2024 APPROVED CBOWERMASTER
Note: 7/15/2024 7:20:08 AM- PREVIOUS INSPECTION NOTES still clearing when inspector went by
WATER METER INSTALLATION REQUEST 07/11/2024 Disapproved -FEE REQUIRED CBOWERMASTER
Note: still clearing when inspector went by

Review History

Department Status Date In Date Out
BADMIN INFORMATION 06/18/2025 06/26/2025
Note: Marked INFORMATION By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Termite for wong address
ENGIN1 COMPLETE 08/23/2024 08/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/23/2024 08/23/2024
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
BADMIN INFORMATION 08/06/2024 08/06/2024
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please label your file names just as the document appears. no addresses or names
BLD COMPLETE 08/06/2024 08/12/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 06/26/2024 06/26/2024
Note: Released By: JPI
ELEC COMPLETE 06/26/2024 06/27/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 06/25/2024 12/06/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN COMPLETE 06/21/2024 06/25/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 06/21/2024 06/24/2024
Note: Held By: JPI 1. Based on an internet inquiry, FL 5675, 101922, and 18449 are not current product approval numbers. Please cure. 107.2.4
CUSVC COMPLETE 06/21/2024 06/24/2024
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 06/21/2024 06/25/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need smoke alarm and carbon outside of spare beds. NEC 2020 FRC 2023 314 315
ENGIN1 COMPLETE 06/21/2024 06/25/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 06/21/2024 06/24/2024
LOCATE COMPLETE 06/21/2024 06/25/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 06/21/2024 06/25/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 06/21/2024 06/25/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON COMPLETE 06/21/2024 06/24/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 07/18/2025
REINSPECTION FEE ¤40.00 07/18/2025
SURCHARGE FS 533.721 ¤6.32 07/08/2024
SURCHARGE - FS 468.631 ¤9.48 07/08/2024
SW ENG - FOUNDATION SURVEY ¤20.00 07/08/2024
SW ENG INSPECTION 80 ¤80.00 07/08/2024
SW ENG PRE APRON ¤30.00 07/08/2024
SW ENG - REVIEW 20 ¤20.00 07/08/2024
SW ENG RES REVIEW 200 ¤200.00 07/08/2024
SEWER CREDIT (¤1,700.00) 07/08/2024
SEWER INSPECTION ¤25.00 07/08/2024
SEWER CAPITAL FACILITY ¤12,241.04 07/08/2024
WATER CAPITAL FACILITY FEE ¤8,702.28 07/08/2024
SITE PLAN 30 ¤30.00 07/08/2024
WATER- TURN ON ¤50.00 07/08/2024
ADJUSTMENT 10% (¤45.20) 07/08/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/08/2024
ADMINISTRATIVE - RESID PP ¤225.00 07/08/2024
PLAN REVIEW - RESIDENTIAL ¤421.98 07/08/2024
CONNECTION FEES ¤2,374.52 07/08/2024
FC IMPACT FEE EMS ¤124.00 07/08/2024
IMPACT FEE FIRE ¤856.18 07/08/2024
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 07/08/2024
FC IMPACT FEE LIBRARY ¤536.00 07/08/2024
IMPACT FEE PARKS ¤3,600.18 07/08/2024
IMPACT FEE SCHOOL ¤10,900.00 07/08/2024
IMPACT FEE TRANSPORTATION ¤2,890.00 07/08/2024
WATER -IRRIGATION INSPECTION ¤50.00 07/08/2024
Fees Total Due: ¤0.00 Total Paid: ¤42,172.78