I want to search for...

Permit #2024061108

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7022-00310-0030
Block: 00310
Subdivision: -
Job Phone: 732-421-5880
Location Address: 10 WESTMILL LN
Type: DR - DRIVEWAY
Issue Date: 08/28/2024
NOC: Unknown
Applicant name: CLAUDIO MIGUEL SARAIVA
Owner: VELEZ DANIEL SR & IRMA H&W

Address

10 WESTMILL LN

PALM COAST, FL 32164

Lot: 0030
Contracted Stated Job Value: ¤3,900.00
Job Description: REPLACE CONCRETE DRIVEWAY AND ADD CIRCULAR
Type: CN

Contractor

CMS CONSTRUCTION LLC
Status Location Address Phone
INACTIVE

19 BRADDOCK LN

PALM COAST, FL 32137

732-421-5880

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 03/04/2025 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 01/14/2025 APPROVED TPOLACEK
Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 12/19/2024 - PREVIOUS INSPECTION NOTES 12/19/24 TPOLACEK** 08:56AM AT THIS TIME THE HOT PATCH IS NOT COMPLETED. PLEASE COMPLETE HOT PATCH BEFORE REQUESTING AFTER POUR INSPECTION +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/5/2024 - PREVIOUS INSPECTION NOTES 11/05/24 TPOLACEK*** CULVERT PIPES NEED TO BE CLEANED OUT OF ALL SEDIMENT, ALL OVER POUR CONCRETE NEEDS TO BE CHIPPED OFF PIPE AND EDGE OF DRIVEWAY,SOD MUST MATCH LEVEL OF CONCRETE TO PREVENT INJURY. ALL BARE EARTH IN THE RIGHT OF WAY MUST HAVE SOD MATCHING EXISTING GRADE. BOTH DRIVEWAY APRONS MUST HAVE HOT PATCH INSTALLED. PHOTOS ATTACHED AS WELL AS COPC CODES. ALL ROADWAY DAMAGE REPAIRS SHALL BE PERFORMED WITH " HOT MIX" ASPHALT. " COLD PATCH" AND CONCRETE WILL NOT BE ACCEPTED. PATCHES ARE TO BE A MINIMUM OF 12" WIDE Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion.
ROW - FINAL INSPECTION 01/14/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - FINAL APRON (AFTER POUR) 12/19/2024 Disapproved -FEE REQUIRED TPOLACEK
Note: 12/19/24 TPOLACEK** 08:56AM AT THIS TIME THE HOT PATCH IS NOT COMPLETED. PLEASE COMPLETE HOT PATCH BEFORE REQUESTING AFTER POUR INSPECTION +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/5/2024 - PREVIOUS INSPECTION NOTES 11/05/24 TPOLACEK*** CULVERT PIPES NEED TO BE CLEANED OUT OF ALL SEDIMENT, ALL OVER POUR CONCRETE NEEDS TO BE CHIPPED OFF PIPE AND EDGE OF DRIVEWAY,SOD MUST MATCH LEVEL OF CONCRETE TO PREVENT INJURY. ALL BARE EARTH IN THE RIGHT OF WAY MUST HAVE SOD MATCHING EXISTING GRADE. BOTH DRIVEWAY APRONS MUST HAVE HOT PATCH INSTALLED. PHOTOS ATTACHED AS WELL AS COPC CODES. ALL ROADWAY DAMAGE REPAIRS SHALL BE PERFORMED WITH " HOT MIX" ASPHALT. " COLD PATCH" AND CONCRETE WILL NOT BE ACCEPTED. PATCHES ARE TO BE A MINIMUM OF 12" WIDE Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion.
ROW - FINAL APRON (AFTER POUR) 11/05/2024 Disapproved -FEE REQUIRED TPOLACEK
Note: 11/05/24 TPOLACEK*** CULVERT PIPES NEED TO BE CLEANED OUT OF ALL SEDIMENT, ALL OVER POUR CONCRETE NEEDS TO BE CHIPPED OFF PIPE AND EDGE OF DRIVEWAY,SOD MUST MATCH LEVEL OF CONCRETE TO PREVENT INJURY. ALL BARE EARTH IN THE RIGHT OF WAY MUST HAVE SOD MATCHING EXISTING GRADE. BOTH DRIVEWAY APRONS MUST HAVE HOT PATCH INSTALLED. PHOTOS ATTACHED AS WELL AS COPC CODES. ALL ROADWAY DAMAGE REPAIRS SHALL BE PERFORMED WITH " HOT MIX" ASPHALT. " COLD PATCH" AND CONCRETE WILL NOT BE ACCEPTED. PATCHES ARE TO BE A MINIMUM OF 12" WIDE Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion.
ROW- PRE-APRON (PRE-POUR) 08/30/2024 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.

Review History

Department Status Date In Date Out
ZON COMPLETE 07/02/2024 07/02/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/25/2024 06/28/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 06/25/2024 07/01/2024
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON HOLD 06/25/2024 06/25/2024
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM demonstrate that the arc of circular driveway will have a minimum of 5' from propertry line to arc.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 03/03/2025
SW ENG RES REVIEW 200 ¤200.00 08/28/2024
SITE PLAN 15 ¤15.00 08/28/2024
ADJUSTMENT 10% (¤3.00) 08/28/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/28/2024
SW ENG INSPECTION 40 ¤40.00 08/28/2024
SW ENG PRE APRON ¤30.00 08/28/2024
Fees Total Due: ¤0.00 Total Paid: ¤332.00