I want to search for...
Permit #2024061108
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7022-00310-0030 |
| Block: 00310 |
| Subdivision: - |
| Job Phone: 732-421-5880 |
| Location Address: 10 WESTMILL LN |
| Type: DR - DRIVEWAY |
| Issue Date: 08/28/2024 |
| NOC: Unknown |
| Applicant name: CLAUDIO MIGUEL SARAIVA |
| Owner: VELEZ DANIEL SR & IRMA H&W |
|
Address 10 WESTMILL LN PALM COAST, FL 32164 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤3,900.00 |
| Job Description: REPLACE CONCRETE DRIVEWAY AND ADD CIRCULAR |
| Type: CN |
Contractor
CMS CONSTRUCTION LLC
| Status | Location Address | Phone |
| INACTIVE |
19 BRADDOCK LN PALM COAST, FL 32137 |
732-421-5880 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 03/04/2025 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 01/14/2025 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 12/19/2024 - PREVIOUS INSPECTION NOTES 12/19/24 TPOLACEK** 08:56AM AT THIS TIME THE HOT PATCH IS NOT COMPLETED. PLEASE COMPLETE HOT PATCH BEFORE REQUESTING AFTER POUR INSPECTION +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/5/2024 - PREVIOUS INSPECTION NOTES 11/05/24 TPOLACEK*** CULVERT PIPES NEED TO BE CLEANED OUT OF ALL SEDIMENT, ALL OVER POUR CONCRETE NEEDS TO BE CHIPPED OFF PIPE AND EDGE OF DRIVEWAY,SOD MUST MATCH LEVEL OF CONCRETE TO PREVENT INJURY. ALL BARE EARTH IN THE RIGHT OF WAY MUST HAVE SOD MATCHING EXISTING GRADE. BOTH DRIVEWAY APRONS MUST HAVE HOT PATCH INSTALLED. PHOTOS ATTACHED AS WELL AS COPC CODES. ALL ROADWAY DAMAGE REPAIRS SHALL BE PERFORMED WITH " HOT MIX" ASPHALT. " COLD PATCH" AND CONCRETE WILL NOT BE ACCEPTED. PATCHES ARE TO BE A MINIMUM OF 12" WIDE Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. | |||
| ROW - FINAL INSPECTION | 01/14/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 12/19/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 12/19/24 TPOLACEK** 08:56AM AT THIS TIME THE HOT PATCH IS NOT COMPLETED. PLEASE COMPLETE HOT PATCH BEFORE REQUESTING AFTER POUR INSPECTION +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/5/2024 - PREVIOUS INSPECTION NOTES 11/05/24 TPOLACEK*** CULVERT PIPES NEED TO BE CLEANED OUT OF ALL SEDIMENT, ALL OVER POUR CONCRETE NEEDS TO BE CHIPPED OFF PIPE AND EDGE OF DRIVEWAY,SOD MUST MATCH LEVEL OF CONCRETE TO PREVENT INJURY. ALL BARE EARTH IN THE RIGHT OF WAY MUST HAVE SOD MATCHING EXISTING GRADE. BOTH DRIVEWAY APRONS MUST HAVE HOT PATCH INSTALLED. PHOTOS ATTACHED AS WELL AS COPC CODES. ALL ROADWAY DAMAGE REPAIRS SHALL BE PERFORMED WITH " HOT MIX" ASPHALT. " COLD PATCH" AND CONCRETE WILL NOT BE ACCEPTED. PATCHES ARE TO BE A MINIMUM OF 12" WIDE Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. | |||
| ROW - FINAL APRON (AFTER POUR) | 11/05/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 11/05/24 TPOLACEK*** CULVERT PIPES NEED TO BE CLEANED OUT OF ALL SEDIMENT, ALL OVER POUR CONCRETE NEEDS TO BE CHIPPED OFF PIPE AND EDGE OF DRIVEWAY,SOD MUST MATCH LEVEL OF CONCRETE TO PREVENT INJURY. ALL BARE EARTH IN THE RIGHT OF WAY MUST HAVE SOD MATCHING EXISTING GRADE. BOTH DRIVEWAY APRONS MUST HAVE HOT PATCH INSTALLED. PHOTOS ATTACHED AS WELL AS COPC CODES. ALL ROADWAY DAMAGE REPAIRS SHALL BE PERFORMED WITH " HOT MIX" ASPHALT. " COLD PATCH" AND CONCRETE WILL NOT BE ACCEPTED. PATCHES ARE TO BE A MINIMUM OF 12" WIDE Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/30/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 07/02/2024 | 07/02/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/25/2024 | 06/28/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 06/25/2024 | 07/01/2024 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/25/2024 | 06/25/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM demonstrate that the arc of circular driveway will have a minimum of 5' from propertry line to arc. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 03/03/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/28/2024 |
| SITE PLAN 15 | ¤15.00 | 08/28/2024 |
| ADJUSTMENT 10% | (¤3.00) | 08/28/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/28/2024 |
| SW ENG INSPECTION 40 | ¤40.00 | 08/28/2024 |
| SW ENG PRE APRON | ¤30.00 | 08/28/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤332.00 |