Permit #2024061147
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00240-0500 |
| CONDITIONED SPACE: 3048 sqft |
| GARAGE: 826 sqft |
| OPENED PORCH (WITH ROOF) : 284 sqft |
| Total Square Footage: 4158 sqft |
| Block: 00240 |
| Subdivision: - |
| Job Phone: 386-445-9009 |
| Location Address: 45 SEATHORN PATH |
| Type: DU - DUPLEX |
| Issue Date: 07/31/2024 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: SEAGATE HOMES LLC |
|
Address 185 CYPRESS POINT PARKWAY PALM COAST, FL 32164 |
|
Address SUITE 7 PALM COAST, FL 32164 |
| Lot: 0500 |
| Contracted Stated Job Value: ¤506,117.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
ROBERTO F GONZALEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
212 PALMETTO AVE CRESCENT CITY, FL 32112 |
RF11067887 (Exp: 08/31/2027) | 286-559-2885 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 01/31/2025 | APPROVED | FSLADISH |
| Note: 1/31/25 BOTH PIPE ELEVATIONS ARE GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 1/22/25 UPON WALKING PROPERTY HAVE DETERMINED THAT THERE IS INDEED A FLAT LOW AREA AT THE LEFT REAR STUCTURE CORNER AND IT IS POOLING HERE AND NOT FLOWING FORWARD. THIS AREA WILL NEED TO BE CORRECTED BEFORE ROW FINAL SURVEY. IN THE RIGHT REAR STRUCTURE CORNER TYOU WILL NEED TO REMOVE/RELOCATE THE TREE AS IT IS DIRECTLY IN THE DRAINAGE CONVEYANCE AT THIS TIME. APPROVING AS NOTED THAT THESE ISSUES WILL NEED TO BE CORRECTED BEFORE ROW FINAL PASSAGE. AS A REMINDER, BUILDER IS RESPONSIBLE FOR REPAIRING THE MEDIAN BEFORE ROW PASSAGE AS NOTED AND DOCUMENTED PEVIOUSLY. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9463 1/22/25 REAR LEFT CORNER OFF OF STRUCTURE SHOWS 25.15 FLAT AROUND CORNER AND THEN UPHILL TO A 25.35. THIS WILL ALLOW WATER TO POOL AND NOT HAVE POSITIVE FORWARD FLOW. AS THIS IS THE ONLY NOTICEABLE DISCREPENCY I SEE, I WILL APPROVE THIS SURVEY AS NOTED AND SEE IF THIS IS TRUE IN THE FIELD. | |||
| ROW - FINAL INSPECTION | 01/31/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/31/25 MEDIAN REPAIRED. ALL REQUIRED CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. LET JOE CM KNOW THAT THERE IS AN AREA IN THE FRONTSLOPE BETWWEN THE DRIVEWAYS THAT NEED TWO PIECES OF SOD. I AM APPROVING THIS AS NOTED THAT THE REPAIR WILL BE MADE. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 1/22/25 UPON WALKING PROPERTY HAVE DETERMINED THAT THERE IS INDEED A FLAT LOW AREA AT THE LEFT REAR STUCTURE CORNER AND IT IS POOLING HERE AND NOT FLOWING FORWARD. THIS AREA WILL NEED TO BE CORRECTED BEFORE ROW FINAL SURVEY. IN THE RIGHT REAR STRUCTURE CORNER TYOU WILL NEED TO REMOVE/RELOCATE THE TREE AS IT IS DIRECTLY IN THE DRAINAGE CONVEYANCE AT THIS TIME. APPROVING AS NOTED THAT THESE ISSUES WILL NEED TO BE CORRECTED BEFORE ROW FINAL PASSAGE. AS A REMINDER, BUILDER IS RESPONSIBLE FOR REPAIRING THE MEDIAN BEFORE ROW PASSAGE AS NOTED AND DOCUMENTED PEVIOUSLY. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9463 1/22/25 REAR LEFT CORNER OFF OF STRUCTURE SHOWS 25.15 FLAT AROUND CORNER AND THEN UPHILL TO A 25.35. THIS WILL ALLOW WATER TO POOL AND NOT HAVE POSITIVE FORWARD FLOW. AS THIS IS THE ONLY NOTICEABLE DISCREPENCY I SEE, I WILL APPROVE THIS SURVEY AS NOTED AND SEE IF THIS IS TRUE IN THE FIELD. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/27/2025 | FINAL APPROVED | BWRIGHT |
| U-CROSS CONNECTION | 01/27/2025 | APPROVED | BWRIGHT |
| BLD - BUILDING FINAL | 01/27/2025 | FINAL APPROVED | BTAYLOR |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/22/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/22/25 RIGHT REAR CORNER OFF OF STRUCTURE SHOWS 25.15 FLAT AROUND CORNER AND THEN UPHILL TO A 25.35. THIS WILL ALLOW WATER TO POOL AND NOT HAVE POSITIVE FORWARD FLOW. AS THIS IS THE ONLY NOTICEABLE DISCREPENCY I SEE, I WILL APPROVE THIS SURVEY AS NOTED AND SEE IF THIS IS TRUE IN THE FIELD. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/22/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/22/25 UPON WALKING PROPERTY HAVE DETERMINED THAT THERE IS INDEED A FLAT LOW AREA AT THE LEFT REAR STUCTURE CORNER AND IT IS POOLING HERE AND NOT FLOWING FORWARD. THIS AREA WILL NEED TO BE CORRECTED BEFORE ROW FINAL SURVEY. IN THE RIGHT REAR STRUCTURE CORNER TYOU WILL NEED TO REMOVE/RELOCATE THE TREE AS IT IS DIRECTLY IN THE DRAINAGE CONVEYANCE AT THIS TIME. APPROVING AS NOTED THAT THESE ISSUES WILL NEED TO BE CORRECTED BEFORE ROW FINAL PASSAGE. AS A REMINDER, BUILDER IS RESPONSIBLE FOR REPAIRING THE MEDIAN BEFORE ROW PASSAGE AS NOTED AND DOCUMENTED PEVIOUSLY. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9463 1/22/25 REAR LEFT CORNER OFF OF STRUCTURE SHOWS 25.15 FLAT AROUND CORNER AND THEN UPHILL TO A 25.35. THIS WILL ALLOW WATER TO POOL AND NOT HAVE POSITIVE FORWARD FLOW. AS THIS IS THE ONLY NOTICEABLE DISCREPENCY I SEE, I WILL APPROVE THIS SURVEY AS NOTED AND SEE IF THIS IS TRUE IN THE FIELD. | |||
| ELECTRIC - EARLY POWER | 01/03/2025 | APPROVED | LMILLER |
| Note: 12/31/2024 - PREVIOUS INSPECTION NOTES Electricains still trimming out duplex | |||
| ELECTRIC - EARLY POWER | 12/31/2024 | Disapproved - NO FEE | MKRASKI |
| Note: Electricains still trimming out duplex | |||
| ROW- PRE-APRON (PRE-POUR) | 12/23/2024 | APPROVED | FSLADISH |
| Note: 12/23/24 PIPE ELEVATIONS ARE OK AT THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9470 10/18/24 AT THE TIME OF THIS INSPECTION THE TEMPPIPE IS SET AT GRADE AND FLOWING. SWALE IS OPEN AND GRADED TO FLOW. PORTA POTTY AND DUMPSTER ARE ON SITE. I AM APPROVING THIS DRAINAGE INSPECTION AS NOTED THAT I WILL MONITOR THIS SITE FOR COMPLIANCE AND THAT YOU WILL BE REQUIRED TO REPAIR THE MEDIAN WHERE AND DISTURBED/DAMAGED AREAS ARE PRESENT BEFORE ROW FINAL. PHOTO FOR REFERENCE __________________________________________________________________________________________________________________________ 10/15/2024 - PREVIOUS INSPECTION NOTES 10/15/24 THIS SWALE ROW AND COPC MEDIAN ARE IN BAD CONDITION. YOU NEED TO REPAIR, CLEAN OUT AND REGRADE TO HAVE FLOW THE TEMPORARY PIPE. YOU NEED TO REMOVE THE DIRT OFF OFF THE ROADWAY. YOU ARE REQUIRED TO KEEP THE SWALE OPEN TO FLOW AND GRADED DAILY. AS STATED IN PREVIOUS DRAINAGE INSPECTION YOU WILL BE REQUIRED AND RESPONSIBLE FOR MEDIAN REPAIR AND RESODDING. I WILL BE BACK ON 10/18/24 FOR COMPLIANCE REINSPECTION ON 10/18/24. 9/20/2024 - PREVIOUS INSPECTION NOTES 9/20/24 NOTHING HAS CHANGED AT THE TIME OF THIS INSPECRTION APPROX 9 AM THERE IS A DUMPTRUCK STUCK IN THE SWALE SPINNING IT'S TIRES. YOU STILL HAVE NOT REMOVED THE CONCRETE SLAG THAT IS PILED IN THE ROW. SWALE IS NOT GRADED NOR IS THERE A TEMPORARY PIPE MINIMUM OF 12" DIAMETER THAT I SEE. I WILL BE BACK FOR COMPLIANCE REINSPECTION ON 9/ 23/24. . PORTA POTTY IN ROW. ________________________________________________________________________________________________________________________ 9/18/2024 - PREVIOUS INSPECTION NOTES 9/18/24 YOU WILL NEED TO REMOVE PORTA POTTY FROM ROW. YOU NEED TO KEEP SWALE OPEN AND GRADE DURING CONSTRUCTION PROCESS. WHILE I WAS ON SITE I OBSERVED CONCRETE PUMP TRUCK DISCHARGING A LARGE AMOUT OF CONCRETE SLAG INTO THE SWALE STORMWATER SYSTEM. THIS IS CONSIDERED ILLICIT DISCHARGE AND WILL NEED TO BE REMOVED IMMEDIATELY AS THIS IS CONSIDERED POINT OF CONTACT POLLUTION . I WILL BE BACK TOMORROW ON 9/19/24 FOR A COMPLIANCE REINSPECTION. TRUCK ALSO DAMAGED MEDIAN. BUILDER WILL BE REQUIRED TO REPAIR THE MEDIAN TO AS GOOD OR BETTER CONDITION. PICCTURE FOR REFERENCE. | |||
| ELECTRIC - EARLY POWER | 12/19/2024 | CANCELLED BY APPLICANT | WEB |
| GRAVITY SEWER TEST | 11/25/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 WATER SERVICE NOT RAN YET | |||
| SEWER TIE IN | 11/25/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 WATER SERVICE NOT RAN YET | |||
| PEP TANK INSTALLATION REQUEST | 11/13/2024 | APPROVED | CBOWERMASTER |
| FIREWALL FINAL | 11/12/2024 | APPROVED | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 11/07/2024 | APPROVED | BTAYLOR |
| INSULATION | 11/04/2024 | APPROVED | MCONTRYMAN |
| Note: Inspector Notes from Inspection 2420 1. Garage entry doors missing FBCR 402.4.1.1 2. Failed 5' head pressure test FBCR P2503.7 Check both on insulation | |||
| ALL ROUGH | 10/31/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Garage entry doors missing FBCR 402.4.1.1 2. Failed 5' head pressure test FBCR P2503.7 Check both on insulation | |||
| FIREWALL FRAMING | 10/24/2024 | APPROVED | BTAYLOR |
| FIREWALL DRYWALL NAILING | 10/24/2024 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 10/24/2024 | APPROVED | BTAYLOR |
| FIREWALL DRYWALL NAILING | 10/21/2024 | CANCELLED BY APPLICANT | WEB |
| FIREWALL FRAMING | 10/21/2024 | CANCELLED BY APPLICANT | WEB |
| ROW - DRAINAGE | 10/18/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 10/18/24 AT THE TIME OF THIS INSPECTION THE TEMPPIPE IS SET AT GRADE AND FLOWING. SWALE IS OPEN AND GRADED TO FLOW. PORTA POTTY AND DUMPSTER ARE ON SITE. I AM APPROVING THIS DRAINAGE INSPECTION AS NOTED THAT I WILL MONITOR THIS SITE FOR COMPLIANCE AND THAT YOU WILL BE REQUIRED TO REPAIR THE MEDIAN WHERE AND DISTURBED/DAMAGED AREAS ARE PRESENT BEFORE ROW FINAL. PHOTO FOR REFERENCE __________________________________________________________________________________________________________________________ 10/15/2024 - PREVIOUS INSPECTION NOTES 10/15/24 THIS SWALE ROW AND COPC MEDIAN ARE IN BAD CONDITION. YOU NEED TO REPAIR, CLEAN OUT AND REGRADE TO HAVE FLOW THE TEMPORARY PIPE. YOU NEED TO REMOVE THE DIRT OFF OFF THE ROADWAY. YOU ARE REQUIRED TO KEEP THE SWALE OPEN TO FLOW AND GRADED DAILY. AS STATED IN PREVIOUS DRAINAGE INSPECTION YOU WILL BE REQUIRED AND RESPONSIBLE FOR MEDIAN REPAIR AND RESODDING. I WILL BE BACK ON 10/18/24 FOR COMPLIANCE REINSPECTION ON 10/18/24. 9/20/2024 - PREVIOUS INSPECTION NOTES 9/20/24 NOTHING HAS CHANGED AT THE TIME OF THIS INSPECRTION APPROX 9 AM THERE IS A DUMPTRUCK STUCK IN THE SWALE SPINNING IT'S TIRES. YOU STILL HAVE NOT REMOVED THE CONCRETE SLAG THAT IS PILED IN THE ROW. SWALE IS NOT GRADED NOR IS THERE A TEMPORARY PIPE MINIMUM OF 12" DIAMETER THAT I SEE. I WILL BE BACK FOR COMPLIANCE REINSPECTION ON 9/ 23/24. . PORTA POTTY IN ROW. ________________________________________________________________________________________________________________________ 9/18/2024 - PREVIOUS INSPECTION NOTES 9/18/24 YOU WILL NEED TO REMOVE PORTA POTTY FROM ROW. YOU NEED TO KEEP SWALE OPEN AND GRADE DURING CONSTRUCTION PROCESS. WHILE I WAS ON SITE I OBSERVED CONCRETE PUMP TRUCK DISCHARGING A LARGE AMOUT OF CONCRETE SLAG INTO THE SWALE STORMWATER SYSTEM. THIS IS CONSIDERED ILLICIT DISCHARGE AND WILL NEED TO BE REMOVED IMMEDIATELY AS THIS IS CONSIDERED POINT OF CONTACT POLLUTION . I WILL BE BACK TOMORROW ON 9/19/24 FOR A COMPLIANCE REINSPECTION. TRUCK ALSO DAMAGED MEDIAN. BUILDER WILL BE REQUIRED TO REPAIR THE MEDIAN TO AS GOOD OR BETTER CONDITION. PICCTURE FOR REFERENCE. | |||
| WALL SHEATHING | 10/16/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/16/2024 | APPROVED | BTAYLOR |
| ROW - DRAINAGE | 10/15/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 10/15/24 THIS SWALE ROW AND COPC MEDIAN ARE IN BAD CONDITION. YOU NEED TO REPAIR, CLEAN OUT AND REGRADE TO HAVE FLOW THE TEMPORARY PIPE. YOU NEED TO REMOVE THE DIRT OFF OFF THE ROADWAY. YOU ARE REQUIRED TO KEEP THE SWALE OPEN TO FLOW AND GRADED DAILY. AS STATED IN PREVIOUS DRAINAGE INSPECTION YOU WILL BE REQUIRED AND RESPONSIBLE FOR MEDIAN REPAIR AND RESODDING. I WILL BE BACK ON 10/18/24 FOR COMPLIANCE REINSPECTION ON 10/18/24. 9/20/2024 - PREVIOUS INSPECTION NOTES 9/20/24 NOTHING HAS CHANGED AT THE TIME OF THIS INSPECRTION APPROX 9 AM THERE IS A DUMPTRUCK STUCK IN THE SWALE SPINNING IT'S TIRES. YOU STILL HAVE NOT REMOVED THE CONCRETE SLAG THAT IS PILED IN THE ROW. SWALE IS NOT GRADED NOR IS THERE A TEMPORARY PIPE MINIMUM OF 12" DIAMETER THAT I SEE. I WILL BE BACK FOR COMPLIANCE REINSPECTION ON 9/ 23/24. . PORTA POTTY IN ROW. ________________________________________________________________________________________________________________________ 9/18/2024 - PREVIOUS INSPECTION NOTES 9/18/24 YOU WILL NEED TO REMOVE PORTA POTTY FROM ROW. YOU NEED TO KEEP SWALE OPEN AND GRADE DURING CONSTRUCTION PROCESS. WHILE I WAS ON SITE I OBSERVED CONCRETE PUMP TRUCK DISCHARGING A LARGE AMOUT OF CONCRETE SLAG INTO THE SWALE STORMWATER SYSTEM. THIS IS CONSIDERED ILLICIT DISCHARGE AND WILL NEED TO BE REMOVED IMMEDIATELY AS THIS IS CONSIDERED POINT OF CONTACT POLLUTION . I WILL BE BACK TOMORROW ON 9/19/24 FOR A COMPLIANCE REINSPECTION. TRUCK ALSO DAMAGED MEDIAN. BUILDER WILL BE REQUIRED TO REPAIR THE MEDIAN TO AS GOOD OR BETTER CONDITION. PICCTURE FOR REFERENCE. | |||
| TIE BEAM / LINTEL | 10/01/2024 | APPROVED | PKNAPIK |
| FOUND SURVEY APPROVED (OFFICE) | 09/30/2024 | APPROVED | JMYERS |
| ROW - DRAINAGE | 09/20/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 9/20/24 NOTHING HAS CHANGED AT THE TIME OF THIS INSPECRTION APPROX 9 AM THERE IS A DUMPTRUCK STUCK IN THE SWALE SPINNING IT'S TIRES. YOU STILL HAVE NOT REMOVED THE CONCRETE SLAG THAT IS PILED IN THE ROW. SWALE IS NOT GRADED NOR IS THERE A TEMPORARY PIPE MINIMUM OF 12" DIAMETER THAT I SEE. I WILL BE BACK FOR COMPLIANCE REINSPECTION ON 9/ 23/24. . PORTA POTTY IN ROW. ________________________________________________________________________________________________________________________ 9/18/2024 - PREVIOUS INSPECTION NOTES 9/18/24 YOU WILL NEED TO REMOVE PORTA POTTY FROM ROW. YOU NEED TO KEEP SWALE OPEN AND GRADE DURING CONSTRUCTION PROCESS. WHILE I WAS ON SITE I OBSERVED CONCRETE PUMP TRUCK DISCHARGING A LARGE AMOUT OF CONCRETE SLAG INTO THE SWALE STORMWATER SYSTEM. THIS IS CONSIDERED ILLICIT DISCHARGE AND WILL NEED TO BE REMOVED IMMEDIATELY AS THIS IS CONSIDERED POINT OF CONTACT POLLUTION . I WILL BE BACK TOMORROW ON 9/19/24 FOR A COMPLIANCE REINSPECTION. TRUCK ALSO DAMAGED MEDIAN. BUILDER WILL BE REQUIRED TO REPAIR THE MEDIAN TO AS GOOD OR BETTER CONDITION. PICCTURE FOR REFERENCE. | |||
| ROW - DRAINAGE | 09/18/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 9/18/24 YOU WILL NEED TO REMOVE PORTA POTTY FROM ROW. YOU NEED TO KEEP SWALE OPEN AND GRADE DURING CONSTRUCTION PROCESS. WHILE I WAS ON SITE I OBSERVED CONCRETE PUMP TRUCK DISCHARGING A LARGE AMOUT OF CONCRETE SLAG INTO THE SWALE STORMWATER SYSTEM. THIS IS CONSIDERED ILLICIT DISCHARGE AND WILL NEED TO BE REMOVED IMMEDIATELY AS THIS IS CONSIDERED POINT OF CONTACT POLLUTION . I WILL BE BACK TOMORROW ON 9/19/24 FOR A COMPLIANCE REINSPECTION. TRUCK ALSO DAMAGED MEDIAN. BUILDER WILL BE REQUIRED TO REPAIR THE MEDIAN TO AS GOOD OR BETTER CONDITION. PICCTURE FOR REFERENCE. | |||
| MONOLITHIC SLAB | 09/18/2024 | APPROVED | BTAYLOR |
| Note: 9/16/2024 - PREVIOUS INSPECTION NOTES 9-16-24 1. Footers full of water. | |||
| MONOLITHIC SLAB | 09/16/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 9-16-24 1. Footers full of water. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/09/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: WATER SERVICE NOT RAN YET | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 09/05/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 08/20/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 12/11/2024 | 12/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/25/2024 | 10/29/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/30/2024 | 09/30/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/30/2024 | 09/30/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/29/2024 | 09/05/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/25/2024 | 07/30/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 07/17/2024 | 07/23/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. 4/0 copper is not rated for a 400 amp service. NEC 2020 310.12 | |||
| ZON | COMPLETE | 07/10/2024 | 07/10/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 07/10/2024 | 07/16/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Can not have 2 seperate services on a duplex. 2 seperate services are for town houses. | |||
| BLD | COMPLETE | 07/10/2024 | 07/16/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 06/25/2024 | 06/27/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/25/2024 | 06/27/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Truss packet or layout needs shop drawing approval stamp by engineer of record. 2. Provide geotechnical investigation report in accordance with Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. If report determines unsuitable sub-surface conditions or unsuitable soil conditions, then engineer shall provide a soils mitigation plan in order to ensure soils are suitable to receive the building's foundation. Report to include fill and compaction specifications and engineering inspection requirements. At conclusion of any soils mitigation work, engineer will be required to certify work was performed according to plans. Be advised, if the geotechnical report reveals any unsuitable soils and / or subsurface conditions, the first inspection for this permit (1st Rough / Underground Plumbing) will be HELD until such time as a report by the geotechnical engineer is submitted to the Building Division documenting that the soil mitigation work has been completed according to the engineer's plans and is now suitable for construction. Report must also include a record of all required compaction testing. | |||
| CUSVC | COMPLETE | 06/25/2024 | 06/27/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 06/25/2024 | 06/27/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. 4/0 copper is not rated for a 400 amp service. NEC 2020 310.12 | |||
| ENGIN1 | COMPLETE | 06/25/2024 | 06/25/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/25/2024 | 06/26/2024 |
| LOCATE | COMPLETE | 06/25/2024 | 07/01/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/25/2024 | 06/26/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/25/2024 | 07/09/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | HOLD | 06/25/2024 | 06/25/2024 |
| Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM no landscape plan uploaded-cannot complete review | |||
| SWALE | COMPLETE | 06/25/2024 | 12/06/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/31/2024 |
| SW ENG PRE APRON | ¤30.00 | 07/31/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/31/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/31/2024 |
| SEWER INSPECTION | ¤25.00 | 07/31/2024 |
| SEWER CAPITAL FACILITY | ¤12,241.04 | 07/31/2024 |
| WATER CAPITAL FACILITY FEE | ¤8,702.28 | 07/31/2024 |
| SITE PLAN 30 | ¤30.00 | 07/31/2024 |
| CONNECTION FEES | ¤2,374.52 | 07/31/2024 |
| FC IMPACT FEE EMS | ¤124.00 | 07/31/2024 |
| IMPACT FEE FIRE | ¤856.18 | 07/31/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 07/31/2024 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 07/31/2024 |
| IMPACT FEE PARKS | ¤3,600.18 | 07/31/2024 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 07/31/2024 |
| IMPACT FEE TRANSPORTATION | ¤2,890.00 | 07/31/2024 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 07/31/2024 |
| SURCHARGE FS 533.721 | ¤18.60 | 07/31/2024 |
| SURCHARGE - FS 468.631 | ¤27.90 | 07/31/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/31/2024 |
| WATER- TURN ON | ¤50.00 | 07/31/2024 |
| ADJUSTMENT 10% | (¤206.68) | 07/31/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/31/2024 |
| INSPECTION - RESIDENTIAL | ¤1,586.75 | 07/31/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤450.06 | 07/31/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤45,184.33 |