Permit #2024070147
Permit Details
Status: COED
| Parcel Id: 05-12-31-2755-00000-0180 |
| GARAGE: 713 sqft |
| OPENED PORCH (WITH ROOF) : 231 sqft |
| CONDITIONED SPACE: 2116 sqft |
| OPENED PORCH (WITH ROOF) : 57 sqft |
| Total Square Footage: 3117 sqft |
| Subdivision: 2313 - THE GABLES SUBDIVISION AT TOWN CENTER |
| Job Phone: (386)756-0439 |
| Location Address: 235 HAWTHORN AVE |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/06/2024 |
| NOC: RECORDED |
| Applicant name: JAMES MICHAEL MATHER |
| Owner: PAYTAS HOMES INC |
|
Address PO BOX 290490 PORT ORANGE, FL 32127 |
| Lot: 18 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PAYTAS HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 290490 PORT ORANGE, FL 32127 |
CBC1261873 (Exp: 08/31/2026) | (386)756-0439 |
Sub Contractors
GERALD EDWARD MASTERS JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
505 HERBERT STREET PORT ORANGE, FL 32129 |
EC13003217 (Exp: 08/31/2026) | (386)304-2600 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
PHILIP ALAN KENOVICH
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 1470 HOLLY HILL, FL 32117 |
LG270 (Exp: 08/31/2026) | (386)672-2507 |
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1345 N US HIGHWAY 1 Ormond Beach, 32174 |
CAC029376 (Exp: 08/31/2026) | (386) 672-8494 | 386-673-7856 |
Inspection History
| Type | Request Date | Result | Inspector |
| GAS FINAL | 01/21/2025 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 01/21/2025 | Approval - Private Provider | PPROVIDER |
| SEWER TIE IN | 01/09/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U-CROSS CONNECTION | 01/09/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 1/9/2025 9:52:52 AM *** reclaim irr-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 01/09/2025 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 01/08/2025 | APPROVED | FSLADISH |
| Note: 1/8/25 PAVERS GLUED. NO CHIPPED, CRACKED OR BROKEN PAVERS OBSERVED AT THE TIME OF THIS INSPECTION. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/08/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/8/25 BUILDER HAS MADE REQUIRED ELEVATION/DRAINAGE CORRECTIONS. DRAINAGE WILL WORK AS INDICATED AT THIS TIME. APPROVING AS NOTED. _____________________________________________________________________________________________________________________ 12/30/2024 - PREVIOUS INSPECTION NOTES 12/30/24 NEED TO HAVE 6" FALL OFF OF STRUCTURE IN THE FIRST 10 FT. PER FLORIDA BUILDING CODE. MET WITH BOB ON SITE AND HE INDICATED HE WOULD HAVE HIS GRADER MAKE REQUIRED CORRECTION. Drainage from the structure is to be a 6-inch (5%) Residential, Chapter 4, R401.3 "Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10 FT E.Florida Building Code, Residential, Chapter 4, R401.3" | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/08/2025 | APPROVED | FSLADISH |
| Note: 1/8/25 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 1/8/25 BUILDER HAS MADE REQUIRED ELEVATION/DRAINAGE CORRECTIONS. DRAINAGE WILL WORK AS INDICATED AT THIS TIME. APPROVING AS NOTED. _____________________________________________________________________________________________________________________ 12/30/2024 - PREVIOUS INSPECTION NOTES 12/30/24 NEED TO HAVE 6" FALL OFF OF STRUCTURE IN THE FIRST 10 FT. PER FLORIDA BUILDING CODE. MET WITH BOB ON SITE AND HE INDICATED HE WOULD HAVE HIS GRADER MAKE REQUIRED CORRECTION. Drainage from the structure is to be a 6-inch (5%) Residential, Chapter 4, R401.3 "Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10 FT E.Florida Building Code, Residential, Chapter 4, R401.3" | |||
| ROW - STORMWATER FINAL | 01/08/2025 | APPROVED | FSLADISH |
| Note: 1/8/95 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ELECTRIC - EARLY POWER | 01/03/2025 | Approval - Private Provider | PPROVIDER |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/30/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 12/30/24 NEED TO HAVE 6" FALL OFF OF STRUCTURE IN THE FIRST 10 FT. PER FLORIDA BUILDING CODE. MET WITH BOB ON SITE AND HE INDICATED HE WOULD HAVE HIS GRADER MAKE REQUIRED CORRECTION. Drainage from the structure is to be a 6-inch (5%) Residential, Chapter 4, R401.3 "Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10 FT E.Florida Building Code, Residential, Chapter 4, R401.3" | |||
| ROW- PRE-APRON (PRE-POUR) | 12/04/2024 | APPROVED | FSLADISH |
| Note: 12/4/24 YOU ARE APPROVED TO LAY PAVERS AT THIS TIME. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _____________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 11/21/24 AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PAVER RESTRAINTS | 11/21/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/21/24 AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 11/21/2024 | PARTIALLY APPROVED | FSLADISH |
| Note: 11/21/24 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS SPOKE WITH BOB, GOING TO HAVE HIM MOVE THE SIDEWALK AS CLOSE TO STRAIGHT AND 9' COMING OUT OF THE CURVE DUE TO LIGHT POLE AND HANDHELD ALREADY POURED. APPROVING THIS PARTIALLY AS NOTED THAT THE SIDEWALK WILL BE MOVED BACK OVER APPROX 10-12 INCHES. | |||
| LATH/BRICK/ WATER BARRIER | 10/22/2024 | Approval - Private Provider | PPROVIDER |
| INSULATION | 10/15/2024 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 10/07/2024 | Approval - Private Provider | PPROVIDER |
| GAS ROUGH | 10/07/2024 | Approval - Private Provider | PPROVIDER |
| ELECTRIC-TUG | 09/17/2024 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 09/13/2024 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 09/11/2024 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/11/2024 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 09/11/2024 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 08/29/2024 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 08/27/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/21/2024 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/16/2024 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 08/13/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/01/2024 | 10/02/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/01/2024 | 10/02/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/01/2024 | 10/02/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/27/2024 | 09/27/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please provide revised site plan with the location of the LP tank and it's setbacks to adjacent property lines. | |||
| ZON | COMPLETE | 08/27/2024 | 08/27/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/27/2024 | 08/27/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/27/2024 | 08/27/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ENGIN1 | COMPLETE | 08/26/2024 | 08/27/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/26/2024 | 08/26/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM House does not meet minimum required 5' side setback right front on foundation survey. | |||
| ENGIN1 | COMPLETE | 08/08/2024 | 08/08/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/08/2024 | 08/23/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM The Main FFE is out of tolerance with lot 19. Please note the following in accordance with the modification letter received on 8/23/24: 1) Min. FFE must be no less than 12" above the road centerline. Max. FFE must be no more than 22" above the road centerline. Additionally, the FFE must be within 10" of adjoining improved lots. To avoid being significantly lower, the structure FFE may exceed the road centerline tolerance in order to match the FFE of adjoining improved lots. The 10" tolerance shall never be exceeded | |||
| ZON | COMPLETE | 08/08/2024 | 08/09/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/08/2024 | 07/08/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 07/03/2024 | 07/11/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/03/2024 | 07/09/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/03/2024 | 07/03/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/03/2024 | 07/10/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/03/2024 | 07/30/2024 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/03/2024 | 07/03/2024 |
| Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM must submit original right of way paver agreement | |||
| URB | COMPLETE | 07/03/2024 | 07/10/2024 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 01/22/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 08/06/2024 |
| IMPACT FEE FIRE | ¤428.09 | 08/06/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 08/06/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 08/06/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 08/06/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 08/06/2024 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 08/06/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 08/06/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/06/2024 |
| SURCHARGE FS 533.721 | ¤5.04 | 08/06/2024 |
| SURCHARGE - FS 468.631 | ¤7.56 | 08/06/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/06/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/06/2024 |
| SW ENG PRE APRON | ¤30.00 | 08/06/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/06/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/06/2024 |
| SEWER INSPECTION | ¤25.00 | 08/06/2024 |
| WORK WITHOUT PERMIT | ¤252.00 | 08/06/2024 |
| SITE PLAN 30 | ¤30.00 | 08/06/2024 |
| WATER-METER | ¤514.49 | 08/06/2024 |
| WATER-METER | ¤427.42 | 08/06/2024 |
| ADJUSTMENT 10% | (¤3.00) | 08/06/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/06/2024 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 08/06/2024 |
| CONNECTION FEES | ¤25.00 | 08/06/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,608.59 |