Permit #2024070356
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7006-00070-0120 |
| Block: 00070 |
| Subdivision: 7006 - |
| Job Phone: (386)931-7331 |
| Location Address: 21 FLORAL CT |
| Type: SW - SEAWALL |
| Issue Date: 07/16/2024 |
| NOC: RECORDED |
| Applicant name: SCOTT DALE SOWERS |
| Owner: MCLAREN EDWARD W & DAWN A H&W |
|
Address 128 MILTON DRIVE THORNWOOD, NY 10594 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤83,847.71 |
| Job Description: seawall with concrete cap |
| Type: CN |
Contractor
S E CLINE CONSTRUCTION, INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 354425 PALM COAST, FL 32137 |
CGC061947 (Exp: 08/31/2028) | (386)446-6426 | (386)446-6481 |
Inspection History
| Type | Request Date | Result | Inspector |
| SEAWALL FINAL | 06/27/2025 | FINAL APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2570 Final section of wall. | |||
| ROW - STORMWATER FINAL | 06/24/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL INSPECTION | 06/24/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - DRAINAGE | 06/16/2025 | APPROVED | PFLANAGAN |
| Note: *** NOTES ADDED BY GBERTOLA 6/18/2025 8:40:03 AM *** Please Call Jordan and Let her know you are going there for the inspection SWALE OPEN AT THIS TIME AND CATCHBASIN THERE IS NO DIRT OR SILT IN THE CATCHBASIN. WATER BEING BACKED UP FROM SWALES NOT GRADED PROPERLY PLEASE SEE PHOTO OF TODAYS INSPECTION. Make sure the Swale is open and is not silt on the CB on the lright side. Per Gbertola | |||
| SEAWALL DEADMAN CAP | 05/09/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: Final section of wall. | |||
| SEAWALL DEADMAN CAP | 03/26/2025 | APPROVED | MCONTRYMAN |
| Note: 2/14/2025 - PREVIOUS INSPECTION NOTES 2-14-25 1. This inspection was for the corner of the seawall. Approved to pour. | |||
| SEAWALL DEADMAN CAP | 02/14/2025 | PARTIALLY APPROVED | BTAYLOR |
| Note: 2-14-25 1. This inspection was for the corner of the seawall. Approved to pour. | |||
| ROW -TURBIDITY BARRER | 12/16/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 12/16/24 TURBIDITY BARRIER TO REMAIN IN PLACE THROUGH OUT SEWALL PROJECT |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 07/09/2024 | 07/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/09/2024 | 07/16/2024 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/09/2024 | 07/09/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/26/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/16/2024 |
| SITE PLAN 15 | ¤15.00 | 07/16/2024 |
| ADJUSTMENT 10% | (¤29.35) | 07/16/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/16/2024 |
| INSPECTION - RESIDENTIAL | ¤231.00 | 07/16/2024 |
| PLAN REVIEW - MISC 32.50 | ¤32.50 | 07/16/2024 |
| SURCHARGE FS 533.721 | ¤2.64 | 07/16/2024 |
| SURCHARGE - FS 468.631 | ¤3.96 | 07/16/2024 |
| SW ENG REVIEW- 40 | ¤40.00 | 07/16/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/16/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤385.75 |