I want to search for...

Permit #2024070879

Permit Details

Status: CANCEL

Parcel Id: 07-11-31-7037-00080-0210
CONDITIONED SPACE: 1574 sqft
GARAGE: 402 sqft
OPENED PORCH (WITH ROOF) : 33 sqft
OPENED PORCH (WITH ROOF) : 62 sqft
Total Square Footage: 2071 sqft
Block: 00080
Subdivision: -
Job Phone: 904-531-5923
Location Address: 30 LUDLOW LN E
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/31/2024
NOC: RECORDED
Applicant name: TAVARIS JEROME DAVIS
Owner: BRIGHTLAND HOMES OF FLORIDA, LLC

Address

15725 N DALLAS PARKWAY

ADDISON, TX 75001

Address

STE 300

ADDISON, TX 75001

Lot: 0210
Contracted Stated Job Value: ¤25,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

BRIGHTLAND HOMES OF FLORIDA, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

3505 EAST FRONTAGE RD

ADDISON, TX 75001

STE 145

TAMPA, FL 33607

CBC1267320 (Exp: 08/31/2026) 904-531-5923

Sub Contractors

DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
LARRY LAVON TURNAGE
Status Location Address State License Number Phone
CANCEL

531 CODISCO WAY

SANFORD, FL 32771

CMC1249777 (Exp: 08/31/2024) 407-333-2665
OLIN MARSHALL CANNON
Status Location Address State License Number Phone
INACTIVE

1794 ROGERO RD #2

JACKSONVILLE, FL 32211

CFC1426140 (Exp: 08/31/2026) 904-343-4344
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980

Inspection History

Type Request Date Result Inspector
ROW - DRAINAGE 01/21/2025 APPROVED GBERTOLA
Note: CORRECTION WERE MADE 1/14/2025 - PREVIOUS INSPECTION NOTES 1/14/25= REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE.Sec 42-42. Driveways- City representatives will visit the site and determine the size, type, and length of the culvert pipe needed to provide proper drainage (if any). ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/13/2024 - PREVIOUS INSPECTION NOTES ** 09/13/24 BUILDER NEEDS TO INSTALL A TEMPORARY CULVERT TO ALLOW STORMWATER TO FLOW IT MUST BE A MINIMUM OF A 12 INCH DIAMETER PIPE YOUR BLOCKING THE FLOW OF WATER ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** INSTALL SILT FENCING AROUND THE PERIMETER OF JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION 09/17/24
ROW - DRAINAGE 01/14/2025 Disapproved - NO FEE GBERTOLA
Note: *** NOTES ADDED BY GBERTOLA 1/14/2025 10:45:33 AM *** INSPECTOR BE BACK 1/21/25. PICTURES ATTACHED 1/14/25= REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE.Sec 42-42. Driveways- City representatives will visit the site and determine the size, type, and length of the culvert pipe needed to provide proper drainage (if any). ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/13/2024 - PREVIOUS INSPECTION NOTES ** 09/13/24 BUILDER NEEDS TO INSTALL A TEMPORARY CULVERT TO ALLOW STORMWATER TO FLOW IT MUST BE A MINIMUM OF A 12 INCH DIAMETER PIPE YOUR BLOCKING THE FLOW OF WATER ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** INSTALL SILT FENCING AROUND THE PERIMETER OF JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION 09/17/24
ROW - DRAINAGE 09/18/2024 CANCELLED BY INSPECTOR EMADISON
Note: 9/13/2024 - PREVIOUS INSPECTION NOTES ** 09/13/24 LEFT SIDE OF TEMPORARY CULVERT NEED TO CLEAN ERODED SEDIMENT FROM THE ROAD SIDE SWALE ** RIGHT SIDE REMOVE SEDIMENT FROM ROAD SIDE SWALE ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** ENSURE YOUR CULVERT IS NOT PLUGGED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/18/24
ROW - DRAINAGE 09/13/2024 Disapproved - NO FEE EMADISON
Note: ** 09/13/24 BUILDER NEEDS TO INSTALL A TEMPORARY CULVERT TO ALLOW STORMWATER TO FLOW IT MUST BE A MINIMUM OF A 12 INCH DIAMETER PIPE YOUR BLOCKING THE FLOW OF WATER ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** INSTALL SILT FENCING AROUND THE PERIMETER OF JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION 09/17/24
ROW - DRAINAGE 09/13/2024 Disapproved - NO FEE EMADISON
Note: ** 09/13/24 LEFT SIDE OF TEMPORARY CULVERT NEED TO CLEAN ERODED SEDIMENT FROM THE ROAD SIDE SWALE ** RIGHT SIDE REMOVE SEDIMENT FROM ROAD SIDE SWALE ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO YOUR JOB SITE ** ENSURE YOUR CULVERT IS NOT PLUGGED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/18/24
ROW- PROJECT STATUS 09/13/2024 APPROVED EMADISON
Note: ** 09/13/24 INSPECTOR WILL PUT A DRAINAGE INSPECTION IN FOR SITE. ____________________________________________________________________________________________________________________ NEIGHBOR AT 34 SAYS NEW CONSTRUCTION HAS DIRT PILED IN THE SWALE PREVENTING WATER FLOW. gb
ROW- PROJECT STATUS 09/05/2024 CANCELLED BY INSPECTOR GBERTOLA
Note: NEIGHBOR AT 34 SAYS NEW CONSTRUCTION HAS DIRT PILED IN THE SWALE PREVENTING WATER FLOW. MH
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 09/05/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 08/22/2024 APPROVED CBOWERMASTER
PEP TANK INSTALLATION REQUEST
U-CROSS CONNECTION
FOUND SURVEY APPROVED (OFFICE)
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
ROW- FINAL SURVEY/GRADING CERTIFICATION
ROW FIELD SURVEY /GRADING CERTIFICATION
PLUMBING 1ST ROUGH UNDERGROUND
GRAVITY SEWER TEST
SEWER TIE IN
ELECTRIC - EARLY POWER
MONOLITHIC SLAB
LATH/BRICK/ WATER BARRIER
ALL ROUGH
WALL SHEATHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL
ROOF VALLEY & METAL
INSULATION
BLD - BUILDING FINAL
ROW - STORMWATER FINAL
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
BLD COMPLETE 09/03/2024 09/05/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 08/14/2024 08/19/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/29/2024 07/29/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ENGIN1 COMPLETE 07/29/2024 07/29/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/29/2024 07/29/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 07/25/2024 07/25/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN COMPLETE 07/18/2024 07/25/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 07/18/2024 07/25/2024
Note: Held By: JPI 1. Based on a DBPR inquiry, product 15957 is a recently expired product on the DBPR website. Please delete from the project approval table and/or provide a substitute. 107.2.4
CUSVC COMPLETE 07/18/2024 07/23/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 07/18/2024 07/25/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/18/2024 07/18/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 07/18/2024 07/23/2024
LOCATE COMPLETE 07/18/2024 07/22/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 07/18/2024 07/24/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 07/18/2024 07/23/2024
Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) A few proposed elevations along the north property line will negatively impact lot 20. Please revise so that these elevations are within the 0.10' tolerance of existing elevations. You may add a berm and flowline to this side as well to help with this. See revision clouds on site plan
ZON COMPLETE 07/18/2024 07/18/2024
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
SWALE COMPLETE 07/18/2024 10/04/2024
Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
FC IMPACT FEE EMS ¤62.00 07/31/2024
IMPACT FEE FIRE ¤428.09 07/31/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 07/31/2024
FC IMPACT FEE LIBRARY ¤268.00 07/31/2024
IMPACT FEE PARKS ¤1,800.99 07/31/2024
IMPACT FEE SCHOOL ¤5,450.00 07/31/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 07/31/2024
WATER -IRRIGATION INSPECTION ¤25.00 07/31/2024
SURCHARGE FS 533.721 ¤4.58 07/31/2024
SURCHARGE - FS 468.631 ¤6.87 07/31/2024
SW ENG - FOUNDATION SURVEY ¤20.00 07/31/2024
WATER- TURN ON ¤25.00 07/31/2024
ADJUSTMENT 10% (¤25.85) 07/31/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/31/2024
ADMINISTRATIVE - RESID PP ¤225.00 07/31/2024
PLAN REVIEW - RESIDENTIAL ¤228.54 07/31/2024
SW ENG INSPECTION 80 ¤80.00 07/31/2024
SW ENG PRE APRON ¤30.00 07/31/2024
SW ENG - REVIEW 20 ¤20.00 07/31/2024
SW ENG RES REVIEW 200 ¤200.00 07/31/2024
SEWER CREDIT (¤850.00) 07/31/2024
SEWER INSPECTION ¤25.00 07/31/2024
SEWER CAPITAL FACILITY ¤6,120.52 07/31/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 07/31/2024
SITE PLAN 30 ¤30.00 07/31/2024
CONNECTION FEES ¤1,187.26 07/31/2024
CONTRACTOR CHANGE ¤20.00
SW ENG REINSPECTION 20 ¤20.00
SW ENG REINSPECTION 20 ¤20.00
PLAN REVIEW - REVISION ¤32.50
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
SW ENG - INSPECTION 20 ¤20.00
Fees Total Due: ¤192.50 Total Paid: ¤21,822.14