I want to search for...
Permit #2024071081
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7009-00170-0040 |
| PATIO/DECK (NO ROOF) : 836 sqft |
| Total Square Footage: 836 sqft |
| Block: 00170 |
| Subdivision: 7009 - |
| Job Phone: (386)451-2445 |
| Location Address: 8 FAIRCHILD LN |
| Type: PO - POOL |
| Issue Date: 08/01/2024 |
| NOC: RECORDED |
| Applicant name: JAMES THOMAS GILBERT |
| Owner: DESOUDA ROBERTO & MARIA M LADO DESOUSA H&W |
|
Address 2637 SPRUCE STREET UNION, NJ 07083 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤68,000.00 |
| Job Description: POOL WITH SCREEN ENCLOSURE |
| Type: CN |
Contractor
EAST COAST POOLS AND SPAS INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
300 WALNUT STREET ORMOND BEACH, FL 32174 |
CPC1457246 (Exp: 08/31/2026) | 386-451-2445 | 386-673-0151 |
Sub Contractors
RICHARD PAUL NEUMANN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
135 BEAU RIVAGE DR. ORMOND BEACH, FL 32176 |
EC13007384 (Exp: 08/31/2026) | 386-441-4212 | 386-441-6889 |
JOSEPH DEREK CARTWRIGHT
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
151 RODEO ROAD ORMOND BEACH, FL 32174 |
SCC131150000 (Exp: 08/31/2026) | 386-310-7962 | (386)615-3713 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 05/09/2025 | FINAL APPROVED | HCAMACHO |
| Note: Structural cracks noted by previuos inspection are not visual at this inspection. | |||
| POOL FINAL | 04/22/2025 | CANCELLED BY APPLICANT | WEB |
| Note: New inspection due to canceled inspection 4/16/2025 - PREVIOUS INSPECTION NOTES Knocked and rang doorbell camera No answer. FBC[A] 110.5 ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS Able to get to back yard, but both screen doors to enclosure are locked, unable to complete inspection. Please tighten 1 tension cable to spec on left side (By Shed). | |||
| POOL FINAL | 04/21/2025 | Disapproved - NO FEE | JSTEWART |
| Note: Pool has cracking seperation at the pool structure to the Slab in 2 locations (Aproximatly 3 to 4 ft each). diffrence in height at the structural cracking. There is visual stress at the tile line. This will need addressed before Final will be approved. Per FBC 454.1.2.1 Pool structure. New inspection due to canceled inspection New inspection due to canceled inspection 4/16/2025 - PREVIOUS INSPECTION NOTES Knocked and rang doorbell camera No answer. FBC[A] 110.5 ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS Able to get to back yard, but both screen doors to enclosure are locked, unable to complete inspection. Please tighten 1 tension cable to spec on left side (By Shed). | |||
| POOL FINAL | 04/17/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 4/16/2025 - PREVIOUS INSPECTION NOTES Knocked and rang doorbell camera No answer. FBC[A] 110.5 ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS Able to get to back yard, but both screen doors to enclosure are locked, unable to complete inspection. Please tighten 1 tension cable to spec on left side (By Shed). | |||
| POOL FINAL | 04/16/2025 | Disapproved - NO FEE | JSTEWART |
| Note: Knocked and rang doorbell camera No answer. FBC[A] 110.5 ACCESS FOR INSPECTION - SPECIAL INSTRUCTIONS Able to get to back yard, but both screen doors to enclosure are locked, unable to complete inspection. Please tighten 1 tension cable to spec on left side (By Shed). | |||
| U -UTILITY RESIDENTIAL FINAL | 04/15/2025 | FINAL APPROVED | DHANEY |
| ROW - FINAL INSPECTION | 04/14/2025 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/11/2025 | APPROVED | EMADISON |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/11/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 04/11/25 MET HOMEOWNER ON SITE HE WILL BE OPENING DRAINAGE BETWEEN SHED AND POOL STRUCTURE IN ORDER TO ACHIEVE A POSITIVE FLOW THE REAR OF STRUCTURE TO FRONT DRAINAGE SWALE. OWNER WILL CONTACT ME INSPECTOR E. MADISON DIRECTLY ONCE HE COMPLETES OPENING THE DRAINAGE | |||
| ROW- PROJECT STATUS | 04/11/2025 | Status Check | EMADISON |
| Note: ** 04/11/25 SITE MEET TO EXPLAIN DRAINAGE CONCERNS TO HOMEOWNER BASED ON THE SUBMITTED FINAL SURVEY | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/27/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: **03/27/25 BERM ACROSS REAR PROPERTY LINE NEEDS TO BE .30 FROM TOP OF BERM TO THE DRAINAGE CONVEYANCE AT BOTTOM OF BERM TO PREVENT YOUR WATER FROM FLOWING TO THE ADJACENT PROPERTY IN THE REAR ** REAR IS FLAT YOU HAVE ONLY .05 FALL AWAY FROM THE POOL AND ONLY .10 FALL FROM RIGHT TO LEFT WILL HOLD WATER ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** YOUR FINAL SURVEY NOW SHOWS A SHED THAT APPEARS TO BE OVER THE REAR PROPERTY LINE THE SHED WAS NOT SHOWN IN THE SITE PLAN _____________________________________________________________________________________________________________________ 1/16/2025 - PREVIOUS INSPECTION NOTES ** 01/16/25 NEED TO HAVE POSITIVE FALL AWAY FROM THE POOL STRUCTURE YOUR ELEVATION SHOTS SHOW THEY GO UP IN ELEVATION WHICH WILL CAUSE WATER TO FLOW BACK TOWARDS THE STRUCTURE ** RIGHT SIDE REAR CORNER ELEVATION SHOTS ARE LOWER THAN THE DRAINAGE CONVEYANCE WHICH WILL NOT ALLOW THE WATER TO FLOW TO THE FRONT ( PIE SHAPE IN CORNER WILL POND WATER ** LEFT SIDE REAR CORNER IS FLAT AND WILL HOLD WATER ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/16/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 01/16/25 NEED TO HAVE POSITIVE FALL AWAY FROM THE POOL STRUCTURE YOUR ELEVATION SHOTS SHOW THEY GO UP IN ELEVATION WHICH WILL CAUSE WATER TO FLOW BACK TOWARDS THE STRUCTURE ** RIGHT SIDE REAR CORNER ELEVATION SHOTS ARE LOWER THAN THE DRAINAGE CONVEYANCE WHICH WILL NOT ALLOW THE WATER TO FLOW TO THE FRONT ( PIE SHAPE IN CORNER WILL POND WATER ** LEFT SIDE REAR CORNER IS FLAT AND WILL HOLD WATER ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 | |||
| ELECTRIC AND ALARM | 11/12/2024 | APPROVED | HCAMACHO |
| POOL DECK | 09/30/2024 | APPROVED | HCAMACHO |
| STEEL AND GROUND | 08/16/2024 | APPROVED | LMILLER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 07/30/2024 | 08/01/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/22/2024 | 07/29/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide note on plan that any glazing 60 inches or less from water’s edge measured in a straight line and with bottom exposed edge of glazing less than 60 inches vertically above any standing or walking surface will be tempered glass before pool final inspection per R308.4.5. | |||
| ELEC | COMPLETE | 07/22/2024 | 07/29/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/22/2024 | 07/25/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/22/2024 | 07/30/2024 |
| Note: Released By: TOM POLACEK - (386)346-8986 - | |||
| ZON | COMPLETE | 07/22/2024 | 07/22/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤25.50) | 08/01/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/01/2024 |
| INSPECTION- POOL | ¤160.00 | 08/01/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 08/01/2024 |
| SURCHARGE FS 533.721 | ¤2.30 | 08/01/2024 |
| SURCHARGE - FS 468.631 | ¤3.44 | 08/01/2024 |
| SW ENG INSPECTION 40 | ¤40.00 | 08/01/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/01/2024 |
| SITE PLAN 30 | ¤30.00 | 08/01/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤325.24 |