I want to search for...
Permit #2024071146
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7011-00080-0530 |
| Block: 00080 |
| Subdivision: 7011 - |
| Job Phone: (386)931-0785 |
| Location Address: 78 BEAVERDAM LN |
| Type: DR - DRIVEWAY |
| Issue Date: 08/02/2024 |
| NOC: RECORDED |
| Applicant name: ROY CHARLES WALDHAUER |
| Owner: MULAYEVA ALIK & VERA H&W |
|
Address 78 BEAVERDAM LANE PALM COAST, FL 32137 |
| Lot: 0530 |
| Contracted Stated Job Value: ¤18,000.00 |
| Job Description: CONCRETE CIRCULAR DRIVEWAY & ADDING WALKWAY |
| Type: CN |
Contractor
BY THE SHORE INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1600 N STATE STREET # 102 , |
CRC1327300 (Exp: 08/31/2026) | 386-263-8272 | 386-263-8289 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 02/21/2025 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 02/14/2025 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - FINAL INSPECTION | 02/14/2025 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - FINAL APRON (AFTER POUR) | 02/12/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 02/12/25 BUILDER NEEDS TO REMOVE CONCRETE FROM EDGE OF ROAD AND APRON MARKED WITH WHITE PAINT ____________________________________________________________________________________________________________________ 12/10/2024 - PREVIOUS INSPECTION NOTES 12/10/24 TPOLACEK*** BUILDER IS REQUIRED TO CUT OUT ASPHALT 12" BY WIDTH OF DRIVEWAY AND REPAIR ROADWAY WITH HOT PATCH TO MATCH NEW DRIVEWAY EDGE. YOU MAY NOT HAVE MORE THAN A 1/4" TRANSITION. 13. ALL ROADWAY DAMAGE REPAIRS SHALL BE PERFORMED WITH " HOT MIX" ASPHALT. " COLD PATCH" AND CONCRETE WILL NOT BE ACCEPTED. PATCHES ARE TO BE A MINIMUM OF 12" WIDE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/8/2024 - PREVIOUS INSPECTION NOTES 11/08/24 TPOLACEK*** SHOT CULVERT AND PIPE IS .02 TOO LOW ON LEFT SIDE. THIS WILL BE ACCPETED HOWEVER, THE ENTIRE ROW (RIGHT OF WAY) MUST BE SODDED AND GRADED TO PROPER ELEVATIONS OF SWALE PLAN DIAGRAM AND MATCH EDGE OF DRIVEWAY TO REVENT WASHOUTS AND INJURY.. ALL OVER POUR AND SLAG MUST BE REMOVED FROM CULVERT PIPE. PLEASE MAKE CORRECTIONS Inspector Notes from Inspection 9270 ** 10/23/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ___________________________________________________________________________________________________________ 10/18/2024 - PREVIOUS INSPECTION NOTES ** 10/18/24 THERE NEEDS TO BE A MINIMUM OF 6 INCHES OF CONCRETE IN THE APRON POUR AREA ALL THE WAY TO THE EDGE OF THE ROAD WAY _____________________________________________________________________________________________________________ 10/16/2024 - PREVIOUS INSPECTION NOTES THE CULVERT NEEDS TO BE 8' FROM CENTER OF CULVERT TO THE EDGE OF ROAD ---------------------------------------------------------------------- 10/15/2024 - PREVIOUS INSPECTION NOTES CANCELLED BY CONTRACTOR ON SITE ----------------------------------------------------------------------- 9/16/2024 - PREVIOUS INSPECTION NOTES 09/16/24 TPOLACEK** DRIVEWAY CULVERT IS UNDER WATER AT THIS TIME. SPOKE WITH CM AND ADVISED MAKING SURE DRIVEWAY IS DRY BEFORE REQUESTING NEXT INSPECTION. PHOTO ATTACHED 9/9/2024 - PREVIOUS INSPECTION NOTES 09/09/24 TPOLACEK*** SITE IS UNDER WATER. IT IS THE BUILDERS RESPOSIBILTY TO CANCEL INSPECTION IF IT IS NOT READY. 9/3/2024 - PREVIOUS INSPECTION NOTES 09/03/24 TPOLACEK*** MET WITH CREW ON SITE. THEY DID NOT HAVE PROPER DOCUMENTS FOR SETTING CULVERT OR THE SIZE AND TYPE OF CULVERT PIPE REQUIRED. THEY WILL RESCHEDULE WHEN EVERYTHING IS CORRECTED. I AM CANCELLING INSPECTION FOR TODAY. | |||
| ROW - FINAL APRON (AFTER POUR) | 12/10/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 12/10/24 TPOLACEK*** BUILDER IS REQUIRED TO CUT OUT ASPHALT 12" BY WIDTH OF DRIVEWAY AND REPAIR ROADWAY WITH HOT PATCH TO MATCH NEW DRIVEWAY EDGE. YOU MAY NOT HAVE MORE THAN A 1/4" TRANSITION. 13. ALL ROADWAY DAMAGE REPAIRS SHALL BE PERFORMED WITH " HOT MIX" ASPHALT. " COLD PATCH" AND CONCRETE WILL NOT BE ACCEPTED. PATCHES ARE TO BE A MINIMUM OF 12" WIDE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/8/2024 - PREVIOUS INSPECTION NOTES 11/08/24 TPOLACEK*** SHOT CULVERT AND PIPE IS .02 TOO LOW ON LEFT SIDE. THIS WILL BE ACCPETED HOWEVER, THE ENTIRE ROW (RIGHT OF WAY) MUST BE SODDED AND GRADED TO PROPER ELEVATIONS OF SWALE PLAN DIAGRAM AND MATCH EDGE OF DRIVEWAY TO REVENT WASHOUTS AND INJURY.. ALL OVER POUR AND SLAG MUST BE REMOVED FROM CULVERT PIPE. PLEASE MAKE CORRECTIONS Inspector Notes from Inspection 9270 ** 10/23/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ___________________________________________________________________________________________________________ 10/18/2024 - PREVIOUS INSPECTION NOTES ** 10/18/24 THERE NEEDS TO BE A MINIMUM OF 6 INCHES OF CONCRETE IN THE APRON POUR AREA ALL THE WAY TO THE EDGE OF THE ROAD WAY _____________________________________________________________________________________________________________ 10/16/2024 - PREVIOUS INSPECTION NOTES THE CULVERT NEEDS TO BE 8' FROM CENTER OF CULVERT TO THE EDGE OF ROAD ---------------------------------------------------------------------- 10/15/2024 - PREVIOUS INSPECTION NOTES CANCELLED BY CONTRACTOR ON SITE ----------------------------------------------------------------------- 9/16/2024 - PREVIOUS INSPECTION NOTES 09/16/24 TPOLACEK** DRIVEWAY CULVERT IS UNDER WATER AT THIS TIME. SPOKE WITH CM AND ADVISED MAKING SURE DRIVEWAY IS DRY BEFORE REQUESTING NEXT INSPECTION. PHOTO ATTACHED 9/9/2024 - PREVIOUS INSPECTION NOTES 09/09/24 TPOLACEK*** SITE IS UNDER WATER. IT IS THE BUILDERS RESPOSIBILTY TO CANCEL INSPECTION IF IT IS NOT READY. 9/3/2024 - PREVIOUS INSPECTION NOTES 09/03/24 TPOLACEK*** MET WITH CREW ON SITE. THEY DID NOT HAVE PROPER DOCUMENTS FOR SETTING CULVERT OR THE SIZE AND TYPE OF CULVERT PIPE REQUIRED. THEY WILL RESCHEDULE WHEN EVERYTHING IS CORRECTED. I AM CANCELLING INSPECTION FOR TODAY. | |||
| ROW - FINAL APRON (AFTER POUR) | 11/08/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 11/08/24 TPOLACEK*** SHOT CULVERT AND PIPE IS .02 TOO LOW ON LEFT SIDE. THIS WILL BE ACCPETED HOWEVER, THE ENTIRE ROW (RIGHT OF WAY) MUST BE SODDED AND GRADED TO PROPER ELEVATIONS OF SWALE PLAN DIAGRAM AND MATCH EDGE OF DRIVEWAY TO REVENT WASHOUTS AND INJURY.. ALL OVER POUR AND SLAG MUST BE REMOVED FROM CULVERT PIPE. PLEASE MAKE CORRECTIONS Inspector Notes from Inspection 9270 ** 10/23/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ___________________________________________________________________________________________________________ 10/18/2024 - PREVIOUS INSPECTION NOTES ** 10/18/24 THERE NEEDS TO BE A MINIMUM OF 6 INCHES OF CONCRETE IN THE APRON POUR AREA ALL THE WAY TO THE EDGE OF THE ROAD WAY _____________________________________________________________________________________________________________ 10/16/2024 - PREVIOUS INSPECTION NOTES THE CULVERT NEEDS TO BE 8' FROM CENTER OF CULVERT TO THE EDGE OF ROAD ---------------------------------------------------------------------- 10/15/2024 - PREVIOUS INSPECTION NOTES CANCELLED BY CONTRACTOR ON SITE ----------------------------------------------------------------------- 9/16/2024 - PREVIOUS INSPECTION NOTES 09/16/24 TPOLACEK** DRIVEWAY CULVERT IS UNDER WATER AT THIS TIME. SPOKE WITH CM AND ADVISED MAKING SURE DRIVEWAY IS DRY BEFORE REQUESTING NEXT INSPECTION. PHOTO ATTACHED 9/9/2024 - PREVIOUS INSPECTION NOTES 09/09/24 TPOLACEK*** SITE IS UNDER WATER. IT IS THE BUILDERS RESPOSIBILTY TO CANCEL INSPECTION IF IT IS NOT READY. 9/3/2024 - PREVIOUS INSPECTION NOTES 09/03/24 TPOLACEK*** MET WITH CREW ON SITE. THEY DID NOT HAVE PROPER DOCUMENTS FOR SETTING CULVERT OR THE SIZE AND TYPE OF CULVERT PIPE REQUIRED. THEY WILL RESCHEDULE WHEN EVERYTHING IS CORRECTED. I AM CANCELLING INSPECTION FOR TODAY. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/23/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 10/23/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ___________________________________________________________________________________________________________ 10/18/2024 - PREVIOUS INSPECTION NOTES ** 10/18/24 THERE NEEDS TO BE A MINIMUM OF 6 INCHES OF CONCRETE IN THE APRON POUR AREA ALL THE WAY TO THE EDGE OF THE ROAD WAY _____________________________________________________________________________________________________________ 10/16/2024 - PREVIOUS INSPECTION NOTES THE CULVERT NEEDS TO BE 8' FROM CENTER OF CULVERT TO THE EDGE OF ROAD ---------------------------------------------------------------------- 10/15/2024 - PREVIOUS INSPECTION NOTES CANCELLED BY CONTRACTOR ON SITE ----------------------------------------------------------------------- 9/16/2024 - PREVIOUS INSPECTION NOTES 09/16/24 TPOLACEK** DRIVEWAY CULVERT IS UNDER WATER AT THIS TIME. SPOKE WITH CM AND ADVISED MAKING SURE DRIVEWAY IS DRY BEFORE REQUESTING NEXT INSPECTION. PHOTO ATTACHED 9/9/2024 - PREVIOUS INSPECTION NOTES 09/09/24 TPOLACEK*** SITE IS UNDER WATER. IT IS THE BUILDERS RESPOSIBILTY TO CANCEL INSPECTION IF IT IS NOT READY. 9/3/2024 - PREVIOUS INSPECTION NOTES 09/03/24 TPOLACEK*** MET WITH CREW ON SITE. THEY DID NOT HAVE PROPER DOCUMENTS FOR SETTING CULVERT OR THE SIZE AND TYPE OF CULVERT PIPE REQUIRED. THEY WILL RESCHEDULE WHEN EVERYTHING IS CORRECTED. I AM CANCELLING INSPECTION FOR TODAY. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/18/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 10/18/24 THERE NEEDS TO BE A MINIMUM OF 6 INCHES OF CONCRETE IN THE APRON POUR AREA ALL THE WAY TO THE EDGE OF THE ROAD WAY _____________________________________________________________________________________________________________ 10/16/2024 - PREVIOUS INSPECTION NOTES THE CULVERT NEEDS TO BE 8' FROM CENTER OF CULVERT TO THE EDGE OF ROAD ---------------------------------------------------------------------- 10/15/2024 - PREVIOUS INSPECTION NOTES CANCELLED BY CONTRACTOR ON SITE ----------------------------------------------------------------------- 9/16/2024 - PREVIOUS INSPECTION NOTES 09/16/24 TPOLACEK** DRIVEWAY CULVERT IS UNDER WATER AT THIS TIME. SPOKE WITH CM AND ADVISED MAKING SURE DRIVEWAY IS DRY BEFORE REQUESTING NEXT INSPECTION. PHOTO ATTACHED 9/9/2024 - PREVIOUS INSPECTION NOTES 09/09/24 TPOLACEK*** SITE IS UNDER WATER. IT IS THE BUILDERS RESPOSIBILTY TO CANCEL INSPECTION IF IT IS NOT READY. 9/3/2024 - PREVIOUS INSPECTION NOTES 09/03/24 TPOLACEK*** MET WITH CREW ON SITE. THEY DID NOT HAVE PROPER DOCUMENTS FOR SETTING CULVERT OR THE SIZE AND TYPE OF CULVERT PIPE REQUIRED. THEY WILL RESCHEDULE WHEN EVERYTHING IS CORRECTED. I AM CANCELLING INSPECTION FOR TODAY. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/16/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE CULVERT NEEDS TO BE 8' FROM CENTER OF CULVERT TO THE EDGE OF ROAD ---------------------------------------------------------------------- 10/15/2024 - PREVIOUS INSPECTION NOTES CANCELLED BY CONTRACTOR ON SITE ----------------------------------------------------------------------- 9/16/2024 - PREVIOUS INSPECTION NOTES 09/16/24 TPOLACEK** DRIVEWAY CULVERT IS UNDER WATER AT THIS TIME. SPOKE WITH CM AND ADVISED MAKING SURE DRIVEWAY IS DRY BEFORE REQUESTING NEXT INSPECTION. PHOTO ATTACHED 9/9/2024 - PREVIOUS INSPECTION NOTES 09/09/24 TPOLACEK*** SITE IS UNDER WATER. IT IS THE BUILDERS RESPOSIBILTY TO CANCEL INSPECTION IF IT IS NOT READY. 9/3/2024 - PREVIOUS INSPECTION NOTES 09/03/24 TPOLACEK*** MET WITH CREW ON SITE. THEY DID NOT HAVE PROPER DOCUMENTS FOR SETTING CULVERT OR THE SIZE AND TYPE OF CULVERT PIPE REQUIRED. THEY WILL RESCHEDULE WHEN EVERYTHING IS CORRECTED. I AM CANCELLING INSPECTION FOR TODAY. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/15/2024 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: CANCELLED BY CONTRACTOR ON SITE ----------------------------------------------------------------------- 9/16/2024 - PREVIOUS INSPECTION NOTES 09/16/24 TPOLACEK** DRIVEWAY CULVERT IS UNDER WATER AT THIS TIME. SPOKE WITH CM AND ADVISED MAKING SURE DRIVEWAY IS DRY BEFORE REQUESTING NEXT INSPECTION. PHOTO ATTACHED 9/9/2024 - PREVIOUS INSPECTION NOTES 09/09/24 TPOLACEK*** SITE IS UNDER WATER. IT IS THE BUILDERS RESPOSIBILTY TO CANCEL INSPECTION IF IT IS NOT READY. 9/3/2024 - PREVIOUS INSPECTION NOTES 09/03/24 TPOLACEK*** MET WITH CREW ON SITE. THEY DID NOT HAVE PROPER DOCUMENTS FOR SETTING CULVERT OR THE SIZE AND TYPE OF CULVERT PIPE REQUIRED. THEY WILL RESCHEDULE WHEN EVERYTHING IS CORRECTED. I AM CANCELLING INSPECTION FOR TODAY. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/16/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 09/16/24 TPOLACEK** DRIVEWAY CULVERT IS UNDER WATER AT THIS TIME. SPOKE WITH CM AND ADVISED MAKING SURE DRIVEWAY IS DRY BEFORE REQUESTING NEXT INSPECTION. PHOTO ATTACHED 9/9/2024 - PREVIOUS INSPECTION NOTES 09/09/24 TPOLACEK*** SITE IS UNDER WATER. IT IS THE BUILDERS RESPOSIBILTY TO CANCEL INSPECTION IF IT IS NOT READY. 9/3/2024 - PREVIOUS INSPECTION NOTES 09/03/24 TPOLACEK*** MET WITH CREW ON SITE. THEY DID NOT HAVE PROPER DOCUMENTS FOR SETTING CULVERT OR THE SIZE AND TYPE OF CULVERT PIPE REQUIRED. THEY WILL RESCHEDULE WHEN EVERYTHING IS CORRECTED. I AM CANCELLING INSPECTION FOR TODAY. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/09/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 09/09/24 TPOLACEK*** SITE IS UNDER WATER. IT IS THE BUILDERS RESPOSIBILTY TO CANCEL INSPECTION IF IT IS NOT READY. 9/3/2024 - PREVIOUS INSPECTION NOTES 09/03/24 TPOLACEK*** MET WITH CREW ON SITE. THEY DID NOT HAVE PROPER DOCUMENTS FOR SETTING CULVERT OR THE SIZE AND TYPE OF CULVERT PIPE REQUIRED. THEY WILL RESCHEDULE WHEN EVERYTHING IS CORRECTED. I AM CANCELLING INSPECTION FOR TODAY. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/03/2024 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 09/03/24 TPOLACEK*** MET WITH CREW ON SITE. THEY DID NOT HAVE PROPER DOCUMENTS FOR SETTING CULVERT OR THE SIZE AND TYPE OF CULVERT PIPE REQUIRED. THEY WILL RESCHEDULE WHEN EVERYTHING IS CORRECTED. I AM CANCELLING INSPECTION FOR TODAY. |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 08/23/2024 | 08/23/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 08/23/2024 | 08/28/2024 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/23/2024 | 08/23/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/30/2024 | 07/31/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/23/2024 | 07/25/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 07/23/2024 | 07/30/2024 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/23/2024 | 07/25/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please show setback from driveway extension to property line on site plan Please show a minimum 5ft setback from the arc to front property line on site plan Patio must be a separate permit and it must meet a 7.5ft side setback |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/20/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/20/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/20/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/20/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/20/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/02/2024 |
| SITE PLAN 15 | ¤15.00 | 08/02/2024 |
| ADJUSTMENT 10% | (¤3.00) | 08/02/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/02/2024 |
| SW ENG INSPECTION 40 | ¤40.00 | 08/02/2024 |
| SW ENG PRE APRON | ¤30.00 | 08/02/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤432.00 |