Permit #2024071318

Permit Details

Status: COED

Parcel Id: 07-11-31-7025-00720-0130
CONDITIONED SPACE: 1800 sqft
GARAGE: 410 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
Total Square Footage: 2246 sqft
Block: 00720
Subdivision: 7025 -
Job Phone: 689-250-2429
Location Address: 42 PALM LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/05/2024
NOC: RECORDED
Applicant name: RYAN M COURECH
Owner: A LAND R-MERIDIAN REAL ESTATE DEVELOPMENT LLC

Address

688 N ORLANDO AVENUE 207

MAITLAND, FL 32751

Lot: 0130
Contracted Stated Job Value: ¤208,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN
Original Permit #: 2024010999

Contractor

MCH CONSTRUCTION LLC
Status Location Address State License Number Phone
INACTIVE

668 N ORLANDO AVE, STE 207

MAITLAND, FL 32751

CBC1262898 (Exp: 08/31/2026) 407-602-8257

Sub Contractors

DUSTIN ARCHER
Status Location Address State License Number Phone
ACTIVE

2785 WRIGHTS ROAD SUITE 1133

OVIEDO, FL 32765

CMC1251099 (Exp: 08/31/2026) 407-391-1145
DANA SUE COOLEY
Status Location Address State License Number Phone
INACTIVE

PO BOX 1718

FLAGLER BEACH, FL 32136

CCC1333449 (Exp: 08/31/2026) 904-535-1680
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/31/2025 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 7/31/2025 11:46:04 AM *** 7/25/2025 - PREVIOUS INSPECTION NOTES 7/25/25: 1). Updated Energy Calcs on site are incomplete. Missing model number page, etc. / previous energy calcs do not match model numbers. FBC [A] 107.4 __________________________________________________________________________________________________________________________ 6/26/25: Check for repair of wall opening at range romex feed as seen during Early Power Inspection.
BLD - BUILDING FINAL 07/25/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 7/25/2025 1:10:40 PM *** 7/25/25: 1). Updated Energy Calcs on site are incomplete. Missing model number page, etc. / previous energy calcs do not match model numbers. FBC [A] 107.4 __________________________________________________________________________________________________________________________ 6/26/25: Check for repair of wall opening at range romex feed as seen during Early Power Inspection.
ROW - FINAL APRON (AFTER POUR) 07/21/2025 APPROVED TPOLACEK
Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 07/21/25 TPOLACEK*** UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION THERE WAS NO STANDING OR POOLING WATER. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/21/2025 APPROVED TPOLACEK
Note: 07/21/25 TPOLACEK*** FINAL SURVEY MEETS ALL COPC MINIMUM STANDARDS 07/11/25 TPOLACEK***INSPECTOR NOTE**** PLEASE SEE PROJECT STATUS NOTES WHEN REVIEWING FINAL SURVEY.
ROW FIELD SURVEY /GRADING CERTIFICATION 07/21/2025 APPROVED - AS NOTED TPOLACEK
Note: 07/21/25 TPOLACEK*** UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION THERE WAS NO STANDING OR POOLING WATER. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 07/21/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- PROJECT STATUS 07/11/2025 Status Check TPOLACEK
Note: 07/11/25 TPOLACEK*** MET ON SITE WITH GRADER, CM (JASON) INSPECTORS BERTOLA,& SLADISH. ELEVATION SHOTS ALONG ADJOINNG PROPERTY WERE TAKEN TO MAKE SURE BUILDER DOES NOT IMPACT ADJOINING LOT. BUILDER HAS CREATED THE MINIMUM COPC STANDARDS FOR DRAINAGE AT THIS TIME.
ROW- PRE-APRON (PRE-POUR) 06/27/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/24/2025 - PREVIOUS INSPECTION NOTES 06/24/25 TPOLACEK*** AT THIS TIME CULVERT IS SET PROPERLY HOWEVER THE FORM BOARDS NEED TO BE SET IN PLACE AND THE SLOPE ON THE RIGHT SIDE EXCEEDS THE MAX 8% . PLEASE HAVE FORMS REESTABLISHED AND RESUBMIT REQUEST. SEE PHOTOS Inspector Notes from Inspection 9470 04/17/25 TPOLACEK**** GRADER IS ON SITE REMOVING CONCRETE AT THE TIME OF INSPECTION. BUILDER MUST MAINTAIN SWALE AND SITE THROUGHOUT THE ENTIRE BUILD PROCESS. 4/16/2025 - PREVIOUS INSPECTION NOTES 04/16/25 TPOLACEK*** BUILDER WAS GIVEN 5 DAYS TO CLEAN UP ILLICIT DISCHARGE. IF NOT CLEANED UP BY TOMORROW 04/17/25 PERMIT WILL BE PLACED ON HOLD. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/11/2025 - PREVIOUS INSPECTION NOTES 04/11/25 TPOLACEK*** BUILDER MUST REMOVE ALL OVER POUR CONCRETE THROUGHOUT LOT THIS IS CONCIDERED AN ILLICIT DISCHARGE AND MUST BE REMOVED WITHIN 5 DAYS OF THIS INSPECTION. BUILDER WILL ALSO NEED TO OPEN SWALE AS THERE ARE DEVIATIONS IN GRADE AND DRAINAGE WILL NOT FLOW CORRECTLY. NEXT INSPECTION WILL BE 4/16/25
ELECTRIC - EARLY POWER 06/26/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/26/2025 9:06:40 AM *** 6/26/25: FPL emailed to release power. 1). Check for repair of wall opening at range romex feed during Building Final Inspection. 6/24/2025 - PREVIOUS INSPECTION NOTES 6/24/25: 1). Missing Surge Protector at Main Meter Panel as required. NEC-230.67(A)/(B)
ELECTRIC - EARLY POWER 06/24/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 6/24/2025 11:20:45 AM *** 6/24/25: 1). Missing Surge Protector at Main Meter Panel as required. NEC-230.67(A)/(B)
ROW- PRE-APRON (PRE-POUR) 06/24/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 06/24/25 TPOLACEK*** AT THIS TIME CULVERT IS SET PROPERLY HOWEVER THE FORM BOARDS NEED TO BE SET IN PLACE AND THE SLOPE ON THE RIGHT SIDE EXCEEDS THE MAX 8% . PLEASE HAVE FORMS REESTABLISHED AND RESUBMIT REQUEST. SEE PHOTOS Inspector Notes from Inspection 9470 04/17/25 TPOLACEK**** GRADER IS ON SITE REMOVING CONCRETE AT THE TIME OF INSPECTION. BUILDER MUST MAINTAIN SWALE AND SITE THROUGHOUT THE ENTIRE BUILD PROCESS. 4/16/2025 - PREVIOUS INSPECTION NOTES 04/16/25 TPOLACEK*** BUILDER WAS GIVEN 5 DAYS TO CLEAN UP ILLICIT DISCHARGE. IF NOT CLEANED UP BY TOMORROW 04/17/25 PERMIT WILL BE PLACED ON HOLD. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/11/2025 - PREVIOUS INSPECTION NOTES 04/11/25 TPOLACEK*** BUILDER MUST REMOVE ALL OVER POUR CONCRETE THROUGHOUT LOT THIS IS CONCIDERED AN ILLICIT DISCHARGE AND MUST BE REMOVED WITHIN 5 DAYS OF THIS INSPECTION. BUILDER WILL ALSO NEED TO OPEN SWALE AS THERE ARE DEVIATIONS IN GRADE AND DRAINAGE WILL NOT FLOW CORRECTLY. NEXT INSPECTION WILL BE 4/16/25
U-CROSS CONNECTION 06/05/2025 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cc
U - SEWER TIE IN 06/05/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 06/05/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 05/05/2025 APPROVED CVANSTRAHLEN
Note:
INSULATION 05/05/2025 APPROVED CVANSTRAHLEN
Note:
LATH/BRICK/ WATER BARRIER 05/02/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 5/2/2025 10:11:47 AM *** 5/2/25: Rear wall: 1). Hole in CMU wall for A/C feed romex needs to have (minimum plastic) lath over it. FBC [A]107.4 2). Hose bibb need (minimum plastic) lath over the hole in the CMU at the top.
INSULATION 05/01/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 5/1/2025 9:02:11 AM *** 5/1/25: 1). Fireblocking at top plate of guest bathroom packout wall does not meet minimum code requirements. ---> FBC-R302.11. Please remove the 3/4" pressure treated currently in place and replace with 2" nominal (1-1/2") lumber or other approved material identified in FBC-R302.11.1
ALL ROUGH 04/23/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/23/2025 1:51:29 PM *** 4/21/2025 - PREVIOUS INSPECTION NOTES 4/21/25: *** Previously listed item 3 remains unresolved. (FBC-[A}110.1) 3). Lineset sleeve needs to be exposed at return box in order to visually verify that it is sealed properly. FBC-R318.2 4/9/2025 - PREVIOUS INSPECTION NOTES 4/9/25: 1). Device boxes attached to bottom cord of truss must be accessible per NEC-314.29(A). Plans show recessed can lights. If using the shallow (puck style) cans, you will need to move the 'junction' boxes up out of the insulation and have the light (driver) whip installed and a cover on the box. 2). Dryer exhaust needs vertical support/strapping. FBC-M1502.4.2 3). Lineset sleeve needs to be exposed at return box in order to visually verify that it is sealed properly. FBC-R318.2
ALL ROUGH 04/21/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/21/2025 9:32:55 AM *** 4/21/25: *** Previously listed item 3 remains unresolved. (FBC-[A}110.1) 3). Lineset sleeve needs to be exposed at return box in order to visually verify that it is sealed properly. FBC-R318.2 4/9/2025 - PREVIOUS INSPECTION NOTES 4/9/25: 1). Device boxes attached to bottom cord of truss must be accessible per NEC-314.29(A). Plans show recessed can lights. If using the shallow (puck style) cans, you will need to move the 'junction' boxes up out of the insulation and have the light (driver) whip installed and a cover on the box. 2). Dryer exhaust needs vertical support/strapping. FBC-M1502.4.2 3). Lineset sleeve needs to be exposed at return box in order to visually verify that it is sealed properly. FBC-R318.2
ROW - DRAINAGE 04/17/2025 APPROVED - AS NOTED TPOLACEK
Note: 04/17/25 TPOLACEK**** GRADER IS ON SITE REMOVING CONCRETE AT THE TIME OF INSPECTION. BUILDER MUST MAINTAIN SWALE AND SITE THROUGHOUT THE ENTIRE BUILD PROCESS. 4/16/2025 - PREVIOUS INSPECTION NOTES 04/16/25 TPOLACEK*** BUILDER WAS GIVEN 5 DAYS TO CLEAN UP ILLICIT DISCHARGE. IF NOT CLEANED UP BY TOMORROW 04/17/25 PERMIT WILL BE PLACED ON HOLD. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/11/2025 - PREVIOUS INSPECTION NOTES 04/11/25 TPOLACEK*** BUILDER MUST REMOVE ALL OVER POUR CONCRETE THROUGHOUT LOT THIS IS CONCIDERED AN ILLICIT DISCHARGE AND MUST BE REMOVED WITHIN 5 DAYS OF THIS INSPECTION. BUILDER WILL ALSO NEED TO OPEN SWALE AS THERE ARE DEVIATIONS IN GRADE AND DRAINAGE WILL NOT FLOW CORRECTLY. NEXT INSPECTION WILL BE 4/16/25
ROW - DRAINAGE 04/16/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 04/16/25 TPOLACEK*** BUILDER WAS GIVEN 5 DAYS TO CLEAN UP ILLICIT DISCHARGE. IF NOT CLEANED UP BY TOMORROW 04/17/25 PERMIT WILL BE PLACED ON HOLD. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/11/2025 - PREVIOUS INSPECTION NOTES 04/11/25 TPOLACEK*** BUILDER MUST REMOVE ALL OVER POUR CONCRETE THROUGHOUT LOT THIS IS CONCIDERED AN ILLICIT DISCHARGE AND MUST BE REMOVED WITHIN 5 DAYS OF THIS INSPECTION. BUILDER WILL ALSO NEED TO OPEN SWALE AS THERE ARE DEVIATIONS IN GRADE AND DRAINAGE WILL NOT FLOW CORRECTLY. NEXT INSPECTION WILL BE 4/16/25
ROW - DRAINAGE 04/11/2025 Disapproved - NO FEE TPOLACEK
Note: 04/11/25 TPOLACEK*** BUILDER MUST REMOVE ALL OVER POUR CONCRETE THROUGHOUT LOT THIS IS CONCIDERED AN ILLICIT DISCHARGE AND MUST BE REMOVED WITHIN 5 DAYS OF THIS INSPECTION. BUILDER WILL ALSO NEED TO OPEN SWALE AS THERE ARE DEVIATIONS IN GRADE AND DRAINAGE WILL NOT FLOW CORRECTLY. NEXT INSPECTION WILL BE 4/16/25
ALL ROUGH 04/09/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 4/9/2025 1:17:22 PM *** 4/9/25: 1). Device boxes attached to bottom cord of truss must be accessible per NEC-314.29(A). Plans show recessed can lights. If using the shallow (puck style) cans, you will need to move the 'junction' boxes up out of the insulation and have the light (driver) whip installed and a cover on the box. 2). Dryer exhaust needs vertical support/strapping. FBC-M1502.4.2 3). Lineset sleeve needs to be exposed at return box in order to visually verify that it is sealed properly. FBC-R318.2
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/03/2025 APPROVED JSTEWART
Note: 3/19/2025 - PREVIOUS INSPECTION NOTES 3/19/25: Truss inspection not complete due to unresolved deficiencies AGAIN. *** Engineer's damaged truss repair has never been submitted, reviewed or approved as requested multiple times. Please STOP re-scheduling this inspection until you have fully resolved ALL previous deficiencies. Previously listed item: 3). Engineer's letter verifying original truss integrity will be required due to prolonged exposure to soil and environment will be required once trusses are cleaned and prior to moving on. FBC [A]107.4 >>> Requested engineer's letter for trusses has not been submitted as of this inspection. Please do not schedule the re-inspection until the Engineer's letter is submitted, reviewed and APPROVED. 2/27/2025 - PREVIOUS INSPECTION NOTES 2/27/25: >> Previously listed deficiencies 1 and 3 remain unresolved. 1). New plans required as existing are disconnected and damaged. Please provide a set for Inspector's use only so that we can avoid wasting resources and time.FBC 107.2.1 >>> Plans are still incomplete and disconnected. New set of complete plans is required before any new inspections will be completed. 3). Engineer's letter verifying original truss integrity will be required due to prolonged exposure to soil and environment will be required once trusses are cleaned and prior to moving on. FBC [A]107.4 >>> Requested engineer's letter for trusses has not been submitted as of this inspection. Please do not schedule the re-inspection until the Engineer's letter is submitted, reviewed and APPROVED. New inspection due to canceled inspection 1/24/2025 - PREVIOUS INSPECTION NOTES 1/24/25: Truss engineering (ONLY) has been checked & approved. 1). New plans required as existing are disconnected and damaged. Please provide a set for Inspector's use only so that we can avoid wasting resources and time.FBC 107.2.1 2). Trusses need to be cleaned of dirt and excessive discoloration. FBC [A]107.4 3). Engineer's letter verifying original truss integrity will be required due to prolonged exposure to soil and environment will be required once trusses are cleaned and prior to moving on. FBC [A]107.4 1/21/2025 - PREVIOUS INSPECTION NOTES 1. Job box is a mess clean up box and have a clean full set of stamped plans onsite along with a set of approved truss engineering packet FBC 1`07.3.1 ***Full re-inspection required***
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/19/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/19/2025 1:40:02 PM *** 3/19/25: Truss inspection not complete due to unresolved deficiencies AGAIN. *** Engineer's damaged truss repair has never been submitted, reviewed or approved as requested multiple times. Please STOP re-scheduling this inspection until you have fully resolved ALL previous deficiencies. Previously listed item: 3). Engineer's letter verifying original truss integrity will be required due to prolonged exposure to soil and environment will be required once trusses are cleaned and prior to moving on. FBC [A]107.4 >>> Requested engineer's letter for trusses has not been submitted as of this inspection. Please do not schedule the re-inspection until the Engineer's letter is submitted, reviewed and APPROVED. 2/27/2025 - PREVIOUS INSPECTION NOTES 2/27/25: >> Previously listed deficiencies 1 and 3 remain unresolved. 1). New plans required as existing are disconnected and damaged. Please provide a set for Inspector's use only so that we can avoid wasting resources and time.FBC 107.2.1 >>> Plans are still incomplete and disconnected. New set of complete plans is required before any new inspections will be completed. 3). Engineer's letter verifying original truss integrity will be required due to prolonged exposure to soil and environment will be required once trusses are cleaned and prior to moving on. FBC [A]107.4 >>> Requested engineer's letter for trusses has not been submitted as of this inspection. Please do not schedule the re-inspection until the Engineer's letter is submitted, reviewed and APPROVED. New inspection due to canceled inspection 1/24/2025 - PREVIOUS INSPECTION NOTES 1/24/25: Truss engineering (ONLY) has been checked & approved. 1). New plans required as existing are disconnected and damaged. Please provide a set for Inspector's use only so that we can avoid wasting resources and time.FBC 107.2.1 2). Trusses need to be cleaned of dirt and excessive discoloration. FBC [A]107.4 3). Engineer's letter verifying original truss integrity will be required due to prolonged exposure to soil and environment will be required once trusses are cleaned and prior to moving on. FBC [A]107.4 1/21/2025 - PREVIOUS INSPECTION NOTES 1. Job box is a mess clean up box and have a clean full set of stamped plans onsite along with a set of approved truss engineering packet FBC 1`07.3.1 ***Full re-inspection required***
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/27/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/27/2025 2:29:33 PM *** 2/27/25: >> Previously listed deficiencies 1 and 3 remain unresolved. 1). New plans required as existing are disconnected and damaged. Please provide a set for Inspector's use only so that we can avoid wasting resources and time.FBC 107.2.1 >>> Plans are still incomplete and disconnected. New set of complete plans is required before any new inspections will be completed. 3). Engineer's letter verifying original truss integrity will be required due to prolonged exposure to soil and environment will be required once trusses are cleaned and prior to moving on. FBC [A]107.4 >>> Requested engineer's letter for trusses has not been submitted as of this inspection. Please do not schedule the re-inspection until the Engineer's letter is submitted, reviewed and APPROVED. New inspection due to canceled inspection 1/24/2025 - PREVIOUS INSPECTION NOTES 1/24/25: Truss engineering (ONLY) has been checked & approved. 1). New plans required as existing are disconnected and damaged. Please provide a set for Inspector's use only so that we can avoid wasting resources and time.FBC 107.2.1 2). Trusses need to be cleaned of dirt and excessive discoloration. FBC [A]107.4 3). Engineer's letter verifying original truss integrity will be required due to prolonged exposure to soil and environment will be required once trusses are cleaned and prior to moving on. FBC [A]107.4 1/21/2025 - PREVIOUS INSPECTION NOTES 1. Job box is a mess clean up box and have a clean full set of stamped plans onsite along with a set of approved truss engineering packet FBC 1`07.3.1 ***Full re-inspection required***
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/06/2025 CANCELLED BY APPLICANT WEB
Note: 1/24/2025 - PREVIOUS INSPECTION NOTES 1/24/25: Truss engineering (ONLY) has been checked & approved. 1). New plans required as existing are disconnected and damaged. Please provide a set for Inspector's use only so tat we can avoid wasting resources and time.FBC 107.2.1 2). Trusses need to be cleaned of dirt and excessive discoloration. FBC [A]107.4 3). Engineer's letter verifying original truss integrity will be required due to prolonged exposure to soil and environment will be required once trusses are cleaned and prior to moving on. FBC [A]107.4 1/21/2025 - PREVIOUS INSPECTION NOTES 1. Job box is a mess clean up box and have a clean full set of stamped plans onsite along with a set of approved truss engineering packet FBC 1`07.3.1 ***Full re-inspection required***
ROOF VALLEY & METAL 01/29/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 1/29/2025 2:13:33 PM ***
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/24/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 1/24/2025 11:41:52 AM *** 1/24/25: Truss engineering (ONLY) has been checked & approved. 1). New plans required as existing are disconnected and damaged. Please provide a set for Inspector's use only so tat we can avoid wasting resources and time.FBC 107.2.1 2). Trusses need to be cleaned of dirt and excessive discoloration. FBC [A]107.4 3). Engineer's letter verifying original truss integrity will be required due to prolonged exposure to soil and environment will be required once trusses are cleaned and prior to moving on. FBC [A]107.4 1/21/2025 - PREVIOUS INSPECTION NOTES 1. Job box is a mess clean up box and have a clean full set of stamped plans onsite along with a set of approved truss engineering packet FBC 1`07.3.1 ***Full re-inspection required***
WALL SHEATHING 01/21/2025 CANCELLED BY INSPECTOR MKRASKI
Note: Inspection not needed
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/21/2025 Disapproved - NO FEE MKRASKI
Note: 1. Job box is a mess clean up box and have a clean full set of stamped plans onsite along with a set of approved truss engineering packet FBC 1`07.3.1 ***Full re-inspection required***
TIE BEAM / LINTEL 01/10/2025 APPROVED MCONTRYMAN
FOUND SURVEY APPROVED (OFFICE) 01/02/2025 APPROVED LSALYERDS
MONOLITHIC SLAB 12/03/2024 APPROVED MCONTRYMAN
PLUMBING 1ST ROUGH UNDERGROUND 11/25/2024 APPROVED MGIBSON
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 11/05/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 09/20/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 07/23/2025 07/23/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 03/28/2025 03/31/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BADMIN INFORMATION 03/27/2025 03/27/2025
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Given sheet name A.1 / Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator Engineer letter should use the Engineer Letter document type and name it - what the doc is - Truss letter
BADMIN CANCEL 12/30/2024 01/06/2025
ENGIN1 COMPLETE 12/30/2024 01/02/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 12/30/2024 12/30/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 12/20/2024 12/23/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 12/05/2024 12/10/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 12/05/2024 12/09/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 10/31/2024 11/05/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 09/18/2024 09/19/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 08/26/2024 08/30/2024
Note: Released By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM PHASE 1 COMPLETE
SW1 COMPLETE 08/01/2024 08/02/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON COMPLETE 08/01/2024 08/02/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 07/26/2024 07/29/2024
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
MECH COMPLETE 07/26/2024 07/31/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN COMPLETE 07/26/2024 07/31/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 07/26/2024 07/26/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/26/2024 07/26/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/26/2024 07/31/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 HOLD 07/26/2024 07/26/2024
Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Please provide driveway apron width at edge of pavement
SWALE COMPLETE 07/26/2024 10/11/2024
Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 07/31/2025
REINSPECTION RESIDENTIAL ¤40.00 07/31/2025
REINSPECTION RESIDENTIAL ¤40.00 07/31/2025
REINSPECTION RESIDENTIAL ¤40.00 07/31/2025
REINSPECTION RESIDENTIAL ¤40.00 07/31/2025
SW ENG - INSPECTION 20 ¤20.00 07/31/2025
SW ENG - INSPECTION 20 ¤20.00 07/31/2025
SW ENG - INSPECTION 20 ¤20.00 07/31/2025
SW ENG REINSPECTION 30 ¤30.00 07/31/2025
SW ENG - REVIEW 20 ¤20.00 08/05/2024
SW ENG RES REVIEW 200 ¤200.00 08/05/2024
SEWER CREDIT (¤958.00) 08/05/2024
SEWER INSPECTION ¤25.00 08/05/2024
SEWER CAPITAL FACILITY ¤6,120.52 08/05/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 08/05/2024
SITE PLAN 30 ¤30.00 08/05/2024
SW ENG INSPECTION 80 ¤80.00 08/05/2024
SW ENG PRE APRON ¤30.00 08/05/2024
WATER- TURN ON ¤25.00 08/05/2024
ADJUSTMENT 50% (¤342.60) 08/05/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/05/2024
INSPECTION - RESIDENTIAL ¤572.00 08/05/2024
PLAN REVIEW - APPROVED MASTER ¤83.20 08/05/2024
CONNECTION FEES ¤1,187.26 08/05/2024
FC IMPACT FEE EMS ¤62.00 08/05/2024
IMPACT FEE FIRE ¤428.09 08/05/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 08/05/2024
FC IMPACT FEE LIBRARY ¤268.00 08/05/2024
IMPACT FEE PARKS ¤1,800.99 08/05/2024
IMPACT FEE SCHOOL ¤5,450.00 08/05/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 08/05/2024
WATER -IRRIGATION INSPECTION ¤25.00 08/05/2024
SURCHARGE FS 533.721 ¤3.43 08/05/2024
SURCHARGE - FS 468.631 ¤5.14 08/05/2024
SW ENG - FOUNDATION SURVEY ¤20.00 08/05/2024
Fees Total Due: ¤0.00 Total Paid: ¤21,878.67