I want to search for...
Permit #2024071450
Permit Details
Status: FINAL
| Parcel Id: 04-11-30-5160-00000-00U0 |
| Block: 00000 |
| Subdivision: 2317 - REVERIE SUBDIVISION PHASE 1 |
| Job Phone: 904-294-2220 |
| Location Address: 1 REVERIE DR N |
| Type: CPO - COMMERCIAL POOL |
| Issue Date: 10/30/2024 |
| NOC: RECORDED |
| Applicant name: JUDSON CLARKSON |
| Owner: SPRING LAKE ASSET LLC |
|
Address 206 WILD BASIN ROAD AUSTIN, TX 78746 |
| Lot: 00U0 |
| Contracted Stated Job Value: ¤385,440.00 |
| Job Description: Commercial Amenity Pool |
| Type: CN |
Contractor
POOLS BY JOHN CLARKSON INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
600 ST JOHNS RD N , |
CPC1459376 (Exp: 08/31/2026) | 904-294-2220 |
Sub Contractors
DAVID THOMAS PRUETTE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
331-8 PARKRIDGE AVE ORANGE PARK , FL 32065 |
EC0002923 (Exp: 08/31/2026) | 904-272-7225 |
Inspection History
| Type | Request Date | Result | Inspector |
| BUILDING POOL FINAL | 03/27/2026 | FINAL APPROVED | KSANDOE |
| FIRE FINAL | 03/27/2026 | APPROVED | RMARTIN |
| Note: 3/23/2026 - PREVIOUS INSPECTION NOTES 3/23/26 - Need to call in other inspections before you can do the Fire Final. 3/16/2026 - PREVIOUS INSPECTION NOTES Need to have Chemical fire extinguisher at pool chemical area. | |||
| ELECTRIC FINAL | 03/26/2026 | APPROVED | RMARTIN |
| Note: 3/16/2026 - PREVIOUS INSPECTION NOTES need to have boiler pump connected and bonded. | |||
| FIRE FINAL | 03/23/2026 | Disapproved - NO FEE | JMUNSON |
| Note: 3/23/26 - Need to call in other inspections before you can do the Fire Final. 3/16/2026 - PREVIOUS INSPECTION NOTES Need to have Chemical fire extinguisher at pool chemical area. | |||
| POOL CERTIFICATION/ OPERATING PERMIT - STATE DOH | 03/19/2026 | APPROVED | CPISCITELLI |
| FIRE FINAL | 03/16/2026 | Disapproved - NO FEE | RMARTIN |
| Note: Need to have Chemical fire extinguisher at pool chemical area. | |||
| ELECTRIC FINAL | 03/16/2026 | Disapproved - NO FEE | RMARTIN |
| Note: need to have boiler pump connected and bonded. | |||
| LDSC- LANDSCAPE FINAL | 03/12/2026 | APPROVED | RPICATAGI |
| POOL SAFETY | 03/11/2026 | APPROVED | KSANDOE |
| PLUMBING FINAL | 03/09/2026 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 3080 REMOVE ALL EXTRA PIPE FROM DITCHES 9/26/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS DUE TO WATER IN TRENCH, BACKFILL AT POOL CONTRACTORS RISK 8/14/2025 - PREVIOUS INSPECTION NOTES TEST ON 2'' BUT NO TEST ON 6'' FOR WATER COLUMN PRESSURE THIS WAS A VIRTUAL INSPECTION WITH COLTON | |||
| POOL DECK | 03/06/2026 | APPROVED | KSANDOE |
| ELECTRIC 1ST ROUGH | 11/13/2025 | APPROVED | MKRASKI |
| ELECTRIC 1ST ROUGH | 11/07/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Missing bonding per NEC 680.26(B)(2) | |||
| PLUMBING 2ND ROUGH | 10/07/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: REMOVE ALL EXTRA PIPE FROM DITCHES 9/26/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3070 THIS WAS DUE TO WATER IN TRENCH, BACKFILL AT POOL CONTRACTORS RISK 8/14/2025 - PREVIOUS INSPECTION NOTES TEST ON 2'' BUT NO TEST ON 6'' FOR WATER COLUMN PRESSURE THIS WAS A VIRTUAL INSPECTION WITH COLTON | |||
| PLUMBING 2ND ROUGH | 09/26/2025 | PARTIALLY APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 3070 THIS WAS DUE TO WATER IN TRENCH, BACKFILL AT POOL CONTRACTORS RISK 8/14/2025 - PREVIOUS INSPECTION NOTES TEST ON 2'' BUT NO TEST ON 6'' FOR WATER COLUMN PRESSURE THIS WAS A VIRTUAL INSPECTION WITH COLTON | |||
| PLUMBING 1ST ROUGH | 08/15/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: 8/14/2025 - PREVIOUS INSPECTION NOTES TEST ON 2'' BUT NO TEST ON 6'' FOR WATER COLUMN PRESSURE THIS WAS A VIRTUAL INSPECTION WITH COLTON | |||
| PLUMBING 1ST ROUGH | 08/14/2025 | PARTIALLY APPROVED | MGIBSON |
| Note: TEST ON 2'' BUT NO TEST ON 6'' FOR WATER COLUMN PRESSURE. RESCHEDUAL SPA AND POOL FOR INSPECTION ON 8/15/25 AND IT CAN BE DONE THROUGH VIRTUAL INSPECTION | |||
| POOL STEEL AND GROUND | 08/14/2025 | APPROVED | FWILLIS |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/18/2026 | 03/19/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| DSD | COMPLETE | 10/17/2024 | 10/18/2024 |
| Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 10/17/2024 | 10/30/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| DSD | HOLD | 09/11/2024 | 09/17/2024 |
| Note: Held By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM Repeat Comment Need approved DO | |||
| ELEC | COMPLETE | 09/11/2024 | 09/16/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/11/2024 | 09/20/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/11/2024 | 09/24/2024 |
| Note: Released By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM | |||
| PLUM | HOLD | 09/11/2024 | 09/24/2024 |
| Note: Held By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM 1. OK 2. REPEAT COMMENT - The City's backflow device referenced in your response comment protects the City's water main and water distribution system from backflow on this site but does not protect the building / site water distribution system from contamination. Per section 454.1.6.3 of the Florida Building Code, Building, every outlet in this building/ site's water system must be protected from backflow by an approved backflow preventer. 3. OK 4. OK | |||
| BLD | HOLD | 07/30/2024 | 08/13/2024 |
| Note: Held By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING, FLORIDA BUILDING CODE-ACCESSIBILITY, FLORIDA STATUTES (F.S.), FLORIDA ADMINISTRATIVE CODE (F.A.C.) AND AUTHORITY HAVING JURISDICTION (AHJ). 1. Plans shall reflect the current code cycle. 2. Show dimensions and floor slope and at deck shower. 454.1.3.1.2 3. Show walkway from pool to restrooms 15ft nonslip surface per 454.1.3.1.5 4. Show details of access gate to amenity center and equipment per 454.1.3.1.9 & 454.1.5.1 5. Show slopes and cross slopes on both sides of access gate. 454.1.3.1.2 6. Show slopes and cross slopes of 4' wide deck behind lift mount per 454.1.2.5.6 7. Show required egress from pool and pool deck. There is one access gate on C1.0 8. Needs manufacturer, model & AHRI information for pool heater. 9. Needs seperate permit for gas pool heater | |||
| DSD | HOLD | 07/30/2024 | 07/30/2024 |
| Note: Held By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM Provide approved DO | |||
| ELEC | HOLD | 07/30/2024 | 08/12/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electrical plans need to reference the 2020 NEC not the 2017 | |||
| MECH | HOLD | 07/30/2024 | 08/12/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Update all code years to 2023. FBC 107.2.1 | |||
| PLUM | HOLD | 07/30/2024 | 08/13/2024 |
| Note: Held By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING, FLORIDA BUILDING CODE-ACCESSIBILITY, FLORIDA STATUTES (F.S.), FLORIDA ADMINISTRATIVE CODE (F.A.C.) AND AUTHORITY HAVING JURISDICTION (AHJ). 1. Plans shall reflect the current code cycle. 2. List the manufacturer, model and design criteria for the backflow prevention device to be used at the potable water connection to the pool 454.1.6.3 3. Show hose bibb at pool deck, equipment area and restrooms per 454.1.3.1.5, 454.1.5.9, & 454.1.6.1.4 4. Fixture count for pool only. Include spa, pool deck and amenity center in calculations per Table 1004.5 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE - EXTENSION | ¤40.00 | 07/30/2025 |
| ADMINISTRATIVE - COMMERCIAL | ¤75.00 | 10/30/2024 |
| INSPECTION COMMERCIAL | ¤2,702.00 | 10/30/2024 |
| PLAN REVIEW - COMMERCIAL | ¤443.90 | 10/30/2024 |
| SURCHARGE FS 533.721 | ¤28.99 | 10/30/2024 |
| SURCHARGE - FS 468.631 | ¤43.48 | 10/30/2024 |
| SITE PLAN 30 | ¤30.00 | 10/30/2024 |
| ADJUSTMENT 10% | (¤322.09) | 10/30/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤3,041.28 |