Permit #2024071553

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00700-0060
CONDITIONED SPACE: 2628 sqft
OPENED PORCH (WITH ROOF) : 290 sqft
GARAGE: 1004 sqft
Total Square Footage: 3922 sqft
Block: 00700
Subdivision: 7058 -
Job Phone: 386-931-5741
Location Address: 12 SECRETARY TRL
Type: DU - DUPLEX
Issue Date: 08/28/2024
NOC: RECORDED
Applicant name: MICHAEL MARINO HANSEN
Owner: JM PROPERTIES X LLC

Address

PO BOX 1347

FLAGLER BEACH, FL 32136

Lot: 0060
Contracted Stated Job Value: ¤350,000.00
Job Description: Duplex
Type: CN

Contractor

RBI HOMES
Status Location Address State License Number Phone
ACTIVE

PO BOX 1347

PALM COAST, FL 32137

RB29003877 (Exp: 08/31/2027) 386-585-4097

Sub Contractors

ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

PO BOX 912

PALM COAST, FL 32164

CAC1820539 (Exp: 08/31/2026) 386-264-0550
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
MICHAEL JON HOWES
Status Location Address State License Number Phone
CANCEL

29 MALACOMPRA RD

PALM COAST, FL 32137

RC29027794 (Exp: 08/31/2025) 410-984-6787

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/06/2025 FINAL APPROVED MCONTRYMAN
Note: 6/4/2025 - PREVIOUS INSPECTION NOTES 6-4-25 1. Both A/C condensating drains need to be 6" above the ground. 2. Energy cals do not match. 3. Light in garage of 12B do not work.
ROW - FINAL APRON (AFTER POUR) 06/05/2025 APPROVED FSLADISH
Note: 6/5/25 REQUIRED SWALE CORRECTION COMPLETED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 6/4/2025 - PREVIOUS INSPECTION NOTES 6/4/25 RECEIVED CALL FROM JIM CM TO PLEASE CANCEL THIS INSPECTION. Inspector Notes from Inspection 9465 6/3/25 I AM APPROVING THIS FIELD SURVEY AS NOTED THAT YOU WILL BE REQUIRED TO FIX THE FRONT SWALE ON THE LEFT SIDE WHERE YOU WENT IN AND OUT WITH A MACHINE. REMOVE/REPAIR THE AREA OUTLINED IN PINK PAINT AND COMPACT IT AND GRADE IT TO HAVE POSITIVE DRAINAGE FLOW IN AS GOOD OR BETTER CONDITION THAN WHEN YOU BEGAN CONSTRUCTION. YOU WILL ALSO NEED TO SOD THE BARE AREA YOU HAVE LAID STRAW. THE SOD SHOULD BE LAID TO 4" FROM THE FENCE. APPROVING AS NOTED AS A COURTESY SO YOU WILL BE ABLE TO MOVE FORWARD WITH INSPECTIONS. CORRECTIONS REQUIRED BEFORE ROW FINAL PASSAGE. PHOTO FOR REFERENCE.
ROW - FINAL INSPECTION 06/05/2025 APPROVED FSLADISH
Note: 6/5/25 REQUIRED SWALE CORRECTION COMPLETED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 6/4/2025 - PREVIOUS INSPECTION NOTES 6/4/25 RECEIVED CALL FROM JIM CM TO PLEASE CANCEL THIS INSPECTION. Inspector Notes from Inspection 9465 6/3/25 I AM APPROVING THIS FIELD SURVEY AS NOTED THAT YOU WILL BE REQUIRED TO FIX THE FRONT SWALE ON THE LEFT SIDE WHERE YOU WENT IN AND OUT WITH A MACHINE. REMOVE/REPAIR THE AREA OUTLINED IN PINK PAINT AND COMPACT IT AND GRADE IT TO HAVE POSITIVE DRAINAGE FLOW IN AS GOOD OR BETTER CONDITION THAN WHEN YOU BEGAN CONSTRUCTION. YOU WILL ALSO NEED TO SOD THE BARE AREA YOU HAVE LAID STRAW. THE SOD SHOULD BE LAID TO 4" FROM THE FENCE. APPROVING AS NOTED AS A COURTESY SO YOU WILL BE ABLE TO MOVE FORWARD WITH INSPECTIONS. CORRECTIONS REQUIRED BEFORE ROW FINAL PASSAGE. PHOTO FOR REFERENCE.
U -UTILITY RESIDENTIAL FINAL 06/04/2025 FINAL APPROVED BWRIGHT
ROW - FINAL APRON (AFTER POUR) 06/04/2025 CANCELLED BY APPLICANT FSLADISH
Note: 6/4/25 RECEIVED CALL FROM JIM CM TO PLEASE CANCEL THIS INSPECTION. Inspector Notes from Inspection 9465 6/3/25 I AM APPROVING THIS FIELD SURVEY AS NOTED THAT YOU WILL BE REQUIRED TO FIX THE FRONT SWALE ON THE LEFT SIDE WHERE YOU WENT IN AND OUT WITH A MACHINE. REMOVE/REPAIR THE AREA OUTLINED IN PINK PAINT AND COMPACT IT AND GRADE IT TO HAVE POSITIVE DRAINAGE FLOW IN AS GOOD OR BETTER CONDITION THAN WHEN YOU BEGAN CONSTRUCTION. YOU WILL ALSO NEED TO SOD THE BARE AREA YOU HAVE LAID STRAW. THE SOD SHOULD BE LAID TO 4" FROM THE FENCE. APPROVING AS NOTED AS A COURTESY SO YOU WILL BE ABLE TO MOVE FORWARD WITH INSPECTIONS. CORRECTIONS REQUIRED BEFORE ROW FINAL PASSAGE. PHOTO FOR REFERENCE.
U-CROSS CONNECTION 06/04/2025 APPROVED BWRIGHT
BLD - BUILDING FINAL 06/04/2025 Disapproved -FEE REQUIRED BTAYLOR
Note: 6-4-25 1. Both A/C condensating drains need to be 6" above the ground. 2. Energy cals do not match. 3. Light in garage of 12B do not work.
ROW - FINAL INSPECTION 06/04/2025 CANCELLED BY APPLICANT FSLADISH
Note: 6/4/25 RECEIVED CALL FROM JIM CM TO PLEASE CANCEL THIS INSPECTION. Inspector Notes from Inspection 9465 6/3/25 I AM APPROVING THIS FIELD SURVEY AS NOTED THAT YOU WILL BE REQUIRED TO FIX THE FRONT SWALE ON THE LEFT SIDE WHERE YOU WENT IN AND OUT WITH A MACHINE. REMOVE/REPAIR THE AREA OUTLINED IN PINK PAINT AND COMPACT IT AND GRADE IT TO HAVE POSITIVE DRAINAGE FLOW IN AS GOOD OR BETTER CONDITION THAN WHEN YOU BEGAN CONSTRUCTION. YOU WILL ALSO NEED TO SOD THE BARE AREA YOU HAVE LAID STRAW. THE SOD SHOULD BE LAID TO 4" FROM THE FENCE. APPROVING AS NOTED AS A COURTESY SO YOU WILL BE ABLE TO MOVE FORWARD WITH INSPECTIONS. CORRECTIONS REQUIRED BEFORE ROW FINAL PASSAGE. PHOTO FOR REFERENCE.
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/03/2025 APPROVED FSLADISH
Note: 6/3/25 ELEVATION SHOTS INDICATE DRAINAGE NOW MEETS COPC MINIMUM STANDARDS WITH THIS SURVEY. _____________________________________________________________________________________________________________________ 5/22/2025 - PREVIOUS INSPECTION NOTES 5.22/25 You are still not showing 6" of fall in the first 10ft off of structure. Both of your 10 ft off the structure corner shots indicate you will not have positive flow to the front swale. Please see photo for reference. ______________________________________________________________________________________________________________________ 5/13/2025 - PREVIOUS INSPECTION NOTES 5/13/25 YOU DO NOT HAVE THE REQUIRED 6" FALL IN THE FIRST 10' OFF THE REAR OF THE STRUCTURE.1 Drainage from the structure is to be a 6-inch (5%) Residential, Chapter 4, R401.3 "Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10 FT. SEE PHOTO FOR REFERENCE
ROW FIELD SURVEY /GRADING CERTIFICATION 06/03/2025 APPROVED - AS NOTED FSLADISH
Note: 6/3/25 I AM APPROVING THIS FIELD SURVEY AS NOTED THAT YOU WILL BE REQUIRED TO FIX THE FRONT SWALE ON THE LEFT SIDE WHERE YOU WENT IN AND OUT WITH A MACHINE. REMOVE/REPAIR THE AREA OUTLINED IN PINK PAINT AND COMPACT IT AND GRADE IT TO HAVE POSITIVE DRAINAGE FLOW IN AS GOOD OR BETTER CONDITION THAN WHEN YOU BEGAN CONSTRUCTION. YOU WILL ALSO NEED TO SOD THE BARE AREA YOU HAVE LAID STRAW. THE SOD SHOULD BE LAID TO 4" FROM THE FENCE. APPROVING AS NOTED AS A COURTESY SO YOU WILL BE ABLE TO MOVE FORWARD WITH INSPECTIONS. CORRECTIONS REQUIRED BEFORE ROW FINAL PASSAGE. PHOTO FOR REFERENCE.
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/22/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 5.22/25 You are still not showing 6" of fall in the first 10ft off of structure. Both of your 10 ft off the structure corner shots indicate you will not have positive flow to the front swale. Please see photo for reference. ______________________________________________________________________________________________________________________ 5/13/2025 - PREVIOUS INSPECTION NOTES 5/13/25 YOU DO NOT HAVE THE REQUIRED 6" FALL IN THE FIRST 10' OFF THE REAR OF THE STRUCTURE.1 Drainage from the structure is to be a 6-inch (5%) Residential, Chapter 4, R401.3 "Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10 FT. SEE PHOTO FOR REFERENCE
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/13/2025 Disapproved - NO FEE FSLADISH
Note: 5/13/25 YOU DO NOT HAVE THE REQUIRED 6" FALL IN THE FIRST 10' OFF THE REAR OF THE STRUCTURE.1 Drainage from the structure is to be a 6-inch (5%) Residential, Chapter 4, R401.3 "Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10 FT. SEE PHOTO FOR REFERENCE
ROW- PRE-APRON (PRE-POUR) 04/25/2025 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
GRAVITY SEWER TEST 04/21/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 SEC-24-162-C SWALE BLOCKED BY PORTABLE RESTROOM, WATER SERVICE NOT RAN YET THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 04/21/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 SEC-24-162-C SWALE BLOCKED BY PORTABLE RESTROOM, WATER SERVICE NOT RAN YET THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 04/15/2025 APPROVED - AS NOTED BTAYLOR
Note: 4-15-25 1. Emailed FPL at 1:48.
FIREWALL FINAL 02/18/2025 APPROVED MCONTRYMAN
LATH/BRICK/ WATER BARRIER 02/14/2025 APPROVED BTAYLOR
INSULATION 02/11/2025 APPROVED BTAYLOR
ALL ROUGH 02/07/2025 APPROVED BTAYLOR
Note: 2/6/2025 - PREVIOUS INSPECTION NOTES 2-6-25 1. Electrical panel in A unit needs holes in top filled. 2. Double washer dryer in both units? 3. Master bath exhaust fan in A unit has fallen out of the roof.
FIREWALL FRAMING 02/06/2025 APPROVED BTAYLOR
ALL ROUGH 02/06/2025 Disapproved - NO FEE BTAYLOR
Note: 2-6-25 1. Electrical panel in A unit needs holes in top filled. 2. Double washer dryer in both units? 3. Master bath exhaust fan in A unit has fallen out of the roof.
FIREWALL DRYWALL NAILING 11/14/2024 APPROVED BTAYLOR
Note: 11/13/2024 - PREVIOUS INSPECTION NOTES 11/12/2024 - PREVIOUS INSPECTION NOTES 11-12-24 1. Screws have been covered up. 11-13-24 1. Can not see screws on top and bottom edges.
ROOF VALLEY & METAL 11/14/2024 APPROVED BTAYLOR
FIREWALL DRYWALL NAILING 11/13/2024 Disapproved - NO FEE BTAYLOR
Note: 11/12/2024 - PREVIOUS INSPECTION NOTES 11-12-24 1. Screws have been covered up. 11-13-24 1. Can not see screws on top and bottom edges.
FIREWALL DRYWALL NAILING 11/12/2024 Disapproved - NO FEE BTAYLOR
Note: 11-12-24 1. Screws have been covered up.
WALL SHEATHING 11/06/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/06/2024 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 10/29/2024 APPROVED TBAKER
TIE BEAM / LINTEL 10/18/2024 APPROVED BTAYLOR
MONOLITHIC SLAB 10/03/2024 APPROVED BTAYLOR
Note: 10/2/2024 - PREVIOUS INSPECTION NOTES
MONOLITHIC SLAB 10/02/2024 CANCELLED BY APPLICANT BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 10/01/2024 APPROVED - AS NOTED MGIBSON
Note: SEC-24-162-C SWALE BLOCKED BY PORTABLE RESTROOM, WATER SERVICE NOT RAN YET
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 09/30/2024 APPROVED CPISCITELLI
WATER METER INSTALLATION REQUEST 09/11/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
CUSVC COMPLETE 05/22/2025 05/28/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ZON COMPLETE 05/22/2025 05/22/2025
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
MECH COMPLETE 05/06/2025 05/08/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/29/2024 10/29/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 10/29/2024 10/29/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 09/24/2024 09/30/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 08/20/2024 08/26/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 08/12/2024 08/12/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD HOLD 08/12/2024 08/16/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Soffits are 16 inches wide. Provide soffit construction detail in accordance with Section R704.2.1 through R704.2.4.
ELEC COMPLETE 08/06/2024 08/12/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 08/06/2024 08/12/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Soffits are 16 inches wide. Provide soffit construction detail in accordance with Section R704.2.1 through R704.2.4.
ZON HOLD 08/06/2024 08/06/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Must have a minimum of 16 foundation plantings with 8 along the front and four along each side. Screening for AC's do not count toward the 16 required
BADMIN COMPLETE 07/31/2024 08/05/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 07/31/2024 08/05/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM All comments per FBC Residential 2023 8th Edition 1. Udate code year on all pages in engineering note box to 2023 8th edition. 107.2.1 2. Plan Page 6.0 under roof general notes update code year 107.2.1 3. Plan Page 9.0 details 3 and 4 have wording that has been over written and not readable. 107.21. 4. Provide presumptive load bearing value used for foundation design per R401.4.1 5.Provide soffit dimensions and framing detail per R704.2.1 6. Update florida product approval revision number for underlayment to 2023 code cycle
CUSVC COMPLETE 07/31/2024 08/02/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 07/31/2024 08/01/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Range and dryer need to be GFCI protected. NEC 2020 210.8
ENGIN1 COMPLETE 07/31/2024 07/31/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 07/31/2024 08/02/2024
LOCATE COMPLETE 07/31/2024 08/02/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 07/31/2024 08/02/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/31/2024 07/31/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON HOLD 07/31/2024 08/05/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Body color does not meet the LRV for a pastel must be 80 or greater Must have a minimum of 16 foundation plantings with 8 along the front and four along each side. Screening for AC's do not count toward the 16 required
SWALE COMPLETE 07/31/2024 11/06/2024
Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 06/06/2025
WATER-METER ¤965.03 05/28/2025
WATER-METER ¤965.03 05/28/2025
WATER- TURN ON ¤50.00 05/28/2025
WATER- TURN ON ¤50.00 05/28/2025
WATER PERMIT INSPECTION ¤40.00 05/28/2025
WATER PERMIT INSPECTION ¤40.00 05/28/2025
SITE PLAN 30 ¤30.00 08/28/2024
WATER- TURN ON ¤50.00 08/28/2024
ADJUSTMENT 10% (¤186.21) 08/28/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/28/2024
INSPECTION - RESIDENTIAL ¤1,427.25 08/28/2024
PLAN REVIEW - RESIDENTIAL ¤404.82 08/28/2024
CONNECTION FEES ¤2,374.52 08/28/2024
FC IMPACT FEE EMS ¤124.00 08/28/2024
IMPACT FEE FIRE ¤856.18 08/28/2024
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 08/28/2024
FC IMPACT FEE LIBRARY ¤536.00 08/28/2024
IMPACT FEE PARKS ¤3,600.18 08/28/2024
IMPACT FEE SCHOOL ¤10,900.00 08/28/2024
IMPACT FEE TRANSPORTATION ¤2,890.00 08/28/2024
WATER -IRRIGATION INSPECTION ¤50.00 08/28/2024
SURCHARGE FS 533.721 ¤16.76 08/28/2024
SURCHARGE - FS 468.631 ¤25.14 08/28/2024
SW ENG - FOUNDATION SURVEY ¤20.00 08/28/2024
SW ENG INSPECTION 80 ¤80.00 08/28/2024
SW ENG PRE APRON ¤30.00 08/28/2024
SW ENG - REVIEW 20 ¤20.00 08/28/2024
SW ENG RES REVIEW 200 ¤200.00 08/28/2024
SEWER CREDIT (¤1,420.00) 08/28/2024
SEWER INSPECTION ¤25.00 08/28/2024
SEWER CAPITAL FACILITY ¤12,241.04 08/28/2024
WATER CAPITAL FACILITY FEE ¤8,702.28 08/28/2024
Fees Total Due: ¤0.00 Total Paid: ¤45,613.02