Permit #2024071557

Permit Details

Status: COED

Parcel Id: 07-11-31-7009-00320-0080
CONDITIONED SPACE: 1810 sqft
GARAGE: 713 sqft
OPENED PORCH (WITH ROOF) : 123 sqft
PATIO/DECK (NO ROOF) : 136 sqft
Total Square Footage: 2782 sqft
Block: 00320
Subdivision: 7009 -
Job Phone: 904-888-6443
Location Address: 83 FELLOWSHIP DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/10/2024
NOC: RECORDED
Applicant name: AMIR BENTOV
Owner: AIHD LLC

Address

2800 N 6TH ST

ST AUGUSTINE, FL 32084

Address

UNIT 790

ST AUGUSTINE, FL 32084

Lot: 0080
Contracted Stated Job Value: ¤230,000.00
Job Description: Single Family Residence
Type: CN

Contractor

MAVEN HOMES LLC
Status Location Address State License Number Phone
ACTIVE

2800 N 6TH ST UNIT 790

,

CRC1333741 (Exp: 08/31/2026) 904-667-4330

Sub Contractors

ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 11/24/2025 FINAL APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9035 potable irr with PVB-no cc
ROW FIELD SURVEY /GRADING CERTIFICATION 11/20/2025 APPROVED EMADISON
Note: ** 11/21/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
BLD - BUILDING FINAL 11/17/2025 Approval - Private Provider PPROVIDER
Note: 11/14/2025 3:27:29 PM- PREVIOUS INSPECTION NOTES
U-CROSS CONNECTION 11/12/2025 APPROVED - AS NOTED LFITZGERALD
Note: potable irr with PVB-no cc
BLD - BUILDING FINAL 11/12/2025 Disapproved- Private Provider PPROVIDER
ROW - FINAL APRON (AFTER POUR) 11/06/2025 APPROVED TPOLACEK
Note: 11-06-25 TPOLACEK**** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/06/2025 APPROVED TPOLACEK
Note: 11-06-25 TPOLACEK**** MET ON SITE WITH G,BERTOLA, E,MADISON, F,SLADISH,P,FLANANGAN TO DISCUSS GRADE LAST WEEK. BUILDER HAS CORRECTED GRADE ALONG RIGHT SIDE PROPERTY LINBE TO ALLOW DRAINAGE TO REACH FRONT SWALE. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW FIELD SURVEY /GRADING CERTIFICATION 11/06/2025 APPROVED TPOLACEK
Note: 11-06-25 TPOLACEK**** MET ON SITE WITH G,BERTOLA, E,MADISON, F,SLADISH,P,FLANANGAN TO DISCUSS GRADE LAST WEEK. BUILDER HAS CORRECTED GRADE ALONG RIGHT SIDE PROPERTY LINBE TO ALLOW DRAINAGE TO REACH FRONT SWALE. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 11/06/2025 APPROVED TPOLACEK
Note: 11-06-25 TPOLACEK**** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- PRE-APRON (PRE-POUR) 10/03/2025 APPROVED - AS NOTED EMADISON
Note: ** 10/03/25 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL
ROW - DRAINAGE 09/17/2025 APPROVED - AS NOTED EMADISON
Note: ** 09/17/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________ 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 MET WITH BUILDER ON SITE WITH (RSI) SUPERVISOR G. BERTOLA REGARDING ISSUES NOTED BELOW ** BUILDER WILL BE INSTALLING A DOUBLE SILT FENCE ALONG RIGHT SIDE PROPERTY LINE AND ALSO DIGGING IN A DRAINAGE CONVEYANCE TO ALLIVEATE WATER FROM NEGATIVELY IMPACTING THE ADJACENT PROPERTY. A FOLLOW UP INSPECTION WILL BE CONDUCTED ON 09/17/25 ALLOWING FOR THE BUILDER TO TAKE ALL NECESSARY CORRECTIONS. ** IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/17/25 _______________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 CORRECTIONS ARE NOT COMPLETE NOR WHAT HAS BEEN DONE CORRECTS ANY ISSUES NOTED ** IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/12/25 _______________________________________________________________________________________________________________________ 9/10/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** REACHED OUT TO BUILDER (AMIR) VIA TEXT HE DID A RETURN PHONE CALL EXPLAINED THE ISSUES REGARDING REPAIRS REQUIRED . ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25 Inspector Notes from Inspection 9470 ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. Inspector Notes from Inspection 9470 ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. Please check the construction site silt fence and the front swale. per GBERTOLA
ROW - DRAINAGE 09/12/2025 Disapproved - NO FEE EMADISON
Note: ** 09/12/25 MET WITH BUILDER ON SITE WITH (RSI) SUPERVISOR G. BERTOLA REGARDING ISSUES NOTED BELOW ** BUILDER WILL BE INSTALLING A DOUBLE SILT FENCE ALONG RIGHT SIDE PROPERTY LINE AND ALSO DIGGING IN A DRAINAGE CONVEYANCE TO ALLIVEATE WATER FROM NEGATIVELY IMPACTING THE ADJACENT PROPERTY. A FOLLOW UP INSPECTION WILL BE CONDUCTED ON 09/17/25 ALLOWING FOR THE BUILDER TO TAKE ALL NECESSARY CORRECTIONS. ** IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/17/25 _______________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 CORRECTIONS ARE NOT COMPLETE NOR WHAT HAS BEEN DONE CORRECTS ANY ISSUES NOTED ** IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/12/25 _______________________________________________________________________________________________________________________ 9/10/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** REACHED OUT TO BUILDER (AMIR) VIA TEXT HE DID A RETURN PHONE CALL EXPLAINED THE ISSUES REGARDING REPAIRS REQUIRED . ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25 Inspector Notes from Inspection 9470 ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. Inspector Notes from Inspection 9470 ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. Please check the construction site silt fence and the front swale. per GBERTOLA
ROW- PROJECT STATUS 09/12/2025 Status Check EMADISON
Note: ** ( RSI ) SUPERVISOR G. BERTOLA AND SENIOR ( RSI ) E. MADISON MEETING WITH BUILDER ON SITE. TO DISCUSS DRAINAGE AND EROSION AND SEDIMENT CONTROL MEASURES THAT ARE REQUIRED DRAINAGE INSPECTIONS WIL BE FOLLOWED UP AS NOTED IN THE DRAINAGE INSPECTION IN PERMIT ROUTE ** MEET BUILDER ON SITE 10:OO AM REGARDING SITE CONDITIONS AND DRAINAGE
ROW - DRAINAGE 09/11/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/11/25 CORRECTIONS ARE NOT COMPLETE NOR WHAT HAS BEEN DONE CORRECTS ANY ISSUES NOTED ** IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/12/25 _______________________________________________________________________________________________________________________ 9/10/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** REACHED OUT TO BUILDER (AMIR) VIA TEXT HE DID A RETURN PHONE CALL EXPLAINED THE ISSUES REGARDING REPAIRS REQUIRED . ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25 Inspector Notes from Inspection 9470 ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. Inspector Notes from Inspection 9470 ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. Please check the construction site silt fence and the front swale. per GBERTOLA
ROW - DRAINAGE 09/10/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/11/25 IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** SEE ATTACHED PHOTOS ** REACHED OUT TO BUILDER (AMIR) VIA TEXT HE DID A RETURN PHONE CALL EXPLAINED THE ISSUES REGARDING REPAIRS REQUIRED . ** FOLLOW UP INSPECTION ON 09/11/25 _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. Inspector Notes from Inspection 9470 ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. Please check the construction site silt fence and the front swale. per GBERTOLA
ROW - DRAINAGE 07/22/2025 APPROVED - AS NOTED EMADISON
Note: ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE.
ROW - DRAINAGE 07/15/2025 Disapproved - NO FEE PFLANAGAN
Note: *** NOTES ADDED BY PFLANAGAN 7/15/2025 9:12:35 AM *** YOU WILL HAVE 7DAYS TO CORRECT ALL ISSUES OR THERE WILL BE INSPECTION HOLD ON THIS PERMIT 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE.
ROW- PROJECT STATUS 07/15/2025 Status Check PFLANAGAN
Note: PUTTING ON A DRAINAGE ON THIS PERMIT ----------------------------------------------------------------------------------- PLEAASE CHECK THE SILT FENCE AND THE FRONT SWALE. hOMEOWNER IS COMPPLAINENT ON 85 fELLOWSHIP.PER GBERTOLA
ELECTRIC - EARLY POWER 06/16/2025 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 05/20/2025 Approval - Private Provider PPROVIDER
SEWER TIE IN 05/20/2025 FINAL APPROVED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 05/20/2025 APPROVED - AS NOTED MGIBSON
Note: SHOUL HAVE BEEN APPROVED AS NOTED NOT FINAL INSPECTION
LATH/BRICK/ WATER BARRIER 05/14/2025 Approval - Private Provider PPROVIDER
INSULATION 05/12/2025 Approval - Private Provider PPROVIDER
Note: 4/17/2025 4:13:31 PM- PREVIOUS INSPECTION NOTES
INSULATION 04/17/2025 Disapproved- Private Provider PPROVIDER
ALL ROUGH 04/10/2025 Approval - Private Provider PPROVIDER
WALL SHEATHING 03/27/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/27/2025 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 03/27/2025 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 03/26/2025 APPROVED - AS NOTED PBUCKLEY
Note: FOUNDATION SURVEY SUBMITTED ON 11/22/24 IS NOW APPROVED AND BASED UPON THE CONTRACTOR'S ENGINEER CONFIRMATION LETTER STATING THEY WILL BE ABLE TO MAKE THE STORMWATER DRAINAGE COMPLY WITH CITY CODES AND STANDARDS. THE ENGINEER'S LETTER WAS SUBMITTED ON 3/25/25 AND THE CONTRACTOR HAS BEEN WARNED IN AN EMAIL SENT ON 3/26/25 THAT THE DRAINAGE MUST COMPLY WITH CITY STANDARDS.
ROW - DRAINAGE 01/21/2025 APPROVED - AS NOTED EMADISON
Note: ** 01/21/25 ALL CORRECTIINS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/17/2025 - PREVIOUS INSPECTION NOTES ** 01/17/25 BUILDER NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** BUILDER ALSO REQUIRED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH AND PUT INTO YOUR DUMPSTER TO PREVENT AND DEBRIS FROM ENTERING THE STORMWATER SYSTEM ** FAILURE TO COMPLY WILL RESULT IN YOUR SITE BEING PLACED ON A INSPECTION HOLD (PRIORITY 1) IF THE CORRECTIONS HAVE NOT BEEN MADE PRIOR TO THE NEXT SCHEDULED INSPECTION ** FOLLOW UP INSPECTION ON 01/21/25 ___________________________________________________________________________________________________________________ 1/10/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9470 ** 10/25/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 BUILDER NEEDS TO INSTALL SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS PROJECT SITE ** CLEAR BOTH ENDS OF THE TEMORARY CULVERT. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ON JOB SITE ** ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 ( PERMIT BOX HAS NOTHING IN IT OR ON IT) ** FOLLOW UP INSPECTION ON 10/25/24 ** 01/10/25 BUILDER NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** BUILDER ALSO REQUIRED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH AND PUT INTO YOUR DUMPSTER TO PREVENT AND DEBRIS FROM ENTERING THE STORMWATER SYSTEM ** FAILURE TO COMPLY WILL RESULT IN YOUR SITE BEING PLACED ON A INSPECTION HOLD (PRIORITY 1) IF THE CORRECTIONS HAVE NOT BEEN MADE PRIOR TO THE NEXT SCHEDULED INSPECTION ** FOLLOW UP INSPECTION ON 01/17/25 I nspector Notes from Inspection 9470 ** 10/25/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 BUILDER NEEDS TO INSTALL SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS PROJECT SITE ** CLEAR BOTH ENDS OF THE TEMORARY CULVERT. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ON JOB SITE ** ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 ( PERMIT BOX HAS NOTHING IN IT OR ON IT) ** FOLLOW UP INSPECTION ON 10/25/24
ROW - DRAINAGE 01/17/2025 Disapproved - NO FEE EMADISON
Note: ** 01/17/25 BUILDER NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** BUILDER ALSO REQUIRED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH AND PUT INTO YOUR DUMPSTER TO PREVENT AND DEBRIS FROM ENTERING THE STORMWATER SYSTEM ** FAILURE TO COMPLY WILL RESULT IN YOUR SITE BEING PLACED ON A INSPECTION HOLD (PRIORITY 1) IF THE CORRECTIONS HAVE NOT BEEN MADE PRIOR TO THE NEXT SCHEDULED INSPECTION ** FOLLOW UP INSPECTION ON 01/21/25 ___________________________________________________________________________________________________________________ 1/10/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9470 ** 10/25/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 BUILDER NEEDS TO INSTALL SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS PROJECT SITE ** CLEAR BOTH ENDS OF THE TEMORARY CULVERT. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ON JOB SITE ** ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 ( PERMIT BOX HAS NOTHING IN IT OR ON IT) ** FOLLOW UP INSPECTION ON 10/25/24 ** 01/10/25 BUILDER NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** BUILDER ALSO REQUIRED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH AND PUT INTO YOUR DUMPSTER TO PREVENT AND DEBRIS FROM ENTERING THE STORMWATER SYSTEM ** FAILURE TO COMPLY WILL RESULT IN YOUR SITE BEING PLACED ON A INSPECTION HOLD (PRIORITY 1) IF THE CORRECTIONS HAVE NOT BEEN MADE PRIOR TO THE NEXT SCHEDULED INSPECTION ** FOLLOW UP INSPECTION ON 01/17/25 I nspector Notes from Inspection 9470 ** 10/25/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 BUILDER NEEDS TO INSTALL SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS PROJECT SITE ** CLEAR BOTH ENDS OF THE TEMORARY CULVERT. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ON JOB SITE ** ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 ( PERMIT BOX HAS NOTHING IN IT OR ON IT) ** FOLLOW UP INSPECTION ON 10/25/24
ROW - DRAINAGE 01/10/2025 Disapproved - NO FEE EMADISON
Note: Inspector Notes from Inspection 9470 ** 10/25/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 BUILDER NEEDS TO INSTALL SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS PROJECT SITE ** CLEAR BOTH ENDS OF THE TEMORARY CULVERT. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ON JOB SITE ** ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 ( PERMIT BOX HAS NOTHING IN IT OR ON IT) ** FOLLOW UP INSPECTION ON 10/25/24 ** 01/10/25 BUILDER NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** BUILDER ALSO REQUIRED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH AND PUT INTO YOUR DUMPSTER TO PREVENT AND DEBRIS FROM ENTERING THE STORMWATER SYSTEM ** FAILURE TO COMPLY WILL RESULT IN YOUR SITE BEING PLACED ON A INSPECTION HOLD (PRIORITY 1) IF THE CORRECTIONS HAVE NOT BEEN MADE PRIOR TO THE NEXT SCHEDULED INSPECTION ** FOLLOW UP INSPECTION ON 01/17/25 I nspector Notes from Inspection 9470 ** 10/25/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 BUILDER NEEDS TO INSTALL SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS PROJECT SITE ** CLEAR BOTH ENDS OF THE TEMORARY CULVERT. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ON JOB SITE ** ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 ( PERMIT BOX HAS NOTHING IN IT OR ON IT) ** FOLLOW UP INSPECTION ON 10/25/24
TIE BEAM / LINTEL 12/05/2024 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 11/15/2024 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 11/12/2024 Approval - Private Provider PPROVIDER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 11/08/2024 APPROVED JMUNSON
ROW - DRAINAGE 10/25/2024 APPROVED - AS NOTED EMADISON
Note: ** 10/25/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 BUILDER NEEDS TO INSTALL SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS PROJECT SITE ** CLEAR BOTH ENDS OF THE TEMORARY CULVERT. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ON JOB SITE ** ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 ( PERMIT BOX HAS NOTHING IN IT OR ON IT) ** FOLLOW UP INSPECTION ON 10/25/24
ROW - DRAINAGE 10/21/2024 Disapproved - NO FEE EMADISON
Note: ** 10/21/24 BUILDER NEEDS TO INSTALL SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS PROJECT SITE ** CLEAR BOTH ENDS OF THE TEMORARY CULVERT. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ON JOB SITE ** ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 ( PERMIT BOX HAS NOTHING IN IT OR ON IT) ** FOLLOW UP INSPECTION ON 10/25/24
WATER METER INSTALLATION REQUEST 10/17/2024 APPROVED CBOWERMASTER
ROW- PROJECT STATUS 10/15/2024 Status Check EMADISON
Note: ** 10/21/24 A ROW DRAINAGE WILL BE IMPLIMENTED ON THIS PERMITFOR NEEDED DRAINAGE CORRECTIONS ____________________________________________________________________________________________________________ Neighbor at 75 says : silt all over, no silt fencing; no appropriate drainage; blocking swale of neighbors downstream PLS INSPECT MH
WILDLIFE CHECK - ENVIRONMENTAL 08/07/2024 APPROVED DRODRIGUEZ

Review History

Department Status Date In Date Out
SW1 COMPLETE 09/17/2025 09/18/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/17/2025 09/24/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
BADMIN INFORMATION 07/31/2025 07/31/2025
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM SUBMIT UNDER 'GRADING PLAN, NOT 'SITE PLAN'
BADMIN INFORMATION 07/31/2025 07/31/2025
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM RENAME FILE NAME TO DRAINAGE PLAN.PDF
SW1 HOLD 07/31/2025 08/04/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM I've mark up the submitted drainage plan for revisions. Comments below as well. - Per Building Code R403.1.4 Footing shall be placed not less than 12"(305mm) below the finished grade of the ground surface. - Please depict dimensions between side of home and property line to clearly indicating slopes. - AA Cross Section has lot 8 incorrectly labeled as lot 32 - Along improved lots grades shall match within ± 0.1'. Please provide proposed elevations between lot 7 and 8. - On the right side of the home grade goes from a 15.50' to a 13.80'. This exceeds a 4:1 slope. - Front property line shall be even with or higher than edge of pavement. Please feel free to call or email if there are questions or concerns.
ENGIN1 HOLD 07/31/2025 08/04/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM I've mark up the submitted drainage plan for revisions. Comments below as well. - Per Building Code R403.1.4 Footing shall be placed not less than 12"(305mm) below the finished grade of the ground surface. - Please depict dimensions between side of home and property line to clearly indicating slopes. - AA Cross Section has lot 8 incorrectly labeled as lot 32 - Along improved lots grades shall match within ± 0.1'. Please provide proposed elevations between lot 7 and 8. - On the right side of the home grade goes from a 15.50' to a 13.80'. This exceeds a 4:1 slope. - Front property line shall be even with or higher than edge of pavement. Please feel free to call or email if there are questions or concerns.
ZON COMPLETE 03/26/2025 03/26/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Drainage plan only that was submitted. No need for zoning review.
SW1 COMPLETE 03/25/2025 03/26/2025
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
BLD COMPLETE 03/25/2025 03/26/2025
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ENGIN1 HOLD 02/14/2025 02/20/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM As discussed with Mr. Bentov and Mr. Wilcox per Patrick Buckley from COPC, since this property's FFE is outside the City's tolerances we are requiring Lot Grading and Drainage Confirmation Letter to move forward. 1) A Florida Professional Engineer (not Surveyor) to review the original City approved Site Plan / Survey 2) P.E. reviews Foundation Survey taking note of the differences in FFE Elevations at both 83 and 85 Fellowship Drive as determined in this email and analyzes the effects of these changes and possible impact on the ability to complete the lot grading in accordance with the approved Site Plan / Survey. 3) If P.E. determines the changes are within his / her ability to provide a Final Lot Grading & Drainage Certificate for this lot that includes a Certification Statement in accordance with Florida Administrative Code 61G15-18.011certify at completion of the final grading and installation of landscaping, then the P.E. writes a letter to the Palm Coast Building Department to Patrick Buckley's attention confirming he will be able to provide said Final Lot Grading & Drainage Certificate and Certification statement. If the P.E. is unable to provide this confirmation letter, than the P.E. shall provide a revised Site Plan / Survey that includes design of lot drainage and grading adjustments, improvements, conveyances necessary for the P.E. to provide a Final Lot Grading & Drainage Certificate and Certification Statement as noted above. The revised Site Plan / Survey shall include a confirmation letter as described above.
SW1 HOLD 02/14/2025 02/20/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM As discussed with Mr. Bentov and Mr. Wilcox per Patrick Buckley from COPC, since this property's FFE is outside the City's tolerances we are requiring Lot Grading and Drainage Confirmation Letter to move forward. 1) A Florida Professional Engineer (not Surveyor) to review the original City approved Site Plan / Survey 2) P.E. reviews Foundation Survey taking note of the differences in FFE Elevations at both 83 and 85 Fellowship Drive as determined in this email and analyzes the effects of these changes and possible impact on the ability to complete the lot grading in accordance with the approved Site Plan / Survey. 3) If P.E. determines the changes are within his / her ability to provide a Final Lot Grading & Drainage Certificate for this lot that includes a Certification Statement in accordance with Florida Administrative Code 61G15-18.011certify at completion of the final grading and installation of landscaping, then the P.E. writes a letter to the Palm Coast Building Department to Patrick Buckley's attention confirming he will be able to provide said Final Lot Grading & Drainage Certificate and Certification statement. If the P.E. is unable to provide this confirmation letter, than the P.E. shall provide a revised Site Plan / Survey that includes design of lot drainage and grading adjustments, improvements, conveyances necessary for the P.E. to provide a Final Lot Grading & Drainage Certificate and Certification Statement as noted above. The revised Site Plan / Survey shall include a confirmation letter as described above.
ZON HOLD 02/14/2025 02/14/2025
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM When submitting a revised site plan, please always indicate on the revision sheet what has been revised. We cannot review without that information.
ENGIN1 HOLD 11/22/2024 01/21/2025
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Slab is more than .83' higher than house to the right.
ZON COMPLETE 11/22/2024 11/22/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 11/04/2024 11/08/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 09/05/2024 09/05/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 08/26/2024 08/26/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC HOLD 08/26/2024 09/03/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed 3 switch wall. NEC 2020 210.52 2nd REQUEST
BADMIN COMPLETE 08/26/2024 09/03/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENV COMPLETE 08/05/2024 08/07/2024
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 08/07/24 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.
BADMIN HOLD 07/31/2024 08/05/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide complete truss plan submittal packet to include all of the following: A. Complete truss plan packet, signed and sealed by a Florida licensed professional engineer (the truss design engineer) D. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal)
BLD COMPLETE 07/31/2024 08/04/2024
Note: Released By: JPI
CUSVC COMPLETE 07/31/2024 08/02/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 07/31/2024 08/01/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed 3. NEC 2020 210.52
ENGIN1 COMPLETE 07/31/2024 07/31/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 07/31/2024 08/02/2024
LOCATE COMPLETE 07/31/2024 08/02/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 07/31/2024 08/02/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/31/2024 07/31/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON HOLD 07/31/2024 08/05/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM AC pad location on landscape doesn't match site and floor plans Lot number incorrect on survey/site plan inside the lot boundaries
SWALE COMPLETE 07/31/2024 10/25/2024
Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - INSPECTION 20 ¤20.00 11/24/2025
SW ENG - INSPECTION 20 ¤20.00 11/24/2025
SW ENG - INSPECTION 20 ¤20.00 11/24/2025
SW ENG - INSPECTION 20 ¤20.00 11/24/2025
SW ENG - INSPECTION 20 ¤20.00 11/24/2025
SW ENG - INSPECTION 20 ¤20.00 11/24/2025
SW ENG - INSPECTION 20 ¤20.00 11/24/2025
SW ENG - INSPECTION 20 ¤20.00 11/24/2025
SW ENG - INSPECTION 20 ¤20.00 11/24/2025
SW ENG - INSPECTION 20 ¤20.00 11/24/2025
SW ENG - INSPECTION 20 ¤20.00 11/24/2025
SW ENG REINSPECTION 20 ¤20.00 11/24/2025
SW ENG - REVIEW 20 ¤20.00 09/10/2024
SW ENG RES REVIEW 200 ¤200.00 09/10/2024
SEWER CREDIT (¤2,465.75) 09/10/2024
SEWER INSPECTION ¤25.00 09/10/2024
SEWER CAPITAL FACILITY ¤6,120.52 09/10/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 09/10/2024
SITE PLAN 30 ¤30.00 09/10/2024
SW ENG INSPECTION 80 ¤80.00 09/10/2024
SW ENG PRE APRON ¤30.00 09/10/2024
WATER- TURN ON ¤25.00 09/10/2024
ADJUSTMENT 10% (¤131.14) 09/10/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/10/2024
INSPECTION - RESIDENTIAL ¤998.25 09/10/2024
PLAN REVIEW - RESIDENTIAL ¤283.14 09/10/2024
CONNECTION FEES ¤1,187.26 09/10/2024
FC IMPACT FEE EMS ¤62.00 09/10/2024
IMPACT FEE FIRE ¤428.09 09/10/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 09/10/2024
FC IMPACT FEE LIBRARY ¤268.00 09/10/2024
IMPACT FEE PARKS ¤1,800.99 09/10/2024
IMPACT FEE SCHOOL ¤5,450.00 09/10/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 09/10/2024
WATER -IRRIGATION INSPECTION ¤25.00 09/10/2024
SURCHARGE FS 533.721 ¤11.80 09/10/2024
SURCHARGE - FS 468.631 ¤17.70 09/10/2024
SW ENG - FOUNDATION SURVEY ¤20.00 09/10/2024
Fees Total Due: ¤0.00 Total Paid: ¤21,187.00