I want to search for...
Permit #2024071557
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00320-0080 |
| CONDITIONED SPACE: 1810 sqft |
| GARAGE: 713 sqft |
| OPENED PORCH (WITH ROOF) : 123 sqft |
| PATIO/DECK (NO ROOF) : 136 sqft |
| Total Square Footage: 2782 sqft |
| Block: 00320 |
| Subdivision: 7009 - |
| Job Phone: 904-888-6443 |
| Location Address: 83 FELLOWSHIP DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/10/2024 |
| NOC: RECORDED |
| Applicant name: AMIR BENTOV |
| Owner: AIHD LLC |
|
Address 2800 N 6TH ST ST AUGUSTINE, FL 32084 |
|
Address UNIT 790 ST AUGUSTINE, FL 32084 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤230,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
MAVEN HOMES LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2800 N 6TH ST UNIT 790 , |
CRC1333741 (Exp: 08/31/2026) | 904-667-4330 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 11/24/2025 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 potable irr with PVB-no cc | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/20/2025 | APPROVED | EMADISON |
| Note: ** 11/21/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| BLD - BUILDING FINAL | 11/17/2025 | Approval - Private Provider | PPROVIDER |
| Note: 11/14/2025 3:27:29 PM- PREVIOUS INSPECTION NOTES | |||
| U-CROSS CONNECTION | 11/12/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: potable irr with PVB-no cc | |||
| BLD - BUILDING FINAL | 11/12/2025 | Disapproved- Private Provider | PPROVIDER |
| ROW - FINAL APRON (AFTER POUR) | 11/06/2025 | APPROVED | TPOLACEK |
| Note: 11-06-25 TPOLACEK**** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/06/2025 | APPROVED | TPOLACEK |
| Note: 11-06-25 TPOLACEK**** MET ON SITE WITH G,BERTOLA, E,MADISON, F,SLADISH,P,FLANANGAN TO DISCUSS GRADE LAST WEEK. BUILDER HAS CORRECTED GRADE ALONG RIGHT SIDE PROPERTY LINBE TO ALLOW DRAINAGE TO REACH FRONT SWALE. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/06/2025 | APPROVED | TPOLACEK |
| Note: 11-06-25 TPOLACEK**** MET ON SITE WITH G,BERTOLA, E,MADISON, F,SLADISH,P,FLANANGAN TO DISCUSS GRADE LAST WEEK. BUILDER HAS CORRECTED GRADE ALONG RIGHT SIDE PROPERTY LINBE TO ALLOW DRAINAGE TO REACH FRONT SWALE. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 11/06/2025 | APPROVED | TPOLACEK |
| Note: 11-06-25 TPOLACEK**** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- PRE-APRON (PRE-POUR) | 10/03/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 10/03/25 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL | |||
| ROW - DRAINAGE | 09/17/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/17/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________ 9/12/2025 - PREVIOUS INSPECTION NOTES ** 09/12/25 MET WITH BUILDER ON SITE WITH (RSI) SUPERVISOR G. BERTOLA REGARDING ISSUES NOTED BELOW ** BUILDER WILL BE INSTALLING A DOUBLE SILT FENCE ALONG RIGHT SIDE PROPERTY LINE AND ALSO DIGGING IN A DRAINAGE CONVEYANCE TO ALLIVEATE WATER FROM NEGATIVELY IMPACTING THE ADJACENT PROPERTY. A FOLLOW UP INSPECTION WILL BE CONDUCTED ON 09/17/25 ALLOWING FOR THE BUILDER TO TAKE ALL NECESSARY CORRECTIONS. ** IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/17/25 _______________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 CORRECTIONS ARE NOT COMPLETE NOR WHAT HAS BEEN DONE CORRECTS ANY ISSUES NOTED ** IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/12/25 _______________________________________________________________________________________________________________________ 9/10/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** REACHED OUT TO BUILDER (AMIR) VIA TEXT HE DID A RETURN PHONE CALL EXPLAINED THE ISSUES REGARDING REPAIRS REQUIRED . ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25 Inspector Notes from Inspection 9470 ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. Inspector Notes from Inspection 9470 ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. Please check the construction site silt fence and the front swale. per GBERTOLA | |||
| ROW - DRAINAGE | 09/12/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 09/12/25 MET WITH BUILDER ON SITE WITH (RSI) SUPERVISOR G. BERTOLA REGARDING ISSUES NOTED BELOW ** BUILDER WILL BE INSTALLING A DOUBLE SILT FENCE ALONG RIGHT SIDE PROPERTY LINE AND ALSO DIGGING IN A DRAINAGE CONVEYANCE TO ALLIVEATE WATER FROM NEGATIVELY IMPACTING THE ADJACENT PROPERTY. A FOLLOW UP INSPECTION WILL BE CONDUCTED ON 09/17/25 ALLOWING FOR THE BUILDER TO TAKE ALL NECESSARY CORRECTIONS. ** IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/17/25 _______________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 CORRECTIONS ARE NOT COMPLETE NOR WHAT HAS BEEN DONE CORRECTS ANY ISSUES NOTED ** IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/12/25 _______________________________________________________________________________________________________________________ 9/10/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** REACHED OUT TO BUILDER (AMIR) VIA TEXT HE DID A RETURN PHONE CALL EXPLAINED THE ISSUES REGARDING REPAIRS REQUIRED . ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25 Inspector Notes from Inspection 9470 ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. Inspector Notes from Inspection 9470 ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. Please check the construction site silt fence and the front swale. per GBERTOLA | |||
| ROW- PROJECT STATUS | 09/12/2025 | Status Check | EMADISON |
| Note: ** ( RSI ) SUPERVISOR G. BERTOLA AND SENIOR ( RSI ) E. MADISON MEETING WITH BUILDER ON SITE. TO DISCUSS DRAINAGE AND EROSION AND SEDIMENT CONTROL MEASURES THAT ARE REQUIRED DRAINAGE INSPECTIONS WIL BE FOLLOWED UP AS NOTED IN THE DRAINAGE INSPECTION IN PERMIT ROUTE ** MEET BUILDER ON SITE 10:OO AM REGARDING SITE CONDITIONS AND DRAINAGE | |||
| ROW - DRAINAGE | 09/11/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/11/25 CORRECTIONS ARE NOT COMPLETE NOR WHAT HAS BEEN DONE CORRECTS ANY ISSUES NOTED ** IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/12/25 _______________________________________________________________________________________________________________________ 9/10/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** REACHED OUT TO BUILDER (AMIR) VIA TEXT HE DID A RETURN PHONE CALL EXPLAINED THE ISSUES REGARDING REPAIRS REQUIRED . ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 09/11/25 Inspector Notes from Inspection 9470 ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. Inspector Notes from Inspection 9470 ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. Please check the construction site silt fence and the front swale. per GBERTOLA | |||
| ROW - DRAINAGE | 09/10/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/11/25 IMMEDIATE ATTENTION IS REQUIRED TO CORRECT THE DRAINAGE ISSUES AT THIS PERMIITTED ADDRESS BY THE BUILDER ** BUILDER NEEDS TO IMMEDIATELY CORRECT DRAINAGE ALONG THE RIGHT SIDE PROPERTY LINE * REMOVE YOUR FAILING SILT FENCE OFF OF THE ADJACENT PROPERTIES FENCE (85 FELLOWSHIPE DR) WHICH IS BEING PUSHED IN BULGING INSIDE THAT PROPERTIES YARD BEFORE ANY FURTHER DAMAGE OCCURS. AND RE-INSTALL SILT FENCE ACCORDING TO THE MANUFACTURERS SPECIFICATIONS ** YOU MUST CREATE DRAINAGE THAT DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTY AS IT IS CURRENTLY CAUSING DRAINAGE CONCERNS WHILE THIS PROPERTY IS UNDER CONSTRUCTION ** REMOVE ANY SEDIMENT THAT HAS ERRODED INTO THE DRAINAGE CONVEYANCE ALONG THE RIGHT SIDE PROPERTY LINE. ** 6) The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** THIS PERMIT HAS BEEN PLACED ON PRIORITY (1) STATUS INSPECTION HOLD DUE TO PREVIOUS DRAINAGE ISSUES INSPECTIONS WILL BE CONDUCTED DAILY AND A FEE WILL BE GENERATED UNTIL ALL CORRECTIONS HAVE BEEN MADE. AS YOUR SITE IS CAUSING AND CREATING A NEGATIVE IMPACT ON THE ADJACENT PROPERTY ON THE RIGHT (85 FELLOWSHIP DR) FOLLOW UP INSPECTIONS WILL BEGIN IMMMEDIATELY DUE PREVIOUSLY FAILED AND NOTED DRAINAGE INSPECTIONS FROM THIS PROPERTY ** ENSURE THE ROADSIDE SWALE IS OPENED RE-INSTALL NEW SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS JOB SITE ** SEE ATTACHED PHOTOS ** REACHED OUT TO BUILDER (AMIR) VIA TEXT HE DID A RETURN PHONE CALL EXPLAINED THE ISSUES REGARDING REPAIRS REQUIRED . ** FOLLOW UP INSPECTION ON 09/11/25 _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. Inspector Notes from Inspection 9470 ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. Please check the construction site silt fence and the front swale. per GBERTOLA | |||
| ROW - DRAINAGE | 07/22/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 07/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 7/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. | |||
| ROW - DRAINAGE | 07/15/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: *** NOTES ADDED BY PFLANAGAN 7/15/2025 9:12:35 AM *** YOU WILL HAVE 7DAYS TO CORRECT ALL ISSUES OR THERE WILL BE INSPECTION HOLD ON THIS PERMIT 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO FIX ALL DOWN SILT FENCE . 3) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE. 4) NEED TO REMOVE PORTER JON FROM THE RIGHT OF WAY AND NEED TO PLACE PORTER JON ON YOUR SITE. | |||
| ROW- PROJECT STATUS | 07/15/2025 | Status Check | PFLANAGAN |
| Note: PUTTING ON A DRAINAGE ON THIS PERMIT ----------------------------------------------------------------------------------- PLEAASE CHECK THE SILT FENCE AND THE FRONT SWALE. hOMEOWNER IS COMPPLAINENT ON 85 fELLOWSHIP.PER GBERTOLA | |||
| ELECTRIC - EARLY POWER | 06/16/2025 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 05/20/2025 | Approval - Private Provider | PPROVIDER |
| SEWER TIE IN | 05/20/2025 | FINAL APPROVED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 05/20/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: SHOUL HAVE BEEN APPROVED AS NOTED NOT FINAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 05/14/2025 | Approval - Private Provider | PPROVIDER |
| INSULATION | 05/12/2025 | Approval - Private Provider | PPROVIDER |
| Note: 4/17/2025 4:13:31 PM- PREVIOUS INSPECTION NOTES | |||
| INSULATION | 04/17/2025 | Disapproved- Private Provider | PPROVIDER |
| ALL ROUGH | 04/10/2025 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 03/27/2025 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/27/2025 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 03/27/2025 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 03/26/2025 | APPROVED - AS NOTED | PBUCKLEY |
| Note: FOUNDATION SURVEY SUBMITTED ON 11/22/24 IS NOW APPROVED AND BASED UPON THE CONTRACTOR'S ENGINEER CONFIRMATION LETTER STATING THEY WILL BE ABLE TO MAKE THE STORMWATER DRAINAGE COMPLY WITH CITY CODES AND STANDARDS. THE ENGINEER'S LETTER WAS SUBMITTED ON 3/25/25 AND THE CONTRACTOR HAS BEEN WARNED IN AN EMAIL SENT ON 3/26/25 THAT THE DRAINAGE MUST COMPLY WITH CITY STANDARDS. | |||
| ROW - DRAINAGE | 01/21/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 01/21/25 ALL CORRECTIINS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/17/2025 - PREVIOUS INSPECTION NOTES ** 01/17/25 BUILDER NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** BUILDER ALSO REQUIRED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH AND PUT INTO YOUR DUMPSTER TO PREVENT AND DEBRIS FROM ENTERING THE STORMWATER SYSTEM ** FAILURE TO COMPLY WILL RESULT IN YOUR SITE BEING PLACED ON A INSPECTION HOLD (PRIORITY 1) IF THE CORRECTIONS HAVE NOT BEEN MADE PRIOR TO THE NEXT SCHEDULED INSPECTION ** FOLLOW UP INSPECTION ON 01/21/25 ___________________________________________________________________________________________________________________ 1/10/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9470 ** 10/25/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 BUILDER NEEDS TO INSTALL SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS PROJECT SITE ** CLEAR BOTH ENDS OF THE TEMORARY CULVERT. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ON JOB SITE ** ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 ( PERMIT BOX HAS NOTHING IN IT OR ON IT) ** FOLLOW UP INSPECTION ON 10/25/24 ** 01/10/25 BUILDER NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** BUILDER ALSO REQUIRED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH AND PUT INTO YOUR DUMPSTER TO PREVENT AND DEBRIS FROM ENTERING THE STORMWATER SYSTEM ** FAILURE TO COMPLY WILL RESULT IN YOUR SITE BEING PLACED ON A INSPECTION HOLD (PRIORITY 1) IF THE CORRECTIONS HAVE NOT BEEN MADE PRIOR TO THE NEXT SCHEDULED INSPECTION ** FOLLOW UP INSPECTION ON 01/17/25 I nspector Notes from Inspection 9470 ** 10/25/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 BUILDER NEEDS TO INSTALL SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS PROJECT SITE ** CLEAR BOTH ENDS OF THE TEMORARY CULVERT. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ON JOB SITE ** ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 ( PERMIT BOX HAS NOTHING IN IT OR ON IT) ** FOLLOW UP INSPECTION ON 10/25/24 | |||
| ROW - DRAINAGE | 01/17/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 01/17/25 BUILDER NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** BUILDER ALSO REQUIRED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH AND PUT INTO YOUR DUMPSTER TO PREVENT AND DEBRIS FROM ENTERING THE STORMWATER SYSTEM ** FAILURE TO COMPLY WILL RESULT IN YOUR SITE BEING PLACED ON A INSPECTION HOLD (PRIORITY 1) IF THE CORRECTIONS HAVE NOT BEEN MADE PRIOR TO THE NEXT SCHEDULED INSPECTION ** FOLLOW UP INSPECTION ON 01/21/25 ___________________________________________________________________________________________________________________ 1/10/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9470 ** 10/25/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 BUILDER NEEDS TO INSTALL SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS PROJECT SITE ** CLEAR BOTH ENDS OF THE TEMORARY CULVERT. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ON JOB SITE ** ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 ( PERMIT BOX HAS NOTHING IN IT OR ON IT) ** FOLLOW UP INSPECTION ON 10/25/24 ** 01/10/25 BUILDER NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** BUILDER ALSO REQUIRED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH AND PUT INTO YOUR DUMPSTER TO PREVENT AND DEBRIS FROM ENTERING THE STORMWATER SYSTEM ** FAILURE TO COMPLY WILL RESULT IN YOUR SITE BEING PLACED ON A INSPECTION HOLD (PRIORITY 1) IF THE CORRECTIONS HAVE NOT BEEN MADE PRIOR TO THE NEXT SCHEDULED INSPECTION ** FOLLOW UP INSPECTION ON 01/17/25 I nspector Notes from Inspection 9470 ** 10/25/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 BUILDER NEEDS TO INSTALL SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS PROJECT SITE ** CLEAR BOTH ENDS OF THE TEMORARY CULVERT. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ON JOB SITE ** ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 ( PERMIT BOX HAS NOTHING IN IT OR ON IT) ** FOLLOW UP INSPECTION ON 10/25/24 | |||
| ROW - DRAINAGE | 01/10/2025 | Disapproved - NO FEE | EMADISON |
| Note: Inspector Notes from Inspection 9470 ** 10/25/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 BUILDER NEEDS TO INSTALL SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS PROJECT SITE ** CLEAR BOTH ENDS OF THE TEMORARY CULVERT. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ON JOB SITE ** ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 ( PERMIT BOX HAS NOTHING IN IT OR ON IT) ** FOLLOW UP INSPECTION ON 10/25/24 ** 01/10/25 BUILDER NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ONTO YOUR JOB SITE ** BUILDER ALSO REQUIRED TO CLEAN ALL CONSTRUCTION DEBRIS AND TRASH AND PUT INTO YOUR DUMPSTER TO PREVENT AND DEBRIS FROM ENTERING THE STORMWATER SYSTEM ** FAILURE TO COMPLY WILL RESULT IN YOUR SITE BEING PLACED ON A INSPECTION HOLD (PRIORITY 1) IF THE CORRECTIONS HAVE NOT BEEN MADE PRIOR TO THE NEXT SCHEDULED INSPECTION ** FOLLOW UP INSPECTION ON 01/17/25 I nspector Notes from Inspection 9470 ** 10/25/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 BUILDER NEEDS TO INSTALL SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS PROJECT SITE ** CLEAR BOTH ENDS OF THE TEMORARY CULVERT. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ON JOB SITE ** ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 ( PERMIT BOX HAS NOTHING IN IT OR ON IT) ** FOLLOW UP INSPECTION ON 10/25/24 | |||
| TIE BEAM / LINTEL | 12/05/2024 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 11/15/2024 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/12/2024 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 11/08/2024 | APPROVED | JMUNSON |
| ROW - DRAINAGE | 10/25/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 10/25/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 BUILDER NEEDS TO INSTALL SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS PROJECT SITE ** CLEAR BOTH ENDS OF THE TEMORARY CULVERT. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ON JOB SITE ** ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 ( PERMIT BOX HAS NOTHING IN IT OR ON IT) ** FOLLOW UP INSPECTION ON 10/25/24 | |||
| ROW - DRAINAGE | 10/21/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 10/21/24 BUILDER NEEDS TO INSTALL SILT FENCING AROUND THE ENTIRE PERIMETER OF THIS PROJECT SITE ** CLEAR BOTH ENDS OF THE TEMORARY CULVERT. ** REMOVE PORT-A-JOHN FROM THE ROAD SIDE SWALE (ROW) AND PUT ON JOB SITE ** ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 ( PERMIT BOX HAS NOTHING IN IT OR ON IT) ** FOLLOW UP INSPECTION ON 10/25/24 | |||
| WATER METER INSTALLATION REQUEST | 10/17/2024 | APPROVED | CBOWERMASTER |
| ROW- PROJECT STATUS | 10/15/2024 | Status Check | EMADISON |
| Note: ** 10/21/24 A ROW DRAINAGE WILL BE IMPLIMENTED ON THIS PERMITFOR NEEDED DRAINAGE CORRECTIONS ____________________________________________________________________________________________________________ Neighbor at 75 says : silt all over, no silt fencing; no appropriate drainage; blocking swale of neighbors downstream PLS INSPECT MH | |||
| WILDLIFE CHECK - ENVIRONMENTAL | 08/07/2024 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 09/17/2025 | 09/18/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/17/2025 | 09/24/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 07/31/2025 | 07/31/2025 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM SUBMIT UNDER 'GRADING PLAN, NOT 'SITE PLAN' | |||
| BADMIN | INFORMATION | 07/31/2025 | 07/31/2025 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM RENAME FILE NAME TO DRAINAGE PLAN.PDF | |||
| SW1 | HOLD | 07/31/2025 | 08/04/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM I've mark up the submitted drainage plan for revisions. Comments below as well. - Per Building Code R403.1.4 Footing shall be placed not less than 12"(305mm) below the finished grade of the ground surface. - Please depict dimensions between side of home and property line to clearly indicating slopes. - AA Cross Section has lot 8 incorrectly labeled as lot 32 - Along improved lots grades shall match within ± 0.1'. Please provide proposed elevations between lot 7 and 8. - On the right side of the home grade goes from a 15.50' to a 13.80'. This exceeds a 4:1 slope. - Front property line shall be even with or higher than edge of pavement. Please feel free to call or email if there are questions or concerns. | |||
| ENGIN1 | HOLD | 07/31/2025 | 08/04/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM I've mark up the submitted drainage plan for revisions. Comments below as well. - Per Building Code R403.1.4 Footing shall be placed not less than 12"(305mm) below the finished grade of the ground surface. - Please depict dimensions between side of home and property line to clearly indicating slopes. - AA Cross Section has lot 8 incorrectly labeled as lot 32 - Along improved lots grades shall match within ± 0.1'. Please provide proposed elevations between lot 7 and 8. - On the right side of the home grade goes from a 15.50' to a 13.80'. This exceeds a 4:1 slope. - Front property line shall be even with or higher than edge of pavement. Please feel free to call or email if there are questions or concerns. | |||
| ZON | COMPLETE | 03/26/2025 | 03/26/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Drainage plan only that was submitted. No need for zoning review. | |||
| SW1 | COMPLETE | 03/25/2025 | 03/26/2025 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/25/2025 | 03/26/2025 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 02/14/2025 | 02/20/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM As discussed with Mr. Bentov and Mr. Wilcox per Patrick Buckley from COPC, since this property's FFE is outside the City's tolerances we are requiring Lot Grading and Drainage Confirmation Letter to move forward. 1) A Florida Professional Engineer (not Surveyor) to review the original City approved Site Plan / Survey 2) P.E. reviews Foundation Survey taking note of the differences in FFE Elevations at both 83 and 85 Fellowship Drive as determined in this email and analyzes the effects of these changes and possible impact on the ability to complete the lot grading in accordance with the approved Site Plan / Survey. 3) If P.E. determines the changes are within his / her ability to provide a Final Lot Grading & Drainage Certificate for this lot that includes a Certification Statement in accordance with Florida Administrative Code 61G15-18.011certify at completion of the final grading and installation of landscaping, then the P.E. writes a letter to the Palm Coast Building Department to Patrick Buckley's attention confirming he will be able to provide said Final Lot Grading & Drainage Certificate and Certification statement. If the P.E. is unable to provide this confirmation letter, than the P.E. shall provide a revised Site Plan / Survey that includes design of lot drainage and grading adjustments, improvements, conveyances necessary for the P.E. to provide a Final Lot Grading & Drainage Certificate and Certification Statement as noted above. The revised Site Plan / Survey shall include a confirmation letter as described above. | |||
| SW1 | HOLD | 02/14/2025 | 02/20/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM As discussed with Mr. Bentov and Mr. Wilcox per Patrick Buckley from COPC, since this property's FFE is outside the City's tolerances we are requiring Lot Grading and Drainage Confirmation Letter to move forward. 1) A Florida Professional Engineer (not Surveyor) to review the original City approved Site Plan / Survey 2) P.E. reviews Foundation Survey taking note of the differences in FFE Elevations at both 83 and 85 Fellowship Drive as determined in this email and analyzes the effects of these changes and possible impact on the ability to complete the lot grading in accordance with the approved Site Plan / Survey. 3) If P.E. determines the changes are within his / her ability to provide a Final Lot Grading & Drainage Certificate for this lot that includes a Certification Statement in accordance with Florida Administrative Code 61G15-18.011certify at completion of the final grading and installation of landscaping, then the P.E. writes a letter to the Palm Coast Building Department to Patrick Buckley's attention confirming he will be able to provide said Final Lot Grading & Drainage Certificate and Certification statement. If the P.E. is unable to provide this confirmation letter, than the P.E. shall provide a revised Site Plan / Survey that includes design of lot drainage and grading adjustments, improvements, conveyances necessary for the P.E. to provide a Final Lot Grading & Drainage Certificate and Certification Statement as noted above. The revised Site Plan / Survey shall include a confirmation letter as described above. | |||
| ZON | HOLD | 02/14/2025 | 02/14/2025 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM When submitting a revised site plan, please always indicate on the revision sheet what has been revised. We cannot review without that information. | |||
| ENGIN1 | HOLD | 11/22/2024 | 01/21/2025 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Slab is more than .83' higher than house to the right. | |||
| ZON | COMPLETE | 11/22/2024 | 11/22/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/04/2024 | 11/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/05/2024 | 09/05/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/26/2024 | 08/26/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 08/26/2024 | 09/03/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed 3 switch wall. NEC 2020 210.52 2nd REQUEST | |||
| BADMIN | COMPLETE | 08/26/2024 | 09/03/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 08/05/2024 | 08/07/2024 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 08/07/24 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. | |||
| BADMIN | HOLD | 07/31/2024 | 08/05/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide complete truss plan submittal packet to include all of the following: A. Complete truss plan packet, signed and sealed by a Florida licensed professional engineer (the truss design engineer) D. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) | |||
| BLD | COMPLETE | 07/31/2024 | 08/04/2024 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/31/2024 | 08/02/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 07/31/2024 | 08/01/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed 3. NEC 2020 210.52 | |||
| ENGIN1 | COMPLETE | 07/31/2024 | 07/31/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 07/31/2024 | 08/02/2024 |
| LOCATE | COMPLETE | 07/31/2024 | 08/02/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/31/2024 | 08/02/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/31/2024 | 07/31/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | HOLD | 07/31/2024 | 08/05/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM AC pad location on landscape doesn't match site and floor plans Lot number incorrect on survey/site plan inside the lot boundaries | |||
| SWALE | COMPLETE | 07/31/2024 | 10/25/2024 |
| Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/24/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/24/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/24/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/24/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/24/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/24/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/24/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/24/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/24/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/24/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/24/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/24/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/10/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/10/2024 |
| SEWER CREDIT | (¤2,465.75) | 09/10/2024 |
| SEWER INSPECTION | ¤25.00 | 09/10/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 09/10/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 09/10/2024 |
| SITE PLAN 30 | ¤30.00 | 09/10/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/10/2024 |
| SW ENG PRE APRON | ¤30.00 | 09/10/2024 |
| WATER- TURN ON | ¤25.00 | 09/10/2024 |
| ADJUSTMENT 10% | (¤131.14) | 09/10/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/10/2024 |
| INSPECTION - RESIDENTIAL | ¤998.25 | 09/10/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤283.14 | 09/10/2024 |
| CONNECTION FEES | ¤1,187.26 | 09/10/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 09/10/2024 |
| IMPACT FEE FIRE | ¤428.09 | 09/10/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 09/10/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 09/10/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 09/10/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 09/10/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 09/10/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/10/2024 |
| SURCHARGE FS 533.721 | ¤11.80 | 09/10/2024 |
| SURCHARGE - FS 468.631 | ¤17.70 | 09/10/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/10/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,187.00 |