I want to search for...

Permit #2024080566

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7001-00100-0180
Block: 00100
Subdivision: 7001 -
Job Phone: 717-307-6845
Location Address: 10 FEDERAL LN
Type: DR - DRIVEWAY
Issue Date: 08/28/2024
NOC: Unknown
Applicant name: JARRETT D LEHMAN
Owner: FATIMA SENA

Address

10 FEDERAL LANE

PALM COAST, FL 32137

Lot: 0180
Contracted Stated Job Value: ¤2,375.00
Job Description: Concrete Driveway
Type: CN

Contractor

SALT FORCE CONCRETE & OUTDOOR CUSTOMS INC
Status Location Address Phone
CANCEL

9979 AMOS AVE

HASTINGS, FL 32145

386-302-3262

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 12/03/2024 APPROVED EMADISON
ROW - FINAL INSPECTION 12/03/2024 APPROVED EMADISON
U -UTILITY RESIDENTIAL FINAL 12/03/2024 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 11/06/2024 Disapproved - NO FEE PFLANAGAN
Note: THIS INSPECTION IS AFTER ALL PAVERS ARE LAID AND HOT PATCH DONE.
ROW- PRE-APRON (PRE-POUR) 11/06/2024 APPROVED PFLANAGAN
Note: READY TO LAY PAVERS ----------------------------------------------------------------- 10/29/2024 - PREVIOUS INSPECTION NOTES READY TO POUR THE APRON AND THE PAVER RESTRAINTS ONLY BEFORE NEXT PRE POUR INSPECTION ALL BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. -------------------------------------------------------------------------------- 10/25/2024 - PREVIOUS INSPECTION NOTES THE LEFT INVERT IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL. THE PAVER DETAIL DOESN'T MATCH THE FIELD. PAVER DETAIL IN THE SYSTEM SHOWS JUST FOOTERS IN THE RIGHT OF WAY. --------------------------------------------------------------------------------- ** 08/29/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW- PAVER RESTRAINTS 10/29/2024 APPROVED PFLANAGAN
Note: ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- PRE-APRON (PRE-POUR) 10/29/2024 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR THE APRON AND THE PAVER RESTRAINTS ONLY BEFORE NEXT PRE POUR INSPECTION ALL BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. -------------------------------------------------------------------------------- 10/25/2024 - PREVIOUS INSPECTION NOTES THE LEFT INVERT IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL. THE PAVER DETAIL DOESN'T MATCH THE FIELD. PAVER DETAIL IN THE SYSTEM SHOWS JUST FOOTERS IN THE RIGHT OF WAY. --------------------------------------------------------------------------------- ** 08/29/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW- PRE-APRON (PRE-POUR) 10/25/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: THE LEFT INVERT IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL. THE PAVER DETAIL DOESN'T MATCH THE FIELD. PAVER DETAIL IN THE SYSTEM SHOWS JUST FOOTERS IN THE RIGHT OF WAY. --------------------------------------------------------------------------------- ** 08/29/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW- PRE-APRON (PRE-POUR) 08/29/2024 APPROVED - AS NOTED EMADISON
Note: ** 08/29/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 10/21/2024 10/22/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 10/21/2024 10/29/2024
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON HOLD 10/21/2024 10/21/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please turn in original right of way agreement for recording
ZON COMPLETE 10/21/2024 10/21/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/14/2024 08/16/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 08/14/2024 08/21/2024
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON COMPLETE 08/14/2024 08/14/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RECORDING FEE REIMBURSE DOC ¤44.00 12/02/2024
SW ENG REINSPECTION 30 ¤30.00 12/02/2024
SW ENG RES REVIEW 200 ¤200.00 08/28/2024
SITE PLAN 15 ¤15.00 08/28/2024
SW ENG INSPECTION 40 ¤40.00 08/28/2024
SW ENG PRE APRON ¤30.00 08/28/2024
ADJUSTMENT 10% (¤3.00) 08/28/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/28/2024
Fees Total Due: ¤0.00 Total Paid: ¤386.00