Permit #2024080593
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7024-00180-0030 |
| GARAGE: 490 sqft |
| OPENED PORCH (WITH ROOF) : 219 sqft |
| CONDITIONED SPACE: 1693 sqft |
| Total Square Footage: 2402 sqft |
| Block: 00180 |
| Subdivision: - |
| Job Phone: 844-885-8913 |
| Location Address: 27 PRINCE KAAREL LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/29/2024 |
| NOC: RECORDED |
| Applicant name: SIMON DALE VANWAGENEN |
| Owner: LGI HOMES-FLORIDA LLC |
|
Address 1450 LAKE ROBBINS DRIVE THE WOODLANDS, TX 77380 |
|
Address STE 430 THE WOODLANDS, TX 77380 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤232,878.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
LGI HOMES-FLORIDA LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2304 SPRING HILL CT TAMPA, FL 33602 |
CBC1257972 (Exp: 08/31/2026) | 904-451-8258 |
Sub Contractors
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
CHRISTOPHER DENNIS O'CONNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
240 N LAKE CUNNINGHAM AVE JACKSONVILLE, FL 32257 |
ER13015361 (Exp: 08/31/2026) | 904-540-0858 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| GRAVITY SEWER TEST | 06/15/2026 | RSIMS | |
| Note: 5/26/2026 - PREVIOUS INSPECTION NOTES 5/21/2026 - PREVIOUS INSPECTION NOTES 5/21/26: Cancelled by Applicant via text at @ 1554. | |||
| SEWER TIE IN | 06/15/2026 | RSIMS | |
| Note: 5/26/2026 - PREVIOUS INSPECTION NOTES 5/21/2026 - PREVIOUS INSPECTION NOTES 5/21/26: Cancelled by Applicant via text at @ 1554. | |||
| INSULATION | 05/27/2026 | APPROVED | CVANSTRAHLEN |
| Note: 5/26/2026 - PREVIOUS INSPECTION NOTES Windows and doors need to be foamed. New inspection due to canceled inspection Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 5/19/2026 10:46:07 AM *** Code for Nail plates is NEC 300.4 *** NOTES ADDED BY RSIMS 5/19/2026 10:27:10 AM *** 5/19/26: Check at Insulation Inspection 1). Front entry door is not installed. 2). Missing 1 of 2 Gable end bracing requires (2) GBC clips. marked on plans. FBC [A]107.4 3). Nail,plates required for top plate penetrations for wires at 7 locations. Stugs marked NP. 4). Smoke detector at vaulted ceiling needs to be 4" vertically & within 36" horizontally from peak of vaulted ceiling. (roughly 21" to CL of box from vault peak measured parallel to bottom truss cord.) NFPA 70 - 29.11.3.1 5). 2 straps at back left wall need nails into stud. Stud marked Clavos. 6). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 .. ** Scabbed stud pieces need to be full length to create the continuous load path that was eliminated by the cut studs on an exterior load bearing/sheer wall. 7). Bathroom exhausts are missing strap. FBC-M1502.4.2 Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 5/18/26: 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 .. ** Scabbed stud pieces need to be full length to create the continuous load path that was eliminated by the cut studs on an exterior load bearing/sheer wall. 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 | |||
| INSULATION | 05/26/2026 | Disapproved - NO FEE | PKNAPIK |
| Note: Windows and doors need to be foamed. New inspection due to canceled inspection Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 5/19/2026 10:46:07 AM *** Code for Nail plates is NEC 300.4 *** NOTES ADDED BY RSIMS 5/19/2026 10:27:10 AM *** 5/19/26: Check at Insulation Inspection 1). Front entry door is not installed. 2). Missing 1 of 2 Gable end bracing requires (2) GBC clips. marked on plans. FBC [A]107.4 3). Nail,plates required for top plate penetrations for wires at 7 locations. Stugs marked NP. 4). Smoke detector at vaulted ceiling needs to be 4" vertically & within 36" horizontally from peak of vaulted ceiling. (roughly 21" to CL of box from vault peak measured parallel to bottom truss cord.) NFPA 70 - 29.11.3.1 5). 2 straps at back left wall need nails into stud. Stud marked Clavos. 6). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 .. ** Scabbed stud pieces need to be full length to create the continuous load path that was eliminated by the cut studs on an exterior load bearing/sheer wall. 7). Bathroom exhausts are missing strap. FBC-M1502.4.2 Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 5/18/26: 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 .. ** Scabbed stud pieces need to be full length to create the continuous load path that was eliminated by the cut studs on an exterior load bearing/sheer wall. 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 | |||
| GRAVITY SEWER TEST | 05/26/2026 | CANCELLED BY APPLICANT | PKNAPIK |
| Note: 5/21/2026 - PREVIOUS INSPECTION NOTES 5/21/26: Cancelled by Applicant via text at @ 1554. | |||
| SEWER TIE IN | 05/26/2026 | CANCELLED BY APPLICANT | PKNAPIK |
| Note: 5/21/2026 - PREVIOUS INSPECTION NOTES 5/21/26: Cancelled by Applicant via text at @ 1554. | |||
| INSULATION | 05/22/2026 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 5/19/2026 10:46:07 AM *** Code for Nail plates is NEC 300.4 *** NOTES ADDED BY RSIMS 5/19/2026 10:27:10 AM *** 5/19/26: Check at Insulation Inspection 1). Front entry door is not installed. 2). Missing 1 of 2 Gable end bracing requires (2) GBC clips. marked on plans. FBC [A]107.4 3). Nail,plates required for top plate penetrations for wires at 7 locations. Stugs marked NP. 4). Smoke detector at vaulted ceiling needs to be 4" vertically & within 36" horizontally from peak of vaulted ceiling. (roughly 21" to CL of box from vault peak measured parallel to bottom truss cord.) NFPA 70 - 29.11.3.1 5). 2 straps at back left wall need nails into stud. Stud marked Clavos. 6). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 .. ** Scabbed stud pieces need to be full length to create the continuous load path that was eliminated by the cut studs on an exterior load bearing/sheer wall. 7). Bathroom exhausts are missing strap. FBC-M1502.4.2 Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 5/18/26: 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 .. ** Scabbed stud pieces need to be full length to create the continuous load path that was eliminated by the cut studs on an exterior load bearing/sheer wall. 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 | |||
| SEWER TIE IN | 05/21/2026 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/21/2026 3:55:32 PM *** 5/21/26: Cancelled by Applicant via text at @ 1554. | |||
| GRAVITY SEWER TEST | 05/21/2026 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/21/2026 3:55:12 PM *** 5/21/26: Cancelled by Applicant via text at @ 1554. | |||
| LATH/BRICK/ WATER BARRIER | 05/21/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/21/2026 2:15:12 PM *** 5/21/26: Check at Insulation. 1). Front entry door has over 1/4" maximum shim space along top jamb that will require solid blocking along entire jamb. FBCR 609.1 Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 5/19/2026 10:46:07 AM *** Code for Nail plates is NEC 300.4 *** NOTES ADDED BY RSIMS 5/19/2026 10:27:10 AM *** 5/19/26: Check at Insulation Inspection 1). Front entry door is not installed. 2). Missing 1 of 2 Gable end bracing requires (2) GBC clips. marked on plans. FBC [A]107.4 3). Nail,plates required for top plate penetrations for wires at 7 locations. Stugs marked NP. 4). Smoke detector at vaulted ceiling needs to be 4" vertically & within 36" horizontally from peak of vaulted ceiling. (roughly 21" to CL of box from vault peak measured parallel to bottom truss cord.) NFPA 70 - 29.11.3.1 5). 2 straps at back left wall need nails into stud. Stud marked Clavos. 6). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 .. ** Scabbed stud pieces need to be full length to create the continuous load path that was eliminated by the cut studs on an exterior load bearing/sheer wall. 7). Bathroom exhausts are missing strap. FBC-M1502.4.2 Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 5/18/26: 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 .. ** Scabbed stud pieces need to be full length to create the continuous load path that was eliminated by the cut studs on an exterior load bearing/sheer wall. 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 | |||
| ALL ROUGH | 05/19/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/19/2026 10:46:07 AM *** Code for Nail plates is NEC 300.4 *** NOTES ADDED BY RSIMS 5/19/2026 10:27:10 AM *** 5/19/26: Check at Insulation Inspection 1). Front entry door is not installed. 2). Missing 1 of 2 Gable end bracing requires (2) GBC clips. marked on plans. FBC [A]107.4 3). Nail,plates required for top plate penetrations for wires at 7 locations. Stugs marked NP. 4). Smoke detector at vaulted ceiling needs to be 4" vertically & within 36" horizontally from peak of vaulted ceiling. (roughly 21" to CL of box from vault peak measured parallel to bottom truss cord.) NFPA 70 - 29.11.3.1 5). 2 straps at back left wall need nails into stud. Stud marked Clavos. 6). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 .. ** Scabbed stud pieces need to be full length to create the continuous load path that was eliminated by the cut studs on an exterior load bearing/sheer wall. 7). Bathroom exhausts are missing strap. FBC-M1502.4.2 Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 5/18/26: 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 .. ** Scabbed stud pieces need to be full length to create the continuous load path that was eliminated by the cut studs on an exterior load bearing/sheer wall. 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 | |||
| ELECTRIC-TUG | 05/18/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/18/2026 9:24:42 AM *** 5/18/26: FPL emailed > Approved for TUG. Also, see notes added to Inspection 2420 from Inspection 2460 that remain unresolved. | |||
| WALL SHEATHING | 05/06/2026 | Disapproved - NO FEE | RSIMS |
| Note: 5/5/26: 1. Remove water barrier from front of house so that exterior sheathing at that section can be checked. | |||
| WALL SHEATHING | 05/06/2026 | APPROVED - AS NOTED | HCAMACHO |
| Note: Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/06/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/5/2026 2:34:59 PM *** 5/5/26: Check at next inspection. 1). studs cut at dttz tie downs at both back and front of the house need to be replaced to maintain 16" OC spread as required on plans. FBC [A]107.4 2). Gable end bracing requires GBC clip. marked on plans. FBC [A]107.4 3). Back lanai door missing LSTA strap. Marked on plans. FBC [A]107.4 | |||
| ROOF VALLEY & METAL | 05/06/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/5/2026 2:34:20 PM *** Approved | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/05/2026 | APPROVED - AS NOTED | PFLANAGAN |
| Note: FOUNDATION SURVEY HAS 2 BENCHMARKS ON IT. PASSING AS NOTED THAT THE ORIGINAL IS ON THERE AND THE BENCHMARKS HOPEFULLY MATCH EACH OTHER IF FOUNDATION IS OUT OF TOLERANCE IT WILL BE ON THE BUILDER. | |||
| MONOLITHIC SLAB | 04/20/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/20/2026 10:33:55 AM *** Approved | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/17/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/17/2026 10:46:59 AM *** 4/17/26: Main underground water service piping is installed from house to meter valve (meter installed). Inspected and approved. RS | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 12/16/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 10/31/2024 | APPROVED | CBOWERMASTER |
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | |||
| ROW - STORMWATER FINAL | |||
| Note: *** INSPECTOR NOTE*** TIRES AND PLYWOOD ON LEFT SIDE SWALE ARE NOT FROM THE BUILDER. I DID NOTICE THEM WHEN I COMPLETED THE PRE POUR INSPECTIONS ACROSS THE STREET. | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| BLD - BUILDING FINAL | |||
| ELECTRIC - EARLY POWER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | HOLD | 05/04/2026 | 05/04/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Benchmark does not match approved grading plan. Benchmark shall be maintained throughout construction cycle. | |||
| ZON | COMPLETE | 05/04/2026 | 05/04/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/04/2026 | 05/05/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/04/2026 | 05/04/2026 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/28/2026 | 04/28/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/30/2025 | 01/31/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/10/2024 | 12/16/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 12/10/2024 | 12/10/2024 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Please rename your file name to Geotech. No names or numbers. | |||
| BLD | HOLD | 12/03/2024 | 12/09/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Original report shows 3 test spots per lift. Only 2 test results done | |||
| MECH | COMPLETE | 10/23/2024 | 10/28/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/08/2024 | 10/14/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/08/2024 | 10/14/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/08/2024 | 10/09/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition 2. Design location on heatload needs to be Daytona Beach | |||
| BADMIN | COMPLETE | 08/14/2024 | 08/19/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/14/2024 | 08/19/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Plans say not for construction or permitting. NO review done. 2. FL 38057, 11473 revision numbers are expired. Update to the most current code cycle 3. Plans need to be digitally signed and sealed. | |||
| CUSVC | COMPLETE | 08/14/2024 | 08/19/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 08/14/2024 | 08/19/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Plans are not for construction or permitting. NO review done 2. Submit a riser diagram that includes all wire sizes and breaker sizes. Also must include the surge protectors and outside disconnects. NEC 2020 230.67, 230.85 | |||
| ENGIN1 | COMPLETE | 08/14/2024 | 08/14/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 08/14/2024 | 08/19/2024 |
| LOCATE | COMPLETE | 08/14/2024 | 08/16/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/14/2024 | 08/19/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition | |||
| SW1 | COMPLETE | 08/14/2024 | 08/14/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | COMPLETE | 08/14/2024 | 08/14/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/14/2024 | 10/09/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONNECTION FEES | (¤233.75) | 10/29/2024 |
| CONNECTION FEES | ¤1,187.26 | 10/29/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 10/29/2024 |
| IMPACT FEE FIRE | ¤434.51 | 10/29/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/29/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/29/2024 |
| IMPACT FEE PARKS | ¤1,828.01 | 10/29/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/29/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 10/29/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/29/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/29/2024 |
| SURCHARGE FS 533.721 | ¤10.63 | 10/29/2024 |
| SURCHARGE - FS 468.631 | ¤15.94 | 10/29/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/29/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/29/2024 |
| SW ENG PRE APRON | ¤30.00 | 10/29/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/29/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/29/2024 |
| SEWER CREDIT | (¤1,342.00) | 10/29/2024 |
| SEWER INSPECTION | (¤25.00) | 10/29/2024 |
| SEWER INSPECTION | ¤25.00 | 10/29/2024 |
| SEWER CAPITAL FACILITY | (¤48.00) | 10/29/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 10/29/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 10/29/2024 |
| WATER CAPITAL FACILITY FEE | (¤1,500.00) | 10/29/2024 |
| SITE PLAN 30 | ¤30.00 | 10/29/2024 |
| WATER-METER | ¤514.49 | 10/29/2024 |
| WATER- TURN ON | ¤25.00 | 10/29/2024 |
| WATER- TURN ON | ¤25.00 | 10/29/2024 |
| ADJUSTMENT 10% | (¤118.08) | 10/29/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/29/2024 |
| INSPECTION - RESIDENTIAL | ¤896.50 | 10/29/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤254.28 | 10/29/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | |
| EXTENSION | ¤40.00 | |
| EXTENSION | ¤40.00 | |
| EXTENSION | ¤40.00 | |
| ADMINISTRATIVE - EXTENSION | ¤40.00 | |
| Fees | Total Due: ¤192.50 | Total Paid: ¤20,741.45 |