Permit #2024080609
Permit Details
Status: COED
| Parcel Id: 06-12-31-5180-00000-0600 |
| OPENED PORCH (WITH ROOF) : 160 sqft |
| GARAGE: 424 sqft |
| CONDITIONED SPACE: 2355 sqft |
| Total Square Footage: 2939 sqft |
| Subdivision: 2322 - RETREAT AT TOWN CENTER PHASE 1 |
| Job Phone: 904-669-7000 |
| Location Address: 19 MAHOGANY WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/21/2024 |
| NOC: RECORDED |
| Applicant name: PAUL GILBERT AXTELL |
| Owner: TOLL SOUTHEAST LP CO INC |
|
Address 1140 VIRGINIA DRIVE FORT WASHINGTON, PA 19034 |
| Lot: 60 |
| Contracted Stated Job Value: ¤189,832.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
TOLL BROS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
40 EVEREST LN, STE 5 ST JOHNS, FL 32259 |
CGC60445 (Exp: 08/31/2026) | 904-217-3852 |
Sub Contractors
JAMES F QUINN III
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3210 SW 40TH BLVD STE F GAINESVILLE, FL 32608 |
EC13010994 (Exp: 08/31/2026) | 352-378-9274 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
HARLEY M BRYAN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
5223 EDGEWOOD CT ORMOND BEACH, FL 32174 |
LI26657 (Exp: 08/31/2028) | 386-463-2700 |
JAMES MICHAEL WATSON
| Status | Location Address | State License Number | Phone |
| INACTIVE |
38115 YALE CIRCLE LEESBURG, FL 34748 |
SCC131152841 (Exp: 08/31/2026) | 352-434-0115 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/21/2025 | FINAL APPROVED | MCONTRYMAN |
| Note: 2/19/2025 - PREVIOUS INSPECTION NOTES 2/13/2025 - PREVIOUS INSPECTION NOTES 2/13/25 1. Guest bath tub drain not holding water 2. Guest bath hot water is luke warm FBCR P2705.1 – 4 3. Tile to wall penetration needs to be sealed up in guest bath 4. Master shower hot water is luke warm FBCR P2705.1 – 4 5. Seal up around mantel for fireplace insert 6. Oven breaker will need a breaker lock since not installed 2/12/2025 - PREVIOUS INSPECTION NOTES 2/12/25: Partial Inspection due to no electricity in house. * Checked the following: HVAC supply & return registers, model numbers and breakers/ drains/dishwasher hookup/dryer exhaust/ Hot water orientation (still need to check shower and bathtub faucets). 1). secondary disconnect near ODU has an unused opening. NEC 408.7 2). Hardi trim around rear columns needs to be finished (painted per Manufacturer's specs). FBC [A]107.4 3). Hole at low voltage in AHU closet needs to be sealed. FBC EC TABLE R402.4.1.1 All other items not listed need to be checked. | |||
| BLD - BUILDING FINAL | 02/19/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: 2/13/2025 - PREVIOUS INSPECTION NOTES 2/13/25 1. Guest bath tub drain not holding water 2. Guest bath hot water is luke warm FBCR P2705.1 – 4 3. Tile to wall penetration needs to be sealed up in guest bath 4. Master shower hot water is luke warm FBCR P2705.1 – 4 5. Seal up around mantel for fireplace insert 6. Oven breaker will need a breaker lock since not installed 2/12/2025 - PREVIOUS INSPECTION NOTES 2/12/25: Partial Inspection due to no electricity in house. * Checked the following: HVAC supply & return registers, model numbers and breakers/ drains/dishwasher hookup/dryer exhaust/ Hot water orientation (still need to check shower and bathtub faucets). 1). secondary disconnect near ODU has an unused opening. NEC 408.7 2). Hardi trim around rear columns needs to be finished (painted per Manufacturer's specs). FBC [A]107.4 3). Hole at low voltage in AHU closet needs to be sealed. FBC EC TABLE R402.4.1.1 All other items not listed need to be checked. | |||
| BLD - BUILDING FINAL | 02/13/2025 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 2/13/25 1. Guest bath tub drain not holding water 2. Guest bath hot water is luke warm FBCR P2705.1 – 4 3. Tile to wall penetration needs to be sealed up in guest bath 4. Master shower hot water is luke warm FBCR P2705.1 – 4 5. Seal up around mantel for fireplace insert 6. No light installed in attic NEC-210.70(2) 7. Oven breaker will need a breaker lock since not installed 2/12/2025 - PREVIOUS INSPECTION NOTES 2/12/25: Partial Inspection due to no electricity in house. * Checked the following: HVAC supply & return registers, model numbers and breakers/ drains/dishwasher hookup/dryer exhaust/ Hot water orientation (still need to check shower and bathtub faucets). 1). secondary disconnect near ODU has an unused opening. NEC 408.7 2). Hardi trim around rear columns needs to be finished (painted per Manufacturer's specs). FBC [A]107.4 3). Hole at low voltage in AHU closet needs to be sealed. FBC EC TABLE R402.4.1.1 All other items not listed need to be checked. | |||
| BLD - BUILDING FINAL | 02/12/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/12/2025 10:16:59 AM *** 2/12/25: Partial Inspection due to no electricity in house. * Checked the following: HVAC supply & return registers, model numbers and breakers/ drains/dishwasher hookup/dryer exhaust/ Hot water orientation (still need to check shower and bathtub faucets). 1). secondary disconnect near ODU has an unused opening. NEC 408.7 2). Hardi trim around rear columns needs to be finished (painted per Manufacturer's specs). FBC [A]107.4 3). Hole at low voltage in AHU closet needs to be sealed. FBC EC TABLE R402.4.1.1 All other items not listed need to be checked. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/12/2025 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 reclaim irr-no cross connection | |||
| ELECTRIC - EARLY POWER | 02/05/2025 | APPROVED | MCONTRYMAN |
| Note: 2/5/25 Okay to release e-mail to FPL 2/3/2025 - PREVIOUS INSPECTION NOTES 2/3/25 1. Need blank covers in panel box where surge protector was taken out 2. GFCI under meter/main needs to be secured 3. Conduit for underground service needs to be secured to the house NEC 352.2 Inspector Notes from Inspection 2200 10/25/2024 1. Check fastener when sidding installed. 10/24/2024 - PREVIOUS INSPECTION NOTES 10 /24/2024 1. PVC conduit needs to be fastened. NEC 352.30 2. Outlet in sub panel needs to be labeled. | |||
| ELECTRIC - EARLY POWER | 02/03/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 2/3/25 1. Need blank covers in panel box where surge protector was taken out 2. GFCI under meter/main needs to be secured 3. Conduit for underground service needs to be secured to the house NEC 352.2 Inspector Notes from Inspection 2200 10/25/2024 1. Check fastener when sidding installed. 10/24/2024 - PREVIOUS INSPECTION NOTES 10 /24/2024 1. PVC conduit needs to be fastened. NEC 352.30 2. Outlet in sub panel needs to be labeled. | |||
| U-CROSS CONNECTION | 01/29/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: reclaim irr-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 01/08/2025 | APPROVED | FSLADISH |
| Note: 1/8/25 NO CHIPPED, CRACKED OR BROKEN CONCRETE OBSERVED AT THE TIME OF THIS INSPECTION. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/08/2025 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9270 12/20/24 BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE IS 3000 PSI AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/08/2025 | APPROVED | FSLADISH |
| Note: 1/8/25 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 01/08/2025 | APPROVED | FSLADISH |
| Note: 1/8/25 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- PRE-APRON (PRE-POUR) | 12/20/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 12/20/24 BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE IS 3000 PSI AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| GRAVITY SEWER TEST | 12/17/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 12/17/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 11/12/2024 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 11/08/2024 | APPROVED | PKNAPIK |
| INSULATION | 11/01/2024 | APPROVED | MCONTRYMAN |
| Note: 10/30/2024 - PREVIOUS INSPECTION NOTES 10/29/2024 - PREVIOUS INSPECTION NOTES 10/29/2024 1. Duct layout still does not match plans. FBC [A]107.4 2. Upstairs double window needs to be taped outside and foamed inside. Inspector Notes from Inspection 2420 10/22/2024 Check at insullation. 1. 2pt conection of bath fans. FBC M1601.4.1 2. Water pressure test. FBCR P2503.5 3. 5ft head test. FBCR P2503.7 4. Dryer vent box not installed. 5. Duct layout does not match plans. FBC [A]107.4 6. Anchors for sliders not visible. | |||
| INSULATION | 10/30/2024 | CANCELLED BY APPLICANT | PKNAPIK |
| Note: 10/29/2024 - PREVIOUS INSPECTION NOTES 10/29/2024 1. Duct layout still does not match plans. FBC [A]107.4 2. Upstairs double window needs to be taped outside and foamed inside. Inspector Notes from Inspection 2420 10/22/2024 Check at insullation. 1. 2pt conection of bath fans. FBC M1601.4.1 2. Water pressure test. FBCR P2503.5 3. 5ft head test. FBCR P2503.7 4. Dryer vent box not installed. 5. Duct layout does not match plans. FBC [A]107.4 6. Anchors for sliders not visible. | |||
| INSULATION | 10/29/2024 | Disapproved -FEE REQUIRED | PKNAPIK |
| Note: 10/29/2024 1. Duct layout still does not match plans. FBC [A]107.4 2. Upstairs double window needs to be taped outside and foamed inside. Inspector Notes from Inspection 2420 10/22/2024 Check at insullation. 1. 2pt conection of bath fans. FBC M1601.4.1 2. Water pressure test. FBCR P2503.5 3. 5ft head test. FBCR P2503.7 4. Dryer vent box not installed. 5. Duct layout does not match plans. FBC [A]107.4 6. Anchors for sliders not visible. | |||
| ELECTRIC-TUG | 10/25/2024 | APPROVED - AS NOTED | PKNAPIK |
| Note: 10/25/2024 1. Check fastener when sidding installed. 10/24/2024 - PREVIOUS INSPECTION NOTES 10 /24/2024 1. PVC conduit needs to be fastened. NEC 352.30 2. Outlet in sub panel needs to be labeled. | |||
| ELECTRIC-TUG | 10/24/2024 | Disapproved - NO FEE | PKNAPIK |
| Note: 10 /24/2024 1. PVC conduit needs to be fastened. NEC 352.30 2. Outlet in sub panel needs to be labeled. | |||
| ALL ROUGH | 10/22/2024 | APPROVED - AS NOTED | PKNAPIK |
| Note: 10/22/2024 Check at insullation. 1. 2pt conection of bath fans. FBC M1601.4.1 2. Water pressure test. FBCR P2503.5 3. 5ft head test. FBCR P2503.7 4. Dryer vent box not installed. 5. Duct layout does not match plans. FBC [A]107.4 6. Anchors for sliders not visible. | |||
| ROOF VALLEY & METAL | 10/04/2024 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/02/2024 | APPROVED | KSANDOE |
| Note: 9/27/2024 - PREVIOUS INSPECTION NOTES Not ready. No access to 2nd floor | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/27/2024 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Not ready. No access to 2nd floor | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/26/2024 | CANCELLED BY APPLICANT | WEB |
| WALL SHEATHING | 09/25/2024 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 09/10/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 09/05/2024 | APPROVED | KSANDOE |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/30/2024 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/14/2025 | 01/17/2025 |
| Note: Released By: PETER KNAPIK - - PKNAPIK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/23/2024 | 12/23/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/19/2024 | 12/23/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| MECH | COMPLETE | 11/01/2024 | 11/06/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/25/2024 | 10/29/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition 2. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition | |||
| ENGIN1 | COMPLETE | 09/10/2024 | 09/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/10/2024 | 09/10/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/06/2024 | 09/06/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/06/2024 | 09/10/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/20/2024 | 08/20/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/20/2024 | 08/20/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 08/15/2024 | 08/15/2024 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 08/14/2024 | 08/19/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/14/2024 | 08/16/2024 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 08/14/2024 | 08/15/2024 |
| Note: Released By: LUCY NABICO - - | |||
| ELEC | COMPLETE | 08/14/2024 | 08/19/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/14/2024 | 08/15/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 08/14/2024 | 08/19/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/14/2024 | 08/16/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/14/2024 | 08/19/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/14/2024 | 08/14/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) Rear drainage must be shown with at least 6" drop from the structure within first 10' See revision clouds and note on site plan. | |||
| ZON | COMPLETE | 08/14/2024 | 08/15/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/20/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/14/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 12/20/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 11/08/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/29/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/17/2024 |
| WATER-METER | ¤514.49 | 08/21/2024 |
| WATER-METER | ¤427.42 | 08/21/2024 |
| ADJUSTMENT 10% | (¤154.08) | 08/21/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/21/2024 |
| INSPECTION - RESIDENTIAL | ¤1,177.00 | 08/21/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤333.84 | 08/21/2024 |
| CONNECTION FEES | ¤25.00 | 08/21/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 08/21/2024 |
| IMPACT FEE FIRE | ¤428.09 | 08/21/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 08/21/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 08/21/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 08/21/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 08/21/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 08/21/2024 |
| SURCHARGE FS 533.721 | ¤13.87 | 08/21/2024 |
| SURCHARGE - FS 468.631 | ¤20.80 | 08/21/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/21/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/21/2024 |
| SW ENG PRE APRON | ¤30.00 | 08/21/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/21/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/21/2024 |
| SEWER INSPECTION | ¤25.00 | 08/21/2024 |
| SITE PLAN 30 | ¤30.00 | 08/21/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,636.92 |