I want to search for...
Permit #2024080655
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7060-00320-0150 |
| Block: 00320 |
| Subdivision: 7060 - |
| Job Phone: 386-931-3778 |
| Location Address: 51 SLOGANEER TRL |
| Type: PO - POOL |
| Issue Date: 08/20/2024 |
| NOC: RECORDED |
| Applicant name: ADAM M BEATY |
| Owner: ARMSTRONG KURT |
|
Address 51 SLOGANEER TRAIL PALM COAST, FL 32164 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤89,110.00 |
| Job Description: In ground concrete pool, spa and screen enclosure |
| Type: CN |
Contractor
POOL CAPTAIN CORP
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2729 E MOODY BLVD BUNNELL, FL 32110 |
STE 308 BUNNELL, FL 32110 |
CPC1457452 (Exp: 08/31/2026) | (386)931-3919 |
Sub Contractors
ADAM M BEATY
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
2729 E MOODY BLVD BUNNELL, FL 32110 |
STE 307 BUNNELL, FL 32110 |
CRC1328621 (Exp: 08/31/2026) | (386)931-3919 | (866)577-8695 |
RICHARD R EDWARDS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P. O. Box 1637 Bunnell, FL 32110 |
EC13010654 (Exp: 08/31/2026) | (386) 437-1537 |
KEN DEPRINZIO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
325 WALKER STREET HOLLY HILL, FL 32117 |
11351 (Exp: 08/31/2026) | 386-672-8494 | 386-673-7856 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 02/26/2025 | FINAL APPROVED | BTAYLOR |
| U -UTILITY RESIDENTIAL FINAL | 02/19/2025 | FINAL APPROVED | BWRIGHT |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/12/2025 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/12/2025 | APPROVED | FSLADISH |
| Note: 2/12/25 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL INSPECTION | 02/12/2025 | APPROVED | FSLADISH |
| Note: 2/12/25 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| GAS FINAL | 01/27/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2225 1/14/2025 - PREVIOUS INSPECTION NOTES 1-14-25 1. Piping used is not what is on the plans. 2. Gas line is hooked up without a gauge can not determine if gas line will hold pressure. SITE PLAN AND GAS RISER SHOW WHAT IS INSTALLED AND GUAGE WASN'T ON INTIALLY | |||
| GAS ROUGH | 01/15/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: 1/14/2025 - PREVIOUS INSPECTION NOTES 1-14-25 1. Piping used is not what is on the plans. 2. Gas line is hooked up without a gauge can not determine if gas line will hold pressure. SITE PLAN AND GAS RISER SHOW WHAT IS INSTALLED AND GUAGE WASN'T ON INTIALLY | |||
| GAS ROUGH | 01/14/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 1-14-25 1. Piping used is not what is on the plans. 2. Gas line is hooked up without a gauge can not determine if gas line will hold pressure. | |||
| ELECTRIC AND ALARM | 01/14/2025 | APPROVED | BTAYLOR |
| POOL DECK | 11/27/2024 | APPROVED | PKNAPIK |
| STEEL AND GROUND | 09/19/2024 | APPROVED | BTAYLOR |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 08/15/2024 | 08/19/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/15/2024 | 08/19/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/15/2024 | 08/19/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/15/2024 | 08/16/2024 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/15/2024 | 08/16/2024 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤26.02) | 08/20/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/20/2024 |
| INSPECTION- POOL | ¤160.00 | 08/20/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤70.20 | 08/20/2024 |
| SURCHARGE FS 533.721 | ¤2.34 | 08/20/2024 |
| SURCHARGE - FS 468.631 | ¤3.51 | 08/20/2024 |
| SW ENG INSPECTION 40 | ¤40.00 | 08/20/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/20/2024 |
| SITE PLAN 30 | ¤30.00 | 08/20/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤330.03 |