I want to search for...
Permit #2024080688
Permit Details
Status: COED
| Parcel Id: 07-11-31-7007-00490-0300 |
| CONDITIONED SPACE: 1555 sqft |
| GARAGE: 434 sqft |
| OPENED PORCH (WITH ROOF) : 212 sqft |
| Total Square Footage: 2201 sqft |
| Block: 00490 |
| Subdivision: - |
| Job Phone: 832-726-2202 |
| Location Address: 42 FULTON PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/20/2024 |
| NOC: RECORDED |
| Applicant name: JONATHON AMBAR |
| Owner: CASPIAN HOMES LLC |
|
Address 1802 NORTH ALAFAYA TRAIL ORLANDO, FL 32826 |
|
Address 164 ORLANDO, FL 32826 |
| Lot: 0300 |
| Contracted Stated Job Value: ¤140,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
CASPIAN HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
SUITE 162 ORLANDO, FL 32826 |
CBC1264918 (Exp: 08/31/2026) | 832-726-2202 |
Sub Contractors
MOISES MERINO DIAZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3104 ORANOLE ROAD ORLANDO, FL 32810 |
CAC1820980 (Exp: 08/31/2026) | 407-225-3149 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/07/2025 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 03/17/2025 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 no irr-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 03/10/2025 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/10/2025 | APPROVED | EMADISON |
| Note: NOTE TO INSPECTOR THE GRADE AT THE BACK PROPERTY IS JUST GOING TO MEET WITH EXISTING GRADE OF THE HOUSE BEHIND THIS LOT ANY QUESTIONS CALL PARREN | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/10/2025 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 03/10/2025 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/13/2025 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. --------------------------------------------------------------------------- 2/12/2025 - PREVIOUS INSPECTION NOTES SOIL IN POURING AREA ON THE SLOPE BEHIND CULVERT IS TOO SOFT AND THE SAND IN FRONT OF CULVERT IS TOO SOFT NEED TO COMPACT SOIL SO SOIL WILL NOT MOVE UNDER WALKING ON IT. SOIL SUBGRADE TO BE COMPACTED TO 95% PROCTOR DENSITY (PER ASTM 1557) | |||
| ROW- PRE-APRON (PRE-POUR) | 02/12/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: SOIL IN POURING AREA ON THE SLOPE BEHIND CULVERT IS TOO SOFT AND THE SAND IN FRONT OF CULVERT IS TOO SOFT NEED TO COMPACT SOIL SO SOIL WILL NOT MOVE UNDER WALKING ON IT. SOIL SUBGRADE TO BE COMPACTED TO 95% PROCTOR DENSITY (PER ASTM 1557) | |||
| ELECTRIC - EARLY POWER | 02/04/2025 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 01/22/2025 | Approval - Private Provider | PPROVIDER |
| Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 01/22/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U-CROSS CONNECTION | 01/22/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cross connection | |||
| ROW - DRAINAGE | 12/20/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 12/20/24 IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ | |||
| ROW - DRAINAGE | 12/19/2024 | Disapproved - NO FEE | EMADISON |
| Note: 12/18/2024 - PREVIOUS INSPECTION NOTES ** 12/18/24 CORRECTION THAT ARE STILL REQUIRED ** 12/17/24 CORRECTIONS AS NOTED IN PREVIOUS INSPECTION ARE STILL REQUIRED 5) NEED TO RE-ESTABLISH THE SILT FENCE AROUND THE PROPERTY. ** AN INSPECTION HOLD HAS BEEN PLACEDON THIS PERMIT UNTIL ALL CORRECTION HAVE BEEN MADE THERE WILL BE INSPECTIONS EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 12/20/24 ____________________________________________________________________________________________________________________ 12/17/2024 - PREVIOUS INSPECTION NOTES ** 12/17/24 CORRECTIONS AS NOTED IN PREVIOUS INSPECTION ARE STILL REQUIRED 2) NEED TO OPEN TEMP. CULVERT SO WATER CAN FLOW TO OUTFALL. 5) NEED TO RE-ESTABLISH THE SILT FENCE AROUND THE PROPERTY. 6) NEED TO CLEAN ALL DIRT FROM THE ROAD SO NO DIRT IS IN THE ROADWAY. ** AN INSPECTION HOLD HAS BEEN PLACEDON THIS PERMIT UNTIL ALL CORRECTION HAVE BEEN MADE THERE WILL BE INSPECTIONS EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 12/18/24 _______________________________________________________________________________________________________________________ 12/10/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL DIRT AND SEDIMENT OUT OF THE SWALE SO WATER CAN FLOW OUTFALL. 2) NEED TO OPEN TEMP. CULVERT SO WATER CAN FLOW TO OUTFALL. 3) NEED TO REMOVE THE DUMPSTER FROM THE VACANT LOT ACROSSED THE STREET AND PUT ON YOUR PROPERTY. 4) NEED TO REMOVE ALL CONCRETE FROM THE ROADSIDE SWALE. 5) NEED TO RE-ESTABLISH THE SILT AROUND THE PROPERTY. 6) NEED TO SWEEP THE ROAD SO NO DIRT IS IN THE ROADWAY. YOU WILL HAVE 7DAYS TO MAKE CORRECTIONS IF ALL CORRECTIONS ARE NOT DONE ON THE 7TH DAY THERE WILL BE INSPECTION HOLD ON THIS PERMIT. NEXT INSPECTION WILL BE IN 7DAYS. 12/17/24 | |||
| ROW - DRAINAGE | 12/18/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/18/24 CORRECTION THAT ARE STILL REQUIRED ** 12/17/24 CORRECTIONS AS NOTED IN PREVIOUS INSPECTION ARE STILL REQUIRED 5) NEED TO RE-ESTABLISH THE SILT FENCE AROUND THE PROPERTY. ** AN INSPECTION HOLD HAS BEEN PLACEDON THIS PERMIT UNTIL ALL CORRECTION HAVE BEEN MADE THERE WILL BE INSPECTIONS EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 12/19/24 ____________________________________________________________________________________________________________________ 12/17/2024 - PREVIOUS INSPECTION NOTES ** 12/17/24 CORRECTIONS AS NOTED IN PREVIOUS INSPECTION ARE STILL REQUIRED 2) NEED TO OPEN TEMP. CULVERT SO WATER CAN FLOW TO OUTFALL. 5) NEED TO RE-ESTABLISH THE SILT FENCE AROUND THE PROPERTY. 6) NEED TO CLEAN ALL DIRT FROM THE ROAD SO NO DIRT IS IN THE ROADWAY. ** AN INSPECTION HOLD HAS BEEN PLACEDON THIS PERMIT UNTIL ALL CORRECTION HAVE BEEN MADE THERE WILL BE INSPECTIONS EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 12/18/24 _______________________________________________________________________________________________________________________ 12/10/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL DIRT AND SEDIMENT OUT OF THE SWALE SO WATER CAN FLOW OUTFALL. 2) NEED TO OPEN TEMP. CULVERT SO WATER CAN FLOW TO OUTFALL. 3) NEED TO REMOVE THE DUMPSTER FROM THE VACANT LOT ACROSSED THE STREET AND PUT ON YOUR PROPERTY. 4) NEED TO REMOVE ALL CONCRETE FROM THE ROADSIDE SWALE. 5) NEED TO RE-ESTABLISH THE SILT AROUND THE PROPERTY. 6) NEED TO SWEEP THE ROAD SO NO DIRT IS IN THE ROADWAY. YOU WILL HAVE 7DAYS TO MAKE CORRECTIONS IF ALL CORRECTIONS ARE NOT DONE ON THE 7TH DAY THERE WILL BE INSPECTION HOLD ON THIS PERMIT. NEXT INSPECTION WILL BE IN 7DAYS. 12/17/24 | |||
| ROW - DRAINAGE | 12/17/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/17/24 CORRECTIONS AS NOTED IN PREVIOUS INSPECTION ARE STILL REQUIRED 2) NEED TO OPEN TEMP. CULVERT SO WATER CAN FLOW TO OUTFALL. 5) NEED TO RE-ESTABLISH THE SILT FENCE AROUND THE PROPERTY. 6) NEED TO CLEAN ALL DIRT FROM THE ROAD SO NO DIRT IS IN THE ROADWAY. ** AN INSPECTION HOLD HAS BEEN PLACEDON THIS PERMIT UNTIL ALL CORRECTION HAVE BEEN MADE THERE WILL BE INSPECTIONS EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 12/18/24 _______________________________________________________________________________________________________________________ 12/10/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL DIRT AND SEDIMENT OUT OF THE SWALE SO WATER CAN FLOW OUTFALL. 2) NEED TO OPEN TEMP. CULVERT SO WATER CAN FLOW TO OUTFALL. 3) NEED TO REMOVE THE DUMPSTER FROM THE VACANT LOT ACROSSED THE STREET AND PUT ON YOUR PROPERTY. 4) NEED TO REMOVE ALL CONCRETE FROM THE ROADSIDE SWALE. 5) NEED TO RE-ESTABLISH THE SILT AROUND THE PROPERTY. 6) NEED TO SWEEP THE ROAD SO NO DIRT IS IN THE ROADWAY. YOU WILL HAVE 7DAYS TO MAKE CORRECTIONS IF ALL CORRECTIONS ARE NOT DONE ON THE 7TH DAY THERE WILL BE INSPECTION HOLD ON THIS PERMIT. NEXT INSPECTION WILL BE IN 7DAYS. 12/17/24 | |||
| INSULATION | 12/13/2024 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 12/13/2024 | Approval - Private Provider | PPROVIDER |
| ROW - DRAINAGE | 12/10/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED TO REMOVE ALL DIRT AND SEDIMENT OUT OF THE SWALE SO WATER CAN FLOW OUTFALL. 2) NEED TO OPEN TEMP. CULVERT SO WATER CAN FLOW TO OUTFALL. 3) NEED TO REMOVE THE DUMPSTER FROM THE VACANT LOT ACROSSED THE STREET AND PUT ON YOUR PROPERTY. 4) NEED TO REMOVE ALL CONCRETE FROM THE ROADSIDE SWALE. 5) NEED TO RE-ESTABLISH THE SILT AROUND THE PROPERTY. 6) NEED TO SWEEP THE ROAD SO NO DIRT IS IN THE ROADWAY. YOU WILL HAVE 7DAYS TO MAKE CORRECTIONS IF ALL CORRECTIONS ARE NOT DONE ON THE 7TH DAY THERE WILL BE INSPECTION HOLD ON THIS PERMIT. NEXT INSPECTION WILL BE IN 7DAYS. 12/17/24 | |||
| ELECTRIC-TUG | 12/04/2024 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 12/04/2024 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 11/26/2024 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 11/19/2024 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/19/2024 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 11/18/2024 | APPROVED | JMYERS |
| TIE BEAM / LINTEL | 11/08/2024 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 10/29/2024 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 10/28/2024 | Disapproved- Private Provider | PPROVIDER |
| Note: 10/25/2024 4:50:31 PM- PREVIOUS INSPECTION NOTES | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/28/2024 | Approval - Private Provider | PPROVIDER |
| Note: 10/25/2024 4:50:41 PM- PREVIOUS INSPECTION NOTES | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/24/2024 | CANCELLED BY APPLICANT | PPROVIDER |
| GRAVITY SEWER TEST | 10/24/2024 | CANCELLED BY APPLICANT | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 10/23/2024 | APPROVED | CPISCITELLI |
| GRAVITY SEWER TEST | 10/22/2024 | CANCELLED BY APPLICANT | WEB |
| WATER METER INSTALLATION REQUEST | 10/17/2024 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 09/03/2024 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 11/12/2024 | 11/18/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/12/2024 | 11/12/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/23/2024 | 10/23/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 10/18/2024 | 10/23/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Formboard surveys are not accepted as foundation surveys. Please submit a foundation survey for review. | |||
| ZON | COMPLETE | 10/18/2024 | 10/18/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 09/03/2024 | 09/03/2024 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM After action report was submitted and accepted by FWC meeting the requirements for 10.04.01 of the LDC. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. | |||
| BADMIN | COMPLETE | 09/03/2024 | 09/05/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 08/16/2024 | 08/23/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide complete truss plan submittal packet to include all of the following: A. Complete truss plan packet, signed and sealed by a Florida licensed professional engineer (the truss design engineer) B. Truss layout / placement plan from truss manufacturer C. Truss profile plan sheets for all trusses. D. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) (MISSING B AND D) 2. Truss packet has no address or lot number 3. Provide geotechnical investigation report in accordance with FBCB Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead. | |||
| CUSVC | COMPLETE | 08/16/2024 | 08/20/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/16/2024 | 08/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/16/2024 | 08/16/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/16/2024 | 08/16/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | COMPLETE | 08/16/2024 | 08/16/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| PLENV | HOLD | 08/16/2024 | 08/19/2024 |
| Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conduced a site visit on 08/19/24 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed. | |||
| SWALE | COMPLETE | 08/16/2024 | 10/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 04/11/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/11/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/11/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/11/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/20/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/20/2024 |
| SEWER CREDIT | (¤1,147.00) | 09/20/2024 |
| SEWER INSPECTION | ¤25.00 | 09/20/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 09/20/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 09/20/2024 |
| SITE PLAN 30 | ¤30.00 | 09/20/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/20/2024 |
| SW ENG PRE APRON | ¤30.00 | 09/20/2024 |
| WATER- TURN ON | ¤25.00 | 09/20/2024 |
| ADJUSTMENT 10% | (¤3.00) | 09/20/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/20/2024 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 09/20/2024 |
| CONNECTION FEES | ¤1,187.26 | 09/20/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 09/20/2024 |
| IMPACT FEE FIRE | ¤428.09 | 09/20/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 09/20/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 09/20/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 09/20/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 09/20/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 09/20/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/20/2024 |
| SURCHARGE FS 533.721 | ¤2.52 | 09/20/2024 |
| SURCHARGE - FS 468.631 | ¤3.78 | 09/20/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/20/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,404.30 |