I want to search for...

Permit #2024080688

Permit Details

Status: COED

Parcel Id: 07-11-31-7007-00490-0300
CONDITIONED SPACE: 1555 sqft
GARAGE: 434 sqft
OPENED PORCH (WITH ROOF) : 212 sqft
Total Square Footage: 2201 sqft
Block: 00490
Subdivision: -
Job Phone: 832-726-2202
Location Address: 42 FULTON PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/20/2024
NOC: RECORDED
Applicant name: JONATHON AMBAR
Owner: CASPIAN HOMES LLC

Address

1802 NORTH ALAFAYA TRAIL

ORLANDO, FL 32826

Address

164

ORLANDO, FL 32826

Lot: 0300
Contracted Stated Job Value: ¤140,000.00
Job Description: Single Family Residence
Type: CN

Contractor

CASPIAN HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

1802 N ALAFAYA TRAIL

ORLANDO, FL 32826

SUITE 162

ORLANDO, FL 32826

CBC1264918 (Exp: 08/31/2026) 832-726-2202

Sub Contractors

MOISES MERINO DIAZ
Status Location Address State License Number Phone
ACTIVE

3104 ORANOLE ROAD

ORLANDO, FL 32810

CAC1820980 (Exp: 08/31/2026) 407-225-3149
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/07/2025 Approval - Private Provider PPROVIDER
U -UTILITY RESIDENTIAL FINAL 03/17/2025 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 no irr-no cross connection
ROW - FINAL APRON (AFTER POUR) 03/10/2025 APPROVED EMADISON
Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/10/2025 APPROVED EMADISON
Note: NOTE TO INSPECTOR THE GRADE AT THE BACK PROPERTY IS JUST GOING TO MEET WITH EXISTING GRADE OF THE HOUSE BEHIND THIS LOT ANY QUESTIONS CALL PARREN
ROW FIELD SURVEY /GRADING CERTIFICATION 03/10/2025 APPROVED EMADISON
Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 03/10/2025 APPROVED EMADISON
Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved.
ROW- PRE-APRON (PRE-POUR) 02/13/2025 APPROVED PFLANAGAN
Note: CORRECTION MADE IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. --------------------------------------------------------------------------- 2/12/2025 - PREVIOUS INSPECTION NOTES SOIL IN POURING AREA ON THE SLOPE BEHIND CULVERT IS TOO SOFT AND THE SAND IN FRONT OF CULVERT IS TOO SOFT NEED TO COMPACT SOIL SO SOIL WILL NOT MOVE UNDER WALKING ON IT. SOIL SUBGRADE TO BE COMPACTED TO 95% PROCTOR DENSITY (PER ASTM 1557)
ROW- PRE-APRON (PRE-POUR) 02/12/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: SOIL IN POURING AREA ON THE SLOPE BEHIND CULVERT IS TOO SOFT AND THE SAND IN FRONT OF CULVERT IS TOO SOFT NEED TO COMPACT SOIL SO SOIL WILL NOT MOVE UNDER WALKING ON IT. SOIL SUBGRADE TO BE COMPACTED TO 95% PROCTOR DENSITY (PER ASTM 1557)
ELECTRIC - EARLY POWER 02/04/2025 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 01/22/2025 Approval - Private Provider PPROVIDER
Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 01/22/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U-CROSS CONNECTION 01/22/2025 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cross connection
ROW - DRAINAGE 12/20/2024 APPROVED - AS NOTED EMADISON
Note: ** 12/20/24 IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________
ROW - DRAINAGE 12/19/2024 Disapproved - NO FEE EMADISON
Note: 12/18/2024 - PREVIOUS INSPECTION NOTES ** 12/18/24 CORRECTION THAT ARE STILL REQUIRED ** 12/17/24 CORRECTIONS AS NOTED IN PREVIOUS INSPECTION ARE STILL REQUIRED 5) NEED TO RE-ESTABLISH THE SILT FENCE AROUND THE PROPERTY. ** AN INSPECTION HOLD HAS BEEN PLACEDON THIS PERMIT UNTIL ALL CORRECTION HAVE BEEN MADE THERE WILL BE INSPECTIONS EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 12/20/24 ____________________________________________________________________________________________________________________ 12/17/2024 - PREVIOUS INSPECTION NOTES ** 12/17/24 CORRECTIONS AS NOTED IN PREVIOUS INSPECTION ARE STILL REQUIRED 2) NEED TO OPEN TEMP. CULVERT SO WATER CAN FLOW TO OUTFALL. 5) NEED TO RE-ESTABLISH THE SILT FENCE AROUND THE PROPERTY. 6) NEED TO CLEAN ALL DIRT FROM THE ROAD SO NO DIRT IS IN THE ROADWAY. ** AN INSPECTION HOLD HAS BEEN PLACEDON THIS PERMIT UNTIL ALL CORRECTION HAVE BEEN MADE THERE WILL BE INSPECTIONS EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 12/18/24 _______________________________________________________________________________________________________________________ 12/10/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL DIRT AND SEDIMENT OUT OF THE SWALE SO WATER CAN FLOW OUTFALL. 2) NEED TO OPEN TEMP. CULVERT SO WATER CAN FLOW TO OUTFALL. 3) NEED TO REMOVE THE DUMPSTER FROM THE VACANT LOT ACROSSED THE STREET AND PUT ON YOUR PROPERTY. 4) NEED TO REMOVE ALL CONCRETE FROM THE ROADSIDE SWALE. 5) NEED TO RE-ESTABLISH THE SILT AROUND THE PROPERTY. 6) NEED TO SWEEP THE ROAD SO NO DIRT IS IN THE ROADWAY. YOU WILL HAVE 7DAYS TO MAKE CORRECTIONS IF ALL CORRECTIONS ARE NOT DONE ON THE 7TH DAY THERE WILL BE INSPECTION HOLD ON THIS PERMIT. NEXT INSPECTION WILL BE IN 7DAYS. 12/17/24
ROW - DRAINAGE 12/18/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 12/18/24 CORRECTION THAT ARE STILL REQUIRED ** 12/17/24 CORRECTIONS AS NOTED IN PREVIOUS INSPECTION ARE STILL REQUIRED 5) NEED TO RE-ESTABLISH THE SILT FENCE AROUND THE PROPERTY. ** AN INSPECTION HOLD HAS BEEN PLACEDON THIS PERMIT UNTIL ALL CORRECTION HAVE BEEN MADE THERE WILL BE INSPECTIONS EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 12/19/24 ____________________________________________________________________________________________________________________ 12/17/2024 - PREVIOUS INSPECTION NOTES ** 12/17/24 CORRECTIONS AS NOTED IN PREVIOUS INSPECTION ARE STILL REQUIRED 2) NEED TO OPEN TEMP. CULVERT SO WATER CAN FLOW TO OUTFALL. 5) NEED TO RE-ESTABLISH THE SILT FENCE AROUND THE PROPERTY. 6) NEED TO CLEAN ALL DIRT FROM THE ROAD SO NO DIRT IS IN THE ROADWAY. ** AN INSPECTION HOLD HAS BEEN PLACEDON THIS PERMIT UNTIL ALL CORRECTION HAVE BEEN MADE THERE WILL BE INSPECTIONS EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 12/18/24 _______________________________________________________________________________________________________________________ 12/10/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL DIRT AND SEDIMENT OUT OF THE SWALE SO WATER CAN FLOW OUTFALL. 2) NEED TO OPEN TEMP. CULVERT SO WATER CAN FLOW TO OUTFALL. 3) NEED TO REMOVE THE DUMPSTER FROM THE VACANT LOT ACROSSED THE STREET AND PUT ON YOUR PROPERTY. 4) NEED TO REMOVE ALL CONCRETE FROM THE ROADSIDE SWALE. 5) NEED TO RE-ESTABLISH THE SILT AROUND THE PROPERTY. 6) NEED TO SWEEP THE ROAD SO NO DIRT IS IN THE ROADWAY. YOU WILL HAVE 7DAYS TO MAKE CORRECTIONS IF ALL CORRECTIONS ARE NOT DONE ON THE 7TH DAY THERE WILL BE INSPECTION HOLD ON THIS PERMIT. NEXT INSPECTION WILL BE IN 7DAYS. 12/17/24
ROW - DRAINAGE 12/17/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 12/17/24 CORRECTIONS AS NOTED IN PREVIOUS INSPECTION ARE STILL REQUIRED 2) NEED TO OPEN TEMP. CULVERT SO WATER CAN FLOW TO OUTFALL. 5) NEED TO RE-ESTABLISH THE SILT FENCE AROUND THE PROPERTY. 6) NEED TO CLEAN ALL DIRT FROM THE ROAD SO NO DIRT IS IN THE ROADWAY. ** AN INSPECTION HOLD HAS BEEN PLACEDON THIS PERMIT UNTIL ALL CORRECTION HAVE BEEN MADE THERE WILL BE INSPECTIONS EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 12/18/24 _______________________________________________________________________________________________________________________ 12/10/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL DIRT AND SEDIMENT OUT OF THE SWALE SO WATER CAN FLOW OUTFALL. 2) NEED TO OPEN TEMP. CULVERT SO WATER CAN FLOW TO OUTFALL. 3) NEED TO REMOVE THE DUMPSTER FROM THE VACANT LOT ACROSSED THE STREET AND PUT ON YOUR PROPERTY. 4) NEED TO REMOVE ALL CONCRETE FROM THE ROADSIDE SWALE. 5) NEED TO RE-ESTABLISH THE SILT AROUND THE PROPERTY. 6) NEED TO SWEEP THE ROAD SO NO DIRT IS IN THE ROADWAY. YOU WILL HAVE 7DAYS TO MAKE CORRECTIONS IF ALL CORRECTIONS ARE NOT DONE ON THE 7TH DAY THERE WILL BE INSPECTION HOLD ON THIS PERMIT. NEXT INSPECTION WILL BE IN 7DAYS. 12/17/24
INSULATION 12/13/2024 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 12/13/2024 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 12/10/2024 Disapproved - NO FEE PFLANAGAN
Note: 1) NEED TO REMOVE ALL DIRT AND SEDIMENT OUT OF THE SWALE SO WATER CAN FLOW OUTFALL. 2) NEED TO OPEN TEMP. CULVERT SO WATER CAN FLOW TO OUTFALL. 3) NEED TO REMOVE THE DUMPSTER FROM THE VACANT LOT ACROSSED THE STREET AND PUT ON YOUR PROPERTY. 4) NEED TO REMOVE ALL CONCRETE FROM THE ROADSIDE SWALE. 5) NEED TO RE-ESTABLISH THE SILT AROUND THE PROPERTY. 6) NEED TO SWEEP THE ROAD SO NO DIRT IS IN THE ROADWAY. YOU WILL HAVE 7DAYS TO MAKE CORRECTIONS IF ALL CORRECTIONS ARE NOT DONE ON THE 7TH DAY THERE WILL BE INSPECTION HOLD ON THIS PERMIT. NEXT INSPECTION WILL BE IN 7DAYS. 12/17/24
ELECTRIC-TUG 12/04/2024 Approval - Private Provider PPROVIDER
ALL ROUGH 12/04/2024 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 11/26/2024 Approval - Private Provider PPROVIDER
WALL SHEATHING 11/19/2024 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/19/2024 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 11/18/2024 APPROVED JMYERS
TIE BEAM / LINTEL 11/08/2024 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 10/29/2024 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 10/28/2024 Disapproved- Private Provider PPROVIDER
Note: 10/25/2024 4:50:31 PM- PREVIOUS INSPECTION NOTES
PLUMBING 1ST ROUGH UNDERGROUND 10/28/2024 Approval - Private Provider PPROVIDER
Note: 10/25/2024 4:50:41 PM- PREVIOUS INSPECTION NOTES
PLUMBING 1ST ROUGH UNDERGROUND 10/24/2024 CANCELLED BY APPLICANT PPROVIDER
GRAVITY SEWER TEST 10/24/2024 CANCELLED BY APPLICANT PPROVIDER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 10/23/2024 APPROVED CPISCITELLI
GRAVITY SEWER TEST 10/22/2024 CANCELLED BY APPLICANT WEB
WATER METER INSTALLATION REQUEST 10/17/2024 APPROVED CBOWERMASTER
WILDLIFE CHECK - ENVIRONMENTAL 09/03/2024 APPROVED DRODRIGUEZ

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 11/12/2024 11/18/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM
ZON COMPLETE 11/12/2024 11/12/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 10/23/2024 10/23/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 HOLD 10/18/2024 10/23/2024
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Formboard surveys are not accepted as foundation surveys. Please submit a foundation survey for review.
ZON COMPLETE 10/18/2024 10/18/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
PLENV COMPLETE 09/03/2024 09/03/2024
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM After action report was submitted and accepted by FWC meeting the requirements for 10.04.01 of the LDC. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.
BADMIN COMPLETE 09/03/2024 09/05/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN HOLD 08/16/2024 08/23/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide complete truss plan submittal packet to include all of the following: A. Complete truss plan packet, signed and sealed by a Florida licensed professional engineer (the truss design engineer) B. Truss layout / placement plan from truss manufacturer C. Truss profile plan sheets for all trusses. D. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) (MISSING B AND D) 2. Truss packet has no address or lot number 3. Provide geotechnical investigation report in accordance with FBCB Section 1803.2.  Report to be conducted per Sections 1803.3 through 1803.5.  Completed report shall comply with Section 1803.6.  Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead.
CUSVC COMPLETE 08/16/2024 08/20/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/16/2024 08/16/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 08/16/2024 08/16/2024
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
SW1 COMPLETE 08/16/2024 08/16/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON COMPLETE 08/16/2024 08/16/2024
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
PLENV HOLD 08/16/2024 08/19/2024
Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conduced a site visit on 08/19/24 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed.
SWALE COMPLETE 08/16/2024 10/16/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 04/11/2025
SW ENG - INSPECTION 20 ¤20.00 04/11/2025
SW ENG - INSPECTION 20 ¤20.00 04/11/2025
SW ENG REINSPECTION 30 ¤30.00 04/11/2025
SW ENG - REVIEW 20 ¤20.00 09/20/2024
SW ENG RES REVIEW 200 ¤200.00 09/20/2024
SEWER CREDIT (¤1,147.00) 09/20/2024
SEWER INSPECTION ¤25.00 09/20/2024
SEWER CAPITAL FACILITY ¤6,120.52 09/20/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 09/20/2024
SITE PLAN 30 ¤30.00 09/20/2024
SW ENG INSPECTION 80 ¤80.00 09/20/2024
SW ENG PRE APRON ¤30.00 09/20/2024
WATER- TURN ON ¤25.00 09/20/2024
ADJUSTMENT 10% (¤3.00) 09/20/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/20/2024
ADMINISTRATIVE - RESID PP ¤225.00 09/20/2024
CONNECTION FEES ¤1,187.26 09/20/2024
FC IMPACT FEE EMS ¤62.00 09/20/2024
IMPACT FEE FIRE ¤428.09 09/20/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 09/20/2024
FC IMPACT FEE LIBRARY ¤268.00 09/20/2024
IMPACT FEE PARKS ¤1,800.99 09/20/2024
IMPACT FEE SCHOOL ¤5,450.00 09/20/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 09/20/2024
WATER -IRRIGATION INSPECTION ¤25.00 09/20/2024
SURCHARGE FS 533.721 ¤2.52 09/20/2024
SURCHARGE - FS 468.631 ¤3.78 09/20/2024
SW ENG - FOUNDATION SURVEY ¤20.00 09/20/2024
Fees Total Due: ¤0.00 Total Paid: ¤21,404.30