I want to search for...

Permit #2024080915

Permit Details

Status: COED

Parcel Id: 07-11-31-7014-00020-0180
CONDITIONED SPACE: 2193 sqft
GARAGE: 684 sqft
OPENED PORCH (WITH ROOF) : 386 sqft
Total Square Footage: 3263 sqft
Block: 00020
Subdivision: -
Job Phone: 386-236-4133
Location Address: 14 COTTONWOOD CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/22/2024
NOC: RECORDED
Applicant name: LEONARDO CIRO SANCLEMENTE
Owner: CARTER DAVID N & GRACE S H&W

Address

4223 TRADEWINDS DRIVE

JACKSONVILLE, FL 32250

Lot: 0180
Contracted Stated Job Value: ¤330,214.00
Job Description: Single Family Residence
Type: CN

Contractor

VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
Status Location Address State License Number Phone
ACTIVE

2379 BEVILLE RD

DAYTONA BEACH, FL 32119

CBC1262114 (Exp: 08/31/2026) 386-236-4133

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
BRENT JAMES STURGELL
Status Location Address State License Number Phone
ACTIVE

651 CARSWELL AVE

HOLLY HILL , FL 32117

CAC1822599 (Exp: 08/31/2026) 386-252-1878
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
HARLEY M BRYAN
Status Location Address State License Number Phone
ACTIVE

5223 EDGEWOOD CT

ORMOND BEACH, FL 32174

LI26657 (Exp: 08/31/2028) 386-463-2700

Inspection History

Type Request Date Result Inspector
GAS FINAL 06/13/2025 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2225 Gas pipe bonded above the ceiling in master Closet.
BLD - BUILDING FINAL 06/13/2025 FINAL APPROVED HCAMACHO
U-CROSS CONNECTION 06/13/2025 APPROVED - AS NOTED LFITZGERALD
Note: potable irr with PVB-NO CC
ROW - FINAL APRON (AFTER POUR) 06/13/2025 APPROVED RRICKS
Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 06/13/2025 APPROVED RRICKS
Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved.
U -UTILITY RESIDENTIAL FINAL 06/13/2025 FINAL APPROVED LFITZGERALD
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/12/2025 APPROVED - AS NOTED PFLANAGAN
Note: THE SWALE IN THE FIELD MATCHES ADJACENT LOTS ----------------------------------------------------------------------- 6/6/2025 - PREVIOUS INSPECTION NOTES 1) FFE OF STRUCTURE NEED TO BE TO THE NEAREST .01 PER CITY CODE Section 300.01 C(7) 2) THE FRONT ROADSIDE SWALE NEEDS TO MATCH EXISTING GRADE TO THE LEFT PROPERTY FINAL SURVEY STATES THAT WATER WILL HOLD IN YOUR SWALE.
ROW FIELD SURVEY /GRADING CERTIFICATION 06/12/2025 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW - STORMWATER FINAL 06/12/2025 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW - FINAL APRON (AFTER POUR) 06/12/2025 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/06/2025 Disapproved - NO FEE PFLANAGAN
Note: 1) FFE OF STRUCTURE NEED TO BE TO THE NEAREST .01 PER CITY CODE Section 300.01 C(7) 2) THE FRONT ROADSIDE SWALE NEEDS TO MATCH EXISTING GRADE TO THE LEFT PROPERTY FINAL SURVEY STATES THAT WATER WILL HOLD IN YOUR SWALE.
U-CROSS CONNECTION 06/06/2025 APPROVED DHANEY
ROW- PROJECT STATUS 05/14/2025 Status Check EMADISON
Note: ** DISCUSS PAVER DRIVEWAY _______________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** 05/14/25 READY TO SET PAVERS _______________________________________________________________________________________________________ 5/7/2025 - PREVIOUS INSPECTION NOTES ** 05/07/25 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ROW- PRE-APRON (PRE-POUR) 05/14/2025 APPROVED - AS NOTED EMADISON
Note: ** 05/14/25 READY TO SET PAVERS _______________________________________________________________________________________________________ 5/7/2025 - PREVIOUS INSPECTION NOTES ** 05/07/25 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ROW- PAVER RESTRAINTS 05/07/2025 APPROVED EMADISON
Note: ** 05/07/25 READY TO POUR PAVER RESTRAINTS WITH APRON ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE
ROW- PRE-APRON (PRE-POUR) 05/07/2025 PARTIALLY APPROVED EMADISON
Note: ** 05/07/25 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ROW- PROJECT STATUS 04/24/2025 Status Check PFLANAGAN
Note: MEETING WITH BUILDER ABOUT REMOVING THE PROPOSED RETENTION POND IN THE BACKYARD. BUILDER WILL NOT BE DOING THE RETENTION AREA HE WILL BE GRADING LOT LIKE ALL OTHER CANAL LOTS AS A "B" DRAINAGE
ELECTRIC - EARLY POWER 04/22/2025 APPROVED HCAMACHO
Note:
GRAVITY SEWER TEST 04/01/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 04/01/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 03/19/2025 APPROVED HCAMACHO
Note: Inspector Notes from Inspection 2490 3/14/25 Previous note not rectified 3. Revise Service Riser to state 300 AMP service installed.FBC [A]107.4 --have approved and stamped revision by building final to avoid failures and fees-- 3/14/2025 - PREVIOUS INSPECTION NOTES 3/14/25 Previous note not rectified 3. Revise Service Riser to state 300 AMP service installed.FBC [A]107.4 Inspector Notes from Inspection 2420 1. Fire blocking need in the wall at the laundry room that backs to the kitchen.FCBR 302.11 2. Needs screws on the hood vent pipe at all connections.FBCR M1601.4.1 3. Revise Service Riser to state 300 AMP service installed.FBC [A]107.4
INSULATION 03/14/2025 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 3/14/25 Previous note not rectified 3. Revise Service Riser to state 300 AMP service installed.FBC [A]107.4 Inspector Notes from Inspection 2420 1. Fire blocking need in the wall at the laundry room that backs to the kitchen.FCBR 302.11 2. Needs screws on the hood vent pipe at all connections.FBCR M1601.4.1 3. Revise Service Riser to state 300 AMP service installed.FBC [A]107.4
INSULATION 03/14/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 3/14/25 Previous note not rectified 3. Revise Service Riser to state 300 AMP service installed.FBC [A]107.4 --have approved and stamped revision by building final to avoid failures and fees-- 3/14/2025 - PREVIOUS INSPECTION NOTES 3/14/25 Previous note not rectified 3. Revise Service Riser to state 300 AMP service installed.FBC [A]107.4 Inspector Notes from Inspection 2420 1. Fire blocking need in the wall at the laundry room that backs to the kitchen.FCBR 302.11 2. Needs screws on the hood vent pipe at all connections.FBCR M1601.4.1 3. Revise Service Riser to state 300 AMP service installed.FBC [A]107.4
ALL ROUGH 03/11/2025 APPROVED - AS NOTED HCAMACHO
Note: 1. Fire blocking need in the wall at the laundry room that backs to the kitchen.FCBR 302.11 2. Needs screws on the hood vent pipe at all connections.FBCR M1601.4.1 3. Revise Service Riser to state 300 AMP service installed.FBC [A]107.4
ELECTRIC-TUG 03/11/2025 APPROVED - AS NOTED HCAMACHO
Note: 300 Amp service installed. Need Revision to Riser.
GAS ROUGH 03/11/2025 APPROVED - AS NOTED HCAMACHO
Note: Gas pipe bonded above the ceiling in master Closet.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/07/2025 APPROVED HCAMACHO
Note: 2/19/2025 - PREVIOUS INSPECTION NOTES Roof Sheathing is ok.
ROOF VALLEY & METAL 03/04/2025 APPROVED HCAMACHO
WALL SHEATHING 02/21/2025 APPROVED HCAMACHO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/19/2025 PARTIALLY APPROVED HCAMACHO
Note: Roof Sheathing is ok.
FOUND SURVEY APPROVED (OFFICE) 02/18/2025 APPROVED TBAKER
TIE BEAM / LINTEL 02/06/2025 APPROVED HCAMACHO
MONOLITHIC SLAB 01/30/2025 APPROVED HCAMACHO
PLUMBING 1ST ROUGH UNDERGROUND 01/16/2025 APPROVED MGIBSON
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 01/15/2025 APPROVED CPISCITELLI
WATER METER INSTALLATION REQUEST 11/21/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 05/30/2025 06/02/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
SW1 COMPLETE 05/30/2025 06/02/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 05/30/2025 05/30/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ELEC COMPLETE 03/14/2025 03/17/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/14/2025 02/18/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN COMPLETE 02/13/2025 02/18/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM label the document correctly and the PDF
ENGIN1 HOLD 02/13/2025 02/13/2025
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please include FFE of both adjacent homes on foundation survey.
ZON COMPLETE 02/13/2025 02/13/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 01/10/2025 01/15/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 10/24/2024 10/24/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 10/08/2024 10/08/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/08/2024 10/15/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/08/2024 10/15/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON HOLD 10/03/2024 10/04/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show driveway width at the widest point and it must extend the width of the garage doors for the first 20ft from garage.
BADMIN COMPLETE 10/03/2024 10/08/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/03/2024 10/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/20/2024 10/03/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD **Although there is no ordinace prohibiting a retention pond here, please consider removing the proposed pond area and drain rear of lot to the basin** This area will most likely be dry most of the time, but upon significant rain events, ponding water may linger for a longer periood of time which could snowball into other issues.
ZON HOLD 09/20/2024 09/20/2024
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Provide the total width of the concrete driveway Site plan needs to indicate the square footage of lot
BADMIN HOLD 09/20/2024 09/24/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Letter needs to be digitally signed and sealed.
ENGIN1 COMPLETE 09/20/2024 09/20/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLFM COMPLETE 08/22/2024 08/26/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM According to the Site plan submitted on 8/20/24, the structure will not fall inside the SFHA. No elevation certificates are required.
BADMIN HOLD 08/21/2024 08/28/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with FBCB Section 1803.2.  Report to be conducted per Sections 1803.3 through 1803.5.  Completed report shall comply with Section 1803.6.  Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead.
BLD COMPLETE 08/21/2024 08/28/2024
Note: Released By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM
CUSVC COMPLETE 08/21/2024 08/26/2024
Note: Released By: PAMELA MILLER - -
ELEC COMPLETE 08/21/2024 08/27/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/21/2024 08/21/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS COMPLETE 08/21/2024 08/26/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
LOCATE COMPLETE 08/21/2024 08/26/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 08/21/2024 08/26/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 08/21/2024 08/21/2024
Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) Proposed elevations are missing 2) Please show culvert pipe including size and material to be used 3) Please provide the main FFE and garage FFE Please note the following: -Min. FFE must be no less than 12" above the road centerline. Max. FFE must be no more than 22" above the road centerline. Additionally, the FFE must be within 10" of adjoining improved lots. To avoid being significantly lower, the structure FFE may exceed the road centerline tolerance in order to match the FFE of adjoining improved lots. The 10” tolerance shall never be exceeded -drainage @ 6” minimum slope from the structure for the first 10’. A 5% slope for 10’ totaling 0.5’ elevation difference perpendicular to the structure -sod elevations at the structure are to be 4" below FFE for block and 6" below FFE for wood frame.
ZON HOLD 08/21/2024 08/22/2024
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Manufacturer of paint color needs to be listed on Color sheet Site plan needs to indicate width of driveway Site plan needs to indicate the square footage of lot
SWALE COMPLETE 08/21/2024 10/24/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER- TURN ON ¤25.00 10/22/2024
ADJUSTMENT 10% (¤155.50) 10/22/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/22/2024
INSPECTION - RESIDENTIAL ¤1,188.00 10/22/2024
PLAN REVIEW - RESIDENTIAL ¤336.96 10/22/2024
CONNECTION FEES ¤1,187.26 10/22/2024
FC IMPACT FEE EMS ¤62.00 10/22/2024
IMPACT FEE FIRE ¤428.09 10/22/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 10/22/2024
FC IMPACT FEE LIBRARY ¤268.00 10/22/2024
IMPACT FEE PARKS ¤1,800.99 10/22/2024
IMPACT FEE SCHOOL ¤5,450.00 10/22/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 10/22/2024
WATER -IRRIGATION INSPECTION ¤25.00 10/22/2024
SURCHARGE FS 533.721 ¤13.99 10/22/2024
SURCHARGE - FS 468.631 ¤20.99 10/22/2024
SW ENG - FOUNDATION SURVEY ¤20.00 10/22/2024
SW ENG INSPECTION 80 ¤80.00 10/22/2024
SW ENG PRE APRON ¤30.00 10/22/2024
SW ENG - REVIEW 20 ¤20.00 10/22/2024
SW ENG RES REVIEW 200 ¤200.00 10/22/2024
SEWER CREDIT (¤850.00) 10/22/2024
SEWER INSPECTION ¤25.00 10/22/2024
SEWER CAPITAL FACILITY ¤6,120.52 10/22/2024
WATER CREDIT (¤60.00) 10/22/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 10/22/2024
SITE PLAN 30 ¤30.00 10/22/2024
Fees Total Due: ¤0.00 Total Paid: ¤22,727.44