Permit #2024081004

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-1280
CONDITIONED SPACE: 3192 sqft
GARAGE: 845 sqft
OPENED PORCH (WITH ROOF) : 70 sqft
OPENED PORCH (WITH ROOF) : 659 sqft
Total Square Footage: 4766 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-447-4400
Location Address: 253 CONSERVATORY DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/10/2024
NOC: RECORDED
Applicant name: JAMES ROBERT BOOHER
Owner: WATKINS GREGORY LEE & TAMARA DALE H&W

Address

4732 CORINA PLACE NE

ROSWELL, GA 30075

Lot: 1280
Contracted Stated Job Value: ¤1,039,800.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SALTWATER HOMES INC
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

138 PALM COAST PARKWAY

PALM COAST, FL 32137

SUITE 328

PALM COAST, FL 32137

CBC1265417 (Exp: 08/31/2026) 386-447-4400 866-244-9639

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
PEDRO DANIEL CHINCHILLA
Status Location Address State License Number Phone
ACTIVE

324 COVENT GARDENS PL

DELTONA, FL 32725

CCC1333997 (Exp: 08/31/2026) 386-679-6228
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
KEN DEPRINZIO
Status Location Address State License Number Phone Fax
ACTIVE

325 WALKER STREET

HOLLY HILL, FL 32117

11351 (Exp: 08/31/2026) 386-672-8494 386-673-7856
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/08/2025 Approval - Private Provider PPROVIDER
U-CROSS CONNECTION 09/12/2025 APPROVED BWRIGHT
ROW - FINAL APRON (AFTER POUR) 09/12/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 09/12/2025 APPROVED EMADISON
Note: ** IRRAGATION SYSTEM AT PONDS EDGE BELONGS TO THE HOA AND BUILDER INDICATED IT IS NON-FUNCTIONAL AND THE HOA IS SUPPOSED TO REMOVE IT AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 09/12/2025 FINAL APPROVED BWRIGHT
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/11/2025 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 09/11/2025 APPROVED - AS NOTED EMADISON
Note: ** 09/11/25 BUILDER IS REQUIRED TO REMOVE THE IRRAGATION FROM THE POND IT NEEDS TO BE INSTALLED 5 FT OR FURTHER BACK FROM THE EDGE OF WATER ** BUILDER NEEDS TO REPAIR WASHOUTS CAUSED BY POP-UP DRAINS BEING INSTALLED IMPROPERLY BENEATH THE SOD CAUSING HIDDEN WASHOUT THAT THIS INSPECTOR FELL THROUGH . ENSURE ALL POP-UP DRAINS ARE INSTALLED ON TOP OF SOD NOT BENEATH
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/09/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/09/25 ALONG BOTH PROPERTY LINES YOU NEED TO HAVE A DEEPER DRAINAGE CONVEYANCE YOU NEED TO BE .30 LOWER THAN YOUR OFFSET SHOTS OF THE ADJACENT PROPERTY TO ENSURE YOUR DRAINAGE DOES NOT NEGATIVELY IMPACT THE ADJACENT PROPERTIES ** LEFT SIDE OFF SCREEN ENCLOSURE YOU SHOW A PATIO TYPE STRUCTURE THAT IS NOT ON YOUR PROPOSED DRAINAGE PLAN ** ELEVATION SHOTS NEEDED ACROSS REER POOL STRUCTURE
ROW- PRE-APRON (PRE-POUR) 05/22/2025 APPROVED - AS NOTED EMADISON
Note: ** 05/22/25 READY TO SET PAVERS AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ______________________________________________________________________________________________________________________ 5/21/2025 - PREVIOUS INSPECTION NOTES ** 05/21/25 DRIVEWAY NEEDS TO BE COMPACTED IN MATERIAL IS TOO LOOSE IN A LARGE PORTION OF THE DRIVEWAY ** **** DO NOT SET ANY PAVERS UNTIL THE PRE-POUR INSPECTION HAS BEEN APPROVED **** _________________________________________________________________________________________________________________ 5/2/2025 - PREVIOUS INSPECTION NOTES AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW- PRE-APRON (PRE-POUR) 05/21/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 05/21/25 DRIVEWAY NEEDS TO BE COMPACTED IN MATERIAL IS TOO LOOSE IN A LARGE PORTION OF THE DRIVEWAY ** **** DO NOT SET ANY PAVERS UNTIL THE PRE-POUR INSPECTION HAS BEEN APPROVED **** _________________________________________________________________________________________________________________ 5/2/2025 - PREVIOUS INSPECTION NOTES AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW- PAVER RESTRAINTS 05/02/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW- PRE-APRON (PRE-POUR) 05/02/2025 PARTIALLY APPROVED TPOLACEK
Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
GRAVITY SEWER TEST 04/24/2025 Approval - Private Provider PPROVIDER
SEWER TIE IN 04/24/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 04/17/2025 Approval - Private Provider PPROVIDER
INSULATION 02/28/2025 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 02/24/2025 Approval - Private Provider PPROVIDER
ALL ROUGH 02/20/2025 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 01/21/2025 Approval - Private Provider PPROVIDER
WALL SHEATHING 01/17/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/17/2025 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 12/31/2024 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 11/19/2024 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 11/18/2024 APPROVED JMYERS
MONOLITHIC SLAB 10/23/2024 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 10/18/2024 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 10/01/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 11/12/2024 11/18/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM
ZON COMPLETE 11/12/2024 11/12/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/09/2024 09/09/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/09/2024 09/09/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON COMPLETE 09/09/2024 09/09/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 09/06/2024 09/09/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/06/2024 09/06/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 09/06/2024 09/06/2024
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM On the revised site plan, the left front setback has been whited out - unable to verify.
ZON COMPLETE 08/29/2024 08/29/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 HOLD 08/29/2024 08/30/2024
Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) Please add drainage from the structure to the rear of lot. 5% slope from the sod elevation at the structure for the first 10'. A 5% slope for 10’ totaling 0.5’ elevation difference perpendicular to the structure is a requirement of the Florida Building Code Section 1804.4 See revision clouds and notes on site plan
BADMIN COMPLETE 08/29/2024 09/05/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/29/2024 09/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
URB COMPLETE 08/23/2024 08/29/2024
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
BADMIN HOLD 08/22/2024 08/27/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Truss letter not accepted. approval stamp needs to be on the Truss layout from the truss manufacturer or the the truss packet. If wanting to use a letter, then the letter needs to be on engineer's letterhead, describe in details the project number, the truss manufactuer, the truss engineer, address etc... .The letter must state that it has been reviewed and is in accordance with their design. the letter must be digitally signed, sealed and verifiable
CUSVC COMPLETE 08/22/2024 08/26/2024
Note: Released By: LUCY NABICO - -
ENGIN1 COMPLETE 08/22/2024 08/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 08/22/2024 08/26/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 HOLD 08/22/2024 08/23/2024
Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) Please provide proposed elevations along rear property line even if matching existing. 2) Please provide proposed elevations showing drainge from the structure to the rear of the lot. 6" minimum slope from the structure for the first 10’. A 5% slope for 10’ totaling 0.5’ elevation difference perpendicular to the structure is a requirement of the Florida Building Code Section 1804.4
ZON HOLD 08/22/2024 08/23/2024
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Map Panel # on site plan is incorrect

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 30 ¤30.00 10/14/2025
SW ENG - REVIEW 20 ¤20.00 09/10/2024
SW ENG RES REVIEW 200 ¤200.00 09/10/2024
SEWER INSPECTION ¤25.00 09/10/2024
SITE PLAN 30 ¤30.00 09/10/2024
WATER-METER ¤514.49 09/10/2024
ADJUSTMENT 10% (¤84.12) 09/10/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/10/2024
ADMINISTRATIVE - RESID PP ¤225.00 09/10/2024
PLAN REVIEW - RESIDENTIAL ¤811.20 09/10/2024
CONNECTION FEES ¤25.00 09/10/2024
FC IMPACT FEE EMS ¤62.00 09/10/2024
IMPACT FEE FIRE ¤428.09 09/10/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 09/10/2024
FC IMPACT FEE LIBRARY ¤268.00 09/10/2024
IMPACT FEE PARKS ¤1,800.99 09/10/2024
IMPACT FEE SCHOOL ¤5,450.00 09/10/2024
IMPACT FEE TRANSPORTATION ¤3,404.00 09/10/2024
SURCHARGE FS 533.721 ¤9.82 09/10/2024
SURCHARGE - FS 468.631 ¤14.73 09/10/2024
SW ENG - FOUNDATION SURVEY ¤20.00 09/10/2024
SW ENG INSPECTION 80 ¤80.00 09/10/2024
SW ENG PRE APRON ¤30.00 09/10/2024
Fees Total Due: ¤0.00 Total Paid: ¤13,612.20