I want to search for...
Permit #2024081101
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00240-0180 |
| CONDITIONED SPACE: 2050 sqft |
| GARAGE: 481 sqft |
| ENCLOSE EXISTING PORCH TO LIVING : 386 sqft |
| OPENED PORCH (WITH ROOF) : 130 sqft |
| Total Square Footage: 3047 sqft |
| Block: 00240 |
| Subdivision: 7009 - |
| Job Phone: 386-627-0430 |
| Location Address: 38 FALLON LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/23/2024 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: GOLDEN FOX PROPERTIES LLC |
|
Address 72 HERNANDEZ AVE PALM COAST, FL 32137 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
SCOTT H STILLWELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4500 US 1 UNIT 206 BUNNELL, FL 32110 |
CAC1819433 (Exp: 08/31/2026) | 386-864-4404 |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CRC1332537 (Exp: 08/31/2026) | 386-445-7945 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/10/2025 | FINAL APPROVED | HCAMACHO |
| Note: | |||
| U-CROSS CONNECTION | 02/19/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: well irrigation-no crossvconnection | |||
| ROW - STORMWATER FINAL | 02/19/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/19/2025 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 02/13/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/13/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/13/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ELECTRIC - EARLY POWER | 01/31/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: House to garage door is installed *Inspected* | |||
| ROW- PRE-APRON (PRE-POUR) | 12/18/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 12/18/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| INSULATION | 12/06/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: No house to garage door installed, plywood in place. Once door is installed need to check for insulation and screws. | |||
| INSULATION | 12/03/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 12/3/24 1. No E-cals on site FBC 107.3.1 2. Garage entry door not installed 3. Wood frame walls (garage wall) calls for insulation of R19 12/2/2024 - PREVIOUS INSPECTION NOTES 12/2/24 1. Nail plate needed for dryer vent in garage area 2. Master Bath window needs to be sealed 3. 5' Head test failed FBCR P2503.5 4. Unused opening in kitchen area missing FS | |||
| INSULATION | 12/02/2024 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 12/2/24 1. Nail plate needed for dryer vent in garage area 2. Master Bath window needs to be sealed 3. 5' Head test failed FBCR P2503.5 4. Unused opening in kitchen area missing FS | |||
| ALL ROUGH | 11/27/2024 | APPROVED | HCAMACHO |
| Note: 11/22/2024 - PREVIOUS INSPECTION NOTES 11/22/24 1. Failed 5' Head test FBCR P2503.7 2. No water pressure in lines FBCR P2503.5 3. Duct work does not match energy calcs FBC(A) 107.4 4. Electrical plans calls for outdoor lights on front entry posts. No wires run. Please put in place or have a revised and approved electrical plan showing that no lights will be placed there. FBC(A) 107.4 5. No Product Approval's available FBC(A) 107.4 Inspector Notes from Inspection 2467 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2320 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2460 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2340 10/22/24 Missing ties on 3 of the vertical to horizontal rebar in bond beam (marked on plans) | |||
| GRAVITY SEWER TEST | 11/26/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 THIS WAS APPROVED ON 10/4/24, WATER SERVICE NOT RAN YET THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 11/26/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 THIS WAS APPROVED ON 10/4/24, WATER SERVICE NOT RAN YET THIS WAS A VIRTUAL INSPECTION | |||
| ALL ROUGH | 11/22/2024 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 11/22/24 1. Failed 5' Head test FBCR P2503.7 2. No water pressure in lines FBCR P2503.5 3. Duct work does not match energy calcs FBC(A) 107.4 4. Electrical plans calls for outdoor lights on front entry posts. No wires run. Please put in place or have a revised and approved electrical plan showing that no lights will be placed there. FBC(A) 107.4 5. No Product Approval's available FBC(A) 107.4 Inspector Notes from Inspection 2467 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2320 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2460 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2340 10/22/24 Missing ties on 3 of the vertical to horizontal rebar in bond beam (marked on plans) | |||
| ROOF VALLEY & METAL | 11/18/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2320 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2460 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2340 10/22/24 Missing ties on 3 of the vertical to horizontal rebar in bond beam (marked on plans) | |||
| LATH/BRICK/ WATER BARRIER | 11/12/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2460 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2340 10/22/24 Missing ties on 3 of the vertical to horizontal rebar in bond beam (marked on plans) | |||
| WALL SHEATHING | 11/06/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: Wall Sheathing is good, however next time donot cover up connectors before TieDown inspection is done. Inspector Notes from Inspection 2340 10/22/24 Missing ties on 3 of the vertical to horizontal rebar in bond beam (marked on plans) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/06/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2340 10/22/24 Missing ties on 3 of the vertical to horizontal rebar in bond beam (marked on plans) | |||
| ELECTRIC-TUG | 10/28/2024 | APPROVED | HCAMACHO |
| FOUND SURVEY APPROVED (OFFICE) | 10/23/2024 | APPROVED | JMYERS |
| TIE BEAM / LINTEL | 10/22/2024 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 10/22/24 Missing ties on 3 of the vertical to horizontal rebar in bond beam (marked on plans) | |||
| MONOLITHIC SLAB | 10/15/2024 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/07/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS APPROVED ON 10/4/24, WATER SERVICE NOT RAN YET | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 10/04/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 09/27/2024 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 09/04/2024 | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 12/04/2024 | 12/05/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/22/2024 | 11/26/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/19/2024 | 11/21/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/21/2024 | 10/23/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/21/2024 | 10/21/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 10/03/2024 | 10/03/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM A geo tech report and a geo tech certification are required to be submitted. You deferred the geo tech report at permit submittal. Please upload both and identify as the following: document type - Geo Tech Report - File name - Geo Tech Report document type - Geo Tech Certification - File name - Geo Tech Certification | |||
| BLD | HOLD | 10/03/2024 | 10/03/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. First Geo Tech letter has the wrong address on it. | |||
| BLD | COMPLETE | 10/03/2024 | 10/04/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/19/2024 | 09/20/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/19/2024 | 09/19/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | COMPLETE | 09/19/2024 | 09/19/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 09/11/2024 | 09/13/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Due to survey elevation inconsistencies - a site meeting between COPC survey crew and Survey Data Solutions will be held on Wed Sept 18 at 10:00 | |||
| ZON | COMPLETE | 09/11/2024 | 09/11/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 09/06/2024 | 09/06/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Site benchmark nail has is no longer there. Please resetablish benchmark and submit updated survey/site plan. | |||
| ZON | HOLD | 09/05/2024 | 09/05/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Circular arc of driveway must meet a minimum 5ft setback from bottom of arc to front property line. Please show this on site plan | |||
| MECH | COMPLETE | 09/05/2024 | 09/11/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/05/2024 | 09/05/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| BLD | COMPLETE | 09/05/2024 | 09/07/2024 |
| Note: Released By: JPI | |||
| BADMIN | COMPLETE | 09/05/2024 | 09/09/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/05/2024 | 09/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/27/2024 | 10/29/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 08/27/2024 | 09/04/2024 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 09/04/24 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. | |||
| BADMIN | HOLD | 08/26/2024 | 09/03/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Truss packet or truss layout need to have shop drawing approval stamp by EOR | |||
| BLD | HOLD | 08/26/2024 | 08/29/2024 |
| Note: Held By: JPI 1. 4103-R12 is Pending FBC Approval. Nothing on 4103R-11 specified. (Aluminum Roof Vent) NOA 23-0213.02 Approved. Please choose a different product or provide an update on the approval. 107.2.4 | |||
| CUSVC | COMPLETE | 08/26/2024 | 08/27/2024 |
| Note: Released By: PAMELA MILLER - - | |||
| ELEC | COMPLETE | 08/26/2024 | 09/03/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/26/2024 | 08/27/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 08/26/2024 | 08/29/2024 |
| LOCATE | COMPLETE | 08/26/2024 | 08/28/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/26/2024 | 08/29/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition 2. Design location on heatload needs to be Daytona Beach to match energy calcs | |||
| SW1 | HOLD | 08/26/2024 | 08/29/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) Please remove the proposed flow arrows from the drainage easement. Water will flow from the site to the ditch, then northeast through the triple pipes under Fallon Lane. 2) Please check the triple pipes under Fallon Lane. Record shows these pipes as 18" HDPE | |||
| ZON | HOLD | 08/26/2024 | 08/27/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Driveway layout on site plan and landscape plan do not match Turnarounds must be 9x18 Please correct whichever is incorrect Left side windows facing right of way must have banding Color sheet states shingle roof, plans show a tile roof please correct whichever is incorrect |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 12/05/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/05/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/05/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/05/2024 |
| CONNECTION FEES | ¤1,187.26 | 09/23/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 09/23/2024 |
| IMPACT FEE FIRE | ¤428.09 | 09/23/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 09/23/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 09/23/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 09/23/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 09/23/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 09/23/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/23/2024 |
| SURCHARGE FS 533.721 | ¤13.17 | 09/23/2024 |
| SURCHARGE - FS 468.631 | ¤19.75 | 09/23/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/23/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/23/2024 |
| SW ENG PRE APRON | ¤30.00 | 09/23/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/23/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/23/2024 |
| SEWER CREDIT | (¤54.00) | 09/23/2024 |
| SEWER INSPECTION | ¤25.00 | 09/23/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 09/23/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 09/23/2024 |
| SITE PLAN 30 | ¤30.00 | 09/23/2024 |
| WATER- TURN ON | ¤25.00 | 09/23/2024 |
| ADJUSTMENT 10% | (¤146.32) | 09/23/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/23/2024 |
| INSPECTION - RESIDENTIAL | ¤1,116.50 | 09/23/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤316.68 | 09/23/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤23,651.28 |