I want to search for...

Permit #2024081101

Permit Details

Status: COED

Parcel Id: 07-11-31-7009-00240-0180
CONDITIONED SPACE: 2050 sqft
GARAGE: 481 sqft
ENCLOSE EXISTING PORCH TO LIVING : 386 sqft
OPENED PORCH (WITH ROOF) : 130 sqft
Total Square Footage: 3047 sqft
Block: 00240
Subdivision: 7009 -
Job Phone: 386-627-0430
Location Address: 38 FALLON LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/23/2024
NOC: RECORDED
Applicant name: ANNA WIKTORIA LISOWSKI
Owner: GOLDEN FOX PROPERTIES LLC

Address

72 HERNANDEZ AVE

PALM COAST, FL 32137

Lot: 0180
Contracted Stated Job Value: ¤350,000.00
Job Description: Single Family Residence
Type: CN

Contractor

GOLDEN FOX HOME REMODELING, INC
Status Location Address State License Number Phone
ACTIVE

72 HERNANDEZ AVE

PALM COAST, FL 32137

CBC1259266 (Exp: 08/31/2026) 386-627-0430

Sub Contractors

JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
SCOTT H STILLWELL
Status Location Address State License Number Phone
ACTIVE

4500 US 1 UNIT 206

BUNNELL, FL 32110

CAC1819433 (Exp: 08/31/2026) 386-864-4404
WILLIAM TODD SIKES
Status Location Address State License Number Phone
ACTIVE

83 PORT ROYAL DR

ST AUGUSTINE, FL 32084

EC0002726 (Exp: 08/31/2026) 904-762-8762
CHRISTOPHER DANIEL FULTON
Status Location Address Mailing Address State License Number Phone
ACTIVE

2 MARKET PLACE

PALM COAST, FL 32137

UNIT D

PALM COAST, FL 32137

CRC1332537 (Exp: 08/31/2026) 386-445-7945

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/10/2025 FINAL APPROVED HCAMACHO
Note:
U-CROSS CONNECTION 02/19/2025 APPROVED - AS NOTED LFITZGERALD
Note: well irrigation-no crossvconnection
ROW - STORMWATER FINAL 02/19/2025 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
U -UTILITY RESIDENTIAL FINAL 02/19/2025 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 02/13/2025 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/13/2025 APPROVED PFLANAGAN
Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 02/13/2025 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ELECTRIC - EARLY POWER 01/31/2025 APPROVED - AS NOTED HCAMACHO
Note: House to garage door is installed *Inspected*
ROW- PRE-APRON (PRE-POUR) 12/18/2024 APPROVED - AS NOTED EMADISON
Note: ** 12/18/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
INSULATION 12/06/2024 APPROVED - AS NOTED HCAMACHO
Note: No house to garage door installed, plywood in place. Once door is installed need to check for insulation and screws.
INSULATION 12/03/2024 Disapproved -FEE REQUIRED MKRASKI
Note: 12/3/24 1. No E-cals on site FBC 107.3.1 2. Garage entry door not installed 3. Wood frame walls (garage wall) calls for insulation of R19 12/2/2024 - PREVIOUS INSPECTION NOTES 12/2/24 1. Nail plate needed for dryer vent in garage area 2. Master Bath window needs to be sealed 3. 5' Head test failed FBCR P2503.5 4. Unused opening in kitchen area missing FS
INSULATION 12/02/2024 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 12/2/24 1. Nail plate needed for dryer vent in garage area 2. Master Bath window needs to be sealed 3. 5' Head test failed FBCR P2503.5 4. Unused opening in kitchen area missing FS
ALL ROUGH 11/27/2024 APPROVED HCAMACHO
Note: 11/22/2024 - PREVIOUS INSPECTION NOTES 11/22/24 1. Failed 5' Head test FBCR P2503.7 2. No water pressure in lines FBCR P2503.5 3. Duct work does not match energy calcs FBC(A) 107.4 4. Electrical plans calls for outdoor lights on front entry posts. No wires run. Please put in place or have a revised and approved electrical plan showing that no lights will be placed there. FBC(A) 107.4 5. No Product Approval's available FBC(A) 107.4 Inspector Notes from Inspection 2467 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2320 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2460 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2340 10/22/24 Missing ties on 3 of the vertical to horizontal rebar in bond beam (marked on plans)
GRAVITY SEWER TEST 11/26/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 THIS WAS APPROVED ON 10/4/24, WATER SERVICE NOT RAN YET THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 11/26/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 THIS WAS APPROVED ON 10/4/24, WATER SERVICE NOT RAN YET THIS WAS A VIRTUAL INSPECTION
ALL ROUGH 11/22/2024 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 11/22/24 1. Failed 5' Head test FBCR P2503.7 2. No water pressure in lines FBCR P2503.5 3. Duct work does not match energy calcs FBC(A) 107.4 4. Electrical plans calls for outdoor lights on front entry posts. No wires run. Please put in place or have a revised and approved electrical plan showing that no lights will be placed there. FBC(A) 107.4 5. No Product Approval's available FBC(A) 107.4 Inspector Notes from Inspection 2467 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2320 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2460 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2340 10/22/24 Missing ties on 3 of the vertical to horizontal rebar in bond beam (marked on plans)
ROOF VALLEY & METAL 11/18/2024 APPROVED - AS NOTED HCAMACHO
Note: 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2320 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2460 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2340 10/22/24 Missing ties on 3 of the vertical to horizontal rebar in bond beam (marked on plans)
LATH/BRICK/ WATER BARRIER 11/12/2024 APPROVED - AS NOTED HCAMACHO
Note: 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2460 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2340 10/22/24 Missing ties on 3 of the vertical to horizontal rebar in bond beam (marked on plans)
WALL SHEATHING 11/06/2024 APPROVED - AS NOTED HCAMACHO
Note: Wall Sheathing is good, however next time donot cover up connectors before TieDown inspection is done. Inspector Notes from Inspection 2340 10/22/24 Missing ties on 3 of the vertical to horizontal rebar in bond beam (marked on plans)
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/06/2024 APPROVED - AS NOTED HCAMACHO
Note: 1. Several Studs are missing SP1 and SP2 on garage bearing wall. 2. Missing Tap Cons on Framed wall at front entry on the left, attaching the framing to the block. See plan detail, marked. 3. T06, T07,T08, T09 are cut at wall on top of Front door. Need engineer letter with approved repair or allowance. Please have it submitted and approved by Rough inspection. Will check at Rough Inspection Inspector Notes from Inspection 2340 10/22/24 Missing ties on 3 of the vertical to horizontal rebar in bond beam (marked on plans)
ELECTRIC-TUG 10/28/2024 APPROVED HCAMACHO
FOUND SURVEY APPROVED (OFFICE) 10/23/2024 APPROVED JMYERS
TIE BEAM / LINTEL 10/22/2024 APPROVED - AS NOTED MCONTRYMAN
Note: 10/22/24 Missing ties on 3 of the vertical to horizontal rebar in bond beam (marked on plans)
MONOLITHIC SLAB 10/15/2024 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 10/07/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS APPROVED ON 10/4/24, WATER SERVICE NOT RAN YET
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 10/04/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 09/27/2024 APPROVED CBOWERMASTER
WILDLIFE CHECK - ENVIRONMENTAL 09/04/2024 DRODRIGUEZ

Review History

Department Status Date In Date Out
MECH COMPLETE 12/04/2024 12/05/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 11/22/2024 11/26/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 11/19/2024 11/21/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/21/2024 10/23/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM
ZON COMPLETE 10/21/2024 10/21/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BADMIN INFORMATION 10/03/2024 10/03/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM A geo tech report and a geo tech certification are required to be submitted. You deferred the geo tech report at permit submittal. Please upload both and identify as the following: document type - Geo Tech Report - File name - Geo Tech Report document type - Geo Tech Certification - File name - Geo Tech Certification
BLD HOLD 10/03/2024 10/03/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. First Geo Tech letter has the wrong address on it.
BLD COMPLETE 10/03/2024 10/04/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/19/2024 09/20/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/19/2024 09/19/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON COMPLETE 09/19/2024 09/19/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 HOLD 09/11/2024 09/13/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Due to survey elevation inconsistencies - a site meeting between COPC survey crew and Survey Data Solutions will be held on Wed Sept 18 at 10:00
ZON COMPLETE 09/11/2024 09/11/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 HOLD 09/06/2024 09/06/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Site benchmark nail has is no longer there. Please resetablish benchmark and submit updated survey/site plan.
ZON HOLD 09/05/2024 09/05/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Circular arc of driveway must meet a minimum 5ft setback from bottom of arc to front property line. Please show this on site plan
MECH COMPLETE 09/05/2024 09/11/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/05/2024 09/05/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
BLD COMPLETE 09/05/2024 09/07/2024
Note: Released By: JPI
BADMIN COMPLETE 09/05/2024 09/09/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/05/2024 09/05/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SWALE COMPLETE 08/27/2024 10/29/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLENV COMPLETE 08/27/2024 09/04/2024
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 09/04/24 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.
BADMIN HOLD 08/26/2024 09/03/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Truss packet or truss layout need to have shop drawing approval stamp by EOR
BLD HOLD 08/26/2024 08/29/2024
Note: Held By: JPI 1. 4103-R12 is Pending FBC Approval. Nothing on 4103R-11 specified. (Aluminum Roof Vent) NOA 23-0213.02 Approved. Please choose a different product or provide an update on the approval. 107.2.4
CUSVC COMPLETE 08/26/2024 08/27/2024
Note: Released By: PAMELA MILLER - -
ELEC COMPLETE 08/26/2024 09/03/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/26/2024 08/27/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 08/26/2024 08/29/2024
LOCATE COMPLETE 08/26/2024 08/28/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 08/26/2024 08/29/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition 2. Design location on heatload needs to be Daytona Beach to match energy calcs
SW1 HOLD 08/26/2024 08/29/2024
Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) Please remove the proposed flow arrows from the drainage easement. Water will flow from the site to the ditch, then northeast through the triple pipes under Fallon Lane. 2) Please check the triple pipes under Fallon Lane. Record shows these pipes as 18" HDPE
ZON HOLD 08/26/2024 08/27/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Driveway layout on site plan and landscape plan do not match Turnarounds must be 9x18 Please correct whichever is incorrect Left side windows facing right of way must have banding Color sheet states shingle roof, plans show a tile roof please correct whichever is incorrect

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 12/05/2024
REINSPECTION RESIDENTIAL ¤40.00 12/05/2024
REINSPECTION RESIDENTIAL ¤40.00 12/05/2024
REINSPECTION RESIDENTIAL ¤40.00 12/05/2024
CONNECTION FEES ¤1,187.26 09/23/2024
FC IMPACT FEE EMS ¤62.00 09/23/2024
IMPACT FEE FIRE ¤428.09 09/23/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 09/23/2024
FC IMPACT FEE LIBRARY ¤268.00 09/23/2024
IMPACT FEE PARKS ¤1,800.99 09/23/2024
IMPACT FEE SCHOOL ¤5,450.00 09/23/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 09/23/2024
WATER -IRRIGATION INSPECTION ¤25.00 09/23/2024
SURCHARGE FS 533.721 ¤13.17 09/23/2024
SURCHARGE - FS 468.631 ¤19.75 09/23/2024
SW ENG - FOUNDATION SURVEY ¤20.00 09/23/2024
SW ENG INSPECTION 80 ¤80.00 09/23/2024
SW ENG PRE APRON ¤30.00 09/23/2024
SW ENG - REVIEW 20 ¤20.00 09/23/2024
SW ENG RES REVIEW 200 ¤200.00 09/23/2024
SEWER CREDIT (¤54.00) 09/23/2024
SEWER INSPECTION ¤25.00 09/23/2024
SEWER CAPITAL FACILITY ¤6,120.52 09/23/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 09/23/2024
SITE PLAN 30 ¤30.00 09/23/2024
WATER- TURN ON ¤25.00 09/23/2024
ADJUSTMENT 10% (¤146.32) 09/23/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/23/2024
INSPECTION - RESIDENTIAL ¤1,116.50 09/23/2024
PLAN REVIEW - RESIDENTIAL ¤316.68 09/23/2024
Fees Total Due: ¤0.00 Total Paid: ¤23,651.28