I want to search for...
Permit #2024081319
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7057-00050-0070 |
| Total Square Footage: 506 sqft |
| Block: 00050 |
| Subdivision: 7057 - |
| Job Phone: 386-225-1722 |
| Location Address: 18 UTHORNE PL |
| Type: PO - POOL |
| Issue Date: 09/11/2024 |
| NOC: RECORDED |
| Applicant name: MICHAEL MARINO HANSEN |
| Owner: HORWATH JOHN S & ROSE ANNA MARIE H&W |
|
Address 18 UTHORNE PLACE PALM COAST, FL 32164 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤67,838.00 |
| Job Description: Pool and Enclosure |
| Type: CN |
Contractor
PALM COAST POOLS, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
29 COLUMBUS CT PALM COAST, FL 32137 |
RP252555609 (Exp: 08/31/2027) | 386-225-1722 |
Sub Contractors
BENJAMIN D DEWITT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
356 UNDERWOOD TRAIL PALM COAST, FL 32164 |
ER13016065 (Exp: 08/31/2026) | 321-262-4104 |
WESLEY KIRKLAND CORDELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
873 HULL RD UNIT 20 ORMOND BEACH, FL 32174 |
SCC131151505 (Exp: 08/31/2026) | 386-852-2209 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 03/07/2025 | FINAL APPROVED | MCONTRYMAN |
| ROW - FINAL INSPECTION | 03/06/2025 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. Inspector Notes from Inspection 9200 3/5/25 MET ON SITE WITH BUILDER TO LOOK AT GRADING FOR SWALE REPAIR. AT THE TIME OF THIS INSPECTION IT WAS IN LINE WITH WHAT WE REQUIRE. HE WILL BE LAYING SOD TODAY AND WILL PUT IN FOR ROW FINAL TOMORROW. AS LONG AS SOD IS LAID TO GRADE IT SHOULD BE ACCEPTABLE AND MEET COPC MINIMUM REQUIREMENTS. PHOTO FOR REFERENCE. _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9200 2/27/25 MET ON SITE WITH POOL BUILDER AND RESIDENTS TO DISCUSS MOVING FORWARD. DISCUSSED COPC REQUIREMENTS AND A DETERMINED A COURSE OF ACTION TO MOVE FORWARD. BUILDER WILL BE DIGGING OUT, COMPACTING, SLOPING AND GRADING AREA IN QUESTION ON LEFT SIDE OF CULVERT. SOD WILL BE LAID TO MATCH GRADE AND ALLOW POSITIVE DRAINAGE FLOW IN THE COPC SWALE SYSTEM. LET BUILDER KNOW TO FEEL FREE TO CONTACT ME WHEN THEY GET IT GRADED AND I WILL TAKE A LOOK AT IT BEFORE THEY LAY THE SOD. HOMEOWNERS WERE IN AGREEMENT OF THE PLAN TO MOVE FORWARD. | |||
| ROW- PROJECT STATUS | 03/05/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/5/25 MET ON SITE WITH BUILDER TO LOOK AT GRADING FOR SWALE REPAIR. AT THE TIME OF THIS INSPECTION IT WAS IN LINE WITH WHAT WE REQUIRE. HE WILL BE LAYING SOD TODAY AND WILL PUT IN FOR ROW FINAL TOMORROW. AS LONG AS SOD IS LAID TO GRADE IT SHOULD BE ACCEPTABLE AND MEET COPC MINIMUM REQUIREMENTS. PHOTO FOR REFERENCE. _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9200 2/27/25 MET ON SITE WITH POOL BUILDER AND RESIDENTS TO DISCUSS MOVING FORWARD. DISCUSSED COPC REQUIREMENTS AND A DETERMINED A COURSE OF ACTION TO MOVE FORWARD. BUILDER WILL BE DIGGING OUT, COMPACTING, SLOPING AND GRADING AREA IN QUESTION ON LEFT SIDE OF CULVERT. SOD WILL BE LAID TO MATCH GRADE AND ALLOW POSITIVE DRAINAGE FLOW IN THE COPC SWALE SYSTEM. LET BUILDER KNOW TO FEEL FREE TO CONTACT ME WHEN THEY GET IT GRADED AND I WILL TAKE A LOOK AT IT BEFORE THEY LAY THE SOD. HOMEOWNERS WERE IN AGREEMENT OF THE PLAN TO MOVE FORWARD. | |||
| ROW- PROJECT STATUS | 02/27/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/27/25 MET ON SITE WITH POOL BUILDER AND RESIDENTS TO DISCUSS MOVING FORWARD. DISCUSSED COPC REQUIREMENTS AND A DETERMINED A COURSE OF ACTION TO MOVE FORWARD. BUILDER WILL BE DIGGING OUT, COMPACTING, SLOPING AND GRADING AREA IN QUESTION ON LEFT SIDE OF CULVERT. SOD WILL BE LAID TO MATCH GRADE AND ALLOW POSITIVE DRAINAGE FLOW IN THE COPC SWALE SYSTEM. LET BUILDER KNOW TO FEEL FREE TO CONTACT ME WHEN THEY GET IT GRADED AND I WILL TAKE A LOOK AT IT BEFORE THEY LAY THE SOD. HOMEOWNERS WERE IN AGREEMENT OF THE PLAN TO MOVE FORWARD. | |||
| ROW - FINAL INSPECTION | 02/26/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 2/26/25 RECEIVED A CALL FROM POOL CM WHO STATED THAT THEY HAD DRAGGED A TIRE THRU THE CULVERT TO CLEAN IT OUT OF DIRT/DEBRIS AND THAT THERE WAS A LITTLE BIT OF MUD THAT THEY DID NOT REMOVE. I TOLD HIM I WOULD TAKE A LOOK AT IT AND DETERMINE IF IT WAS TO COPC STANDARDS. UPON ARRIVING I FOUND THAT THE RIGHT SIDE WAS NOT IN COMPLIANCE TO THE COPCC STANDARD OF RETURNED TO AS GOOD OR BETTER CONDITION. THE SWALE HAS A SMALL TRENCH AND IS COVERED WITH MUD ATOP THE SOD NOT MEETING OUR SWALE PLAN DIAGRAM REQUIREMENTS. THE EDGE OF PAVEMENT SOD IS HIGHER THAN ALLOWED BY THE COPC STANDARD OF 2" BELOW GRADE COMPACTED DIRT AND SOD TO FLUSH WITH EOP TO ALLOW ROAD DRAINAGE TO FLOW UNIMPEDED INTO SWALE SYSTEM. THE CONTRACTOR ALSO SPREAD DIRT FROM THE CULVERT INTO THE MEDIAN. YOU WILL BE REQUIRED TO MAKE THE REQUIRED CORRECTIONS TO THE COPC STANDARDS BEFORE ROW FINAL PASSAGE, REPAIR SWALE CORRECTLY, REMOVE MUD/DEBRIS AND GRADE SOD TO ALLOW DRAINGE TO HAVE POSITIVE FLOW FROMLEFT TO RIGHT. PHOTOS FOR REFERENCE. SWALE PROFILE / RESIDENTIAL SWALE PROFILE DRAWING 300.D 4) MATCH SOD TO EXISTING LAWNS. *SWALE PROFILE / RESIDENTIAL SWALE PROFILE DRAWING 300.D 6) DISPOSE OF EXCESS EXCAVATED MATERIAL IN A APPROVED MANNER. *SWALE PROFILE / RESIDENTIAL SWALE PROFILE DRAWING 300.D 8) FINISH GRADE TO BE 2 INCHES BELOW THE EDGE OF THE PAVEMENT BEFORE THE SOD IS LAID *SWALE PROFILE / RESIDENTIAL SWALE PROFILE DRAWING 300.D 10) BOTTON OF THE SWALE NEED TO BE 12" WIDE 2/18/2025 - PREVIOUS INSPECTION NOTES ** 02/18/25 AS NOTED IN THE PREVIOUS INSPECTION BUILDER NEEDS TO CLEAN THE ENTIRE CULVERT PIPE OF MUD AND SEDIENT THAT HAD WAHED INTO THE CULVERT DURING THE POOL CONSTRUCTION PROJECT THERE IS APPROXIMATELY 6 INCHES OF MATERIAL INSIDE CULVERT ** RIGHT SIDE BUILDER NEEDS TO LOWER SOD SO THE SOD ELEVATION MATCHES THE EXISTING GRADE YOU NOTE WHITE PAINT IN (ROW) SWALE WHERE YOU NEED TO LOWER AS CURRENTLY THE ELEVATION GRADUALLY GETS HIGHER. ________________________________________________________________________________________________________________________ INSPECTORS NOTE. POOL BUILDER WILL BE RESPONSIBLE TO MAKE SURE CULVERT PIPE IS COMPLETELY CLEANED OUT BEFORE ROW FINAL PASSAGE. | |||
| ROW - FINAL INSPECTION | 02/18/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 02/18/25 AS NOTED IN THE PREVIOUS INSPECTION BUILDER NEEDS TO CLEAN THE ENTIRE CULVERT PIPE OF MUD AND SEDIENT THAT HAD WAHED INTO THE CULVERT DURING THE POOL CONSTRUCTION PROJECT THERE IS APPROXIMATELY 6 INCHES OF MATERIAL INSIDE CULVERT ** RIGHT SIDE BUILDER NEEDS TO LOWER SOD SO THE SOD ELEVATION MATCHES THE EXISTING GRADE YOU NOTE WHITE PAINT IN (ROW) SWALE WHERE YOU NEED TO LOWER AS CURRENTLY THE ELEVATION GRADUALLY GETS HIGHER. ________________________________________________________________________________________________________________________ INSPECTORS NOTE. POOL BUILDER WILL BE RESPONSIBLE TO MAKE SURE CULVERT PIPE IS COMPLETELY CLEANED OUT BEFORE ROW FINAL PASSAGE. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/18/2025 | FINAL APPROVED | BWRIGHT |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/14/2025 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/14/2025 | APPROVED | FSLADISH |
| Note: 2/14/25 UPON WALKING PROPERTY DETERMINED DRAINAGE WILL WORK. BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ELECTRIC AND ALARM | 11/26/2024 | APPROVED | BTAYLOR |
| ELECTRIC AND ALARM | 11/21/2024 | CANCELLED BY APPLICANT | WEB |
| POOL DECK | 10/15/2024 | APPROVED | MKRASKI |
| STEEL AND GROUND | 09/16/2024 | APPROVED | MKRASKI |
| WILDLIFE CHECK - ENVIRONMENTAL | 09/06/2024 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 08/30/2024 | 09/05/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/30/2024 | 09/05/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/30/2024 | 09/05/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/30/2024 | 09/05/2024 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/30/2024 | 08/30/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 08/30/2024 | 09/06/2024 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 09/06/24 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 03/06/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 03/06/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/11/2024 |
| SITE PLAN 30 | ¤30.00 | 09/11/2024 |
| ADJUSTMENT 10% | (¤25.50) | 09/11/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/11/2024 |
| INSPECTION- POOL | ¤160.00 | 09/11/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 09/11/2024 |
| SURCHARGE FS 533.721 | ¤2.30 | 09/11/2024 |
| SURCHARGE - FS 468.631 | ¤3.44 | 09/11/2024 |
| SW ENG INSPECTION 40 | ¤40.00 | 09/11/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤365.24 |