I want to search for...
Permit #2024090004
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00180-0110 |
| GARAGE: 539 sqft |
| OPENED PORCH (WITH ROOF) : 425 sqft |
| ENCLOSE EXISTING PORCH TO LIVING : 151 sqft |
| CONDITIONED SPACE: 2570 sqft |
| Total Square Footage: 3685 sqft |
| Subdivision: 2302 - SECTION 28-PINE GROVE |
| Job Phone: 386-569-7882 |
| Location Address: 2 POPPY PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/31/2024 |
| NOC: RECORDED |
| Applicant name: VLADIMIR V PEREPECHKIN |
| Owner: SANCHEZ, MICHAEL MENEDEZ & PEREPECHKIN, KATRIN |
|
Address 77 SOUTHLAKE DR PALM COAST, FL 32137 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
WISE CHOICE CUSTOM HOMES, INC.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
77 SOUTHLAKE DR PALM COAST, FL 32137 |
CRC1328738 (Exp: 08/31/2026) | 386-569-7882 |
Sub Contractors
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
MAXIM BUDNIK
| Status | Location Address | State License Number |
| ACTIVE |
3 WAVECREST PL PALM COAST, FL 32164 |
CAC1818445 (Exp: 08/31/2026) |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/31/2025 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 10/30/2025 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Light over tub in master bathroom can not be within 8' of tub rail (vertical) NEC 410.10(D)(2) 2. Front cloumb lights need to be sealed where romex emerges from brick face 3. 3' working clearence for ODU disconnect 4. Seal wall penitrations under outdoor kitchen 5. Loos outlet under outdoor sink 6. Rear outlet on lani not GFCI 7. Secure PVC under pool panel glue and locknut required for male adapter 8. Conduit for irrigation line must be sealed at wall penitration 9. Ceiling and wall penitrations in garage must be sealed for fire seperation 10. Outdoor soffit power (for future) must have an approved water proof cover (left front corner of garage) 11. Trim our all attic access's 12. Light not working in master right side closet 13. AHU breaker lock or disconnect required 14. Missing notice to owner sticker on elec panel for AHU in attic 15. No fall for condensation line in attic for AHU 16. AHU aux pan does not have a float switch Make ALL repairs | |||
| ROW - STORMWATER FINAL | 10/29/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 10/28/2025 - PREVIOUS INSPECTION NOTES 10-28-25 TPOLACEK*** BUILDER NEEDS TO MAKE A FEW CORRECTIONS, ALL SOD ALONG ROAD EDGE MUST BE BELOW EDGEOF PAVEMENT, LEFT SIDE PROPERTY LINE SOD MUST MATCH GRADE, CULVERT PIPE NEEDS TO BE CLEAR OF ALL SEDIMENT. * SWALE PROFILE / RESIDENTIAL SWALE PROFILE DRAWING 300.D 8) FINISH GRADE TO BE 2 INCHES BELOW THE EDGE OF THE PAVEMENT BEFORE THE SOD IS LAID * SWALE PROFILE / RESIDENTIAL SWALE PROFILE DRAWING 300.D 4) MATCH SOD TO EXISTING LAWNS. SWALE PLAN 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. Inspector Notes from Inspection 9465 10=27-25 TPOLACEK*** COPC WILL BE REGRADING FROM RIGHT SIDE PROPERTY LINE TO SPILLWAY AND THAT SHOULD HELP WITH POOLING WATER ALONG RIGHT SIDE BACK SWALE. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 10/28/2025 | FINAL APPROVED | BHAINES |
| Note: Inspector Notes from Inspection 9035 No CC, IRR using well | |||
| ROW - FINAL APRON (AFTER POUR) | 10/28/2025 | APPROVED | TPOLACEK |
| Note: 10-28-25 TPOLACEK** PAVERS ARE SET, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 10=27-25 TPOLACEK*** COPC WILL BE REGRADING FROM RIGHT SIDE PROPERTY LINE TO SPILLWAY AND THAT SHOULD HELP WITH POOLING WATER ALONG RIGHT SIDE BACK SWALE. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 10/28/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 10-28-25 TPOLACEK*** BUILDER NEEDS TO MAKE A FEW CORRECTIONS, ALL SOD ALONG ROAD EDGE MUST BE BELOW EDGEOF PAVEMENT, LEFT SIDE PROPERTY LINE SOD MUST MATCH GRADE, CULVERT PIPE NEEDS TO BE CLEAR OF ALL SEDIMENT. * SWALE PROFILE / RESIDENTIAL SWALE PROFILE DRAWING 300.D 8) FINISH GRADE TO BE 2 INCHES BELOW THE EDGE OF THE PAVEMENT BEFORE THE SOD IS LAID * SWALE PROFILE / RESIDENTIAL SWALE PROFILE DRAWING 300.D 4) MATCH SOD TO EXISTING LAWNS. SWALE PLAN 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. Inspector Notes from Inspection 9465 10=27-25 TPOLACEK*** COPC WILL BE REGRADING FROM RIGHT SIDE PROPERTY LINE TO SPILLWAY AND THAT SHOULD HELP WITH POOLING WATER ALONG RIGHT SIDE BACK SWALE. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/27/2025 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/27/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 10=27-25 TPOLACEK*** COPC WILL BE REGRADING FROM RIGHT SIDE PROPERTY LINE TO SPILLWAY AND THAT SHOULD HELP WITH POOLING WATER ALONG RIGHT SIDE BACK SWALE. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U-CROSS CONNECTION | 10/21/2025 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, IRR using well | |||
| ELECTRIC - EARLY POWER | 09/30/2025 | APPROVED | RMARTIN |
| Note: 9/29/2025 - PREVIOUS INSPECTION NOTES 9/29/25: Cancelled by Applicant via text at @ 0751. | |||
| ELECTRIC - EARLY POWER | 09/29/2025 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/29/2025 8:05:56 AM *** 9/29/25: Cancelled by Applicant via text at @ 0751. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/19/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 09-19-25 TPOLACEK*** ON LEFT SIDE OF DRIVEWAY BEHIOND THE MITERED END MARKED IN PINK PAINT THERE IS A LOW AREA OF FOOTER. PLEASE RAISE THIS AREA TO GRADE BEFORE LAYING PAVERS. APPROVED TO LAY PAVERS ONCE NOTES ARE CORRECTED. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 9/15/2025 - PREVIOUS INSPECTION NOTES AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 9/12/2025 - PREVIOUS INSPECTION NOTES 09-12-25 TPOLACEK*** SITE IS WASHED OUT AND UNDER WATER. (SEE PHOTOS) PAVERS MUST BE REMOVED FROMTHE ROW ASAP. THERE CANNOT BE ANY CONSTRUCTION MATERIALS STORED IN THE ROW AS THEY POSE A DANGER TO VEHICLES. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/11/2025 - PREVIOUS INSPECTION NOTES 09-11-25 TPOLACEK*** THE APPROVED SITE PLAN INDICATES A PAVER DRIVEWAY. THE BUILDER IS REQUIRED TO MAKE A SELCTION ON THE COPC OPTION PAGE FOR THE PAVER DEATIL OF CHOICE. I HAVE ATTACHED A PHOTO OF THE PAVER DETAIL SHEET SO THE BUILDER CAN SEE WHAT IT LOOKS LIKE. PLEASE CIRCLE THE CHOICE AND UPLOAD DOCUMENT INTO THE PERMIT. DRIVEWAY CANNOT BE INSPECTED WITHOUT THE DOCUMENT AND THE OPTION CHOSEN. | |||
| ROW- PAVER RESTRAINTS | 09/15/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 09/15/2025 | PARTIALLY APPROVED | TPOLACEK |
| Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 9/12/2025 - PREVIOUS INSPECTION NOTES 09-12-25 TPOLACEK*** SITE IS WASHED OUT AND UNDER WATER. (SEE PHOTOS) PAVERS MUST BE REMOVED FROMTHE ROW ASAP. THERE CANNOT BE ANY CONSTRUCTION MATERIALS STORED IN THE ROW AS THEY POSE A DANGER TO VEHICLES. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/11/2025 - PREVIOUS INSPECTION NOTES 09-11-25 TPOLACEK*** THE APPROVED SITE PLAN INDICATES A PAVER DRIVEWAY. THE BUILDER IS REQUIRED TO MAKE A SELCTION ON THE COPC OPTION PAGE FOR THE PAVER DEATIL OF CHOICE. I HAVE ATTACHED A PHOTO OF THE PAVER DETAIL SHEET SO THE BUILDER CAN SEE WHAT IT LOOKS LIKE. PLEASE CIRCLE THE CHOICE AND UPLOAD DOCUMENT INTO THE PERMIT. DRIVEWAY CANNOT BE INSPECTED WITHOUT THE DOCUMENT AND THE OPTION CHOSEN. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/12/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 09-12-25 TPOLACEK*** SITE IS WASHED OUT AND UNDER WATER. (SEE PHOTOS) PAVERS MUST BE REMOVED FROMTHE ROW ASAP. THERE CANNOT BE ANY CONSTRUCTION MATERIALS STORED IN THE ROW AS THEY POSE A DANGER TO VEHICLES. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/11/2025 - PREVIOUS INSPECTION NOTES 09-11-25 TPOLACEK*** THE APPROVED SITE PLAN INDICATES A PAVER DRIVEWAY. THE BUILDER IS REQUIRED TO MAKE A SELCTION ON THE COPC OPTION PAGE FOR THE PAVER DEATIL OF CHOICE. I HAVE ATTACHED A PHOTO OF THE PAVER DETAIL SHEET SO THE BUILDER CAN SEE WHAT IT LOOKS LIKE. PLEASE CIRCLE THE CHOICE AND UPLOAD DOCUMENT INTO THE PERMIT. DRIVEWAY CANNOT BE INSPECTED WITHOUT THE DOCUMENT AND THE OPTION CHOSEN. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/11/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 09-11-25 TPOLACEK*** THE APPROVED SITE PLAN INDICATES A PAVER DRIVEWAY. THE BUILDER IS REQUIRED TO MAKE A SELCTION ON THE COPC OPTION PAGE FOR THE PAVER DEATIL OF CHOICE. I HAVE ATTACHED A PHOTO OF THE PAVER DETAIL SHEET SO THE BUILDER CAN SEE WHAT IT LOOKS LIKE. PLEASE CIRCLE THE CHOICE AND UPLOAD DOCUMENT INTO THE PERMIT. DRIVEWAY CANNOT BE INSPECTED WITHOUT THE DOCUMENT AND THE OPTION CHOSEN. | |||
| GRAVITY SEWER TEST | 09/10/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 THIS WAS A VIRTUAL INSPECTION WATER SERVICE NOT RAN YET | |||
| SEWER TIE IN | 09/10/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION Inspector Notes from Inspection 2060 THIS WAS A VIRTUAL INSPECTION WATER SERVICE NOT RAN YET Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION Inspector Notes from Inspection 2060 THIS WAS A VIRTUAL INSPECTION WATER SERVICE NOT RAN YET | |||
| PEP TANK INSTALLATION REQUEST | 08/27/2025 | APPROVED | CBOWERMASTER |
| INSULATION | 07/28/2025 | APPROVED | MCONTRYMAN |
| Note: Inspector Notes from Inspection 2420 7/22/25 1. E-cals and site plan have not been approved by Building dept. will need to check duct layout and site plan at next inspection once they are approved 2. Disconnect for ODU can not be behind unit and requires 3' of working space, will check at final once equipment is installed 7/14/2025 - PREVIOUS INSPECTION NOTES 1. E-cals, duct layout does not match what was installed FBC (A)107.4 2. Studs and top plate have been complertely cut in kitchen wall for range vent FBC (A)107.4 3. Range vent requires nail plates at top plate FBCR M1308.2 4. Service outlet missing for ODU per plans, FBCM 1305.1.4.3/E3401.1 FBC (A)107.4 5. Romex not ran for range FBC (A)107.4 6. Ground rod missing per elec. riser diagram FBC (A)107.4 | |||
| ALL ROUGH | 07/22/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: 7/22/25 1. E-cals and site plan have not been approved by Building dept. will need to check duct layout and site plan at next inspection once they are approved 2. Disconnect for ODU can not be behind unit and requires 3' of working space, will check at final once equipment is installed 7/14/2025 - PREVIOUS INSPECTION NOTES 1. E-cals, duct layout does not match what was installed FBC (A)107.4 2. Studs and top plate have been complertely cut in kitchen wall for range vent FBC (A)107.4 3. Range vent requires nail plates at top plate FBCR M1308.2 4. Service outlet missing for ODU per plans, FBCM 1305.1.4.3/E3401.1 FBC (A)107.4 5. Romex not ran for range FBC (A)107.4 6. Ground rod missing per elec. riser diagram FBC (A)107.4 | |||
| ALL ROUGH | 07/14/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. E-cals, duct layout does not match what was installed FBC (A)107.4 2. Studs and top plate have been complertely cut in kitchen wall for range vent FBC (A)107.4 3. Range vent requires nail plates at top plate FBCR M1308.2 4. Service outlet missing for ODU per plans, FBCM 1305.1.4.3/E3401.1 FBC (A)107.4 5. Romex not ran for range FBC (A)107.4 6. Ground rod missing per elec. riser diagram FBC (A)107.4 | |||
| LATH/BRICK/ WATER BARRIER | 07/01/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. WATER BARRIER/FLASHING MISSING AROUND FRONT ENTRY AND LANI SWINGING DOORS, MARGIN GAPS PER MANUFACTURE SPECS FBC R703.4 (1) 2. CORNER BEAD MISSING ON CLOUMBS AND GARAGE WINDOW BUMP OUT FBC R703.7.1 3. ELECTRICAL OUTLET BOX PENITRATION REQUIRE WATER BARRIER ON LANI BY SGD FBC R703.7.1 | |||
| LATH/BRICK/ WATER BARRIER | 07/01/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: 7/1/25 Via virtual re-inspection 7/1/25 1. WATER BARRIER/FLASHING MISSING AROUND FRONT ENTRY AND LANI SWINGING DOORS, MARGIN GAPS PER MANUFACTURE SPECS FBC R703.4 (1) 2. CORNER BEAD MISSING ON CLOUMBS AND GARAGE WINDOW BUMP OUT FBC R703.7.1 3. ELECTRICAL OUTLET BOX PENITRATION REQUIRE WATER BARRIER ON LANI BY SGD FBC R703.7.1 | |||
| ALL ROUGH | 06/30/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Repair silt fence to orginal condition FBC 3307.1 2. Truss A04 missing engineering marked on packet FBC (A)107.4 3. Fire blocking (not just foam) required above electrical panel FBC 302.11.1 4. Window missing anchor in bedroom close to garage FBC (A)107.4 5. Off ridge vent placement does not match plans FBC (A)107.4 6. Wet bar on lani does not match plans FBC (A)107.4 7. Duct layout does not match e-cals plan FBC (A)107.4 | |||
| ALL ROUGH | 06/27/2025 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/27/2025 8:37:02 AM *** 6/27/25: Cancelled by Applicant via text/voicemail at @ 08:25. | |||
| WALL SHEATHING | 06/26/2025 | APPROVED | BTAYLOR |
| Note: 6/6/2025 - PREVIOUS INSPECTION NOTES 6/6/25: Still missing revisions for previously listed items 2 and 3. 1). RSG install does not match submitted and approved revision. FBC [A]107.4 >>> Also, all non PT lumber needs to have tape or similar at area against CMU wall to protect from decay as required. (or change to PT lumber). FBC-R317.1 >>> Shims between rough framing and door buck does not meet code = Requires solid blocking with maximum 1/4" shim space between door jamb and door buck. FBCR 609.1 2). Change in framing at front entry does not meet standard load bearing requirements, details are not shown on plans, window above entry door is not installed per manufacturer's installation instructions. FBC [A]107.4 3). Pack out for all windows does not meet installation requirements. Need details for rough framing pack out installed showing that it meets manufacturer's installation requirements. FBC [A]107.4 4). Previously listed items not fully resolved. FBC [A]107.4 >>> Cannot find window and door bucking Rough Opening details in plans. Please provide. 5/15/2025 - PREVIOUS INSPECTION NOTES 5/15/25: Not Ready! 1). Rear sliding glass door has additional framing that is covered with sheathing and details are not shown anywhere on the plans. Need details and framing needs to be exposed to verify that lumber is treated as required. FBC [A]107.4 2). Change in framing at front entry does not meet standard load bearing requirements, details are not shown on plans, window above entry door is not installed per manufacturer's installation instructions. FBC [A]107.4 3). Pack out for all windows does not meet installation requirements. Need details for rough framing pack out installed showing that it meets manufacturer's installation requirements. FBC [A]107.4 4). Previously listed items not fully resolved. FBC [A]107.4 5/9/2025 - PREVIOUS INSPECTION NOTES HTU26 Face mounted truss hangars used on header over front entry cannot be installed as is. Check manufacturer installation instructions. Cannot find window and door bucking Rough Opening details in plans. Please provide. Rear triple SGD not installed per installation instructions. Gaps in framing over 1/2", Tapcons into wood framing. | |||
| WALL SHEATHING | 06/06/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/6/2025 3:07:38 PM *** 6/6/25: Still missing revisions for previously listed items 2 and 3. 1). RSG install does not match submitted and approved revision. FBC [A]107.4 >>> Also, all non PT lumber needs to have tape or similar at area against CMU wall to protect from decay as required. (or change to PT lumber). FBC-R317.1 >>> Shims between rough framing and door buck does not meet code = Requires solid blocking with maximum 1/4" shim space between door jamb and door buck. FBCR 609.1 2). Change in framing at front entry does not meet standard load bearing requirements, details are not shown on plans, window above entry door is not installed per manufacturer's installation instructions. FBC [A]107.4 3). Pack out for all windows does not meet installation requirements. Need details for rough framing pack out installed showing that it meets manufacturer's installation requirements. FBC [A]107.4 4). Previously listed items not fully resolved. FBC [A]107.4 >>> Cannot find window and door bucking Rough Opening details in plans. Please provide. 5/15/2025 - PREVIOUS INSPECTION NOTES 5/15/25: Not Ready! 1). Rear sliding glass door has additional framing that is covered with sheathing and details are not shown anywhere on the plans. Need details and framing needs to be exposed to verify that lumber is treated as required. FBC [A]107.4 2). Change in framing at front entry does not meet standard load bearing requirements, details are not shown on plans, window above entry door is not installed per manufacturer's installation instructions. FBC [A]107.4 3). Pack out for all windows does not meet installation requirements. Need details for rough framing pack out installed showing that it meets manufacturer's installation requirements. FBC [A]107.4 4). Previously listed items not fully resolved. FBC [A]107.4 5/9/2025 - PREVIOUS INSPECTION NOTES HTU26 Face mounted truss hangars used on header over front entry cannot be installed as is. Check manufacturer installation instructions. Cannot find window and door bucking Rough Opening details in plans. Please provide. Rear triple SGD not installed per installation instructions. Gaps in framing over 1/2", Tapcons into wood framing. | |||
| WALL SHEATHING | 05/15/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/15/2025 9:23:12 AM *** 5/15/25: Not Ready! 1). Rear sliding glass door has additional framing that is covered with sheathing and details are not shown anywhere on the plans. Need details and framing needs to be exposed to verify that lumber is treated as required. FBC [A]107.4 2). Change in framing at front entry does not meet standard load bearing requirements, details are not shown on plans, window above entry door is not installed per manufacturer's installation instructions. FBC [A]107.4 3). Pack out for all windows does not meet installation requirements. Need details for rough framing pack out installed showing that it meets manufacturer's installation requirements. FBC [A]107.4 4). Previously listed items not fully resolved. FBC [A]107.4 5/9/2025 - PREVIOUS INSPECTION NOTES HTU26 Face mounted truss hangars used on header over front entry cannot be installed as is. Check manufacturer installation instructions. Cannot find window and door bucking Rough Opening details in plans. Please provide. Rear triple SGD not installed per installation instructions. Gaps in framing over 1/2", Tapcons into wood framing. | |||
| WALL SHEATHING | 05/09/2025 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: HTU26 Face mounted truss hangars used on header over front entry cannot be installed as is. Check manufacturer installation instructions. Cannot find window and door bucking Rough Opening details in plans. Please provide. Rear triple SGD not installed per installation instructions. Gaps in framing over 1/2", Tapcons into wood framing. | |||
| ROOF VALLEY & METAL | 04/23/2025 | APPROVED | MCONTRYMAN |
| Note: 4/21/2025 - PREVIOUS INSPECTION NOTES 4/21/25: 1). Wall flashing is not sealed to the CMU wall as required. FBC-R903.2 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/7/2025 4:14:19 PM *** 4/7/25: 1). Truss A04 is missing 1 piece of bracing on web 6/20. Marked on MiTek. | |||
| ROOF VALLEY & METAL | 04/21/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/21/2025 2:02:01 PM *** 4/21/25: 1). Wall flashing is not sealed to the CMU wall as required. FBC-R903.2 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/7/2025 4:14:19 PM *** 4/7/25: 1). Truss A04 is missing 1 piece of bracing on web 6/20. Marked on MiTek. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/07/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/7/2025 4:14:19 PM *** 4/7/25: 1). Truss A04 is missing 1 piece of bracing on web 6/20. Marked on MiTek. | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/04/2025 | APPROVED | RRICKS |
| ROW - DRAINAGE | 03/31/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/24/2025 - PREVIOUS INSPECTION NOTES BUILDER NEEDS TO REESTABLISH SILT FENCE WILL RETURN TO REINSPECT IN 1 WEEK. | |||
| ROW - DRAINAGE | 03/24/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: BUILDER NEEDS TO REESTABLISH SILT FENCE WILL RETURN TO REINSPECT IN 1 WEEK. | |||
| TIE BEAM / LINTEL | 03/06/2025 | APPROVED | MCONTRYMAN |
| MONOLITHIC SLAB | 02/07/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/7/2025 2:33:45 PM *** 2/6/2025 - PREVIOUS INSPECTION NOTES 2/6/25: 1). Footer at garage opening does not match required dimensions shown on plan. Highlighted on plan. | |||
| MONOLITHIC SLAB | 02/06/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/6/2025 10:24:00 AM *** 2/6/25: 1). Footer at garage opening does not match required dimensions shown on plan. Highlighted on plan. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/03/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: WATER SERVICE NOT RAN YET | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 01/31/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 01/09/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 10/30/2025 | 10/30/2025 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Termite Certificate incorrect. Termite Protection Section 1816 requires a certificate issued to the building department with specific language for termite protection. SECTION 1816 TERMITE PROTECTION 1816.1 Termite protection. Termite protection shall be provided by registered termiticides, including soil applied pesticides, baiting systems, and pesticides applied to wood, or other approved methods of termite protection labeled for use as a preventative treatment to new construction. See Section 202, “Registered termiticide.” Upon completion of the application of the termite protective treatment, a certificate of compliance shall be issued to the building department by the licensed pest control company that contains the following statement: “The building has received a complete treatment for the prevention of subterranean termites. Treatment is in accordance with rules and laws established by the Florida Department of Agriculture and Consumer Services.” | |||
| MECH | COMPLETE | 10/03/2025 | 10/06/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/11/2025 | 09/12/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/21/2025 | 07/21/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/21/2025 | 07/22/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/21/2025 | 07/21/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/21/2025 | 07/25/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/15/2025 | 07/16/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor with license number | |||
| ENGIN1 | COMPLETE | 07/14/2025 | 07/14/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 07/14/2025 | 07/15/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM SITE PLAN IS REJECTED NEED TO SUBMIT NEW SITE PLAN | |||
| ZON | HOLD | 07/14/2025 | 07/14/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Driveway cannot go all the way up to house on that right side of the entry. There must be a separation for foundation plantings | |||
| MECH | COMPLETE | 07/10/2025 | 07/11/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/08/2025 | 07/10/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/08/2025 | 07/08/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout not readable. Need clear copy with clear sizes of lines. There are alot of extra lines on the plan sheet | |||
| ZON | COMPLETE | 07/08/2025 | 07/08/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/23/2025 | 06/25/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/27/2025 | 05/28/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/18/2025 | 03/25/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/24/2025 | 02/25/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/24/2025 | 02/24/2025 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/29/2025 | 01/31/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/06/2025 | 01/10/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/01/2024 | 11/01/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/21/2024 | 10/21/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM The notary must also attest to witnessing Ms. Perepechkin's signature as well by inserting her name in the notary section. Once this is completed, please resubmit electronic copy for staff review. | |||
| ZON | HOLD | 10/21/2024 | 10/21/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original Right of Way Utilization Agreement. | |||
| BADMIN | INFORMATION | 10/21/2024 | 10/21/2024 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM This document has been modfied please look at original and fillout correctly as these documnet get recorded. please submit the correct version of this form | |||
| ZON | HOLD | 10/16/2024 | 10/16/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please provide a right of way agreement for paver driveway. Must be signed by all owners. Once electronic copy is approved we will ask for original | |||
| SW1 | COMPLETE | 10/16/2024 | 10/17/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ENGIN1 | COMPLETE | 10/16/2024 | 10/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/07/2024 | 10/08/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Ac pad location on site plan does not match location on landscape and floor plans Please provide a right of way agreement for paver driveway. Must be signed by all owners. Once electronic copy is approved we will ask for original | |||
| MECH | COMPLETE | 10/07/2024 | 10/08/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/07/2024 | 10/11/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/07/2024 | 10/08/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/07/2024 | 10/08/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | HOLD | 09/30/2024 | 09/30/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: A/C PAD LOCATION MISSING ON SITE PLAN | |||
| MECH | HOLD | 09/30/2024 | 10/01/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition (Second Request) | |||
| ELEC | COMPLETE | 09/30/2024 | 10/03/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/30/2024 | 10/03/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Geo Tech has wrong address | |||
| SWALE | COMPLETE | 09/04/2024 | 11/01/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 09/03/2024 | 09/09/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/03/2024 | 09/09/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit Geo Tech | |||
| CUSVC | COMPLETE | 09/03/2024 | 09/06/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 09/03/2024 | 09/06/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Washer and dryer need to be GFCI protected. NEC 2020 210.8 2. Need switch in master bedroom by exterior door. NEC 2020 210.70 | |||
| ENGIN1 | COMPLETE | 09/03/2024 | 09/04/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 09/03/2024 | 09/05/2024 |
| LOCATE | COMPLETE | 09/03/2024 | 09/06/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/03/2024 | 09/05/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition 2. Plans show R5 insulation in wall and R30 in attic. Energy calcs say R6 in walls and R38 in attic. Revise to match. 107.21. | |||
| SW1 | COMPLETE | 09/03/2024 | 09/03/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | HOLD | 09/03/2024 | 09/04/2024 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. BAND SHOULD WRAP LEFT SIDE AT TOP 2. A/C PAD LOCATION MISSING ON SITE PLAN |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/31/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/30/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/30/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/30/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 10/30/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 10/30/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/30/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/30/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/31/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/31/2024 |
| SEWER INSPECTION | ¤25.00 | 12/31/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 12/31/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 12/31/2024 |
| SITE PLAN 30 | ¤30.00 | 12/31/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/31/2024 |
| SW ENG PRE APRON | ¤30.00 | 12/31/2024 |
| WATER- TURN ON | ¤25.00 | 12/31/2024 |
| ADJUSTMENT 10% | (¤178.79) | 12/31/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/31/2024 |
| INSPECTION - RESIDENTIAL | ¤1,369.50 | 12/31/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤388.44 | 12/31/2024 |
| CONNECTION FEES | ¤1,187.26 | 12/31/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 12/31/2024 |
| IMPACT FEE FIRE | ¤434.51 | 12/31/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 12/31/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 12/31/2024 |
| IMPACT FEE PARKS | ¤1,828.01 | 12/31/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 12/31/2024 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 12/31/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 12/31/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/31/2024 |
| SURCHARGE FS 533.721 | ¤16.09 | 12/31/2024 |
| SURCHARGE - FS 468.631 | ¤24.14 | 12/31/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/31/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤24,192.32 |