I want to search for...

Permit #2024090004

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00180-0110
GARAGE: 539 sqft
OPENED PORCH (WITH ROOF) : 425 sqft
ENCLOSE EXISTING PORCH TO LIVING : 151 sqft
CONDITIONED SPACE: 2570 sqft
Total Square Footage: 3685 sqft
Subdivision: 2302 - SECTION 28-PINE GROVE
Job Phone: 386-569-7882
Location Address: 2 POPPY PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/31/2024
NOC: RECORDED
Applicant name: VLADIMIR V PEREPECHKIN
Owner: SANCHEZ, MICHAEL MENEDEZ & PEREPECHKIN, KATRIN

Address

77 SOUTHLAKE DR

PALM COAST, FL 32137

Contracted Stated Job Value: ¤250,000.00
Job Description: Single Family Residence
Type: CN

Contractor

WISE CHOICE CUSTOM HOMES, INC.
Status Location Address State License Number Phone
ACTIVE

77 SOUTHLAKE DR

PALM COAST, FL 32137

CRC1328738 (Exp: 08/31/2026) 386-569-7882

Sub Contractors

MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
MAXIM BUDNIK
Status Location Address State License Number
ACTIVE

3 WAVECREST PL

PALM COAST, FL 32164

CAC1818445 (Exp: 08/31/2026)
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/31/2025 FINAL APPROVED MKRASKI
BLD - BUILDING FINAL 10/30/2025 Disapproved -FEE REQUIRED MKRASKI
Note: 1. Light over tub in master bathroom can not be within 8' of tub rail (vertical) NEC 410.10(D)(2) 2. Front cloumb lights need to be sealed where romex emerges from brick face 3. 3' working clearence for ODU disconnect 4. Seal wall penitrations under outdoor kitchen 5. Loos outlet under outdoor sink 6. Rear outlet on lani not GFCI 7. Secure PVC under pool panel glue and locknut required for male adapter 8. Conduit for irrigation line must be sealed at wall penitration 9. Ceiling and wall penitrations in garage must be sealed for fire seperation 10. Outdoor soffit power (for future) must have an approved water proof cover (left front corner of garage) 11. Trim our all attic access's 12. Light not working in master right side closet 13. AHU breaker lock or disconnect required 14. Missing notice to owner sticker on elec panel for AHU in attic 15. No fall for condensation line in attic for AHU 16. AHU aux pan does not have a float switch Make ALL repairs
ROW - STORMWATER FINAL 10/29/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 10/28/2025 - PREVIOUS INSPECTION NOTES 10-28-25 TPOLACEK*** BUILDER NEEDS TO MAKE A FEW CORRECTIONS, ALL SOD ALONG ROAD EDGE MUST BE BELOW EDGEOF PAVEMENT, LEFT SIDE PROPERTY LINE SOD MUST MATCH GRADE, CULVERT PIPE NEEDS TO BE CLEAR OF ALL SEDIMENT. * SWALE PROFILE / RESIDENTIAL SWALE PROFILE DRAWING 300.D 8) FINISH GRADE TO BE 2 INCHES BELOW THE EDGE OF THE PAVEMENT BEFORE THE SOD IS LAID * SWALE PROFILE / RESIDENTIAL SWALE PROFILE DRAWING 300.D 4) MATCH SOD TO EXISTING LAWNS. SWALE PLAN 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. Inspector Notes from Inspection 9465 10=27-25 TPOLACEK*** COPC WILL BE REGRADING FROM RIGHT SIDE PROPERTY LINE TO SPILLWAY AND THAT SHOULD HELP WITH POOLING WATER ALONG RIGHT SIDE BACK SWALE. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 10/28/2025 FINAL APPROVED BHAINES
Note: Inspector Notes from Inspection 9035 No CC, IRR using well
ROW - FINAL APRON (AFTER POUR) 10/28/2025 APPROVED TPOLACEK
Note: 10-28-25 TPOLACEK** PAVERS ARE SET, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 10=27-25 TPOLACEK*** COPC WILL BE REGRADING FROM RIGHT SIDE PROPERTY LINE TO SPILLWAY AND THAT SHOULD HELP WITH POOLING WATER ALONG RIGHT SIDE BACK SWALE. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 10/28/2025 Disapproved - NO FEE TPOLACEK
Note: 10-28-25 TPOLACEK*** BUILDER NEEDS TO MAKE A FEW CORRECTIONS, ALL SOD ALONG ROAD EDGE MUST BE BELOW EDGEOF PAVEMENT, LEFT SIDE PROPERTY LINE SOD MUST MATCH GRADE, CULVERT PIPE NEEDS TO BE CLEAR OF ALL SEDIMENT. * SWALE PROFILE / RESIDENTIAL SWALE PROFILE DRAWING 300.D 8) FINISH GRADE TO BE 2 INCHES BELOW THE EDGE OF THE PAVEMENT BEFORE THE SOD IS LAID * SWALE PROFILE / RESIDENTIAL SWALE PROFILE DRAWING 300.D 4) MATCH SOD TO EXISTING LAWNS. SWALE PLAN 5. Swales at the construction site and on adjacent lots MUST NOT be OBSTRUCTED at any time. Any obstruction MUST be cleared IMMEDIATELY. Inspector Notes from Inspection 9465 10=27-25 TPOLACEK*** COPC WILL BE REGRADING FROM RIGHT SIDE PROPERTY LINE TO SPILLWAY AND THAT SHOULD HELP WITH POOLING WATER ALONG RIGHT SIDE BACK SWALE. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/27/2025 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 10/27/2025 APPROVED - AS NOTED TPOLACEK
Note: 10=27-25 TPOLACEK*** COPC WILL BE REGRADING FROM RIGHT SIDE PROPERTY LINE TO SPILLWAY AND THAT SHOULD HELP WITH POOLING WATER ALONG RIGHT SIDE BACK SWALE. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U-CROSS CONNECTION 10/21/2025 APPROVED - AS NOTED BHAINES
Note: No CC, IRR using well
ELECTRIC - EARLY POWER 09/30/2025 APPROVED RMARTIN
Note: 9/29/2025 - PREVIOUS INSPECTION NOTES 9/29/25: Cancelled by Applicant via text at @ 0751.
ELECTRIC - EARLY POWER 09/29/2025 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 9/29/2025 8:05:56 AM *** 9/29/25: Cancelled by Applicant via text at @ 0751.
ROW- PRE-APRON (PRE-POUR) 09/19/2025 APPROVED - AS NOTED TPOLACEK
Note: 09-19-25 TPOLACEK*** ON LEFT SIDE OF DRIVEWAY BEHIOND THE MITERED END MARKED IN PINK PAINT THERE IS A LOW AREA OF FOOTER. PLEASE RAISE THIS AREA TO GRADE BEFORE LAYING PAVERS. APPROVED TO LAY PAVERS ONCE NOTES ARE CORRECTED. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 9/15/2025 - PREVIOUS INSPECTION NOTES AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 9/12/2025 - PREVIOUS INSPECTION NOTES 09-12-25 TPOLACEK*** SITE IS WASHED OUT AND UNDER WATER. (SEE PHOTOS) PAVERS MUST BE REMOVED FROMTHE ROW ASAP. THERE CANNOT BE ANY CONSTRUCTION MATERIALS STORED IN THE ROW AS THEY POSE A DANGER TO VEHICLES. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/11/2025 - PREVIOUS INSPECTION NOTES 09-11-25 TPOLACEK*** THE APPROVED SITE PLAN INDICATES A PAVER DRIVEWAY. THE BUILDER IS REQUIRED TO MAKE A SELCTION ON THE COPC OPTION PAGE FOR THE PAVER DEATIL OF CHOICE. I HAVE ATTACHED A PHOTO OF THE PAVER DETAIL SHEET SO THE BUILDER CAN SEE WHAT IT LOOKS LIKE. PLEASE CIRCLE THE CHOICE AND UPLOAD DOCUMENT INTO THE PERMIT. DRIVEWAY CANNOT BE INSPECTED WITHOUT THE DOCUMENT AND THE OPTION CHOSEN.
ROW- PAVER RESTRAINTS 09/15/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW- PRE-APRON (PRE-POUR) 09/15/2025 PARTIALLY APPROVED TPOLACEK
Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 9/12/2025 - PREVIOUS INSPECTION NOTES 09-12-25 TPOLACEK*** SITE IS WASHED OUT AND UNDER WATER. (SEE PHOTOS) PAVERS MUST BE REMOVED FROMTHE ROW ASAP. THERE CANNOT BE ANY CONSTRUCTION MATERIALS STORED IN THE ROW AS THEY POSE A DANGER TO VEHICLES. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/11/2025 - PREVIOUS INSPECTION NOTES 09-11-25 TPOLACEK*** THE APPROVED SITE PLAN INDICATES A PAVER DRIVEWAY. THE BUILDER IS REQUIRED TO MAKE A SELCTION ON THE COPC OPTION PAGE FOR THE PAVER DEATIL OF CHOICE. I HAVE ATTACHED A PHOTO OF THE PAVER DETAIL SHEET SO THE BUILDER CAN SEE WHAT IT LOOKS LIKE. PLEASE CIRCLE THE CHOICE AND UPLOAD DOCUMENT INTO THE PERMIT. DRIVEWAY CANNOT BE INSPECTED WITHOUT THE DOCUMENT AND THE OPTION CHOSEN.
ROW- PRE-APRON (PRE-POUR) 09/12/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 09-12-25 TPOLACEK*** SITE IS WASHED OUT AND UNDER WATER. (SEE PHOTOS) PAVERS MUST BE REMOVED FROMTHE ROW ASAP. THERE CANNOT BE ANY CONSTRUCTION MATERIALS STORED IN THE ROW AS THEY POSE A DANGER TO VEHICLES. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/11/2025 - PREVIOUS INSPECTION NOTES 09-11-25 TPOLACEK*** THE APPROVED SITE PLAN INDICATES A PAVER DRIVEWAY. THE BUILDER IS REQUIRED TO MAKE A SELCTION ON THE COPC OPTION PAGE FOR THE PAVER DEATIL OF CHOICE. I HAVE ATTACHED A PHOTO OF THE PAVER DETAIL SHEET SO THE BUILDER CAN SEE WHAT IT LOOKS LIKE. PLEASE CIRCLE THE CHOICE AND UPLOAD DOCUMENT INTO THE PERMIT. DRIVEWAY CANNOT BE INSPECTED WITHOUT THE DOCUMENT AND THE OPTION CHOSEN.
ROW- PRE-APRON (PRE-POUR) 09/11/2025 Disapproved - NO FEE TPOLACEK
Note: 09-11-25 TPOLACEK*** THE APPROVED SITE PLAN INDICATES A PAVER DRIVEWAY. THE BUILDER IS REQUIRED TO MAKE A SELCTION ON THE COPC OPTION PAGE FOR THE PAVER DEATIL OF CHOICE. I HAVE ATTACHED A PHOTO OF THE PAVER DETAIL SHEET SO THE BUILDER CAN SEE WHAT IT LOOKS LIKE. PLEASE CIRCLE THE CHOICE AND UPLOAD DOCUMENT INTO THE PERMIT. DRIVEWAY CANNOT BE INSPECTED WITHOUT THE DOCUMENT AND THE OPTION CHOSEN.
GRAVITY SEWER TEST 09/10/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 THIS WAS A VIRTUAL INSPECTION WATER SERVICE NOT RAN YET
SEWER TIE IN 09/10/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION Inspector Notes from Inspection 2060 THIS WAS A VIRTUAL INSPECTION WATER SERVICE NOT RAN YET Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION Inspector Notes from Inspection 2060 THIS WAS A VIRTUAL INSPECTION WATER SERVICE NOT RAN YET
PEP TANK INSTALLATION REQUEST 08/27/2025 APPROVED CBOWERMASTER
INSULATION 07/28/2025 APPROVED MCONTRYMAN
Note: Inspector Notes from Inspection 2420 7/22/25 1. E-cals and site plan have not been approved by Building dept. will need to check duct layout and site plan at next inspection once they are approved 2. Disconnect for ODU can not be behind unit and requires 3' of working space, will check at final once equipment is installed 7/14/2025 - PREVIOUS INSPECTION NOTES 1. E-cals, duct layout does not match what was installed FBC (A)107.4 2. Studs and top plate have been complertely cut in kitchen wall for range vent FBC (A)107.4 3. Range vent requires nail plates at top plate FBCR M1308.2 4. Service outlet missing for ODU per plans, FBCM 1305.1.4.3/E3401.1 FBC (A)107.4 5. Romex not ran for range FBC (A)107.4 6. Ground rod missing per elec. riser diagram FBC (A)107.4
ALL ROUGH 07/22/2025 APPROVED - AS NOTED MKRASKI
Note: 7/22/25 1. E-cals and site plan have not been approved by Building dept. will need to check duct layout and site plan at next inspection once they are approved 2. Disconnect for ODU can not be behind unit and requires 3' of working space, will check at final once equipment is installed 7/14/2025 - PREVIOUS INSPECTION NOTES 1. E-cals, duct layout does not match what was installed FBC (A)107.4 2. Studs and top plate have been complertely cut in kitchen wall for range vent FBC (A)107.4 3. Range vent requires nail plates at top plate FBCR M1308.2 4. Service outlet missing for ODU per plans, FBCM 1305.1.4.3/E3401.1 FBC (A)107.4 5. Romex not ran for range FBC (A)107.4 6. Ground rod missing per elec. riser diagram FBC (A)107.4
ALL ROUGH 07/14/2025 Disapproved - NO FEE MKRASKI
Note: 1. E-cals, duct layout does not match what was installed FBC (A)107.4 2. Studs and top plate have been complertely cut in kitchen wall for range vent FBC (A)107.4 3. Range vent requires nail plates at top plate FBCR M1308.2 4. Service outlet missing for ODU per plans, FBCM 1305.1.4.3/E3401.1 FBC (A)107.4 5. Romex not ran for range FBC (A)107.4 6. Ground rod missing per elec. riser diagram FBC (A)107.4
LATH/BRICK/ WATER BARRIER 07/01/2025 Disapproved - NO FEE MKRASKI
Note: 1. WATER BARRIER/FLASHING MISSING AROUND FRONT ENTRY AND LANI SWINGING DOORS, MARGIN GAPS PER MANUFACTURE SPECS FBC R703.4 (1) 2. CORNER BEAD MISSING ON CLOUMBS AND GARAGE WINDOW BUMP OUT FBC R703.7.1 3. ELECTRICAL OUTLET BOX PENITRATION REQUIRE WATER BARRIER ON LANI BY SGD FBC R703.7.1
LATH/BRICK/ WATER BARRIER 07/01/2025 APPROVED - AS NOTED MKRASKI
Note: 7/1/25 Via virtual re-inspection 7/1/25 1. WATER BARRIER/FLASHING MISSING AROUND FRONT ENTRY AND LANI SWINGING DOORS, MARGIN GAPS PER MANUFACTURE SPECS FBC R703.4 (1) 2. CORNER BEAD MISSING ON CLOUMBS AND GARAGE WINDOW BUMP OUT FBC R703.7.1 3. ELECTRICAL OUTLET BOX PENITRATION REQUIRE WATER BARRIER ON LANI BY SGD FBC R703.7.1
ALL ROUGH 06/30/2025 Disapproved - NO FEE MKRASKI
Note: 1. Repair silt fence to orginal condition FBC 3307.1 2. Truss A04 missing engineering marked on packet FBC (A)107.4 3. Fire blocking (not just foam) required above electrical panel FBC 302.11.1 4. Window missing anchor in bedroom close to garage FBC (A)107.4 5. Off ridge vent placement does not match plans FBC (A)107.4 6. Wet bar on lani does not match plans FBC (A)107.4 7. Duct layout does not match e-cals plan FBC (A)107.4
ALL ROUGH 06/27/2025 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 6/27/2025 8:37:02 AM *** 6/27/25: Cancelled by Applicant via text/voicemail at @ 08:25.
WALL SHEATHING 06/26/2025 APPROVED BTAYLOR
Note: 6/6/2025 - PREVIOUS INSPECTION NOTES 6/6/25: Still missing revisions for previously listed items 2 and 3. 1). RSG install does not match submitted and approved revision. FBC [A]107.4 >>> Also, all non PT lumber needs to have tape or similar at area against CMU wall to protect from decay as required. (or change to PT lumber). FBC-R317.1 >>> Shims between rough framing and door buck does not meet code = Requires solid blocking with maximum 1/4" shim space between door jamb and door buck. FBCR 609.1 2). Change in framing at front entry does not meet standard load bearing requirements, details are not shown on plans, window above entry door is not installed per manufacturer's installation instructions. FBC [A]107.4 3). Pack out for all windows does not meet installation requirements. Need details for rough framing pack out installed showing that it meets manufacturer's installation requirements. FBC [A]107.4 4). Previously listed items not fully resolved. FBC [A]107.4 >>> Cannot find window and door bucking Rough Opening details in plans. Please provide. 5/15/2025 - PREVIOUS INSPECTION NOTES 5/15/25: Not Ready! 1). Rear sliding glass door has additional framing that is covered with sheathing and details are not shown anywhere on the plans. Need details and framing needs to be exposed to verify that lumber is treated as required. FBC [A]107.4 2). Change in framing at front entry does not meet standard load bearing requirements, details are not shown on plans, window above entry door is not installed per manufacturer's installation instructions. FBC [A]107.4 3). Pack out for all windows does not meet installation requirements. Need details for rough framing pack out installed showing that it meets manufacturer's installation requirements. FBC [A]107.4 4). Previously listed items not fully resolved. FBC [A]107.4 5/9/2025 - PREVIOUS INSPECTION NOTES HTU26 Face mounted truss hangars used on header over front entry cannot be installed as is. Check manufacturer installation instructions. Cannot find window and door bucking Rough Opening details in plans. Please provide. Rear triple SGD not installed per installation instructions. Gaps in framing over 1/2", Tapcons into wood framing.
WALL SHEATHING 06/06/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/6/2025 3:07:38 PM *** 6/6/25: Still missing revisions for previously listed items 2 and 3. 1). RSG install does not match submitted and approved revision. FBC [A]107.4 >>> Also, all non PT lumber needs to have tape or similar at area against CMU wall to protect from decay as required. (or change to PT lumber). FBC-R317.1 >>> Shims between rough framing and door buck does not meet code = Requires solid blocking with maximum 1/4" shim space between door jamb and door buck. FBCR 609.1 2). Change in framing at front entry does not meet standard load bearing requirements, details are not shown on plans, window above entry door is not installed per manufacturer's installation instructions. FBC [A]107.4 3). Pack out for all windows does not meet installation requirements. Need details for rough framing pack out installed showing that it meets manufacturer's installation requirements. FBC [A]107.4 4). Previously listed items not fully resolved. FBC [A]107.4 >>> Cannot find window and door bucking Rough Opening details in plans. Please provide. 5/15/2025 - PREVIOUS INSPECTION NOTES 5/15/25: Not Ready! 1). Rear sliding glass door has additional framing that is covered with sheathing and details are not shown anywhere on the plans. Need details and framing needs to be exposed to verify that lumber is treated as required. FBC [A]107.4 2). Change in framing at front entry does not meet standard load bearing requirements, details are not shown on plans, window above entry door is not installed per manufacturer's installation instructions. FBC [A]107.4 3). Pack out for all windows does not meet installation requirements. Need details for rough framing pack out installed showing that it meets manufacturer's installation requirements. FBC [A]107.4 4). Previously listed items not fully resolved. FBC [A]107.4 5/9/2025 - PREVIOUS INSPECTION NOTES HTU26 Face mounted truss hangars used on header over front entry cannot be installed as is. Check manufacturer installation instructions. Cannot find window and door bucking Rough Opening details in plans. Please provide. Rear triple SGD not installed per installation instructions. Gaps in framing over 1/2", Tapcons into wood framing.
WALL SHEATHING 05/15/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/15/2025 9:23:12 AM *** 5/15/25: Not Ready! 1). Rear sliding glass door has additional framing that is covered with sheathing and details are not shown anywhere on the plans. Need details and framing needs to be exposed to verify that lumber is treated as required. FBC [A]107.4 2). Change in framing at front entry does not meet standard load bearing requirements, details are not shown on plans, window above entry door is not installed per manufacturer's installation instructions. FBC [A]107.4 3). Pack out for all windows does not meet installation requirements. Need details for rough framing pack out installed showing that it meets manufacturer's installation requirements. FBC [A]107.4 4). Previously listed items not fully resolved. FBC [A]107.4 5/9/2025 - PREVIOUS INSPECTION NOTES HTU26 Face mounted truss hangars used on header over front entry cannot be installed as is. Check manufacturer installation instructions. Cannot find window and door bucking Rough Opening details in plans. Please provide. Rear triple SGD not installed per installation instructions. Gaps in framing over 1/2", Tapcons into wood framing.
WALL SHEATHING 05/09/2025 Disapproved -FEE REQUIRED KSANDOE
Note: HTU26 Face mounted truss hangars used on header over front entry cannot be installed as is. Check manufacturer installation instructions. Cannot find window and door bucking Rough Opening details in plans. Please provide. Rear triple SGD not installed per installation instructions. Gaps in framing over 1/2", Tapcons into wood framing.
ROOF VALLEY & METAL 04/23/2025 APPROVED MCONTRYMAN
Note: 4/21/2025 - PREVIOUS INSPECTION NOTES 4/21/25: 1). Wall flashing is not sealed to the CMU wall as required. FBC-R903.2 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/7/2025 4:14:19 PM *** 4/7/25: 1). Truss A04 is missing 1 piece of bracing on web 6/20. Marked on MiTek.
ROOF VALLEY & METAL 04/21/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 4/21/2025 2:02:01 PM *** 4/21/25: 1). Wall flashing is not sealed to the CMU wall as required. FBC-R903.2 Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 4/7/2025 4:14:19 PM *** 4/7/25: 1). Truss A04 is missing 1 piece of bracing on web 6/20. Marked on MiTek.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/07/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/7/2025 4:14:19 PM *** 4/7/25: 1). Truss A04 is missing 1 piece of bracing on web 6/20. Marked on MiTek.
FOUND SURVEY APPROVED (OFFICE) 04/04/2025 APPROVED RRICKS
ROW - DRAINAGE 03/31/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/24/2025 - PREVIOUS INSPECTION NOTES BUILDER NEEDS TO REESTABLISH SILT FENCE WILL RETURN TO REINSPECT IN 1 WEEK.
ROW - DRAINAGE 03/24/2025 Disapproved - NO FEE TPOLACEK
Note: BUILDER NEEDS TO REESTABLISH SILT FENCE WILL RETURN TO REINSPECT IN 1 WEEK.
TIE BEAM / LINTEL 03/06/2025 APPROVED MCONTRYMAN
MONOLITHIC SLAB 02/07/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/7/2025 2:33:45 PM *** 2/6/2025 - PREVIOUS INSPECTION NOTES 2/6/25: 1). Footer at garage opening does not match required dimensions shown on plan. Highlighted on plan.
MONOLITHIC SLAB 02/06/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 2/6/2025 10:24:00 AM *** 2/6/25: 1). Footer at garage opening does not match required dimensions shown on plan. Highlighted on plan.
PLUMBING 1ST ROUGH UNDERGROUND 02/03/2025 APPROVED - AS NOTED MGIBSON
Note: WATER SERVICE NOT RAN YET
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 01/31/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 01/09/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BADMIN INFORMATION 10/30/2025 10/30/2025
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Termite Certificate incorrect. Termite Protection Section 1816 requires a certificate issued to the building department with specific language for termite protection. SECTION 1816 TERMITE PROTECTION 1816.1 Termite protection. Termite protection shall be provided by registered termiticides, including soil applied pesticides, baiting systems, and pesticides applied to wood, or other approved methods of termite protection labeled for use as a preventative treatment to new construction. See Section 202, “Registered termiticide.” Upon completion of the application of the termite protective treatment, a certificate of compliance shall be issued to the building department by the licensed pest control company that contains the following statement: “The building has received a complete treatment for the prevention of subterranean termites. Treatment is in accordance with rules and laws established by the Florida Department of Agriculture and Consumer Services.”
MECH COMPLETE 10/03/2025 10/06/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/11/2025 09/12/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
MECH COMPLETE 07/21/2025 07/21/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/21/2025 07/22/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 07/21/2025 07/21/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 07/21/2025 07/25/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
MECH HOLD 07/15/2025 07/16/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor with license number
ENGIN1 COMPLETE 07/14/2025 07/14/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 HOLD 07/14/2025 07/15/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM SITE PLAN IS REJECTED NEED TO SUBMIT NEW SITE PLAN
ZON HOLD 07/14/2025 07/14/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Driveway cannot go all the way up to house on that right side of the entry. There must be a separation for foundation plantings
MECH COMPLETE 07/10/2025 07/11/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 07/08/2025 07/10/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH HOLD 07/08/2025 07/08/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout not readable. Need clear copy with clear sizes of lines. There are alot of extra lines on the plan sheet
ZON COMPLETE 07/08/2025 07/08/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 06/23/2025 06/25/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 05/27/2025 05/28/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 03/18/2025 03/25/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 02/24/2025 02/25/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 02/24/2025 02/24/2025
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
BLD COMPLETE 01/29/2025 01/31/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 01/06/2025 01/10/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 11/01/2024 11/01/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON HOLD 10/21/2024 10/21/2024
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM The notary must also attest to witnessing Ms. Perepechkin's signature as well by inserting her name in the notary section. Once this is completed, please resubmit electronic copy for staff review.
ZON HOLD 10/21/2024 10/21/2024
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original Right of Way Utilization Agreement.
BADMIN INFORMATION 10/21/2024 10/21/2024
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM This document has been modfied please look at original and fillout correctly as these documnet get recorded. please submit the correct version of this form
ZON HOLD 10/16/2024 10/16/2024
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please provide a right of way agreement for paver driveway. Must be signed by all owners. Once electronic copy is approved we will ask for original
SW1 COMPLETE 10/16/2024 10/17/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ENGIN1 COMPLETE 10/16/2024 10/16/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 10/07/2024 10/08/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Ac pad location on site plan does not match location on landscape and floor plans Please provide a right of way agreement for paver driveway. Must be signed by all owners. Once electronic copy is approved we will ask for original
MECH COMPLETE 10/07/2024 10/08/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 10/07/2024 10/11/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/07/2024 10/08/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/07/2024 10/08/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON HOLD 09/30/2024 09/30/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: A/C PAD LOCATION MISSING ON SITE PLAN
MECH HOLD 09/30/2024 10/01/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition (Second Request)
ELEC COMPLETE 09/30/2024 10/03/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 09/30/2024 10/03/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Geo Tech has wrong address
SWALE COMPLETE 09/04/2024 11/01/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN COMPLETE 09/03/2024 09/09/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 09/03/2024 09/09/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit Geo Tech
CUSVC COMPLETE 09/03/2024 09/06/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 09/03/2024 09/06/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Washer and dryer need to be GFCI protected. NEC 2020 210.8 2. Need switch in master bedroom by exterior door. NEC 2020 210.70
ENGIN1 COMPLETE 09/03/2024 09/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 09/03/2024 09/05/2024
LOCATE COMPLETE 09/03/2024 09/06/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 09/03/2024 09/05/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition 2. Plans show R5 insulation in wall and R30 in attic. Energy calcs say R6 in walls and R38 in attic. Revise to match. 107.21.
SW1 COMPLETE 09/03/2024 09/03/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON HOLD 09/03/2024 09/04/2024
Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. BAND SHOULD WRAP LEFT SIDE AT TOP 2. A/C PAD LOCATION MISSING ON SITE PLAN

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 10/31/2025
REINSPECTION RESIDENTIAL ¤40.00 10/30/2025
REINSPECTION RESIDENTIAL ¤40.00 10/30/2025
REINSPECTION RESIDENTIAL ¤40.00 10/30/2025
SW ENG - INSPECTION 20 ¤20.00 10/30/2025
SW ENG - INSPECTION 20 ¤20.00 10/30/2025
SW ENG REINSPECTION 30 ¤30.00 10/30/2025
PLAN REVIEW - REVISION ¤32.50 10/30/2025
SW ENG - REVIEW 20 ¤20.00 12/31/2024
SW ENG RES REVIEW 200 ¤200.00 12/31/2024
SEWER INSPECTION ¤25.00 12/31/2024
SEWER CAPITAL FACILITY ¤6,120.52 12/31/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 12/31/2024
SITE PLAN 30 ¤30.00 12/31/2024
SW ENG INSPECTION 80 ¤80.00 12/31/2024
SW ENG PRE APRON ¤30.00 12/31/2024
WATER- TURN ON ¤25.00 12/31/2024
ADJUSTMENT 10% (¤178.79) 12/31/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/31/2024
INSPECTION - RESIDENTIAL ¤1,369.50 12/31/2024
PLAN REVIEW - RESIDENTIAL ¤388.44 12/31/2024
CONNECTION FEES ¤1,187.26 12/31/2024
FC IMPACT FEE EMS ¤62.00 12/31/2024
IMPACT FEE FIRE ¤434.51 12/31/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/31/2024
FC IMPACT FEE LIBRARY ¤268.00 12/31/2024
IMPACT FEE PARKS ¤1,828.01 12/31/2024
IMPACT FEE SCHOOL ¤5,450.00 12/31/2024
RECORDING FEE REIMBURSE DOC ¤44.00 12/31/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 12/31/2024
WATER -IRRIGATION INSPECTION ¤25.00 12/31/2024
SURCHARGE FS 533.721 ¤16.09 12/31/2024
SURCHARGE - FS 468.631 ¤24.14 12/31/2024
SW ENG - FOUNDATION SURVEY ¤20.00 12/31/2024
Fees Total Due: ¤0.00 Total Paid: ¤24,192.32