Permit #2024090282
Permit Details
Status: FINAL
| Total Square Footage: 35890 sqft |
| Block: 00000 |
| Subdivision: 2334 - EVOLVE PALM COAST - SANDLAKE SUBDIVISION LOT 4 |
| Job Phone: 304-694-7694 |
| Location Address: 70 EVOLVE PKWY |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 09/26/2024 |
| NOC: RECORDED |
| Applicant name: MATTHEW ADAM ROGERS |
| Owner: EVOLVE PALM COAST LLC |
|
Address 2918-A MARTINVILLE ROAD GREENSBORO, NC 27408 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤1,912,500.00 |
| Job Description: BLDG 1200 - TYPE II - 70 EVOLVE PARKWAY (20 UNITS) |
| Type: CN |
| Original Permit #: 2024090226 |
Contractor
EVOLVE CONSTRUCTION OF FL LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
2018A MARTINSVILLE RD GREENSBORO, NC 27408 |
CGC1532932 (Exp: 08/31/2026) | 304-694-7694 |
Sub Contractors
PAUL LEONARD RICHARDS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
671 BUSINESS PARK BLVD WINTER GARDEN, FL 34787 |
CAC057235 (Exp: 08/31/2026) | 407-877-8090 | 407-877-8479 |
TRACEY LYNN HYMAN-MONTEE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
75 STUMPFIELD ROAD PENSACOLA, FL 32503 |
CFC1430978 (Exp: 08/31/2026) | 850-477-0388 | 850-477-0381 |
MARK ASSELIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3508 LENOX AVE JACKSONVILLE, FL 32254 |
EC13009251 (Exp: 08/31/2026) | 904-726-7966 |
Inspection History
| Type | Request Date | Result | Inspector |
| BUILDING FINAL | 01/29/2026 | FINAL APPROVED | KSANDOE |
| Note: 1/27/2026 - PREVIOUS INSPECTION NOTES Repairs to drywall have not been made | |||
| U - SEWER TIE IN | 01/28/2026 | APPROVED | RSIMS |
| Note: 1/28/26: Connection visually verified via scope camera. RS | |||
| U - UTILITY COMMERCIAL FINAL | 01/27/2026 | FINAL APPROVED | BHAINES |
| BUILDING FINAL | 01/27/2026 | Disapproved - NO FEE | KSANDOE |
| Note: Repairs to drywall have not been made | |||
| U -UTILITY RESIDENTIAL FINAL | 01/26/2026 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 No CC, IRR with pond water. | |||
| FIRE FINAL | 01/26/2026 | APPROVED | RMARTIN |
| EXTERIOR ARCHITECTURAL FEATURES | 01/26/2026 | APPROVED | RPICATAGI |
| HORIZONTAL ASSEMB PENETRATIONS | 01/26/2026 | APPROVED | KSANDOE |
| HORIZONTAL ASSEMB FINAL | 01/26/2026 | APPROVED | KSANDOE |
| ELECTRIC FINAL | 01/22/2026 | APPROVED - AS NOTED | MKRASKI |
| Note: 1/22/26 Approved, have revision for heater in fire room before building final 1/20/26 Plans still do not match house panel and schdule subbmit a revision and have approved before re-inspection 1/15/26 Make all repairs before re-inspection 1. House panel schdule does not match, revision required showing only one house panel and matching schdules 2. Breaker in house panel turned off 3. Label all meters and SPDs with fixed labeles (spares too) 4. Units where not looked at at first inspection, first floor units inspected had several breakers off, ensure all units are 100% on and everything is working properly will inspect the units at re-inspection 1/12/26 1. Exterior light not trimmed out 2. Label SPDs 3. Label all meters properly (spares included) 4. House panel breakers off 5. Ensure house panel schdule matches approved plans 6. Exposed romex in fire room 7. Secure all conduits properly in fire room 8. Not ready a full re-inspection required only looked on outside of building and first floor breeze ways | |||
| ELECTRIC FINAL | 01/20/2026 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1/20/26 Plans still do not match house panel and schdule subbmit a revision and have approved before re-inspection 1/15/26 Make all repairs before re-inspection 1. House panel schdule does not match, revision required showing only one house panel and matching schdules 2. Breaker in house panel turned off 3. Label all meters and SPDs with fixed labeles (spares too) 4. Units where not looked at at first inspection, first floor units inspected had several breakers off, ensure all units are 100% on and everything is working properly will inspect the units at re-inspection 1/12/26 1. Exterior light not trimmed out 2. Label SPDs 3. Label all meters properly (spares included) 4. House panel breakers off 5. Ensure house panel schdule matches approved plans 6. Exposed romex in fire room 7. Secure all conduits properly in fire room 8. Not ready a full re-inspection required only looked on outside of building and first floor breeze ways | |||
| ELECTRIC FINAL | 01/15/2026 | Disapproved - NO FEE | MKRASKI |
| Note: 1/15/26 Make all repairs before re-inspection 1. House panel schdule does not match, revision required showing only one house panel and matching schdules 2. Breaker in house panel turned off 3. Label all meters and SPDs with fixed labeles (spares too) 4. Units where not looked at at first inspection, first floor units inspected had several breakers off, ensure all units are 100% on and everything is working properly will inspect the units at re-inspection 1/12/26 1. Exterior light not trimmed out 2. Label SPDs 3. Label all meters properly (spares included) 4. House panel breakers off 5. Ensure house panel schdule matches approved plans 6. Exposed romex in fire room 7. Secure all conduits properly in fire room 8. Not ready a full re-inspection required only looked on outside of building and first floor breeze ways | |||
| ELECTRIC FINAL | 01/14/2026 | CANCELLED BY APPLICANT | WEB |
| Note: 1/12/2026 - PREVIOUS INSPECTION NOTES 1. Exterior light not trimmed out 2. Label SPDs and all 3. Label all meters properly (spares included) 4. House panel breakers off 5. Ensure house panel schdule matches approved plans 6. Exposed romex in fire room 7. Secure all conduits properly in fire room 8. Not ready a full re-inspection required only looked on outside of building and first floor breeze ways | |||
| ELECTRIC FINAL | 01/12/2026 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Exterior light not trimmed out 2. Label SPDs and all 3. Label all meters properly (spares included) 4. House panel breakers off 5. Ensure house panel schdule matches approved plans 6. Exposed romex in fire room 7. Secure all conduits properly in fire room 8. Not ready a full re-inspection required only looked on outside of building and first floor breeze ways | |||
| ELECTRIC FINAL | 01/09/2026 | CANCELLED BY APPLICANT | WEB |
| Note: 11/21/2025 - PREVIOUS INSPECTION NOTES Called in by mistake, added a early power inspection 11/21/25 | |||
| HVAC FINAL | 01/09/2026 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 3140 ALL MECHANICAL, ALL UNITS ON ALL FLOORS APPROVED. | |||
| PLUMBING FINAL | 01/09/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 1/9/2026 10:18:48 AM *** 1/9/25: This inspection was completed partially on 1/5/26 while the City permit site was down due to server complications. Follow up today to check water heater relief valve discharge tubes and condensate drains air gap into indirect waste line. 12/19/2025 - PREVIOUS INSPECTION NOTES 12/19/25: This Inspection will need to be re-scheduled when the shower and bathtub drain assemblies are complete with the strainers, stoppers and faceplates as required. FBC[A]110.1 / FBC [A] 110.3(6) | |||
| PLUMBING FINAL | 12/19/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/19/2025 4:02:59 PM *** 12/19/25: This Inspection will need to be re-scheduled when the shower and bathtub drain assemblies are complete with the strainers, stoppers and faceplates as required. FBC[A]110.1 / FBC [A] 110.3(6) | |||
| FRAMING | 12/19/2025 | APPROVED | KSANDOE |
| U-CROSS CONNECTION | 12/19/2025 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, IRR with pond water. | |||
| INSULATION | 12/19/2025 | APPROVED | KSANDOE |
| Note: 9/3/2025 - PREVIOUS INSPECTION NOTES 9/3/25 - ITEM HAS BEEN CORRECTED. 8/29/2025 - PREVIOUS INSPECTION NOTES SHOWER WALL INSERTS HAVE NOT BEEN INSTALLED PER INSTALLATION INSTRUCTIONS. CANNOT AUTHORIZE DRYWALL INSTALLATION UNTIL REPAIRS/CORRECTIONS ARE MADE 8/27/2025 - PREVIOUS INSPECTION NOTES 8/25/2025 - PREVIOUS INSPECTION NOTES 8/25/25 - SECURE SHOWER WALL WITH FASTENERS AS PER PLANS. RE-INSTALL INSULATION WHERE IT HAS FALLEN OR BEEN REMOVED. 8/18/2025 - PREVIOUS INSPECTION NOTES 7/23/2025 - PREVIOUS INSPECTION NOTES TUB AND SHOWER AREAS AS REQUESTED. | |||
| ELECTRIC - EARLY POWER | 11/24/2025 | APPROVED | MKRASKI |
| Note: 11/24/25 Power release, emailed FPL @ 9:40am 11/21/25 1. Units are approved, contractor needs to be onsite to torque lugs on services before power can be released | |||
| ELECTRIC FINAL | 11/21/2025 | CANCELLED BY APPLICANT | MKRASKI |
| Note: Called in by mistake, added a early power inspection 11/21/25 | |||
| ELECTRIC - EARLY POWER | 11/21/2025 | PARTIALLY APPROVED | MKRASKI |
| Note: 1. Units are approved, contractor needs to be onsite to torque lugs on services before power can be released | |||
| FIREWALL FINAL | 10/14/2025 | FINAL APPROVED | FWILLIS |
| FIREWALL FRAMING | 10/09/2025 | APPROVED | FWILLIS |
| HORIZONTAL ASSEMB DRYWALL | 10/07/2025 | APPROVED | FWILLIS |
| Note: 9/17/2025 - PREVIOUS INSPECTION NOTES 9/16/2025 - PREVIOUS INSPECTION NOTES 9/16/25 - "B" SIDE ONLY RC CHANNEL . 9/2/2025 - PREVIOUS INSPECTION NOTES BREEZEWAYS AND BALCONIES 8/4/2025 - PREVIOUS INSPECTION NOTES | |||
| FIREWALL DRYWALL NAILING | 09/30/2025 | APPROVED | HCAMACHO |
| Note: second layer in garages next to the strairs, hall and closets. | |||
| FIREWALL DRYWALL NAILING | 09/29/2025 | APPROVED | FWILLIS |
| Note: 9/26/2025 - PREVIOUS INSPECTION NOTES LEFT AND RIGHT SIDE OF ENTRY INTO GARAGE MISSING FASTENERS THROUGHOUT. ALSO RECHECK FASTENER SPACING THROUGHOUT. | |||
| FIREWALL DRYWALL NAILING | 09/26/2025 | Disapproved - NO FEE | FWILLIS |
| Note: LEFT AND RIGHT SIDE OF ENTRY INTO GARAGE MISSING FASTENERS THROUGHOUT. ALSO RECHECK FASTENER SPACING THROUGHOUT. | |||
| HORIZONTAL ASSEMB DRYWALL | 09/17/2025 | PARTIALLY APPROVED | FWILLIS |
| Note: 9/16/2025 - PREVIOUS INSPECTION NOTES 9/16/25 - "B" SIDE ONLY RC CHANNEL . 9/2/2025 - PREVIOUS INSPECTION NOTES BREEZEWAYS AND BALCONIES 8/4/2025 - PREVIOUS INSPECTION NOTES | |||
| HORIZONTAL ASSEMB DRYWALL | 09/16/2025 | PARTIALLY APPROVED | FWILLIS |
| Note: 9/16/25 - "B" SIDE ONLY RC CHANNEL . 9/2/2025 - PREVIOUS INSPECTION NOTES BREEZEWAYS AND BALCONIES 8/4/2025 - PREVIOUS INSPECTION NOTES | |||
| INSULATION | 09/03/2025 | PARTIALLY APPROVED | FWILLIS |
| Note: 9/3/25 - ITEM HAS BEEN CORRECTED. 8/29/2025 - PREVIOUS INSPECTION NOTES SHOWER WALL INSERTS HAVE NOT BEEN INSTALLED PER INSTALLATION INSTRUCTIONS. CANNOT AUTHORIZE DRYWALL INSTALLATION UNTIL REPAIRS/CORRECTIONS ARE MADE 8/27/2025 - PREVIOUS INSPECTION NOTES 8/25/2025 - PREVIOUS INSPECTION NOTES 8/25/25 - SECURE SHOWER WALL WITH FASTENERS AS PER PLANS. RE-INSTALL INSULATION WHERE IT HAS FALLEN OR BEEN REMOVED. 8/18/2025 - PREVIOUS INSPECTION NOTES 7/23/2025 - PREVIOUS INSPECTION NOTES TUB AND SHOWER AREAS AS REQUESTED. | |||
| HORIZONTAL ASSEMB DRYWALL | 09/02/2025 | PARTIALLY APPROVED | FWILLIS |
| Note: BREEZEWAYS AND BALCONIES 8/4/2025 - PREVIOUS INSPECTION NOTES | |||
| INSULATION | 08/29/2025 | Disapproved - NO FEE | KSANDOE |
| Note: SHOWER WALL INSERTS HAVE NOT BEEN INSTALLED PER INSTALLATION INSTRUCTIONS. CANNOT AUTHORIZE DRYWALL INSTALLATION UNTIL REPAIRS/CORRECTIONS ARE MADE 8/27/2025 - PREVIOUS INSPECTION NOTES 8/25/2025 - PREVIOUS INSPECTION NOTES 8/25/25 - SECURE SHOWER WALL WITH FASTENERS AS PER PLANS. RE-INSTALL INSULATION WHERE IT HAS FALLEN OR BEEN REMOVED. 8/18/2025 - PREVIOUS INSPECTION NOTES 7/23/2025 - PREVIOUS INSPECTION NOTES TUB AND SHOWER AREAS AS REQUESTED. | |||
| BLD - SEWER TIE IN | 08/28/2025 | APPROVED | MGIBSON |
| INSULATION | 08/27/2025 | PARTIALLY APPROVED | FWILLIS |
| Note: 8/25/2025 - PREVIOUS INSPECTION NOTES 8/25/25 - SECURE SHOWER WALL WITH FASTENERS AS PER PLANS. RE-INSTALL INSULATION WHERE IT HAS FALLEN OR BEEN REMOVED. 8/18/2025 - PREVIOUS INSPECTION NOTES 7/23/2025 - PREVIOUS INSPECTION NOTES TUB AND SHOWER AREAS AS REQUESTED. | |||
| INSULATION | 08/25/2025 | Disapproved - NO FEE | FWILLIS |
| Note: 8/25/25 - SECURE SHOWER WALL WITH FASTENERS AS PER PLANS. RE-INSTALL INSULATION WHERE IT HAS FALLEN OR BEEN REMOVED. 8/18/2025 - PREVIOUS INSPECTION NOTES 7/23/2025 - PREVIOUS INSPECTION NOTES TUB AND SHOWER AREAS AS REQUESTED. | |||
| HORIZONTAL ASSEMB FRAMING | 08/20/2025 | APPROVED | KSANDOE |
| Note: RC | |||
| PLUMBING 2ND ROUGH | 08/19/2025 | APPROVED | MGIBSON |
| Note: 8/14/2025 - PREVIOUS INSPECTION NOTES WALKED JOB WITH PLUMBER MULTIPLE CODE ISSUES BUT CAN BE REPAIRED | |||
| INSULATION | 08/18/2025 | PARTIALLY APPROVED | FWILLIS |
| Note: 7/23/2025 - PREVIOUS INSPECTION NOTES TUB AND SHOWER AREAS AS REQUESTED. | |||
| PLUMBING 2ND ROUGH | 08/14/2025 | PARTIALLY APPROVED | MGIBSON |
| Note: WALKED JOB WITH PLUMBER MULTIPLE CODE ISSUES BUT CAN BE REPAIRED | |||
| PLUMBING 2ND ROUGH | 08/12/2025 | CANCELLED BY APPLICANT | WEB |
| FIREWALL PENETRATIONS | 08/11/2025 | APPROVED | KSANDOE |
| Note: 8/8/2025 - PREVIOUS INSPECTION NOTES Not ready 7/18/2025 - PREVIOUS INSPECTION NOTES 7/16/2025 - PREVIOUS INSPECTION NOTES FBC 714.5.1.2 Through penetrations shall be protected by an approved through-penetration firestop system. | |||
| LINTEL | 08/08/2025 | CANCELLED BY INSPECTOR | KSANDOE |
| FIREWALL PENETRATIONS | 08/08/2025 | Disapproved - NO FEE | KSANDOE |
| Note: Not ready 7/18/2025 - PREVIOUS INSPECTION NOTES 7/16/2025 - PREVIOUS INSPECTION NOTES FBC 714.5.1.2 Through penetrations shall be protected by an approved through-penetration firestop system. | |||
| HORIZONTAL ASSEMB DRYWALL | 08/04/2025 | PARTIALLY APPROVED | KSANDOE |
| STOREFRONT | 08/01/2025 | CANCELLED BY INSPECTOR | KSANDOE |
| LATH/BRICK/WATER BARRIER | 08/01/2025 | APPROVED | KSANDOE |
| HORIZONTAL ASSEMB FRAMING | 07/24/2025 | APPROVED | FWILLIS |
| INSULATION | 07/23/2025 | PARTIALLY APPROVED | FWILLIS |
| Note: TUB AND SHOWER AREAS AS REQUESTED. | |||
| FIREWALL PENETRATIONS | 07/18/2025 | PARTIALLY APPROVED | FWILLIS |
| Note: 7/16/2025 - PREVIOUS INSPECTION NOTES FBC 714.5.1.2 Through penetrations shall be protected by an approved through-penetration firestop system. | |||
| FIREWALL PENETRATIONS | 07/16/2025 | Disapproved - NO FEE | KSANDOE |
| Note: FBC 714.5.1.2 Through penetrations shall be protected by an approved through-penetration firestop system. | |||
| HORIZONTAL ASSEMB FRAMING | 07/14/2025 | CANCELLED BY APPLICANT | WEB |
| WINDOW NAILING | 07/07/2025 | APPROVED | FWILLIS |
| ELECTRIC 2ND ROUGH | 07/07/2025 | APPROVED | MKRASKI |
| HVAC ROUGH | 06/18/2025 | APPROVED - AS NOTED | PBUCKLEY |
| Note: ALL MECHANICAL, ALL UNITS ON ALL FLOORS APPROVED. | |||
| LATH/BRICK/WATER BARRIER | 05/14/2025 | APPROVED | FWILLIS |
| Note: 4/2/2025 1:15:06 PM- PREVIOUS INSPECTION NOTES | |||
| WINDOW NAILING | 05/08/2025 | APPROVED | FWILLIS |
| FIREWALL DRYWALL NAILING | 04/10/2025 | APPROVED | FWILLIS |
| Note: TWO LAYERS OF 5/8" ON EACH SIDE OF GARAGE. | |||
| FIREWALL DRYWALL NAILING | 04/04/2025 | APPROVED | FWILLIS |
| Note: FIRST LAYER OF 5/8" BUILDING 1200, GARAGE SIDE. | |||
| LATH/BRICK/WATER BARRIER | 04/02/2025 | CANCELLED BY APPLICANT | FWILLIS |
| ROOF SHEATHING / BRACE / TIE DOWN | 04/02/2025 | APPROVED | FWILLIS |
| Note: ROOF INSPECTION PARTIAL | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/25/2025 | APPROVED | DLEAP |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/03/2025 | 10/15/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/04/2025 | 06/18/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 03/25/2025 | 03/25/2025 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| PLENG | HOLD | 03/12/2025 | 03/13/2025 |
| Note: Held By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM 1. Label plan "FOUNDATION SURVEY" and not SPECIFIC PURPOSE SURVEY. 2. Highlight foundation for specific foundation being permitted for in this permit application. | |||
| BLD | CANCEL | 09/26/2024 | 09/26/2024 |
| PLFM | INFORMATION | 09/13/2024 | 09/16/2024 |
| Note: Marked INFORMATION By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Vertical construction is not authorized until floodplain requirements have been met. | |||
| UD1 | COMPLETE | 09/09/2024 | 09/12/2024 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 09/09/2024 | 09/13/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/09/2024 | 09/13/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| DSD | COMPLETE | 09/09/2024 | 09/09/2024 |
| Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/09/2024 | 09/13/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 09/09/2024 | 09/13/2024 |
| Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 09/09/2024 | 09/13/2024 |
| MECH | COMPLETE | 09/09/2024 | 09/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ARCHR | COMPLETE | 09/09/2024 | 09/16/2024 |
| Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| IMPACT FEE PARKS | ¤36,019.80 | 07/30/2025 |
| IMPACT FEE TRANSPORTATION | ¤39,240.00 | 07/30/2025 |
| IMPACT FEE FIRE | ¤8,561.80 | 04/02/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤2,220.00 | 09/26/2024 |
| FC IMPACT FEE LIBRARY | ¤2,780.00 | 09/26/2024 |
| IMPACT FEE SCHOOL | ¤27,200.00 | 09/26/2024 |
| ADJUSTMENT 10% | (¤1,394.43) | 09/26/2024 |
| ADMINISTRATIVE - COMMERCIAL | ¤75.00 | 09/26/2024 |
| INSPECTION COMMERCIAL | ¤13,391.00 | 09/26/2024 |
| INSPECTION - FIRE COMMERCIAL | ¤478.25 | 09/26/2024 |
| SURCHARGE FS 533.721 | ¤125.50 | 09/26/2024 |
| SURCHARGE - FS 468.631 | ¤188.25 | 09/26/2024 |
| SITE PLAN 30 | ¤30.00 | 09/26/2024 |
| FC IMPACT FEE EMS | ¤640.00 | 09/26/2024 |
| REINSPECTION - COMMERCIAL | ¤60.00 | |
| Fees | Total Due: ¤60.00 | Total Paid: ¤129,555.17 |