Permit #2024090365
Permit Details
Status: COED
| Total Square Footage: 30027 sqft |
| Block: 00000 |
| Subdivision: 2334 - EVOLVE PALM COAST - SANDLAKE SUBDIVISION LOT 4 |
| Job Phone: 304-694-7694 |
| Location Address: 47 EVOLVE PKWY |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 09/26/2024 |
| NOC: RECORDED |
| Applicant name: MATTHEW ADAM ROGERS |
| Owner: EVOLVE PALM COAST LLC |
|
Address 2918-A MARTINSVILLE ROAD GREENSBORO, NC 27408 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤1,650,000.00 |
| Job Description: BLDG 1000 - (22 UNITS) |
| Type: CN |
| Original Permit #: 2024030358 |
Contractor
EVOLVE CONSTRUCTION OF FL LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
2018A MARTINSVILLE RD GREENSBORO, NC 27408 |
CGC1532932 (Exp: 08/31/2026) | 304-694-7694 |
Sub Contractors
PAUL LEONARD RICHARDS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
671 BUSINESS PARK BLVD WINTER GARDEN, FL 34787 |
CAC057235 (Exp: 08/31/2026) | 407-877-8090 | 407-877-8479 |
TRACEY LYNN HYMAN-MONTEE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
75 STUMPFIELD ROAD PENSACOLA, FL 32503 |
CFC1430978 (Exp: 08/31/2026) | 850-477-0388 | 850-477-0381 |
MARK ASSELIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3508 LENOX AVE JACKSONVILLE, FL 32254 |
EC13009251 (Exp: 08/31/2026) | 904-726-7966 |
JOSHUA DAVID CADILLAC
| Status | Location Address | State License Number | Phone |
| CANCEL |
3264 S UNIVERSITY DRIVE MIRMAR, FL 33025 |
CCC1333894 (Exp: 08/31/2026) | 954-333-8697 |
Inspection History
| Type | Request Date | Result | Inspector |
| HORIZONTAL ASSEMB FINAL | 12/17/2025 | FINAL APPROVED | KSANDOE |
| Note: 12/10/2025 - PREVIOUS INSPECTION NOTES 1.Unit 207 has a hole in the ceiling inside the utility closet. 2. Unit 101 has drywal removed in the kitchen wall and garage wall due to a plumbing leak. 11/10/2025 - PREVIOUS INSPECTION NOTES | |||
| BUILDING FINAL | 12/17/2025 | FINAL APPROVED | KSANDOE |
| Note: 12/10/2025 - PREVIOUS INSPECTION NOTES 1. Unit 207 ha a hole in the ceiling drywall inside the utility closet. 2. Unit 101 has drywall damage in the garage and kitchen area due to a plumbing leak. 3. Units 105,106,205,208,302 and 308 are missing the Vanity lights in the bath rooms. 4. Unit 305 the Water Heater may have a leak, because the safety pan is full of water. | |||
| FIRE FINAL | 12/17/2025 | APPROVED | RMARTIN |
| Note: 12/10/2025 - PREVIOUS INSPECTION NOTES Need to have Fire Extinguisher lables at Fire Extinguisher locations in breeze ways. | |||
| EXTERIOR ARCHITECTURAL FEATURES | 12/10/2025 | APPROVED | RPICATAGI |
| FIRE FINAL | 12/10/2025 | Disapproved - NO FEE | RMARTIN |
| Note: Need to have Fire Extinguisher lables at Fire Extinguisher locations in breeze ways. | |||
| HORIZONTAL ASSEMB FINAL | 12/10/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1.Unit 207 has a hole in the ceiling inside the utility closet. 2. Unit 101 has drywal removed in the kitchen wall and garage wall due to a plumbing leak. 11/10/2025 - PREVIOUS INSPECTION NOTES | |||
| BUILDING FINAL | 12/10/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Unit 207 ha a hole in the ceiling drywall inside the utility closet. 2. Unit 101 has drywall damage in the garage and kitchen area due to a plumbing leak. 3. Units 105,106,205,208,302 and 308 are missing the Vanity lights in the bath rooms. 4. Unit 305 the Water Heater may have a leak, because the safety pan is full of water. | |||
| U - UTILITY COMMERCIAL FINAL | 12/10/2025 | FINAL APPROVED | BWRIGHT |
| U -UTILITY RESIDENTIAL FINAL | 12/03/2025 | FINAL APPROVED | BHAINES |
| U-CROSS CONNECTION | 12/03/2025 | APPROVED - AS NOTED | BHAINES |
| Note: IRR with pond water. | |||
| ELECTRIC FINAL | 11/13/2025 | APPROVED | JMUNSON |
| Note: Inspector Notes from Inspection 3210 Emailed FPL @ 1:20pm | |||
| PLUMBING FINAL | 11/12/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: FIRE CAULKING NEEDED IN 4 PLACES OR DRYWALL, NAIL PLATES NEEDED IN 5 SPOTS AND ATTCH WHERE SHOWER WHERE DRYWALL WAS INSTALLED ON EXTERIOR WALL. WILL CHECK AT LATER DATE | |||
| FRAMING | 11/10/2025 | APPROVED | KSANDOE |
| HORIZONTAL ASSEMB PENETRATIONS | 11/10/2025 | APPROVED | KSANDOE |
| HORIZONTAL ASSEMB FINAL | 11/10/2025 | CANCELLED BY APPLICANT | KSANDOE |
| FIREWALL PENETRATIONS | 11/07/2025 | APPROVED | KSANDOE |
| HVAC FINAL | 10/17/2025 | FINAL APPROVED | CPISCITELLI |
| Note: | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 10/15/2025 | APPROVED | CPISCITELLI |
| Note: report submitted | |||
| U - SEWER TIE IN | 10/03/2025 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 09/24/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 1:20pm | |||
| ELECTRIC - EARLY POWER | 09/17/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: Power release to house panel only, Emailed FPL | |||
| ELECTRIC - EARLY POWER | 09/04/2025 | CANCELLED BY APPLICANT | RMARTIN |
| Note: Inspector Notes from Inspection 3210 Power release to house panel only, Emailed FPL | |||
| BLD - SEWER TIE IN | 08/28/2025 | APPROVED | MGIBSON |
| FIREWALL FRAMING | 08/08/2025 | APPROVED | KSANDOE |
| FIREWALL FINAL | 08/08/2025 | APPROVED | KSANDOE |
| STOREFRONT | 08/01/2025 | CANCELLED BY INSPECTOR | KSANDOE |
| FIREWALL DRYWALL NAILING | 07/29/2025 | APPROVED | KSANDOE |
| Note: 7/22/2025 - PREVIOUS INSPECTION NOTES 1st layer breezeways | |||
| ELECTRIC - EARLY POWER | 07/28/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: Power release to house panel only, Emailed FPL | |||
| FIREWALL DRYWALL NAILING | 07/22/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: 1st layer breezeways | |||
| HORIZONTAL ASSEMB DRYWALL | 07/21/2025 | APPROVED | FWILLIS |
| HORIZONTAL ASSEMB DRYWALL | 07/16/2025 | APPROVED | KSANDOE |
| HORIZONTAL ASSEMB FRAMING | 07/10/2025 | APPROVED | FWILLIS |
| Note: 7/2/2025 - PREVIOUS INSPECTION NOTES 7/2/25 - RC CHANNEL NOT INSTALLED YET. (Horizonal Assembly) Inspector Notes from Inspection 3443 6/30/25 - A- SIDE TOWER, (right side) ALL THREE FLOORS. FIRE CAULK MUST BE IN THE ANNULAR SPACE NOT JUST SMEARED ON. FBC315.1 FBC714.4.1. 6/12/2025 - PREVIOUS INSPECTION NOTES BEHIND THE SHOWER STALLS EACH FLOOR | |||
| FIREWALL PENETRATIONS | 07/10/2025 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 07/08/2025 | APPROVED | FWILLIS |
| Note: 7/8/25 - ALL EXCEPT CEILING ON THIRD FLOOR. WILL BE BLOWN IN AT A LATER DATE. 6/16/2025 - PREVIOUS INSPECTION NOTES | |||
| FIREWALL PENETRATIONS | 07/02/2025 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 3443 6/30/25 - A- SIDE TOWER, (right side) ALL THREE FLOORS. FIRE CAULK MUST BE IN THE ANNULAR SPACE NOT JUST SMEARED ON. FBC315.1 FBC714.4.1. 6/12/2025 - PREVIOUS INSPECTION NOTES BEHIND THE SHOWER STALLS EACH FLOOR | |||
| HORIZONTAL ASSEMB FRAMING | 07/02/2025 | Disapproved - NO FEE | FWILLIS |
| Note: 7/2/25 - RC CHANNEL NOT INSTALLED YET. (Horizonal Assembly) Inspector Notes from Inspection 3443 6/30/25 - A- SIDE TOWER, (right side) ALL THREE FLOORS. FIRE CAULK MUST BE IN THE ANNULAR SPACE NOT JUST SMEARED ON. FBC315.1 FBC714.4.1. 6/12/2025 - PREVIOUS INSPECTION NOTES BEHIND THE SHOWER STALLS EACH FLOOR | |||
| PLUMBING 2ND ROUGH | 07/01/2025 | APPROVED | MGIBSON |
| Note: 6/27/2025 - PREVIOUS INSPECTION NOTES WASTE LINES IN SEVERAL AREAS NOT HOLDING HEAD PRESSURE, FLOOR PATCH @ 3'' IN GARAGE AREA MUST BE 3 1/2'' THICK NEED TO FIRE CAULK AREAS THAT I WENT OVER WITH PLUMBER, W/M P-TRAP IS CROWNED IN 3 UNITS | |||
| FIREWALL PENETRATIONS | 06/30/2025 | APPROVED - AS NOTED | FWILLIS |
| Note: 6/30/25 - A- SIDE TOWER, (right side) ALL THREE FLOORS. FIRE CAULK MUST BE IN THE ANNULAR SPACE NOT JUST SMEARED ON. FBC315.1 FBC714.4.1. 6/12/2025 - PREVIOUS INSPECTION NOTES BEHIND THE SHOWER STALLS EACH FLOOR | |||
| PLUMBING 2ND ROUGH | 06/27/2025 | PARTIALLY APPROVED | MGIBSON |
| Note: WASTE LINES IN SEVERAL AREAS NOT HOLDING HEAD PRESSURE, FLOOR PATCH @ 3'' IN GARAGE AREA MUST BE 3 1/2'' THICK NEED TO FIRE CAULK AREAS THAT I WENT OVER WITH PLUMBER, W/M P-TRAP IS CROWNED IN 3 UNITS | |||
| WINDOW NAILING | 06/26/2025 | APPROVED | FWILLIS |
| Note: 5/1/2025 - PREVIOUS INSPECTION NOTES 1. Windows only. Doors are not installed yet. | |||
| ELECTRIC 2ND ROUGH | 06/24/2025 | APPROVED | RMARTIN |
| Note: 5/29/2025 - PREVIOUS INSPECTION NOTES | |||
| HVAC ROUGH | 06/20/2025 | APPROVED - AS NOTED | PBUCKLEY |
| Note: 6/5/2025 - PREVIOUS INSPECTION NOTES inspected freshair seams to be able to wrap 06/20/25 All mechanical, all units, all floors approved. | |||
| LATH/BRICK/WATER BARRIER | 06/17/2025 | APPROVED | FWILLIS |
| Note: 5/14/2025 - PREVIOUS INSPECTION NOTES NOT COMPLETE | |||
| INSULATION | 06/16/2025 | PARTIALLY APPROVED | FWILLIS |
| FIREWALL PENETRATIONS | 06/12/2025 | PARTIALLY APPROVED | FWILLIS |
| Note: BEHIND THE SHOWER STALLS EACH FLOOR | |||
| HVAC ROUGH | 06/05/2025 | PARTIALLY APPROVED | CPISCITELLI |
| Note: inspected freshair seams to be able to wrap | |||
| ELECTRIC 2ND ROUGH | 05/29/2025 | CANCELLED BY APPLICANT | RMARTIN |
| HVAC ROUGH | 05/28/2025 | CANCELLED BY APPLICANT | RMARTIN |
| LATH/BRICK/WATER BARRIER | 05/14/2025 | Disapproved - NO FEE | FWILLIS |
| Note: NOT COMPLETE | |||
| ELECTRIC 2ND ROUGH | 05/08/2025 | CANCELLED BY APPLICANT | WEB |
| WINDOW NAILING | 05/01/2025 | PARTIALLY APPROVED | HCAMACHO |
| Note: 1. Windows only. Doors are not installed yet. | |||
| FIREWALL DRYWALL NAILING | 04/03/2025 | APPROVED | FWILLIS |
| Note: FIRST LAYER OF 5/8" SHEETROCK FOR FIREWALL, IN BREEZEWAY ON GARAGE SIDE. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/25/2025 | APPROVED | DLEAP |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/03/2025 | 10/15/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/25/2025 | 10/01/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit pictures that go along with the report | |||
| BLD | COMPLETE | 06/04/2025 | 06/18/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 03/25/2025 | 03/25/2025 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| PLENG | HOLD | 03/12/2025 | 03/13/2025 |
| Note: Held By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM 1. Label plan "FOUNDATION SURVEY" and not SPECIFIC PURPOSE SURVEY. 2. Highlight foundation for specific foundation being permitted for in this permit application. | |||
| BLD | CANCEL | 09/26/2024 | 09/26/2024 |
| PLFM | INFORMATION | 09/13/2024 | 09/16/2024 |
| Note: Marked INFORMATION By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Vertical construction is not authorized until floodplain requirements have been met. | |||
| ARCHR | COMPLETE | 09/10/2024 | 09/16/2024 |
| Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/10/2024 | 09/13/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| DSD | COMPLETE | 09/10/2024 | 09/12/2024 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/10/2024 | 09/13/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 09/10/2024 | 09/13/2024 |
| Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 09/10/2024 | 09/13/2024 |
| MECH | COMPLETE | 09/10/2024 | 09/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 09/10/2024 | 09/12/2024 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 09/10/2024 | 09/13/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| IMPACT FEE PARKS | ¤39,621.78 | 05/23/2025 |
| IMPACT FEE TRANSPORTATION | ¤43,164.00 | 05/23/2025 |
| IMPACT FEE FIRE | ¤9,417.98 | 04/02/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤2,442.00 | 09/26/2024 |
| FC IMPACT FEE LIBRARY | ¤3,058.00 | 09/26/2024 |
| IMPACT FEE SCHOOL | ¤29,920.00 | 09/26/2024 |
| ADJUSTMENT 10% | (¤1,203.75) | 09/26/2024 |
| ADMINISTRATIVE - COMMERCIAL | ¤75.00 | 09/26/2024 |
| INSPECTION COMMERCIAL | ¤11,550.00 | 09/26/2024 |
| INSPECTION - FIRE COMMERCIAL | ¤412.50 | 09/26/2024 |
| FC IMPACT FEE EMS | ¤704.00 | 09/26/2024 |
| SURCHARGE FS 533.721 | ¤108.34 | 09/26/2024 |
| SURCHARGE - FS 468.631 | ¤162.51 | 09/26/2024 |
| SITE PLAN 30 | ¤30.00 | 09/26/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤139,462.36 |