I want to search for...

Permit #2024090365

Permit Details

Status: COED

Total Square Footage: 30027 sqft
Block: 00000
Subdivision: 2334 - EVOLVE PALM COAST - SANDLAKE SUBDIVISION LOT 4
Job Phone: 304-694-7694
Location Address: 47 EVOLVE PKWY
Type: BM - BUILDING MULTI - APARTMENT
Issue Date: 09/26/2024
NOC: RECORDED
Applicant name: MATTHEW ADAM ROGERS
Owner: EVOLVE PALM COAST LLC

Address

2918-A MARTINSVILLE ROAD

GREENSBORO, NC 27408

Lot: 0040
Contracted Stated Job Value: ¤1,650,000.00
Job Description: BLDG 1000 - (22 UNITS)
Type: CN
Original Permit #: 2024030358

Contractor

EVOLVE CONSTRUCTION OF FL LLC
Status Location Address State License Number Phone
INACTIVE

2018A MARTINSVILLE RD

GREENSBORO, NC 27408

CGC1532932 (Exp: 08/31/2026) 304-694-7694

Sub Contractors

PAUL LEONARD RICHARDS
Status Location Address State License Number Phone Fax
ACTIVE

671 BUSINESS PARK BLVD

WINTER GARDEN, FL 34787

CAC057235 (Exp: 08/31/2026) 407-877-8090 407-877-8479
TRACEY LYNN HYMAN-MONTEE
Status Location Address State License Number Phone Fax
ACTIVE

75 STUMPFIELD ROAD

PENSACOLA, FL 32503

CFC1430978 (Exp: 08/31/2026) 850-477-0388 850-477-0381
MARK ASSELIN
Status Location Address State License Number Phone
ACTIVE

3508 LENOX AVE

JACKSONVILLE, FL 32254

EC13009251 (Exp: 08/31/2026) 904-726-7966
JOSHUA DAVID CADILLAC
Status Location Address State License Number Phone
CANCEL

3264 S UNIVERSITY DRIVE

MIRMAR, FL 33025

CCC1333894 (Exp: 08/31/2026) 954-333-8697

Inspection History

Type Request Date Result Inspector
HORIZONTAL ASSEMB FINAL 12/17/2025 FINAL APPROVED KSANDOE
Note: 12/10/2025 - PREVIOUS INSPECTION NOTES 1.Unit 207 has a hole in the ceiling inside the utility closet. 2. Unit 101 has drywal removed in the kitchen wall and garage wall due to a plumbing leak. 11/10/2025 - PREVIOUS INSPECTION NOTES
BUILDING FINAL 12/17/2025 FINAL APPROVED KSANDOE
Note: 12/10/2025 - PREVIOUS INSPECTION NOTES 1. Unit 207 ha a hole in the ceiling drywall inside the utility closet. 2. Unit 101 has drywall damage in the garage and kitchen area due to a plumbing leak. 3. Units 105,106,205,208,302 and 308 are missing the Vanity lights in the bath rooms. 4. Unit 305 the Water Heater may have a leak, because the safety pan is full of water.
FIRE FINAL 12/17/2025 APPROVED RMARTIN
Note: 12/10/2025 - PREVIOUS INSPECTION NOTES Need to have Fire Extinguisher lables at Fire Extinguisher locations in breeze ways.
EXTERIOR ARCHITECTURAL FEATURES 12/10/2025 APPROVED RPICATAGI
FIRE FINAL 12/10/2025 Disapproved - NO FEE RMARTIN
Note: Need to have Fire Extinguisher lables at Fire Extinguisher locations in breeze ways.
HORIZONTAL ASSEMB FINAL 12/10/2025 Disapproved - NO FEE HCAMACHO
Note: 1.Unit 207 has a hole in the ceiling inside the utility closet. 2. Unit 101 has drywal removed in the kitchen wall and garage wall due to a plumbing leak. 11/10/2025 - PREVIOUS INSPECTION NOTES
BUILDING FINAL 12/10/2025 Disapproved - NO FEE HCAMACHO
Note: 1. Unit 207 ha a hole in the ceiling drywall inside the utility closet. 2. Unit 101 has drywall damage in the garage and kitchen area due to a plumbing leak. 3. Units 105,106,205,208,302 and 308 are missing the Vanity lights in the bath rooms. 4. Unit 305 the Water Heater may have a leak, because the safety pan is full of water.
U - UTILITY COMMERCIAL FINAL 12/10/2025 FINAL APPROVED BWRIGHT
U -UTILITY RESIDENTIAL FINAL 12/03/2025 FINAL APPROVED BHAINES
U-CROSS CONNECTION 12/03/2025 APPROVED - AS NOTED BHAINES
Note: IRR with pond water.
ELECTRIC FINAL 11/13/2025 APPROVED JMUNSON
Note: Inspector Notes from Inspection 3210 Emailed FPL @ 1:20pm
PLUMBING FINAL 11/12/2025 APPROVED - AS NOTED MGIBSON
Note: FIRE CAULKING NEEDED IN 4 PLACES OR DRYWALL, NAIL PLATES NEEDED IN 5 SPOTS AND ATTCH WHERE SHOWER WHERE DRYWALL WAS INSTALLED ON EXTERIOR WALL. WILL CHECK AT LATER DATE
FRAMING 11/10/2025 APPROVED KSANDOE
HORIZONTAL ASSEMB PENETRATIONS 11/10/2025 APPROVED KSANDOE
HORIZONTAL ASSEMB FINAL 11/10/2025 CANCELLED BY APPLICANT KSANDOE
FIREWALL PENETRATIONS 11/07/2025 APPROVED KSANDOE
HVAC FINAL 10/17/2025 FINAL APPROVED CPISCITELLI
Note:
ROOF SHEATHING / BRACE / TIE DOWN 10/15/2025 APPROVED CPISCITELLI
Note: report submitted
U - SEWER TIE IN 10/03/2025 APPROVED MGIBSON
ELECTRIC - EARLY POWER 09/24/2025 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 1:20pm
ELECTRIC - EARLY POWER 09/17/2025 APPROVED - AS NOTED MKRASKI
Note: Power release to house panel only, Emailed FPL
ELECTRIC - EARLY POWER 09/04/2025 CANCELLED BY APPLICANT RMARTIN
Note: Inspector Notes from Inspection 3210 Power release to house panel only, Emailed FPL
BLD - SEWER TIE IN 08/28/2025 APPROVED MGIBSON
FIREWALL FRAMING 08/08/2025 APPROVED KSANDOE
FIREWALL FINAL 08/08/2025 APPROVED KSANDOE
STOREFRONT 08/01/2025 CANCELLED BY INSPECTOR KSANDOE
FIREWALL DRYWALL NAILING 07/29/2025 APPROVED KSANDOE
Note: 7/22/2025 - PREVIOUS INSPECTION NOTES 1st layer breezeways
ELECTRIC - EARLY POWER 07/28/2025 APPROVED - AS NOTED MKRASKI
Note: Power release to house panel only, Emailed FPL
FIREWALL DRYWALL NAILING 07/22/2025 PARTIALLY APPROVED KSANDOE
Note: 1st layer breezeways
HORIZONTAL ASSEMB DRYWALL 07/21/2025 APPROVED FWILLIS
HORIZONTAL ASSEMB DRYWALL 07/16/2025 APPROVED KSANDOE
HORIZONTAL ASSEMB FRAMING 07/10/2025 APPROVED FWILLIS
Note: 7/2/2025 - PREVIOUS INSPECTION NOTES 7/2/25 - RC CHANNEL NOT INSTALLED YET. (Horizonal Assembly) Inspector Notes from Inspection 3443 6/30/25 - A- SIDE TOWER, (right side) ALL THREE FLOORS. FIRE CAULK MUST BE IN THE ANNULAR SPACE NOT JUST SMEARED ON. FBC315.1 FBC714.4.1. 6/12/2025 - PREVIOUS INSPECTION NOTES BEHIND THE SHOWER STALLS EACH FLOOR
FIREWALL PENETRATIONS 07/10/2025 CANCELLED BY APPLICANT WEB
INSULATION 07/08/2025 APPROVED FWILLIS
Note: 7/8/25 - ALL EXCEPT CEILING ON THIRD FLOOR. WILL BE BLOWN IN AT A LATER DATE. 6/16/2025 - PREVIOUS INSPECTION NOTES
FIREWALL PENETRATIONS 07/02/2025 APPROVED FWILLIS
Note: Inspector Notes from Inspection 3443 6/30/25 - A- SIDE TOWER, (right side) ALL THREE FLOORS. FIRE CAULK MUST BE IN THE ANNULAR SPACE NOT JUST SMEARED ON. FBC315.1 FBC714.4.1. 6/12/2025 - PREVIOUS INSPECTION NOTES BEHIND THE SHOWER STALLS EACH FLOOR
HORIZONTAL ASSEMB FRAMING 07/02/2025 Disapproved - NO FEE FWILLIS
Note: 7/2/25 - RC CHANNEL NOT INSTALLED YET. (Horizonal Assembly) Inspector Notes from Inspection 3443 6/30/25 - A- SIDE TOWER, (right side) ALL THREE FLOORS. FIRE CAULK MUST BE IN THE ANNULAR SPACE NOT JUST SMEARED ON. FBC315.1 FBC714.4.1. 6/12/2025 - PREVIOUS INSPECTION NOTES BEHIND THE SHOWER STALLS EACH FLOOR
PLUMBING 2ND ROUGH 07/01/2025 APPROVED MGIBSON
Note: 6/27/2025 - PREVIOUS INSPECTION NOTES WASTE LINES IN SEVERAL AREAS NOT HOLDING HEAD PRESSURE, FLOOR PATCH @ 3'' IN GARAGE AREA MUST BE 3 1/2'' THICK NEED TO FIRE CAULK AREAS THAT I WENT OVER WITH PLUMBER, W/M P-TRAP IS CROWNED IN 3 UNITS
FIREWALL PENETRATIONS 06/30/2025 APPROVED - AS NOTED FWILLIS
Note: 6/30/25 - A- SIDE TOWER, (right side) ALL THREE FLOORS. FIRE CAULK MUST BE IN THE ANNULAR SPACE NOT JUST SMEARED ON. FBC315.1 FBC714.4.1. 6/12/2025 - PREVIOUS INSPECTION NOTES BEHIND THE SHOWER STALLS EACH FLOOR
PLUMBING 2ND ROUGH 06/27/2025 PARTIALLY APPROVED MGIBSON
Note: WASTE LINES IN SEVERAL AREAS NOT HOLDING HEAD PRESSURE, FLOOR PATCH @ 3'' IN GARAGE AREA MUST BE 3 1/2'' THICK NEED TO FIRE CAULK AREAS THAT I WENT OVER WITH PLUMBER, W/M P-TRAP IS CROWNED IN 3 UNITS
WINDOW NAILING 06/26/2025 APPROVED FWILLIS
Note: 5/1/2025 - PREVIOUS INSPECTION NOTES 1. Windows only. Doors are not installed yet.
ELECTRIC 2ND ROUGH 06/24/2025 APPROVED RMARTIN
Note: 5/29/2025 - PREVIOUS INSPECTION NOTES
HVAC ROUGH 06/20/2025 APPROVED - AS NOTED PBUCKLEY
Note: 6/5/2025 - PREVIOUS INSPECTION NOTES inspected freshair seams to be able to wrap 06/20/25 All mechanical, all units, all floors approved.
LATH/BRICK/WATER BARRIER 06/17/2025 APPROVED FWILLIS
Note: 5/14/2025 - PREVIOUS INSPECTION NOTES NOT COMPLETE
INSULATION 06/16/2025 PARTIALLY APPROVED FWILLIS
FIREWALL PENETRATIONS 06/12/2025 PARTIALLY APPROVED FWILLIS
Note: BEHIND THE SHOWER STALLS EACH FLOOR
HVAC ROUGH 06/05/2025 PARTIALLY APPROVED CPISCITELLI
Note: inspected freshair seams to be able to wrap
ELECTRIC 2ND ROUGH 05/29/2025 CANCELLED BY APPLICANT RMARTIN
HVAC ROUGH 05/28/2025 CANCELLED BY APPLICANT RMARTIN
LATH/BRICK/WATER BARRIER 05/14/2025 Disapproved - NO FEE FWILLIS
Note: NOT COMPLETE
ELECTRIC 2ND ROUGH 05/08/2025 CANCELLED BY APPLICANT WEB
WINDOW NAILING 05/01/2025 PARTIALLY APPROVED HCAMACHO
Note: 1. Windows only. Doors are not installed yet.
FIREWALL DRYWALL NAILING 04/03/2025 APPROVED FWILLIS
Note: FIRST LAYER OF 5/8" SHEETROCK FOR FIREWALL, IN BREEZEWAY ON GARAGE SIDE.
FOUND SURVEY APPROVED (OFFICE) 03/25/2025 APPROVED DLEAP

Review History

Department Status Date In Date Out
BLD COMPLETE 10/03/2025 10/15/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 09/25/2025 10/01/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit pictures that go along with the report
BLD COMPLETE 06/04/2025 06/18/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 03/25/2025 03/25/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLENG HOLD 03/12/2025 03/13/2025
Note: Held By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM 1. Label plan "FOUNDATION SURVEY" and not SPECIFIC PURPOSE SURVEY. 2. Highlight foundation for specific foundation being permitted for in this permit application.
BLD CANCEL 09/26/2024 09/26/2024
PLFM INFORMATION 09/13/2024 09/16/2024
Note: Marked INFORMATION By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Vertical construction is not authorized until floodplain requirements have been met.
ARCHR COMPLETE 09/10/2024 09/16/2024
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
BLD COMPLETE 09/10/2024 09/13/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
DSD COMPLETE 09/10/2024 09/12/2024
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
ELEC COMPLETE 09/10/2024 09/13/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
FI1 COMPLETE 09/10/2024 09/13/2024
Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM
GAS CANCEL 09/10/2024 09/13/2024
MECH COMPLETE 09/10/2024 09/13/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
UD1 COMPLETE 09/10/2024 09/12/2024
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM
PLUM COMPLETE 09/10/2024 09/13/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
IMPACT FEE PARKS ¤39,621.78 05/23/2025
IMPACT FEE TRANSPORTATION ¤43,164.00 05/23/2025
IMPACT FEE FIRE ¤9,417.98 04/02/2025
FC IMPACT FEE LAW ENFORCEMENT ¤2,442.00 09/26/2024
FC IMPACT FEE LIBRARY ¤3,058.00 09/26/2024
IMPACT FEE SCHOOL ¤29,920.00 09/26/2024
ADJUSTMENT 10% (¤1,203.75) 09/26/2024
ADMINISTRATIVE - COMMERCIAL ¤75.00 09/26/2024
INSPECTION COMMERCIAL ¤11,550.00 09/26/2024
INSPECTION - FIRE COMMERCIAL ¤412.50 09/26/2024
FC IMPACT FEE EMS ¤704.00 09/26/2024
SURCHARGE FS 533.721 ¤108.34 09/26/2024
SURCHARGE - FS 468.631 ¤162.51 09/26/2024
SITE PLAN 30 ¤30.00 09/26/2024
Fees Total Due: ¤0.00 Total Paid: ¤139,462.36