I want to search for...

Permit #2024090366

Permit Details

Status: COED

Total Square Footage: 30027 sqft
Block: 00000
Subdivision: 2334 - EVOLVE PALM COAST - SANDLAKE SUBDIVISION LOT 4
Job Phone: 304-694-7694
Location Address: 51 EVOLVE PKWY
Type: BM - BUILDING MULTI - APARTMENT
Issue Date: 09/26/2024
NOC: RECORDED
Applicant name: MATTHEW ADAM ROGERS
Owner: EVOLVE PALM COAST LLC

Address

2918-A MARTINSVILLE ROAD

GREENSBORO, NC 27408

Lot: 0040
Contracted Stated Job Value: ¤1,650,000.00
Job Description: BLDG 1100 - (22 UNITS)
Type: CN
Original Permit #: 2024030358

Contractor

EVOLVE CONSTRUCTION OF FL LLC
Status Location Address State License Number Phone
INACTIVE

2018A MARTINSVILLE RD

GREENSBORO, NC 27408

CGC1532932 (Exp: 08/31/2026) 304-694-7694

Sub Contractors

PAUL LEONARD RICHARDS
Status Location Address State License Number Phone Fax
ACTIVE

671 BUSINESS PARK BLVD

WINTER GARDEN, FL 34787

CAC057235 (Exp: 08/31/2026) 407-877-8090 407-877-8479
TRACEY LYNN HYMAN-MONTEE
Status Location Address State License Number Phone Fax
ACTIVE

75 STUMPFIELD ROAD

PENSACOLA, FL 32503

CFC1430978 (Exp: 08/31/2026) 850-477-0388 850-477-0381
MARK ASSELIN
Status Location Address State License Number Phone
ACTIVE

3508 LENOX AVE

JACKSONVILLE, FL 32254

EC13009251 (Exp: 08/31/2026) 904-726-7966
JOSHUA DAVID CADILLAC
Status Location Address State License Number Phone
CANCEL

3264 S UNIVERSITY DRIVE

MIRMAR, FL 33025

CCC1333894 (Exp: 08/31/2026) 954-333-8697

Inspection History

Type Request Date Result Inspector
EXTERIOR ARCHITECTURAL FEATURES 01/12/2026 APPROVED RPICATAGI
Note: 1/8/2026 5:02:48 PM- PREVIOUS INSPECTION NOTES Top support of one garage needs to be painted
EXTERIOR ARCHITECTURAL FEATURES 01/08/2026 PARTIALLY APPROVED DRODRIGUEZ
Note: Top support of one garage needs to be painted
HORIZONTAL ASSEMB PENETRATIONS 01/08/2026 APPROVED KSANDOE
HORIZONTAL ASSEMB FINAL 01/08/2026 APPROVED KSANDOE
BUILDING FINAL 01/08/2026 FINAL APPROVED KSANDOE
FIRE FINAL 01/08/2026 APPROVED RMARTIN
U - UTILITY COMMERCIAL FINAL 12/19/2025 FINAL APPROVED BHAINES
U -UTILITY RESIDENTIAL FINAL 12/18/2025 FINAL APPROVED BWRIGHT
EXTERIOR ARCHITECTURAL FEATURES 12/18/2025 Disapproved - NO FEE DRODRIGUEZ
Note: Garage exterior unpainted, Stair rail unpainted, exterior door on side has paint and other products on surface as well as damage, stone surrounding water faucet and electrical box missing, multiple strips on balconies damaged, multiple doors appear to be lacking proper paint, stair well appears to have overspray on exterior portions, general paint has been put on contrasting areas that is required to be fixed. Further requirements may be found on next inspection.
ELECTRIC FINAL 12/17/2025 APPROVED RMARTIN
Note: 12/12/2025 - PREVIOUS INSPECTION NOTES 1. Conduits at meter banks must be secured 2. House panel schdule does not match what is installed a revision is required 3. Level one kitchen outlets not GFCI protected 4. Unit 104 has no power Stopped inspection, not ready, only looked at bottom units, garages and outside devices
ELECTRIC FINAL 12/12/2025 Disapproved -FEE REQUIRED MKRASKI
Note: 1. Conduits at meter banks must be secured 2. House panel schdule does not match what is installed a revision is required 3. Level one kitchen outlets not GFCI protected 4. Unit 104 has no power Stopped inspection, not ready, only looked at bottom units, garages and outside devices
FRAMING 12/11/2025 APPROVED KSANDOE
U-CROSS CONNECTION 12/11/2025 APPROVED BWRIGHT
FIREWALL FINAL 12/11/2025 APPROVED KSANDOE
PLUMBING FINAL 11/20/2025 APPROVED MGIBSON
Note: New inspection due to canceled inspection 11/17/2025 - PREVIOUS INSPECTION NOTES
PLUMBING FINAL 11/19/2025 CANCELLED BY APPLICANT WEB
Note: 11/17/2025 - PREVIOUS INSPECTION NOTES
PLUMBING FINAL 11/17/2025 CANCELLED BY APPLICANT MGIBSON
HVAC FINAL 11/13/2025 FINAL APPROVED CPISCITELLI
Note:
ELECTRIC - EARLY POWER 10/22/2025 APPROVED MKRASKI
Note: 10/22/25 1. Power relase, emailed FPL @ 12:15pm
ELECTRIC - EARLY POWER 10/21/2025 PARTIALLY APPROVED MKRASKI
Note: 1. Power relase to house panel only, emailed FPL @ 12:15pm
ELECTRIC - EARLY POWER 10/17/2025 CANCELLED BY APPLICANT WEB
FIREWALL FRAMING 10/08/2025 APPROVED FWILLIS
Note: 8/13/2025 - PREVIOUS INSPECTION NOTES 8/11/2025 - PREVIOUS INSPECTION NOTES
FIREWALL PENETRATIONS 10/08/2025 APPROVED FWILLIS
Note: 7/10/2025 - PREVIOUS INSPECTION NOTES
U - SEWER TIE IN 10/07/2025 APPROVED MGIBSON
ELECTRIC - EARLY POWER 09/17/2025 CANCELLED BY APPLICANT WEB
BLD - SEWER TIE IN 08/28/2025 APPROVED MGIBSON
FIREWALL DRYWALL NAILING 08/14/2025 APPROVED KSANDOE
FIREWALL FRAMING 08/13/2025 CANCELLED BY APPLICANT FWILLIS
Note: 8/11/2025 - PREVIOUS INSPECTION NOTES
HORIZONTAL ASSEMB DRYWALL 08/12/2025 APPROVED KSANDOE
Note: 8/4/2025 - PREVIOUS INSPECTION NOTES
FIREWALL FRAMING 08/11/2025 PARTIALLY APPROVED KSANDOE
FIREWALL FRAMING 08/08/2025 APPROVED KSANDOE
HORIZONTAL ASSEMB DRYWALL 08/04/2025 PARTIALLY APPROVED KSANDOE
STOREFRONT 08/01/2025 CANCELLED BY INSPECTOR KSANDOE
HORIZONTAL ASSEMB FRAMING 07/21/2025 APPROVED FWILLIS
HORIZONTAL ASSEMB DRYWALL 07/17/2025 APPROVED FWILLIS
Note: B TOWER INSPECTED. 7/16/2025 - PREVIOUS INSPECTION NOTES A tower only. B tower not ready
INSULATION 07/17/2025 APPROVED FWILLIS
Note: 7/17/25 - BOTH A AND B SIDES ALL THREE FLOORS. 6/24/2025 - PREVIOUS INSPECTION NOTES BATHROOMS IN CORNER UNITS. INSULATION BEHIND SHOWERS, ALL FLOORS. Inspector Notes from Inspection 3443 Contractor will make sure areas behind shower enclosure and side walls are Fire Caulked.
HORIZONTAL ASSEMB DRYWALL 07/16/2025 PARTIALLY APPROVED KSANDOE
Note: A tower only. B tower not ready
HORIZONTAL ASSEMB FRAMING 07/16/2025 CANCELLED BY APPLICANT WEB
PLUMBING 2ND ROUGH 07/15/2025 APPROVED MGIBSON
Note: 7/10/2025 - PREVIOUS INSPECTION NOTES 7/9/2025 - PREVIOUS INSPECTION NOTES CROWNING VENT IN 2 AREAS AT W/M, LEAKING INWATER HEATER ROOM IN ONE UNIT, P-TRAP LEAKING ON FIRST FLOOR UNIT, NEED NAIL PLATES IN SEVERAL AREAS, FIRE CAULKING IN MULTIPLE AREAS, WENT SHOWED PLUMBER AS WE WALKED THROUGH INSPECTION NEED TO TEST ALL HUB DRAINS INSIDE OF MCHANICAL ROOMS ON ALL UNITS BEFORE SECOND ROUGH CAN BE APPROVED. ALLOTHER WASTE LINES ARE APPROVED
PLUMBING 2ND ROUGH 07/10/2025 PARTIALLY APPROVED MGIBSON
Note: 7/9/2025 - PREVIOUS INSPECTION NOTES CROWNING VENT IN 2 AREAS AT W/M, LEAKING INWATER HEATER ROOM IN ONE UNIT, P-TRAP LEAKING ON FIRST FLOOR UNIT, NEED NAIL PLATES IN SEVERAL AREAS, FIRE CAULKING IN MULTIPLE AREAS, WENT SHOWED PLUMBER AS WE WALKED THROUGH INSPECTION NEED TO TEST ALL HUB DRAINS INSIDE OF MCHANICAL ROOMS ON ALL UNITS BEFORE SECOND ROUGH CAN BE APPROVED. ALLOTHER WASTE LINES ARE APPROVED
FIREWALL PENETRATIONS 07/10/2025 PARTIALLY APPROVED FWILLIS
HORIZONTAL ASSEMB FRAMING 07/09/2025 APPROVED FWILLIS
PLUMBING 2ND ROUGH 07/09/2025 PARTIALLY APPROVED MGIBSON
Note: CROWNING VENT IN 2 AREAS AT W/M, LEAKING INWATER HEATER ROOM IN ONE UNIT, P-TRAP LEAKING ON FIRST FLOOR UNIT, NEED NAIL PLATES IN SEVERAL AREAS, FIRE CAULKING IN MULTIPLE AREAS, WENT SHOWED PLUMBER AS WE WALKED THROUGH INSPECTION
HORIZONTAL ASSEMB FRAMING 07/02/2025 APPROVED FWILLIS
Note: THIRD FLOOR ONLY
WINDOW NAILING 06/25/2025 APPROVED FWILLIS
Note: Inspector Notes from Inspection 3443 Contractor will make sure areas behind shower enclosure and side walls are Fire Caulked.
INSULATION 06/24/2025 PARTIALLY APPROVED FWILLIS
Note: BATHROOMS IN CORNER UNITS. INSULATION BEHIND SHOWERS, ALL FLOORS. Inspector Notes from Inspection 3443 Contractor will make sure areas behind shower enclosure and side walls are Fire Caulked.
FIREWALL PENETRATIONS 06/16/2025 APPROVED - AS NOTED FWILLIS
Note: Contractor will make sure areas behind shower enclosure and side walls are Fire Caulked.
HVAC ROUGH 06/06/2025 APPROVED - AS NOTED CPISCITELLI
Note: Need to support linesets
HVAC ROUGH 06/05/2025 CANCELLED BY APPLICANT WEB
Note: 5/29/2025 - PREVIOUS INSPECTION NOTES Inspected fresh air seams to be able to wrap
ELECTRIC 2ND ROUGH 05/30/2025 APPROVED RMARTIN
LATH/BRICK/WATER BARRIER 05/29/2025 APPROVED FWILLIS
Note: 5/28/2025 - PREVIOUS INSPECTION NOTES 5/28/ - NOT COMPLETE ON SIDE WHERE THE STAND PIPE IS. 5/14/2025 - PREVIOUS INSPECTION NOTES 4/2/2025 1:13:42 PM- PREVIOUS INSPECTION NOTES
HVAC ROUGH 05/29/2025 PARTIALLY APPROVED CPISCITELLI
Note: Inspected fresh air seams to be able to wrap
ELECTRIC 2ND ROUGH 05/29/2025 CANCELLED BY APPLICANT WEB
HVAC ROUGH 05/28/2025 CANCELLED BY APPLICANT RMARTIN
LATH/BRICK/WATER BARRIER 05/28/2025 Disapproved - NO FEE FWILLIS
Note: 5/28/ - NOT COMPLETE ON SIDE WHERE THE STAND PIPE IS. 5/14/2025 - PREVIOUS INSPECTION NOTES 4/2/2025 1:13:42 PM- PREVIOUS INSPECTION NOTES
ELECTRIC 2ND ROUGH 05/22/2025 CANCELLED BY APPLICANT WEB
ELECTRIC 2ND ROUGH 05/20/2025 CANCELLED BY APPLICANT WEB
LATH/BRICK/WATER BARRIER 05/14/2025 PARTIALLY APPROVED FWILLIS
Note: 4/2/2025 1:13:42 PM- PREVIOUS INSPECTION NOTES
WINDOW NAILING 05/01/2025 PARTIALLY APPROVED HCAMACHO
Note: 1. Windows Only. Doors are not installed yet.
LATH/BRICK/WATER BARRIER 04/02/2025 CANCELLED BY APPLICANT CPISCITELLI
FIREWALL DRYWALL NAILING 04/02/2025 APPROVED FWILLIS
Note: 3/31/2025 - PREVIOUS INSPECTION NOTES BUILDING #1111 FIRST LAYER OF 5/8" FIREWALL ON GARAGE SIDE. BUILDING #1100 SECOND LAYER OF 5/8" FIREWALL ON GARAGE SIDE.
ROOF SHEATHING / BRACE / TIE DOWN 04/02/2025 APPROVED FWILLIS
Note: PARTIAL ROOF INSPECTION
FIREWALL DRYWALL NAILING 03/31/2025 PARTIALLY APPROVED FWILLIS
Note: BUILDING #1111 FIRST LAYER OF 5/8" FIREWALL ON GARAGE SIDE.
FOUND SURVEY APPROVED (OFFICE) 03/25/2025 APPROVED DLEAP

Review History

Department Status Date In Date Out
BLD COMPLETE 10/03/2025 10/15/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 09/24/2025 10/01/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit pictures that go along with the report
PLENG COMPLETE 03/25/2025 03/25/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLENG HOLD 03/12/2025 03/13/2025
Note: Held By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM 1. Label plan "FOUNDATION SURVEY" and not SPECIFIC PURPOSE SURVEY. 2. Highlight foundation for specific foundation being permitted for in this permit application.
BLD CANCEL 09/26/2024 09/26/2024
PLFM INFORMATION 09/13/2024 09/16/2024
Note: Marked INFORMATION By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Vertical construction is not authorized until floodplain requirements have been met.
ARCHR COMPLETE 09/10/2024 09/16/2024
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
BLD COMPLETE 09/10/2024 09/13/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
DSD COMPLETE 09/10/2024 09/12/2024
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
ELEC COMPLETE 09/10/2024 09/13/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
FI1 COMPLETE 09/10/2024 09/13/2024
Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM
GAS CANCEL 09/10/2024 09/13/2024
MECH COMPLETE 09/10/2024 09/13/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
UD1 COMPLETE 09/10/2024 09/12/2024
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM
PLUM COMPLETE 09/10/2024 09/13/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
IMPACT FEE PARKS ¤39,621.78 05/23/2025
IMPACT FEE TRANSPORTATION ¤43,164.00 05/23/2025
IMPACT FEE FIRE ¤9,417.98 04/02/2025
FC IMPACT FEE LAW ENFORCEMENT ¤2,442.00 09/26/2024
FC IMPACT FEE LIBRARY ¤3,058.00 09/26/2024
IMPACT FEE SCHOOL ¤29,920.00 09/26/2024
ADJUSTMENT 10% (¤1,203.75) 09/26/2024
ADMINISTRATIVE - COMMERCIAL ¤75.00 09/26/2024
INSPECTION COMMERCIAL ¤11,550.00 09/26/2024
INSPECTION - FIRE COMMERCIAL ¤412.50 09/26/2024
FC IMPACT FEE EMS ¤704.00 09/26/2024
SURCHARGE FS 533.721 ¤108.34 09/26/2024
SURCHARGE - FS 468.631 ¤162.51 09/26/2024
SITE PLAN 30 ¤30.00 09/26/2024
Fees Total Due: ¤0.00 Total Paid: ¤139,462.36