Permit #2024090367

Permit Details

Status: FINAL

Total Square Footage: 30027 sqft
Block: 00000
Subdivision: 2334 - EVOLVE PALM COAST - SANDLAKE SUBDIVISION LOT 4
Job Phone: 304-694-7694
Location Address: 72 EVOLVE PKWY
Type: BM - BUILDING MULTI - APARTMENT
Issue Date: 09/26/2024
NOC: RECORDED
Applicant name: MATTHEW ADAM ROGERS
Owner: EVOLVE PALM COAST LLC

Address

2918-A MARTINSVILLE ROAD

GREENSBORO, NC 27408

Lot: 0040
Contracted Stated Job Value: ¤1,650,000.00
Job Description: BLDG 1300 - (22 UNITS)
Type: CN
Original Permit #: 2024030358

Contractor

EVOLVE CONSTRUCTION OF FL LLC
Status Location Address State License Number Phone
INACTIVE

2018A MARTINSVILLE RD

GREENSBORO, NC 27408

CGC1532932 (Exp: 08/31/2026) 304-694-7694

Sub Contractors

PAUL LEONARD RICHARDS
Status Location Address State License Number Phone Fax
ACTIVE

671 BUSINESS PARK BLVD

WINTER GARDEN, FL 34787

CAC057235 (Exp: 08/31/2026) 407-877-8090 407-877-8479
TRACEY LYNN HYMAN-MONTEE
Status Location Address State License Number Phone Fax
ACTIVE

75 STUMPFIELD ROAD

PENSACOLA, FL 32503

CFC1430978 (Exp: 08/31/2026) 850-477-0388 850-477-0381
MARK ASSELIN
Status Location Address State License Number Phone
ACTIVE

3508 LENOX AVE

JACKSONVILLE, FL 32254

EC13009251 (Exp: 08/31/2026) 904-726-7966
JOSHUA DAVID CADILLAC
Status Location Address State License Number Phone
CANCEL

3264 S UNIVERSITY DRIVE

MIRMAR, FL 33025

CCC1333894 (Exp: 08/31/2026) 954-333-8697

Inspection History

Type Request Date Result Inspector
HORIZONTAL ASSEMB PENETRATIONS 02/06/2026 APPROVED KSANDOE
Note: 2/3/2026 - PREVIOUS INSPECTION NOTES 2/2/2026 - PREVIOUS INSPECTION NOTES
HORIZONTAL ASSEMB FINAL 02/06/2026 APPROVED KSANDOE
Note: 2/3/2026 - PREVIOUS INSPECTION NOTES 2/2/2026 - PREVIOUS INSPECTION NOTES
BUILDING FINAL 02/06/2026 FINAL APPROVED KSANDOE
Note: 2/3/2026 - PREVIOUS INSPECTION NOTES 2/2/2026 - PREVIOUS INSPECTION NOTES
BUILDING FINAL 02/03/2026 CANCELLED BY APPLICANT KSANDOE
Note: 2/2/2026 - PREVIOUS INSPECTION NOTES
HORIZONTAL ASSEMB PENETRATIONS 02/03/2026 CANCELLED BY APPLICANT KSANDOE
Note: 2/2/2026 - PREVIOUS INSPECTION NOTES
HORIZONTAL ASSEMB FINAL 02/03/2026 CANCELLED BY APPLICANT KSANDOE
Note: 2/2/2026 - PREVIOUS INSPECTION NOTES
HORIZONTAL ASSEMB FINAL 02/02/2026 CANCELLED BY APPLICANT KSANDOE
HORIZONTAL ASSEMB PENETRATIONS 02/02/2026 CANCELLED BY APPLICANT KSANDOE
BUILDING FINAL 02/02/2026 CANCELLED BY APPLICANT KSANDOE
U - UTILITY COMMERCIAL FINAL 02/02/2026 FINAL APPROVED BWRIGHT
FIRE FINAL 02/02/2026 APPROVED RMARTIN
U - SEWER TIE IN 01/28/2026 APPROVED RSIMS
Note: 1/28/26: Connection visually verified via scope camera. RS New inspection due to canceled inspection 1/20/2026 - PREVIOUS INSPECTION NOTES 1/20/26: Cancelled by Applicant in person. Waiting on RFI.
U -UTILITY RESIDENTIAL FINAL 01/27/2026 FINAL APPROVED BHAINES
U - SEWER TIE IN 01/27/2026 CANCELLED BY APPLICANT WEB
Note: 1/20/2026 - PREVIOUS INSPECTION NOTES 1/20/26: Cancelled by Applicant in person. Waiting on RFI.
EXTERIOR ARCHITECTURAL FEATURES 01/27/2026 APPROVED RPICATAGI
ELECTRIC FINAL 01/22/2026 APPROVED - AS NOTED MKRASKI
Note: 1/22/26 Approved, have revision for heater in fire room before building final 1/20/26 Plans still do not match house panel and schdule subbmit a revision and have approved before re-inspection 1/15/26 Make all repairs before re-inspection 1. House panel schdule does not match, revision required showing only one house panel and matching schdules 2. Breaker in house panel turned off 3. Label all meters and SPDs with fixed labeles (spares too) 4. Units where not looked at at first inspection, first unit that was inspected had several breakers off, ensure all units are 100% on and everything is working properly will inspect the units at re-inspection 1/12/26 1. ODU disconnects within 3' units must have proper working space 2. Label all meters in meter banks properly 3. Strap all conduit under meter banks 4. Mini strap for conduit feeding house panel not properly installed missing nut and bolt 5. Check to ensure house panel schedule matches plans 6. Breaker blanks required in house panel 7. Lights not working in fire room 8. Exposed romex wired off and secure conduits properly in fire room 9. Multiple breakers off in house panel and unit panels 10. Not ready for inspection a full re-inspection is required
HVAC FINAL 01/21/2026 FINAL APPROVED HCAMACHO
Note: 1/15/2026 - PREVIOUS INSPECTION NOTES 1. Unit 203 & 303 kitchen exhaust fan is not working. 2. CU labeled 108 and disconnet 108 are miss labeled. It should be 104 since there's no 108 and you are missing 104. Please Fix labeling.
ELECTRIC FINAL 01/20/2026 Disapproved - NO FEE MKRASKI
Note: 1/20/26 Plans still do not match house panel and schdule subbmit a revision and have approved before re-inspection 1/15/26 Make all repairs before re-inspection 1. House panel schdule does not match, revision required showing only one house panel and matching schdules 2. Breaker in house panel turned off 3. Label all meters and SPDs with fixed labeles (spares too) 4. Units where not looked at at first inspection, first unit that was inspected had several breakers off, ensure all units are 100% on and everything is working properly will inspect the units at re-inspection 1/12/26 1. ODU disconnects within 3' units must have proper working space 2. Label all meters in meter banks properly 3. Strap all conduit under meter banks 4. Mini strap for conduit feeding house panel not properly installed missing nut and bolt 5. Check to ensure house panel schedule matches plans 6. Breaker blanks required in house panel 7. Lights not working in fire room 8. Exposed romex wired off and secure conduits properly in fire room 9. Multiple breakers off in house panel and unit panels 10. Not ready for inspection a full re-inspection is required
FRAMING 01/20/2026 APPROVED KSANDOE
U-CROSS CONNECTION 01/20/2026 APPROVED BWRIGHT
U - SEWER TIE IN 01/20/2026 CANCELLED BY APPLICANT RSIMS
Note: 1/20/26: Cancelled by Applicant in person. Waiting on RFI.
INSULATION 01/20/2026 APPROVED KSANDOE
Note: 9/3/2025 - PREVIOUS INSPECTION NOTES 9/3/25 - ALL THREE FLOORS. THIRD FLOOR CEILING WILL BE BLOWN IN. 7/23/2025 - PREVIOUS INSPECTION NOTES TUB AND SHOWER AREAS AS REQUESTED.
ELECTRIC FINAL 01/15/2026 Disapproved - NO FEE MKRASKI
Note: 1/15/26 Make all repairs before re-inspection 1. House panel schdule does not match, revision required showing only one house panel and matching schdules 2. Breaker in house panel turned off 3. Label all meters and SPDs with fixed labeles (spares too) 4. Units where not looked at at first inspection, first unit that was inspected had several breakers off, ensure all units are 100% on and everything is working properly will inspect the units at re-inspection 1/12/26 1. ODU disconnects within 3' units must have proper working space 2. Label all meters in meter banks properly 3. Strap all conduit under meter banks 4. Mini strap for conduit feeding house panel not properly installed missing nut and bolt 5. Check to ensure house panel schedule matches plans 6. Breaker blanks required in house panel 7. Lights not working in fire room 8. Exposed romex wired off and secure conduits properly in fire room 9. Multiple breakers off in house panel and unit panels 10. Not ready for inspection a full re-inspection is required
HVAC FINAL 01/15/2026 Disapproved - NO FEE HCAMACHO
Note: 1. Unit 203 & 303 kitchen exhaust fan is not working. 2. CU labeled 108 and disconnet 108 are miss labeled. It should be 104 since there's no 108 and you are missing 104. Please Fix labeling.
PLUMBING FINAL 01/14/2026 APPROVED RSIMS
ELECTRIC FINAL 01/12/2026 Disapproved -FEE REQUIRED MKRASKI
Note: 1. ODU disconnects within 3' units must have proper working space 2. Label all meters in meter banks properly 3. Strap all conduit under meter banks 4. Mini strap for conduit feeding house panel not properly installed missing nut and bolt 5. Check to ensure house panel schedule matches plans 6. Breaker blanks required in house panel 7. Lights not working in fire room 8. Exposed romex wired off and secure conduits properly in fire room 9. Multiple breakers off in house panel and unit panels 10. Not ready for inspection a full re-inspection is required
ELECTRIC - EARLY POWER 12/05/2025 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 2:30pm
ELECTRIC FINAL 12/05/2025 CANCELLED BY APPLICANT MKRASKI
FIREWALL FINAL 10/14/2025 FINAL APPROVED FWILLIS
HORIZONTAL ASSEMB DRYWALL 10/14/2025 APPROVED FWILLIS
Note: 9/17/2025 - PREVIOUS INSPECTION NOTES
FIREWALL FRAMING 10/09/2025 APPROVED FWILLIS
FIREWALL DRYWALL NAILING 09/29/2025 APPROVED FWILLIS
Note: 9/18/2025 - PREVIOUS INSPECTION NOTES
FIREWALL DRYWALL NAILING 09/18/2025 PARTIALLY APPROVED FWILLIS
HORIZONTAL ASSEMB DRYWALL 09/17/2025 PARTIALLY APPROVED FWILLIS
INSULATION 09/03/2025 PARTIALLY APPROVED FWILLIS
Note: 9/3/25 - ALL THREE FLOORS. THIRD FLOOR CEILING WILL BE BLOWN IN. 7/23/2025 - PREVIOUS INSPECTION NOTES TUB AND SHOWER AREAS AS REQUESTED.
BLD - SEWER TIE IN 08/28/2025 APPROVED MGIBSON
PLUMBING 2ND ROUGH 08/22/2025 APPROVED MGIBSON
PLUMBING 2ND ROUGH 08/21/2025 CANCELLED BY APPLICANT WEB
FIREWALL PENETRATIONS 08/21/2025 APPROVED KSANDOE
Note: 7/18/2025 - PREVIOUS INSPECTION NOTES 7/16/2025 - PREVIOUS INSPECTION NOTES FBC 714.5.1.2 Through penetrations shall be protected by an approved through-penetration firestop system.
HORIZONTAL ASSEMB FRAMING 08/15/2025 APPROVED FWILLIS
Note: 8/15/25 - as per your request THIRD FLOOR AND BREEZE WAYS. 7/30/2025 - PREVIOUS INSPECTION NOTES Breezeways only. 3rd floor incomplete 7/28/2025 - PREVIOUS INSPECTION NOTES 7/24/2025 - PREVIOUS INSPECTION NOTES NOT READY. NO RC CHANNEL INSTALLED YET.
STOREFRONT 08/01/2025 CANCELLED BY INSPECTOR KSANDOE
LATH/BRICK/WATER BARRIER 08/01/2025 APPROVED KSANDOE
HORIZONTAL ASSEMB FRAMING 07/30/2025 PARTIALLY APPROVED KSANDOE
Note: Breezeways only. 3rd floor incomplete 7/28/2025 - PREVIOUS INSPECTION NOTES 7/24/2025 - PREVIOUS INSPECTION NOTES NOT READY. NO RC CHANNEL INSTALLED YET.
HORIZONTAL ASSEMB FRAMING 07/28/2025 CANCELLED BY APPLICANT KSANDOE
Note: 7/24/2025 - PREVIOUS INSPECTION NOTES NOT READY. NO RC CHANNEL INSTALLED YET.
HORIZONTAL ASSEMB FRAMING 07/24/2025 Disapproved - NO FEE FWILLIS
Note: NOT READY. NO RC CHANNEL INSTALLED YET.
INSULATION 07/23/2025 PARTIALLY APPROVED FWILLIS
Note: TUB AND SHOWER AREAS AS REQUESTED.
ELECTRIC 2ND ROUGH 07/22/2025 APPROVED RMARTIN
Note: 7/18/2025 - PREVIOUS INSPECTION NOTES right side only, 1st, 2nd, and 3rd floors need to double check all boxes in kitchens for fire caulk left side
ELECTRIC 2ND ROUGH 07/18/2025 PARTIALLY APPROVED RMARTIN
Note: right side only, 1st, 2nd, and 3rd floors need to double check all boxes in kitchens for fire caulk left side
FIREWALL PENETRATIONS 07/18/2025 PARTIALLY APPROVED FWILLIS
Note: 7/16/2025 - PREVIOUS INSPECTION NOTES FBC 714.5.1.2 Through penetrations shall be protected by an approved through-penetration firestop system.
FIREWALL PENETRATIONS 07/16/2025 Disapproved - NO FEE KSANDOE
Note: FBC 714.5.1.2 Through penetrations shall be protected by an approved through-penetration firestop system.
HVAC ROUGH 07/10/2025 APPROVED CPISCITELLI
Note: virtual inspection
WINDOW NAILING 06/27/2025 APPROVED FWILLIS
LATH/BRICK/WATER BARRIER 05/14/2025 APPROVED FWILLIS
WINDOW NAILING 05/08/2025 APPROVED FWILLIS
FIREWALL DRYWALL NAILING 04/14/2025 APPROVED FWILLIS
Note: 4/14/25 - FIRST FLOOR - only 4/10/2025 - PREVIOUS INSPECTION NOTES NOT COMPLETE WITH 5/8" DRYWALL IN BREEZEWAY ON GARAGE SIDE.
FIREWALL DRYWALL NAILING 04/10/2025 Disapproved - NO FEE FWILLIS
Note: NOT COMPLETE WITH 5/8" DRYWALL IN BREEZEWAY ON GARAGE SIDE.
FIREWALL DRYWALL NAILING 04/04/2025 APPROVED FWILLIS
Note: BUILDING 1300 BREEZEWAY GARAGE SIDE
ROOF SHEATHING / BRACE / TIE DOWN 04/04/2025 APPROVED FWILLIS
Note: ROOF SHEATHING (dry-in) ONLY.
FOUND SURVEY APPROVED (OFFICE) 03/25/2025 APPROVED DLEAP

Review History

Department Status Date In Date Out
BLD COMPLETE 09/25/2025 10/08/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 06/04/2025 06/18/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 03/25/2025 03/25/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLENG HOLD 03/12/2025 03/13/2025
Note: Held By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM 1. Label plan "FOUNDATION SURVEY" and not SPECIFIC PURPOSE SURVEY. 2. Highlight foundation for specific foundation being permitted for in this permit application.
BLD CANCEL 09/26/2024 09/26/2024
PLFM INFORMATION 09/13/2024 09/16/2024
Note: Marked INFORMATION By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Vertical construction is not authorized until floodplain requirements have been met.
ARCHR COMPLETE 09/10/2024 09/16/2024
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
BLD COMPLETE 09/10/2024 09/13/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
DSD COMPLETE 09/10/2024 09/12/2024
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
ELEC COMPLETE 09/10/2024 09/13/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
FI1 COMPLETE 09/10/2024 09/13/2024
Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM
GAS CANCEL 09/10/2024 09/13/2024
MECH COMPLETE 09/10/2024 09/13/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
UD1 COMPLETE 09/10/2024 09/12/2024
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM
PLUM COMPLETE 09/10/2024 09/13/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
IMPACT FEE PARKS ¤39,621.78 07/30/2025
IMPACT FEE TRANSPORTATION ¤43,164.00 07/30/2025
IMPACT FEE FIRE ¤9,417.98 04/02/2025
FC IMPACT FEE LAW ENFORCEMENT ¤2,442.00 09/26/2024
FC IMPACT FEE LIBRARY ¤3,058.00 09/26/2024
IMPACT FEE SCHOOL ¤29,920.00 09/26/2024
ADJUSTMENT 10% (¤1,203.75) 09/26/2024
ADMINISTRATIVE - COMMERCIAL ¤75.00 09/26/2024
INSPECTION COMMERCIAL ¤11,550.00 09/26/2024
INSPECTION - FIRE COMMERCIAL ¤412.50 09/26/2024
SURCHARGE FS 533.721 ¤108.34 09/26/2024
SURCHARGE - FS 468.631 ¤162.51 09/26/2024
SITE PLAN 30 ¤30.00 09/26/2024
FC IMPACT FEE EMS ¤704.00 09/26/2024
REINSPECTION - COMMERCIAL ¤60.00
Fees Total Due: ¤60.00 Total Paid: ¤139,462.36