Permit #2024090367
Permit Details
Status: FINAL
| Total Square Footage: 30027 sqft |
| Block: 00000 |
| Subdivision: 2334 - EVOLVE PALM COAST - SANDLAKE SUBDIVISION LOT 4 |
| Job Phone: 304-694-7694 |
| Location Address: 72 EVOLVE PKWY |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 09/26/2024 |
| NOC: RECORDED |
| Applicant name: MATTHEW ADAM ROGERS |
| Owner: EVOLVE PALM COAST LLC |
|
Address 2918-A MARTINSVILLE ROAD GREENSBORO, NC 27408 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤1,650,000.00 |
| Job Description: BLDG 1300 - (22 UNITS) |
| Type: CN |
| Original Permit #: 2024030358 |
Contractor
EVOLVE CONSTRUCTION OF FL LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
2018A MARTINSVILLE RD GREENSBORO, NC 27408 |
CGC1532932 (Exp: 08/31/2026) | 304-694-7694 |
Sub Contractors
PAUL LEONARD RICHARDS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
671 BUSINESS PARK BLVD WINTER GARDEN, FL 34787 |
CAC057235 (Exp: 08/31/2026) | 407-877-8090 | 407-877-8479 |
TRACEY LYNN HYMAN-MONTEE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
75 STUMPFIELD ROAD PENSACOLA, FL 32503 |
CFC1430978 (Exp: 08/31/2026) | 850-477-0388 | 850-477-0381 |
MARK ASSELIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3508 LENOX AVE JACKSONVILLE, FL 32254 |
EC13009251 (Exp: 08/31/2026) | 904-726-7966 |
JOSHUA DAVID CADILLAC
| Status | Location Address | State License Number | Phone |
| CANCEL |
3264 S UNIVERSITY DRIVE MIRMAR, FL 33025 |
CCC1333894 (Exp: 08/31/2026) | 954-333-8697 |
Inspection History
| Type | Request Date | Result | Inspector |
| HORIZONTAL ASSEMB PENETRATIONS | 02/06/2026 | APPROVED | KSANDOE |
| Note: 2/3/2026 - PREVIOUS INSPECTION NOTES 2/2/2026 - PREVIOUS INSPECTION NOTES | |||
| HORIZONTAL ASSEMB FINAL | 02/06/2026 | APPROVED | KSANDOE |
| Note: 2/3/2026 - PREVIOUS INSPECTION NOTES 2/2/2026 - PREVIOUS INSPECTION NOTES | |||
| BUILDING FINAL | 02/06/2026 | FINAL APPROVED | KSANDOE |
| Note: 2/3/2026 - PREVIOUS INSPECTION NOTES 2/2/2026 - PREVIOUS INSPECTION NOTES | |||
| BUILDING FINAL | 02/03/2026 | CANCELLED BY APPLICANT | KSANDOE |
| Note: 2/2/2026 - PREVIOUS INSPECTION NOTES | |||
| HORIZONTAL ASSEMB PENETRATIONS | 02/03/2026 | CANCELLED BY APPLICANT | KSANDOE |
| Note: 2/2/2026 - PREVIOUS INSPECTION NOTES | |||
| HORIZONTAL ASSEMB FINAL | 02/03/2026 | CANCELLED BY APPLICANT | KSANDOE |
| Note: 2/2/2026 - PREVIOUS INSPECTION NOTES | |||
| HORIZONTAL ASSEMB FINAL | 02/02/2026 | CANCELLED BY APPLICANT | KSANDOE |
| HORIZONTAL ASSEMB PENETRATIONS | 02/02/2026 | CANCELLED BY APPLICANT | KSANDOE |
| BUILDING FINAL | 02/02/2026 | CANCELLED BY APPLICANT | KSANDOE |
| U - UTILITY COMMERCIAL FINAL | 02/02/2026 | FINAL APPROVED | BWRIGHT |
| FIRE FINAL | 02/02/2026 | APPROVED | RMARTIN |
| U - SEWER TIE IN | 01/28/2026 | APPROVED | RSIMS |
| Note: 1/28/26: Connection visually verified via scope camera. RS New inspection due to canceled inspection 1/20/2026 - PREVIOUS INSPECTION NOTES 1/20/26: Cancelled by Applicant in person. Waiting on RFI. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/27/2026 | FINAL APPROVED | BHAINES |
| U - SEWER TIE IN | 01/27/2026 | CANCELLED BY APPLICANT | WEB |
| Note: 1/20/2026 - PREVIOUS INSPECTION NOTES 1/20/26: Cancelled by Applicant in person. Waiting on RFI. | |||
| EXTERIOR ARCHITECTURAL FEATURES | 01/27/2026 | APPROVED | RPICATAGI |
| ELECTRIC FINAL | 01/22/2026 | APPROVED - AS NOTED | MKRASKI |
| Note: 1/22/26 Approved, have revision for heater in fire room before building final 1/20/26 Plans still do not match house panel and schdule subbmit a revision and have approved before re-inspection 1/15/26 Make all repairs before re-inspection 1. House panel schdule does not match, revision required showing only one house panel and matching schdules 2. Breaker in house panel turned off 3. Label all meters and SPDs with fixed labeles (spares too) 4. Units where not looked at at first inspection, first unit that was inspected had several breakers off, ensure all units are 100% on and everything is working properly will inspect the units at re-inspection 1/12/26 1. ODU disconnects within 3' units must have proper working space 2. Label all meters in meter banks properly 3. Strap all conduit under meter banks 4. Mini strap for conduit feeding house panel not properly installed missing nut and bolt 5. Check to ensure house panel schedule matches plans 6. Breaker blanks required in house panel 7. Lights not working in fire room 8. Exposed romex wired off and secure conduits properly in fire room 9. Multiple breakers off in house panel and unit panels 10. Not ready for inspection a full re-inspection is required | |||
| HVAC FINAL | 01/21/2026 | FINAL APPROVED | HCAMACHO |
| Note: 1/15/2026 - PREVIOUS INSPECTION NOTES 1. Unit 203 & 303 kitchen exhaust fan is not working. 2. CU labeled 108 and disconnet 108 are miss labeled. It should be 104 since there's no 108 and you are missing 104. Please Fix labeling. | |||
| ELECTRIC FINAL | 01/20/2026 | Disapproved - NO FEE | MKRASKI |
| Note: 1/20/26 Plans still do not match house panel and schdule subbmit a revision and have approved before re-inspection 1/15/26 Make all repairs before re-inspection 1. House panel schdule does not match, revision required showing only one house panel and matching schdules 2. Breaker in house panel turned off 3. Label all meters and SPDs with fixed labeles (spares too) 4. Units where not looked at at first inspection, first unit that was inspected had several breakers off, ensure all units are 100% on and everything is working properly will inspect the units at re-inspection 1/12/26 1. ODU disconnects within 3' units must have proper working space 2. Label all meters in meter banks properly 3. Strap all conduit under meter banks 4. Mini strap for conduit feeding house panel not properly installed missing nut and bolt 5. Check to ensure house panel schedule matches plans 6. Breaker blanks required in house panel 7. Lights not working in fire room 8. Exposed romex wired off and secure conduits properly in fire room 9. Multiple breakers off in house panel and unit panels 10. Not ready for inspection a full re-inspection is required | |||
| FRAMING | 01/20/2026 | APPROVED | KSANDOE |
| U-CROSS CONNECTION | 01/20/2026 | APPROVED | BWRIGHT |
| U - SEWER TIE IN | 01/20/2026 | CANCELLED BY APPLICANT | RSIMS |
| Note: 1/20/26: Cancelled by Applicant in person. Waiting on RFI. | |||
| INSULATION | 01/20/2026 | APPROVED | KSANDOE |
| Note: 9/3/2025 - PREVIOUS INSPECTION NOTES 9/3/25 - ALL THREE FLOORS. THIRD FLOOR CEILING WILL BE BLOWN IN. 7/23/2025 - PREVIOUS INSPECTION NOTES TUB AND SHOWER AREAS AS REQUESTED. | |||
| ELECTRIC FINAL | 01/15/2026 | Disapproved - NO FEE | MKRASKI |
| Note: 1/15/26 Make all repairs before re-inspection 1. House panel schdule does not match, revision required showing only one house panel and matching schdules 2. Breaker in house panel turned off 3. Label all meters and SPDs with fixed labeles (spares too) 4. Units where not looked at at first inspection, first unit that was inspected had several breakers off, ensure all units are 100% on and everything is working properly will inspect the units at re-inspection 1/12/26 1. ODU disconnects within 3' units must have proper working space 2. Label all meters in meter banks properly 3. Strap all conduit under meter banks 4. Mini strap for conduit feeding house panel not properly installed missing nut and bolt 5. Check to ensure house panel schedule matches plans 6. Breaker blanks required in house panel 7. Lights not working in fire room 8. Exposed romex wired off and secure conduits properly in fire room 9. Multiple breakers off in house panel and unit panels 10. Not ready for inspection a full re-inspection is required | |||
| HVAC FINAL | 01/15/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Unit 203 & 303 kitchen exhaust fan is not working. 2. CU labeled 108 and disconnet 108 are miss labeled. It should be 104 since there's no 108 and you are missing 104. Please Fix labeling. | |||
| PLUMBING FINAL | 01/14/2026 | APPROVED | RSIMS |
| ELECTRIC FINAL | 01/12/2026 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. ODU disconnects within 3' units must have proper working space 2. Label all meters in meter banks properly 3. Strap all conduit under meter banks 4. Mini strap for conduit feeding house panel not properly installed missing nut and bolt 5. Check to ensure house panel schedule matches plans 6. Breaker blanks required in house panel 7. Lights not working in fire room 8. Exposed romex wired off and secure conduits properly in fire room 9. Multiple breakers off in house panel and unit panels 10. Not ready for inspection a full re-inspection is required | |||
| ELECTRIC - EARLY POWER | 12/05/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 2:30pm | |||
| ELECTRIC FINAL | 12/05/2025 | CANCELLED BY APPLICANT | MKRASKI |
| FIREWALL FINAL | 10/14/2025 | FINAL APPROVED | FWILLIS |
| HORIZONTAL ASSEMB DRYWALL | 10/14/2025 | APPROVED | FWILLIS |
| Note: 9/17/2025 - PREVIOUS INSPECTION NOTES | |||
| FIREWALL FRAMING | 10/09/2025 | APPROVED | FWILLIS |
| FIREWALL DRYWALL NAILING | 09/29/2025 | APPROVED | FWILLIS |
| Note: 9/18/2025 - PREVIOUS INSPECTION NOTES | |||
| FIREWALL DRYWALL NAILING | 09/18/2025 | PARTIALLY APPROVED | FWILLIS |
| HORIZONTAL ASSEMB DRYWALL | 09/17/2025 | PARTIALLY APPROVED | FWILLIS |
| INSULATION | 09/03/2025 | PARTIALLY APPROVED | FWILLIS |
| Note: 9/3/25 - ALL THREE FLOORS. THIRD FLOOR CEILING WILL BE BLOWN IN. 7/23/2025 - PREVIOUS INSPECTION NOTES TUB AND SHOWER AREAS AS REQUESTED. | |||
| BLD - SEWER TIE IN | 08/28/2025 | APPROVED | MGIBSON |
| PLUMBING 2ND ROUGH | 08/22/2025 | APPROVED | MGIBSON |
| PLUMBING 2ND ROUGH | 08/21/2025 | CANCELLED BY APPLICANT | WEB |
| FIREWALL PENETRATIONS | 08/21/2025 | APPROVED | KSANDOE |
| Note: 7/18/2025 - PREVIOUS INSPECTION NOTES 7/16/2025 - PREVIOUS INSPECTION NOTES FBC 714.5.1.2 Through penetrations shall be protected by an approved through-penetration firestop system. | |||
| HORIZONTAL ASSEMB FRAMING | 08/15/2025 | APPROVED | FWILLIS |
| Note: 8/15/25 - as per your request THIRD FLOOR AND BREEZE WAYS. 7/30/2025 - PREVIOUS INSPECTION NOTES Breezeways only. 3rd floor incomplete 7/28/2025 - PREVIOUS INSPECTION NOTES 7/24/2025 - PREVIOUS INSPECTION NOTES NOT READY. NO RC CHANNEL INSTALLED YET. | |||
| STOREFRONT | 08/01/2025 | CANCELLED BY INSPECTOR | KSANDOE |
| LATH/BRICK/WATER BARRIER | 08/01/2025 | APPROVED | KSANDOE |
| HORIZONTAL ASSEMB FRAMING | 07/30/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: Breezeways only. 3rd floor incomplete 7/28/2025 - PREVIOUS INSPECTION NOTES 7/24/2025 - PREVIOUS INSPECTION NOTES NOT READY. NO RC CHANNEL INSTALLED YET. | |||
| HORIZONTAL ASSEMB FRAMING | 07/28/2025 | CANCELLED BY APPLICANT | KSANDOE |
| Note: 7/24/2025 - PREVIOUS INSPECTION NOTES NOT READY. NO RC CHANNEL INSTALLED YET. | |||
| HORIZONTAL ASSEMB FRAMING | 07/24/2025 | Disapproved - NO FEE | FWILLIS |
| Note: NOT READY. NO RC CHANNEL INSTALLED YET. | |||
| INSULATION | 07/23/2025 | PARTIALLY APPROVED | FWILLIS |
| Note: TUB AND SHOWER AREAS AS REQUESTED. | |||
| ELECTRIC 2ND ROUGH | 07/22/2025 | APPROVED | RMARTIN |
| Note: 7/18/2025 - PREVIOUS INSPECTION NOTES right side only, 1st, 2nd, and 3rd floors need to double check all boxes in kitchens for fire caulk left side | |||
| ELECTRIC 2ND ROUGH | 07/18/2025 | PARTIALLY APPROVED | RMARTIN |
| Note: right side only, 1st, 2nd, and 3rd floors need to double check all boxes in kitchens for fire caulk left side | |||
| FIREWALL PENETRATIONS | 07/18/2025 | PARTIALLY APPROVED | FWILLIS |
| Note: 7/16/2025 - PREVIOUS INSPECTION NOTES FBC 714.5.1.2 Through penetrations shall be protected by an approved through-penetration firestop system. | |||
| FIREWALL PENETRATIONS | 07/16/2025 | Disapproved - NO FEE | KSANDOE |
| Note: FBC 714.5.1.2 Through penetrations shall be protected by an approved through-penetration firestop system. | |||
| HVAC ROUGH | 07/10/2025 | APPROVED | CPISCITELLI |
| Note: virtual inspection | |||
| WINDOW NAILING | 06/27/2025 | APPROVED | FWILLIS |
| LATH/BRICK/WATER BARRIER | 05/14/2025 | APPROVED | FWILLIS |
| WINDOW NAILING | 05/08/2025 | APPROVED | FWILLIS |
| FIREWALL DRYWALL NAILING | 04/14/2025 | APPROVED | FWILLIS |
| Note: 4/14/25 - FIRST FLOOR - only 4/10/2025 - PREVIOUS INSPECTION NOTES NOT COMPLETE WITH 5/8" DRYWALL IN BREEZEWAY ON GARAGE SIDE. | |||
| FIREWALL DRYWALL NAILING | 04/10/2025 | Disapproved - NO FEE | FWILLIS |
| Note: NOT COMPLETE WITH 5/8" DRYWALL IN BREEZEWAY ON GARAGE SIDE. | |||
| FIREWALL DRYWALL NAILING | 04/04/2025 | APPROVED | FWILLIS |
| Note: BUILDING 1300 BREEZEWAY GARAGE SIDE | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 04/04/2025 | APPROVED | FWILLIS |
| Note: ROOF SHEATHING (dry-in) ONLY. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/25/2025 | APPROVED | DLEAP |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 09/25/2025 | 10/08/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/04/2025 | 06/18/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 03/25/2025 | 03/25/2025 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| PLENG | HOLD | 03/12/2025 | 03/13/2025 |
| Note: Held By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM 1. Label plan "FOUNDATION SURVEY" and not SPECIFIC PURPOSE SURVEY. 2. Highlight foundation for specific foundation being permitted for in this permit application. | |||
| BLD | CANCEL | 09/26/2024 | 09/26/2024 |
| PLFM | INFORMATION | 09/13/2024 | 09/16/2024 |
| Note: Marked INFORMATION By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Vertical construction is not authorized until floodplain requirements have been met. | |||
| ARCHR | COMPLETE | 09/10/2024 | 09/16/2024 |
| Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/10/2024 | 09/13/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| DSD | COMPLETE | 09/10/2024 | 09/12/2024 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/10/2024 | 09/13/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 09/10/2024 | 09/13/2024 |
| Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 09/10/2024 | 09/13/2024 |
| MECH | COMPLETE | 09/10/2024 | 09/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 09/10/2024 | 09/12/2024 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 09/10/2024 | 09/13/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| IMPACT FEE PARKS | ¤39,621.78 | 07/30/2025 |
| IMPACT FEE TRANSPORTATION | ¤43,164.00 | 07/30/2025 |
| IMPACT FEE FIRE | ¤9,417.98 | 04/02/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤2,442.00 | 09/26/2024 |
| FC IMPACT FEE LIBRARY | ¤3,058.00 | 09/26/2024 |
| IMPACT FEE SCHOOL | ¤29,920.00 | 09/26/2024 |
| ADJUSTMENT 10% | (¤1,203.75) | 09/26/2024 |
| ADMINISTRATIVE - COMMERCIAL | ¤75.00 | 09/26/2024 |
| INSPECTION COMMERCIAL | ¤11,550.00 | 09/26/2024 |
| INSPECTION - FIRE COMMERCIAL | ¤412.50 | 09/26/2024 |
| SURCHARGE FS 533.721 | ¤108.34 | 09/26/2024 |
| SURCHARGE - FS 468.631 | ¤162.51 | 09/26/2024 |
| SITE PLAN 30 | ¤30.00 | 09/26/2024 |
| FC IMPACT FEE EMS | ¤704.00 | 09/26/2024 |
| REINSPECTION - COMMERCIAL | ¤60.00 | |
| Fees | Total Due: ¤60.00 | Total Paid: ¤139,462.36 |