I want to search for...

Permit #2024090517

Permit Details

Status: COED

Parcel Id: 07-11-31-7023-00280-0290
CONDITIONED SPACE: 1800 sqft
GARAGE: 410 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
Total Square Footage: 2246 sqft
Block: 00280
Subdivision: 7023 -
Job Phone: 689-250-2429
Location Address: 25 WHITE BIRCH LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/25/2024
NOC: RECORDED
Applicant name: RYAN M COURECH
Owner: A AND R-MERIDIAN REAL ESTATE DEVELOPMENT LLC

Address

688 N ORLANDO AVENUE

MAITLAND, FL 32751

Address

SUITE 207

MAITLAND, FL 32751

Lot: 0290
Contracted Stated Job Value: ¤208,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN
Original Permit #: 2024010999

Contractor

MCH CONSTRUCTION LLC
Status Location Address State License Number Phone
INACTIVE

668 N ORLANDO AVE, STE 207

MAITLAND, FL 32751

CBC1262898 (Exp: 08/31/2026) 407-602-8257

Sub Contractors

DANA SUE COOLEY
Status Location Address State License Number Phone
INACTIVE

PO BOX 1718

FLAGLER BEACH, FL 32136

CCC1333449 (Exp: 08/31/2026) 904-535-1680
DUSTIN ARCHER
Status Location Address State License Number Phone
ACTIVE

2785 WRIGHTS ROAD SUITE 1133

OVIEDO, FL 32765

CMC1251099 (Exp: 08/31/2026) 407-391-1145
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/01/2025 FINAL APPROVED MCONTRYMAN
Note: 7/31/2025 - PREVIOUS INSPECTION NOTES 7/31/25 1. Smoke that was moved in bedroom needs to have the ceiling patched FBC EC R402.4.1.1 7/21/25 1. No plans on site FBC 107.3.1 2. E-cals onsite do not match equipment that was installed FBC [A] 107.4 3. Emergency disconnect sticker has been painted over on meter main box NEC 230.85 4. Attic access cover is missing FBC R302.6 5. Front door is missing seals FBC R402.4.1.1 6. Smokes in bedroom is with in 3' of fan blades per manufacturer specs FBCR 314 & 315
BLD - BUILDING FINAL 07/31/2025 Disapproved - NO FEE MKRASKI
Note: 7/31/25 1. Smoke that was moved in bedroom needs to have the ceiling patched FBC EC R402.4.1.1 7/21/25 1. No plans on site FBC 107.3.1 2. E-cals onsite do not match equipment that was installed FBC [A] 107.4 3. Emergency disconnect sticker has been painted over on meter main box NEC 230.85 4. Attic access cover is missing FBC R302.6 5. Front door is missing seals FBC R402.4.1.1 6. Smokes in bedroom is with in 3' of fan blades per manufacturer specs FBCR 314 & 315
BLD - BUILDING FINAL 07/21/2025 Disapproved - NO FEE MKRASKI
Note: 1. No plans on site FBC 107.3.1 2. E-cals onsite do not match equipment that was installed FBC [A] 107.4 3. Emergency disconnect sticker has been painted over on meter main box NEC 230.85 4. Attic access cover is missing FBC R302.6 5. Front door is missing seals FBC R402.4.1.1 6. Smokes in bedroom is with in 3' of fan blades per manufacturer specs FBCR 314 & 315
ROW - FINAL APRON (AFTER POUR) 07/16/2025 APPROVED - AS NOTED TPOLACEK
Note: 07/16/25 TPOLACEK*** THERE IS A SMALL HIRLINE CRACK AT LEAD WALKWAY INSPECTOR RECOMMENDS SEALING, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/16/2025 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 07/16/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 07/16/2025 APPROVED - AS NOTED TPOLACEK
Note: 07/16/25 TPOLACEK*** SPOKE WITH CM THE PORTA POTTY IS SCHEDULED TO BE PICKED UP THIS WEEK. APPROVING AS NOTED. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9272 07/16/25 TPOLACEK*** THERE IS A SMALL HIRLINE CRACK AT LEAD WALKWAY INSPECTOR RECOMMENDS SEALING, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ELECTRIC - EARLY POWER 06/26/2025 APPROVED - AS NOTED MKRASKI
Note: 1. Meter main must be identified on outside as service disconnect NEC 230.70(B) Make repair by final, Emailed FPL @ 11:30am
ROW- PRE-APRON (PRE-POUR) 06/17/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR.
GRAVITY SEWER TEST 05/16/2025 APPROVED MGIBSON
U - SEWER TIE IN 05/16/2025 APPROVED MGIBSON
U-CROSS CONNECTION 05/16/2025 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cc
PEP TANK INSTALLATION REQUEST 04/21/2025 APPROVED BVITALE
INSULATION 04/15/2025 APPROVED KSANDOE
LATH/BRICK/ WATER BARRIER 04/15/2025 APPROVED KSANDOE
Note: 4/11/2025 - PREVIOUS INSPECTION NOTES 4/11/25 Previous note still not rectified 1. Please install water barrier at the Margins of the front entry door (self adhesive membrane) Per Portland cement manufacturer spec, and FBC R703.4 (1) Flashing 4/9/2025 - PREVIOUS INSPECTION NOTES 4/9/25 1. Repair not made 4/8/2025 - PREVIOUS INSPECTION NOTES 1. Please install water barrier at the Margins of the front entry door (self adhesive membrane) Per Portland cement manufacturer spec, and FBC R703.4 (1) Flashing.
LATH/BRICK/ WATER BARRIER 04/11/2025 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 4/11/25 Previous note still not rectified 1. Please install water barrier at the Margins of the front entry door (self adhesive membrane) Per Portland cement manufacturer spec, and FBC R703.4 (1) Flashing 4/9/2025 - PREVIOUS INSPECTION NOTES 4/9/25 1. Repair not made 4/8/2025 - PREVIOUS INSPECTION NOTES 1. Please install water barrier at the Margins of the front entry door (self adhesive membrane) Per Portland cement manufacturer spec, and FBC R703.4 (1) Flashing.
LATH/BRICK/ WATER BARRIER 04/09/2025 Disapproved -FEE REQUIRED MKRASKI
Note: 4/9/25 1. Repair not made 4/8/2025 - PREVIOUS INSPECTION NOTES 1. Please install water barrier at the Margins of the front entry door (self adhesive membrane) Per Portland cement manufacturer spec, and FBC R703.4 (1) Flashing.
LATH/BRICK/ WATER BARRIER 04/08/2025 Disapproved - NO FEE JSTEWART
Note: Please install water barrier at the Margins of the front entry door (self adhesive membrane) Per Portland cement manufacturer spec, and FBC R703.4 (1) Flashing.
ALL ROUGH 04/08/2025 APPROVED - AS NOTED JSTEWART
Note: Previous note not rectified.....4. Master shower studs (where mixing valve is installed) have been notched and exceeded limitations WFCM 2.4.1.1.1 (PLEASE REPLACE OR ADD FULL LENGTH STUDS) Needs completed prior to Insulation inspection. 3/26/2025 - PREVIOUS INSPECTION NOTES 1. J-boxeds for lighting need to have covers installed FBC (A)107.4 2. Product approval sheet does not match windows installed FBC (A)107.4 3. Nail plates required for romex wiring above elec. panel NEC 300.4 4. Master shower studs (where mixing valve is installed) have been notched and exceeded limitations WFCM 2.4.1.1.1 5. Solid blocking required at front door and SGD 1/4'' gap max allowable FBCR 609.1 PLease make all repairs and revisions before re-inspection
ALL ROUGH 03/26/2025 Disapproved - NO FEE MKRASKI
Note: 1. J-boxeds for lighting need to have covers installed FBC (A)107.4 2. Product approval sheet does not match windows installed FBC (A)107.4 3. Nail plates required for romex wiring above elec. panel NEC 300.4 4. Master shower studs (where mixing valve is installed) have been notched and exceeded limitations WFCM 2.4.1.1.1 5. Solid blocking required at front door and SGD 1/4'' gap max allowable FBCR 609.1 PLease make all repairs and revisions before re-inspection
ALL ROUGH 03/24/2025 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2467 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 Make repair by all rough inspection 2/19/2025 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 2. No truss engineering packet onsite with approved stamp of approval from Building Dept. FBC 107.3.1 3. Job box needs to be cleaned up with full set of plans bound together per FBC 107.3.1 Please make all repairs by re-inspection ***Roof sheathing approved***
ROOF VALLEY & METAL 03/13/2025 APPROVED - AS NOTED MKRASKI
Note: 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 Make repair by all rough inspection 2/19/2025 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 2. No truss engineering packet onsite with approved stamp of approval from Building Dept. FBC 107.3.1 3. Job box needs to be cleaned up with full set of plans bound together per FBC 107.3.1 Please make all repairs by re-inspection ***Roof sheathing approved***
ROOF VALLEY & METAL 03/12/2025 Disapproved - NO FEE MKRASKI
Note: 3/12/25 1. Cut back synthetic underlayment to check valley material used in both valleys the entire length of valley FBC(A)107.4 3/7/25 1). Cannot see the valley naterial as synthitc underlayment is completely covering the valleys. Synthetic underlayment will need to be cut back so that the Valley material is exposed for inspection. Inspector Notes from Inspection 2460 2/25/25 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 Make repair by next inspection 2/19/2025 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 2. No truss engineering packet onsite with approved stamp of approval from Building Dept. FBC 107.3.1 3. Job box needs to be cleaned up with full set of plans bound together per FBC 107.3.1 Please make all repairs by re-inspection ***Roof sheathing approved***
ROOF VALLEY & METAL 03/07/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 3/7/2025 3:45:04 PM *** 3/7/25 1). Cannot see the valley naterial as synthitc underlayment is completely covering the valleys. Synthetic underlayment will need to be cut back so that the Valley material is exposed for inspection. Inspector Notes from Inspection 2460 2/25/25 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 Make repair by next inspection 2/19/2025 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 2. No truss engineering packet onsite with approved stamp of approval from Building Dept. FBC 107.3.1 3. Job box needs to be cleaned up with full set of plans bound together per FBC 107.3.1 Please make all repairs by re-inspection ***Roof sheathing approved***
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/25/2025 APPROVED - AS NOTED MKRASKI
Note: 2/25/25 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 Make repair by next inspection 2/19/2025 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 2. No truss engineering packet onsite with approved stamp of approval from Building Dept. FBC 107.3.1 3. Job box needs to be cleaned up with full set of plans bound together per FBC 107.3.1 Please make all repairs by re-inspection ***Roof sheathing approved***
WALL SHEATHING 02/19/2025 APPROVED MKRASKI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/19/2025 Disapproved - NO FEE MKRASKI
Note: 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 2. No truss engineering packet onsite with approved stamp of approval from Building Dept. FBC 107.3.1 3. Job box needs to be cleaned up with full set of plans bound together per FBC 107.3.1 Please make all repairs by re-inspection ***Roof sheathing approved***
TIE BEAM / LINTEL 01/30/2025 APPROVED HCAMACHO
FOUND SURVEY APPROVED (OFFICE) 01/29/2025 APPROVED TBAKER
ROW - DRAINAGE 01/28/2025 APPROVED PFLANAGAN
Note: TEMP. CULVERT REMOVED AND SWALE OPEN AT THIS TIME. ------------------------------------------------------------------- 1/17/2025 - PREVIOUS INSPECTION NOTES 1/17/25= NEED TO REMOVE THE DIRT IN FRONT OF THE HDPE PIPE. SWLAE NEED TO BE OPEN. Sec 300.02 e3 The Builder will be notified if additional Erosion Control Measures are required anytime during construction. Construction activities cannot continue until the Erosion Control Measures have been competed. INSPECTOR BE BACK. 1/28/25
ROW - DRAINAGE 01/17/2025 Disapproved - NO FEE GBERTOLA
Note: 1/17/25= NEED TO REMOVE THE DIRT IN FRONT OF THE HDPE PIPE. SWLAE NEED TO BE OPEN. Sec 300.02 e3 The Builder will be notified if additional Erosion Control Measures are required anytime during construction. Construction activities cannot continue until the Erosion Control Measures have been competed. INSPECTOR BE BACK. 1/28/25
ROW- PROJECT STATUS 01/17/2025 APPROVED - AS NOTED GBERTOLA
Note: 1/17/25= NEED TO REMOVE THE DIRT IN FRONT OF THE HDPE PIPE. SWLAE NEED TO BE OPEN. Sec 300.02 e3 The Builder will be notified if additional Erosion Control Measures are required anytime during construction. Construction activities cannot continue until the Erosion Control Measures have been competed. RESIDENT SAYS CULVERT PIPE IS PLACED BY A TRUCK RAN IT OVER TODAY AND THE MIDDLE IS CRUSHED PLS INSPECT PRIOR TO DRIVEWAY BEING POURED MH
MONOLITHIC SLAB 01/02/2025 APPROVED MKRASKI
MONOLITHIC SLAB 12/31/2024 Disapproved - NO FEE MKRASKI
Note: 1. No intent to treat for termite paper in job box FBC [A] 105.11 2. Wash out in foot rebar needs clearence from earth FBC R404.1.3.3.7.4 3. Back fill footing walls or add form board where needed per plans
PLUMBING 1ST ROUGH UNDERGROUND 12/23/2024 APPROVED MGIBSON
Note: 12/20/2024 - PREVIOUS INSPECTION NOTES REMOVE ANY AND ALL ROOTS AND VEGITATION FROM EXTERIOR OF FOOTER AREAS
PLUMBING 1ST ROUGH UNDERGROUND 12/20/2024 PARTIALLY APPROVED MGIBSON
Note: REMOVE ANY AND ALL ROOTS AND VEGITATION FROM EXTERIOR OF FOOTER AREAS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 12/09/2024 APPROVED CPISCITELLI
WATER METER INSTALLATION REQUEST 11/25/2024 APPROVED CBOWERMASTER
Note: 9/30/2024 11:01:13 AM- PREVIOUS INSPECTION NOTES not cleared wooded lot
WATER METER INSTALLATION REQUEST 09/30/2024 Disapproved -FEE REQUIRED CBOWERMASTER
Note: not cleared wooded lot

Review History

Department Status Date In Date Out
MECH COMPLETE 07/23/2025 07/23/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 06/13/2025 06/17/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 04/03/2025 04/07/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/28/2025 01/29/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/28/2025 01/28/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 12/20/2024 12/23/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 12/02/2024 12/09/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 12/02/2024 12/05/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 10/31/2024 11/05/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 09/19/2024 09/19/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 09/19/2024 09/24/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 09/13/2024 11/14/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
MECH HOLD 09/12/2024 09/16/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Heatload does not match the site plan. Revise to match per R403.7 FBC Energy Conservation 2023 8Th Edition
ENGIN1 COMPLETE 09/12/2024 09/13/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/12/2024 09/17/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 COMPLETE 09/12/2024 09/13/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON HOLD 09/12/2024 09/13/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Windows facing right of way must have banding (right side)
BADMIN COMPLETE 09/12/2024 09/18/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 09/12/2024 09/13/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 08/01/2025
REINSPECTION RESIDENTIAL ¤40.00 08/01/2025
REINSPECTION RESIDENTIAL ¤40.00 08/01/2025
REINSPECTION FEE ¤40.00 08/01/2025
SW ENG - INSPECTION 20 ¤20.00 08/01/2025
SW ENG - INSPECTION 20 ¤20.00 08/01/2025
SW ENG INSPECTION 80 ¤80.00 09/25/2024
SW ENG PRE APRON ¤30.00 09/25/2024
SW ENG - REVIEW 20 ¤20.00 09/25/2024
SW ENG RES REVIEW 200 ¤200.00 09/25/2024
SEWER CREDIT (¤1,147.00) 09/25/2024
SEWER INSPECTION ¤25.00 09/25/2024
SEWER CAPITAL FACILITY ¤6,120.52 09/25/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 09/25/2024
SITE PLAN 30 ¤30.00 09/25/2024
SURCHARGE FS 533.721 ¤3.43 09/25/2024
SURCHARGE - FS 468.631 ¤5.14 09/25/2024
SW ENG - FOUNDATION SURVEY ¤20.00 09/25/2024
WATER- TURN ON ¤25.00 09/25/2024
ADJUSTMENT 50% (¤342.60) 09/25/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/25/2024
INSPECTION - RESIDENTIAL ¤572.00 09/25/2024
PLAN REVIEW - APPROVED MASTER ¤83.20 09/25/2024
CONNECTION FEES ¤1,187.26 09/25/2024
FC IMPACT FEE EMS ¤62.00 09/25/2024
IMPACT FEE FIRE ¤428.09 09/25/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 09/25/2024
FC IMPACT FEE LIBRARY ¤268.00 09/25/2024
IMPACT FEE PARKS ¤1,800.99 09/25/2024
IMPACT FEE SCHOOL ¤5,450.00 09/25/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 09/25/2024
WATER -IRRIGATION INSPECTION ¤25.00 09/25/2024
Fees Total Due: ¤0.00 Total Paid: ¤21,599.67