I want to search for...
Permit #2024090517
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00280-0290 |
| CONDITIONED SPACE: 1800 sqft |
| GARAGE: 410 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| Total Square Footage: 2246 sqft |
| Block: 00280 |
| Subdivision: 7023 - |
| Job Phone: 689-250-2429 |
| Location Address: 25 WHITE BIRCH LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/25/2024 |
| NOC: RECORDED |
| Applicant name: RYAN M COURECH |
| Owner: A AND R-MERIDIAN REAL ESTATE DEVELOPMENT LLC |
|
Address 688 N ORLANDO AVENUE MAITLAND, FL 32751 |
|
Address SUITE 207 MAITLAND, FL 32751 |
| Lot: 0290 |
| Contracted Stated Job Value: ¤208,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
| Original Permit #: 2024010999 |
Contractor
MCH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
668 N ORLANDO AVE, STE 207 MAITLAND, FL 32751 |
CBC1262898 (Exp: 08/31/2026) | 407-602-8257 |
Sub Contractors
DANA SUE COOLEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1718 FLAGLER BEACH, FL 32136 |
CCC1333449 (Exp: 08/31/2026) | 904-535-1680 |
DUSTIN ARCHER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2785 WRIGHTS ROAD SUITE 1133 OVIEDO, FL 32765 |
CMC1251099 (Exp: 08/31/2026) | 407-391-1145 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/01/2025 | FINAL APPROVED | MCONTRYMAN |
| Note: 7/31/2025 - PREVIOUS INSPECTION NOTES 7/31/25 1. Smoke that was moved in bedroom needs to have the ceiling patched FBC EC R402.4.1.1 7/21/25 1. No plans on site FBC 107.3.1 2. E-cals onsite do not match equipment that was installed FBC [A] 107.4 3. Emergency disconnect sticker has been painted over on meter main box NEC 230.85 4. Attic access cover is missing FBC R302.6 5. Front door is missing seals FBC R402.4.1.1 6. Smokes in bedroom is with in 3' of fan blades per manufacturer specs FBCR 314 & 315 | |||
| BLD - BUILDING FINAL | 07/31/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 7/31/25 1. Smoke that was moved in bedroom needs to have the ceiling patched FBC EC R402.4.1.1 7/21/25 1. No plans on site FBC 107.3.1 2. E-cals onsite do not match equipment that was installed FBC [A] 107.4 3. Emergency disconnect sticker has been painted over on meter main box NEC 230.85 4. Attic access cover is missing FBC R302.6 5. Front door is missing seals FBC R402.4.1.1 6. Smokes in bedroom is with in 3' of fan blades per manufacturer specs FBCR 314 & 315 | |||
| BLD - BUILDING FINAL | 07/21/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. No plans on site FBC 107.3.1 2. E-cals onsite do not match equipment that was installed FBC [A] 107.4 3. Emergency disconnect sticker has been painted over on meter main box NEC 230.85 4. Attic access cover is missing FBC R302.6 5. Front door is missing seals FBC R402.4.1.1 6. Smokes in bedroom is with in 3' of fan blades per manufacturer specs FBCR 314 & 315 | |||
| ROW - FINAL APRON (AFTER POUR) | 07/16/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 07/16/25 TPOLACEK*** THERE IS A SMALL HIRLINE CRACK AT LEAD WALKWAY INSPECTOR RECOMMENDS SEALING, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/16/2025 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/16/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 07/16/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 07/16/25 TPOLACEK*** SPOKE WITH CM THE PORTA POTTY IS SCHEDULED TO BE PICKED UP THIS WEEK. APPROVING AS NOTED. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9272 07/16/25 TPOLACEK*** THERE IS A SMALL HIRLINE CRACK AT LEAD WALKWAY INSPECTOR RECOMMENDS SEALING, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ELECTRIC - EARLY POWER | 06/26/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Meter main must be identified on outside as service disconnect NEC 230.70(B) Make repair by final, Emailed FPL @ 11:30am | |||
| ROW- PRE-APRON (PRE-POUR) | 06/17/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. | |||
| GRAVITY SEWER TEST | 05/16/2025 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 05/16/2025 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 05/16/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cc | |||
| PEP TANK INSTALLATION REQUEST | 04/21/2025 | APPROVED | BVITALE |
| INSULATION | 04/15/2025 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 04/15/2025 | APPROVED | KSANDOE |
| Note: 4/11/2025 - PREVIOUS INSPECTION NOTES 4/11/25 Previous note still not rectified 1. Please install water barrier at the Margins of the front entry door (self adhesive membrane) Per Portland cement manufacturer spec, and FBC R703.4 (1) Flashing 4/9/2025 - PREVIOUS INSPECTION NOTES 4/9/25 1. Repair not made 4/8/2025 - PREVIOUS INSPECTION NOTES 1. Please install water barrier at the Margins of the front entry door (self adhesive membrane) Per Portland cement manufacturer spec, and FBC R703.4 (1) Flashing. | |||
| LATH/BRICK/ WATER BARRIER | 04/11/2025 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 4/11/25 Previous note still not rectified 1. Please install water barrier at the Margins of the front entry door (self adhesive membrane) Per Portland cement manufacturer spec, and FBC R703.4 (1) Flashing 4/9/2025 - PREVIOUS INSPECTION NOTES 4/9/25 1. Repair not made 4/8/2025 - PREVIOUS INSPECTION NOTES 1. Please install water barrier at the Margins of the front entry door (self adhesive membrane) Per Portland cement manufacturer spec, and FBC R703.4 (1) Flashing. | |||
| LATH/BRICK/ WATER BARRIER | 04/09/2025 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 4/9/25 1. Repair not made 4/8/2025 - PREVIOUS INSPECTION NOTES 1. Please install water barrier at the Margins of the front entry door (self adhesive membrane) Per Portland cement manufacturer spec, and FBC R703.4 (1) Flashing. | |||
| LATH/BRICK/ WATER BARRIER | 04/08/2025 | Disapproved - NO FEE | JSTEWART |
| Note: Please install water barrier at the Margins of the front entry door (self adhesive membrane) Per Portland cement manufacturer spec, and FBC R703.4 (1) Flashing. | |||
| ALL ROUGH | 04/08/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: Previous note not rectified.....4. Master shower studs (where mixing valve is installed) have been notched and exceeded limitations WFCM 2.4.1.1.1 (PLEASE REPLACE OR ADD FULL LENGTH STUDS) Needs completed prior to Insulation inspection. 3/26/2025 - PREVIOUS INSPECTION NOTES 1. J-boxeds for lighting need to have covers installed FBC (A)107.4 2. Product approval sheet does not match windows installed FBC (A)107.4 3. Nail plates required for romex wiring above elec. panel NEC 300.4 4. Master shower studs (where mixing valve is installed) have been notched and exceeded limitations WFCM 2.4.1.1.1 5. Solid blocking required at front door and SGD 1/4'' gap max allowable FBCR 609.1 PLease make all repairs and revisions before re-inspection | |||
| ALL ROUGH | 03/26/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. J-boxeds for lighting need to have covers installed FBC (A)107.4 2. Product approval sheet does not match windows installed FBC (A)107.4 3. Nail plates required for romex wiring above elec. panel NEC 300.4 4. Master shower studs (where mixing valve is installed) have been notched and exceeded limitations WFCM 2.4.1.1.1 5. Solid blocking required at front door and SGD 1/4'' gap max allowable FBCR 609.1 PLease make all repairs and revisions before re-inspection | |||
| ALL ROUGH | 03/24/2025 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2467 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 Make repair by all rough inspection 2/19/2025 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 2. No truss engineering packet onsite with approved stamp of approval from Building Dept. FBC 107.3.1 3. Job box needs to be cleaned up with full set of plans bound together per FBC 107.3.1 Please make all repairs by re-inspection ***Roof sheathing approved*** | |||
| ROOF VALLEY & METAL | 03/13/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 Make repair by all rough inspection 2/19/2025 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 2. No truss engineering packet onsite with approved stamp of approval from Building Dept. FBC 107.3.1 3. Job box needs to be cleaned up with full set of plans bound together per FBC 107.3.1 Please make all repairs by re-inspection ***Roof sheathing approved*** | |||
| ROOF VALLEY & METAL | 03/12/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 3/12/25 1. Cut back synthetic underlayment to check valley material used in both valleys the entire length of valley FBC(A)107.4 3/7/25 1). Cannot see the valley naterial as synthitc underlayment is completely covering the valleys. Synthetic underlayment will need to be cut back so that the Valley material is exposed for inspection. Inspector Notes from Inspection 2460 2/25/25 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 Make repair by next inspection 2/19/2025 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 2. No truss engineering packet onsite with approved stamp of approval from Building Dept. FBC 107.3.1 3. Job box needs to be cleaned up with full set of plans bound together per FBC 107.3.1 Please make all repairs by re-inspection ***Roof sheathing approved*** | |||
| ROOF VALLEY & METAL | 03/07/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/7/2025 3:45:04 PM *** 3/7/25 1). Cannot see the valley naterial as synthitc underlayment is completely covering the valleys. Synthetic underlayment will need to be cut back so that the Valley material is exposed for inspection. Inspector Notes from Inspection 2460 2/25/25 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 Make repair by next inspection 2/19/2025 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 2. No truss engineering packet onsite with approved stamp of approval from Building Dept. FBC 107.3.1 3. Job box needs to be cleaned up with full set of plans bound together per FBC 107.3.1 Please make all repairs by re-inspection ***Roof sheathing approved*** | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/25/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: 2/25/25 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 Make repair by next inspection 2/19/2025 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 2. No truss engineering packet onsite with approved stamp of approval from Building Dept. FBC 107.3.1 3. Job box needs to be cleaned up with full set of plans bound together per FBC 107.3.1 Please make all repairs by re-inspection ***Roof sheathing approved*** | |||
| WALL SHEATHING | 02/19/2025 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/19/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Truss C1 must be clen of debris per manufacturer spec FBC [A]107.4 2. No truss engineering packet onsite with approved stamp of approval from Building Dept. FBC 107.3.1 3. Job box needs to be cleaned up with full set of plans bound together per FBC 107.3.1 Please make all repairs by re-inspection ***Roof sheathing approved*** | |||
| TIE BEAM / LINTEL | 01/30/2025 | APPROVED | HCAMACHO |
| FOUND SURVEY APPROVED (OFFICE) | 01/29/2025 | APPROVED | TBAKER |
| ROW - DRAINAGE | 01/28/2025 | APPROVED | PFLANAGAN |
| Note: TEMP. CULVERT REMOVED AND SWALE OPEN AT THIS TIME. ------------------------------------------------------------------- 1/17/2025 - PREVIOUS INSPECTION NOTES 1/17/25= NEED TO REMOVE THE DIRT IN FRONT OF THE HDPE PIPE. SWLAE NEED TO BE OPEN. Sec 300.02 e3 The Builder will be notified if additional Erosion Control Measures are required anytime during construction. Construction activities cannot continue until the Erosion Control Measures have been competed. INSPECTOR BE BACK. 1/28/25 | |||
| ROW - DRAINAGE | 01/17/2025 | Disapproved - NO FEE | GBERTOLA |
| Note: 1/17/25= NEED TO REMOVE THE DIRT IN FRONT OF THE HDPE PIPE. SWLAE NEED TO BE OPEN. Sec 300.02 e3 The Builder will be notified if additional Erosion Control Measures are required anytime during construction. Construction activities cannot continue until the Erosion Control Measures have been competed. INSPECTOR BE BACK. 1/28/25 | |||
| ROW- PROJECT STATUS | 01/17/2025 | APPROVED - AS NOTED | GBERTOLA |
| Note: 1/17/25= NEED TO REMOVE THE DIRT IN FRONT OF THE HDPE PIPE. SWLAE NEED TO BE OPEN. Sec 300.02 e3 The Builder will be notified if additional Erosion Control Measures are required anytime during construction. Construction activities cannot continue until the Erosion Control Measures have been competed. RESIDENT SAYS CULVERT PIPE IS PLACED BY A TRUCK RAN IT OVER TODAY AND THE MIDDLE IS CRUSHED PLS INSPECT PRIOR TO DRIVEWAY BEING POURED MH | |||
| MONOLITHIC SLAB | 01/02/2025 | APPROVED | MKRASKI |
| MONOLITHIC SLAB | 12/31/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. No intent to treat for termite paper in job box FBC [A] 105.11 2. Wash out in foot rebar needs clearence from earth FBC R404.1.3.3.7.4 3. Back fill footing walls or add form board where needed per plans | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/23/2024 | APPROVED | MGIBSON |
| Note: 12/20/2024 - PREVIOUS INSPECTION NOTES REMOVE ANY AND ALL ROOTS AND VEGITATION FROM EXTERIOR OF FOOTER AREAS | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/20/2024 | PARTIALLY APPROVED | MGIBSON |
| Note: REMOVE ANY AND ALL ROOTS AND VEGITATION FROM EXTERIOR OF FOOTER AREAS | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 12/09/2024 | APPROVED | CPISCITELLI |
| WATER METER INSTALLATION REQUEST | 11/25/2024 | APPROVED | CBOWERMASTER |
| Note: 9/30/2024 11:01:13 AM- PREVIOUS INSPECTION NOTES not cleared wooded lot | |||
| WATER METER INSTALLATION REQUEST | 09/30/2024 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: not cleared wooded lot |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 07/23/2025 | 07/23/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/13/2025 | 06/17/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/03/2025 | 04/07/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/28/2025 | 01/29/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/28/2025 | 01/28/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/20/2024 | 12/23/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/02/2024 | 12/09/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/02/2024 | 12/05/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/31/2024 | 11/05/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/19/2024 | 09/19/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/19/2024 | 09/24/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/13/2024 | 11/14/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/12/2024 | 09/16/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Heatload does not match the site plan. Revise to match per R403.7 FBC Energy Conservation 2023 8Th Edition | |||
| ENGIN1 | COMPLETE | 09/12/2024 | 09/13/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/12/2024 | 09/17/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/12/2024 | 09/13/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | HOLD | 09/12/2024 | 09/13/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Windows facing right of way must have banding (right side) | |||
| BADMIN | COMPLETE | 09/12/2024 | 09/18/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/12/2024 | 09/13/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 08/01/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/01/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/01/2025 |
| REINSPECTION FEE | ¤40.00 | 08/01/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/01/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/01/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/25/2024 |
| SW ENG PRE APRON | ¤30.00 | 09/25/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/25/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/25/2024 |
| SEWER CREDIT | (¤1,147.00) | 09/25/2024 |
| SEWER INSPECTION | ¤25.00 | 09/25/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 09/25/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 09/25/2024 |
| SITE PLAN 30 | ¤30.00 | 09/25/2024 |
| SURCHARGE FS 533.721 | ¤3.43 | 09/25/2024 |
| SURCHARGE - FS 468.631 | ¤5.14 | 09/25/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/25/2024 |
| WATER- TURN ON | ¤25.00 | 09/25/2024 |
| ADJUSTMENT 50% | (¤342.60) | 09/25/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/25/2024 |
| INSPECTION - RESIDENTIAL | ¤572.00 | 09/25/2024 |
| PLAN REVIEW - APPROVED MASTER | ¤83.20 | 09/25/2024 |
| CONNECTION FEES | ¤1,187.26 | 09/25/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 09/25/2024 |
| IMPACT FEE FIRE | ¤428.09 | 09/25/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 09/25/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 09/25/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 09/25/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 09/25/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 09/25/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/25/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,599.67 |