I want to search for...
Permit #2024100021
Permit Details
Status: COED
| CONDITIONED SPACE: 1809 sqft |
| GARAGE: 400 sqft |
| OPENED PORCH (WITH ROOF) : 175 sqft |
| Total Square Footage: 2384 sqft |
| Subdivision: 2345 - RETREAT PHASE 2 |
| Job Phone: 904-669-7000 |
| Location Address: 36 MULBERRY RD |
| Type: TH - TOWNHOUSE |
| Issue Date: 10/18/2024 |
| NOC: RECORDED |
| Applicant name: PAUL GILBERT AXTELL |
| Owner: TOLL SOUTHEAST LP CO INC |
|
Address 1140 VIRGINIA DRIVE FORT WASHINGTON, PA 19034 |
| Contracted Stated Job Value: ¤336,606.28 |
| Job Description: TOWNHOME |
| Type: CN |
Contractor
TOLL BROS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
40 EVEREST LN, STE 5 ST JOHNS, FL 32259 |
CGC60445 (Exp: 08/31/2026) | 904-217-3852 |
Sub Contractors
JAMES F QUINN III
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3210 SW 40TH BLVD STE F GAINESVILLE, FL 32608 |
EC13010994 (Exp: 08/31/2026) | 352-378-9274 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
HARLEY M BRYAN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
5223 EDGEWOOD CT ORMOND BEACH, FL 32174 |
LI26657 (Exp: 08/31/2028) | 386-463-2700 |
JAMES MICHAEL WATSON
| Status | Location Address | State License Number | Phone |
| INACTIVE |
38115 YALE CIRCLE LEESBURG, FL 34748 |
SCC131152841 (Exp: 08/31/2026) | 352-434-0115 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/21/2025 | FINAL APPROVED | PKNAPIK |
| Note: 4/15/2025 - PREVIOUS INSPECTION NOTES 4/15/25 1. ODU needs to be 3" above finsihed grade FBCR M1305.1.4.1 2. Outlets in Laundry room are not tripping (AFCI breaker) | |||
| BLD - BUILDING FINAL | 04/15/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 4/15/25 1. ODU needs to be 3" above finsihed grade FBCR M1305.1.4.1 2. Outlets in Laundry room are not tripping (AFCI breaker) | |||
| U-CROSS CONNECTION | 04/04/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: reclaim irr-no cc | |||
| U -UTILITY RESIDENTIAL FINAL | 04/04/2025 | FINAL APPROVED | LFITZGERALD |
| LDSC- LANDSCAPE FINAL | 04/02/2025 | APPROVED | RPICATAGI |
| ELECTRIC - EARLY POWER | 03/14/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 8:30am | |||
| FIREWALL DRYWALL NAILING | 01/30/2025 | APPROVED | MCONTRYMAN |
| GRAVITY SEWER TEST | 01/27/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 01/27/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 01/24/2025 | APPROVED | MKRASKI |
| ALL ROUGH | 01/22/2025 | APPROVED | MCONTRYMAN |
| Note: 1/17/2025 - PREVIOUS INSPECTION NOTES 01/17/25 Previous inspection note still need to be rectified 1/14/2025 - PREVIOUS INSPECTION NOTES 1/14/25 Previous notes still not rectified 12/31/2024 - PREVIOUS INSPECTION NOTES 12/31/24 Previous notes not rectified 4. SGD need to be in ecalcs and product approvals. (Renaissance) Additionally 12/31/2024 - PREVIOUS INSPECTION NOTES 12/31/24 Previous notes not rectified 2. Plumbing nail plate in master bath. (not secured) FBCR P2603.2.1 3. Electrical nail plate kitchen island for conduit. (use correct plate) NEC 300.4 4. Sliders need to be in ecalcs and product approvals. Additionally : 5. Master Bath vent fan not wired in 6. All vent pipes going to soffit are crushed FBC M1301.3 12/26/2024 - PREVIOUS INSPECTION NOTES 12/26/2024 1. 2pt connection bath fans. FBC M1601.4.1 2. Plumbing nail plate in master bath. FBCR P2603.2.1 3. Electrical nail plate kitchen island for conduit. NEC 300.4 4. Sliders need to be in ecalcs. U-factor and SHGC not on sliders. | |||
| ALL ROUGH | 01/17/2025 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: 01/17/25 Previous inspection note still need to be rectified 1/14/2025 - PREVIOUS INSPECTION NOTES 1/14/25 Previous notes still not rectified 12/31/2024 - PREVIOUS INSPECTION NOTES 12/31/24 Previous notes not rectified 4. SGD need to be in ecalcs and product approvals. (Renaissance) Additionally 12/31/2024 - PREVIOUS INSPECTION NOTES 12/31/24 Previous notes not rectified 2. Plumbing nail plate in master bath. (not secured) FBCR P2603.2.1 3. Electrical nail plate kitchen island for conduit. (use correct plate) NEC 300.4 4. Sliders need to be in ecalcs and product approvals. Additionally : 5. Master Bath vent fan not wired in 6. All vent pipes going to soffit are crushed FBC M1301.3 12/26/2024 - PREVIOUS INSPECTION NOTES 12/26/2024 1. 2pt connection bath fans. FBC M1601.4.1 2. Plumbing nail plate in master bath. FBCR P2603.2.1 3. Electrical nail plate kitchen island for conduit. NEC 300.4 4. Sliders need to be in ecalcs. U-factor and SHGC not on sliders. | |||
| ELECTRIC-TUG | 01/16/2025 | APPROVED | CVANSTRAHLEN |
| ALL ROUGH | 01/14/2025 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 1/14/25 Previous notes still not rectified 12/31/2024 - PREVIOUS INSPECTION NOTES 12/31/24 Previous notes not rectified 4. SGD need to be in ecalcs and product approvals. (Renaissance) Additionally : 5. Master Bath vent fan not wired in 12/31/2024 - PREVIOUS INSPECTION NOTES 12/31/24 Previous notes not rectified 2. Plumbing nail plate in master bath. (not secured) FBCR P2603.2.1 3. Electrical nail plate kitchen island for conduit. (use correct plate) NEC 300.4 4. Sliders need to be in ecalcs and product approvals. Additionally : 5. Master Bath vent fan not wired in 6. All vent pipes going to soffit are crushed FBC M1301.3 12/26/2024 - PREVIOUS INSPECTION NOTES 12/26/2024 1. 2pt connection bath fans. FBC M1601.4.1 2. Plumbing nail plate in master bath. FBCR P2603.2.1 3. Electrical nail plate kitchen island for conduit. NEC 300.4 4. Sliders need to be in ecalcs. U-factor and SHGC not on sliders. | |||
| ALL ROUGH | 12/31/2024 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 12/31/24 Previous notes not rectified 2. Plumbing nail plate in master bath. (not secured) FBCR P2603.2.1 3. Electrical nail plate kitchen island for conduit. (use correct plate) NEC 300.4 4. Sliders need to be in ecalcs and product approvals. Additionally : 5. Master Bath vent fan not wired in 6. All vent pipes going to soffit are crushed FBC M1301.3 12/26/2024 - PREVIOUS INSPECTION NOTES 12/26/2024 1. 2pt connection bath fans. FBC M1601.4.1 2. Plumbing nail plate in master bath. FBCR P2603.2.1 3. Electrical nail plate kitchen island for conduit. NEC 300.4 4. Sliders need to be in ecalcs. U-factor and SHGC not on sliders. | |||
| FIREWALL FRAMING | 12/26/2024 | APPROVED | PKNAPIK |
| FIREWALL PENETRATIONS | 12/26/2024 | APPROVED | PKNAPIK |
| LATH/BRICK/ WATER BARRIER | 12/26/2024 | APPROVED | PKNAPIK |
| ALL ROUGH | 12/26/2024 | Disapproved - NO FEE | PKNAPIK |
| Note: 12/26/2024 1. 2pt connection bath fans. FBC M1601.4.1 2. Plumbing nail plate in master bath. FBCR P2603.2.1 3. Electrical nail plate kitchen island for conduit. NEC 300.4 4. Sliders need to be in ecalcs. U-factor and SHGC not on sliders. | |||
| ROOF VALLEY & METAL | 11/25/2024 | APPROVED | KSANDOE |
| WATER METER INSTALLATION REQUEST | 11/21/2024 | APPROVED | CBOWERMASTER |
| Note: 11/19/2024 9:07:48 AM- PREVIOUS INSPECTION NOTES WATER INSTALL FEES HAVE NOT BEEN PAID | |||
| WATER METER INSTALLATION REQUEST | 11/19/2024 | Disapproved - NO FEE | CBOWERMASTER |
| Note: WATER INSTALL FEES HAVE NOT BEEN PAID | |||
| WALL SHEATHING | 11/19/2024 | APPROVED | PKNAPIK |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/19/2024 | APPROVED - AS NOTED | PKNAPIK |
| Note: 11/19/2024 1. Missing engineering on trusses A01, A02, and A04, Marked in plans. | |||
| FOUNDATION SURVEY - OFFICE USE ONLY | 11/01/2024 | APPROVED | DLEAP |
| MONOLITHIC SLAB | 10/28/2024 | APPROVED | PKNAPIK |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/24/2024 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| ARCHR | COMPLETE | 04/02/2025 | 04/10/2025 |
| Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/15/2025 | 01/21/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/15/2025 | 01/21/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/02/2025 | 01/06/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 11/19/2024 | 11/19/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 11/01/2024 | 11/01/2024 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/14/2024 | 10/18/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ARCHR | COMPLETE | 10/01/2024 | 10/08/2024 |
| Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 10/01/2024 | 10/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/01/2024 | 10/07/2024 |
| Note: Released By: JPI | |||
| DSD | COMPLETE | 10/01/2024 | 10/08/2024 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/01/2024 | 10/03/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | CANCEL | 10/01/2024 | 10/03/2024 |
| GAS | COMPLETE | 10/01/2024 | 10/03/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/01/2024 | 10/07/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Duct layout needs to be from this address only. Or gray out one not being used 2. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition | |||
| PLUM | COMPLETE | 10/01/2024 | 10/07/2024 |
| Note: Released By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 10/01/2024 | 10/03/2024 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 03/20/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/14/2025 |
| CONNECTION FEES | ¤25.00 | 11/19/2024 |
| SEWER INSPECTION | ¤25.00 | 11/19/2024 |
| WATER-METER | ¤514.49 | 11/19/2024 |
| WATER-METER | ¤427.42 | 11/19/2024 |
| ADJUSTMENT 10% | (¤121.96) | 10/18/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/18/2024 |
| INSPECTION - RESIDENTIAL | ¤926.75 | 10/18/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤262.86 | 10/18/2024 |
| SITE PLAN 30 | ¤30.00 | 10/18/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 10/18/2024 |
| IMPACT FEE FIRE | ¤434.51 | 10/18/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/18/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/18/2024 |
| IMPACT FEE PARKS | ¤1,828.01 | 10/18/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/18/2024 |
| IMPACT FEE TRANSPORTATION | ¤2,638.00 | 10/18/2024 |
| SURCHARGE FS 533.721 | ¤10.98 | 10/18/2024 |
| SURCHARGE - FS 468.631 | ¤16.47 | 10/18/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,105.53 |