Permit #2024100162
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-2150 |
| CONDITIONED SPACE: 3108 sqft |
| GARAGE: 733 sqft |
| OPENED PORCH (WITH ROOF) : 718 sqft |
| OPENED PORCH (WITH ROOF) : 73 sqft |
| Total Square Footage: 4632 sqft |
| Block: 00000 |
| Subdivision: - |
| Job Phone: 386-237-0328 |
| Location Address: 186 ASPEN WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/22/2024 |
| NOC: RECORDED |
| Applicant name: JAMES JOSEPH ALBANO |
| Owner: KROPFF DAVID H & DEBBIE G H&W |
|
Address 13846 ATLANTIC BLVD JACKSONVILLE, FL 32225 |
|
Address MIRA VISTA #401 JACKSONVILLE, FL 32225 |
| Lot: 2150 |
| Contracted Stated Job Value: ¤619,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
ALBANO DESIGNS STUDIOS, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
82 LEE DR PALM COAST, FL 32137 |
CBC050078 (Exp: 08/31/2026) | 386-237-0328 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
ROBERTO F GONZALEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
212 PALMETTO AVE CRESCENT CITY, FL 32112 |
RF11067887 (Exp: 08/31/2027) | 286-559-2885 |
SCOTT DALE CRIDER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 353092 PALM COAST, FL 32137 |
CCC1333991 (Exp: 08/31/2026) | 386-276-0758 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 11/24/2025 | FINAL APPROVED | BWRIGHT |
| Note: 11/21/2025 - PREVIOUS INSPECTION NOTES | |||
| U -UTILITY RESIDENTIAL FINAL | 11/21/2025 | Disapproved - NO FEE | BWRIGHT |
| ROW - STORMWATER FINAL | 11/20/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 11/20/2025 | APPROVED | GBERTOLA |
| Note: Inspector Notes from Inspection 9465 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Correction were made it. Passing as noted that the final survey now shows that the water will not impact the adjacent lot to the right. ---------------------------------------------------------------- 10/17/2025 - PREVIOUS INSPECTION NOTES ** 10/17/25 RIGHT SIDE ALONG PROPERTY LINE SHOWS YOUR DRAINAGE WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" NOTE TO INSPECTOR FINAL SURVEY STAES THAT THE WATER WILL NOT IMPACT THE ADJACENT LOT TO THE RIGHT. THESE HOUSE A FLAT IN THIS COMMUNITY PLEASE INSPECT. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/19/2025 | APPROVED | GBERTOLA |
| Note: Inspector Notes from Inspection 9463 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Correction were made it Passing as noted that the final survey now shows that the water will not impact the adjacent lot to the right. ---------------------------------------------------------------- 10/17/2025 - PREVIOUS INSPECTION NOTES ** 10/17/25 RIGHT SIDE ALONG PROPERTY LINE SHOWS YOUR DRAINAGE WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/19/2025 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Correction were made it. Passing as noted that the final survey now shows that the water will not impact the adjacent lot to the right. ---------------------------------------------------------------- 10/17/2025 - PREVIOUS INSPECTION NOTES ** 10/17/25 RIGHT SIDE ALONG PROPERTY LINE SHOWS YOUR DRAINAGE WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" NOTE TO INSPECTOR FINAL SURVEY STAES THAT THE WATER WILL NOT IMPACT THE ADJACENT LOT TO THE RIGHT. THESE HOUSE A FLAT IN THIS COMMUNITY PLEASE INSPECT. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/18/2025 | APPROVED - AS NOTED | PFLANAGAN |
| Note: Passing as noted that the final survey now shows that the water will not impact the adjacent lot to the right. ---------------------------------------------------------------- 10/17/2025 - PREVIOUS INSPECTION NOTES ** 10/17/25 RIGHT SIDE ALONG PROPERTY LINE SHOWS YOUR DRAINAGE WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" | |||
| BLD - BUILDING FINAL | 10/27/2025 | FINAL APPROVED | HCAMACHO |
| BLD - BUILDING FINAL | 10/24/2025 | CANCELLED BY APPLICANT | WEB |
| BLD - BUILDING FINAL | 10/21/2025 | CANCELLED BY APPLICANT | WEB |
| U-CROSS CONNECTION | 10/17/2025 | APPROVED | BWRIGHT |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/17/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 10/17/25 RIGHT SIDE ALONG PROPERTY LINE SHOWS YOUR DRAINAGE WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" | |||
| ELECTRIC - EARLY POWER | 06/23/2025 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2200 *** NOTES ADDED BY RMARTIN 1/9/2025 9:28:57 AM *** need to have spd installed at early power | |||
| ROW- PRE-APRON (PRE-POUR) | 06/12/2025 | APPROVED | PFLANAGAN |
| Note: READY FOR PAVERS ------------------------------------------------------------------- 6/4/2025 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- PAVER RESTRAINTS | 06/04/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/04/2025 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/21/2025 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 05/19/2025 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2420 Addedn a window nailing inspection for Front entry and corner SGD. please have areas blocked off from weather prior to Insulation. | |||
| ALL ROUGH | 05/09/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: Addedn a window nailing inspection for Front entry and corner SGD. please have areas blocked off from weather prior to Insulation. | |||
| LATH/BRICK/ WATER BARRIER | 05/07/2025 | APPROVED | HCAMACHO |
| Note: 2/6/2025 - PREVIOUS INSPECTION NOTES Lath installed only on the walls that the roof meets. Need to call back for another Inspection once everything else is ready. | |||
| GRAVITY SEWER TEST | 03/24/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 FBCR-319.1 NEED ADDRESS POSTED FOR ''911'' | |||
| SEWER TIE IN | 03/24/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 FBCR-319.1 NEED ADDRESS POSTED FOR ''911'' | |||
| LATH/BRICK/ WATER BARRIER | 02/06/2025 | PARTIALLY APPROVED | HCAMACHO |
| Note: Lath installed only on the walls that the roof meets. Need to call back for another Inspection once everything else is ready. | |||
| ROOF VALLEY & METAL | 02/04/2025 | APPROVED | HCAMACHO |
| WALL SHEATHING | 01/29/2025 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2340 Super told me there's a small section on the rear porch that is being revised to wood frame because of slider being bigger. Marked on plan. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/29/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: Area in the back of the house where part of the wall is Framed in the Lanai, needs revision. The plans call for Block Wall *This Revision needs to be in and Submitted by Rough Inspection.* | |||
| ELECTRIC-TUG | 01/09/2025 | APPROVED - AS NOTED | RMARTIN |
| Note: *** NOTES ADDED BY RMARTIN 1/9/2025 9:28:57 AM *** need to have spd installed at early power | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/07/2025 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 12/26/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: Super told me there's a small section on the rear porch that is being revised to wood frame because of slider being bigger. Marked on plan. | |||
| MONOLITHIC SLAB | 12/02/2024 | APPROVED | HCAMACHO |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/19/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: FBCR-319.1 NEED ADDRESS POSTED FOR ''911'' | |||
| WATER METER INSTALLATION REQUEST | 11/01/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 05/05/2025 | 05/12/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/07/2025 | 01/07/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/07/2025 | 01/07/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 10/15/2024 | 10/21/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/15/2024 | 10/21/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 10/04/2024 | 10/04/2024 |
| Note: Released By: MATTHEW SIERRA - - | |||
| BADMIN | HOLD | 10/03/2024 | 10/11/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Truss packet or truss layout need shop drawing approval stamp by engineer of record. | |||
| BLD | COMPLETE | 10/03/2024 | 10/11/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/03/2024 | 10/14/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/03/2024 | 10/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/03/2024 | 10/03/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 10/03/2024 | 10/07/2024 |
| LOCATE | COMPLETE | 10/03/2024 | 10/07/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/03/2024 | 10/07/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/03/2024 | 10/04/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/03/2024 | 10/07/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤514.49 | 10/22/2024 |
| ADJUSTMENT 10% | (¤221.86) | 10/22/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/22/2024 |
| INSPECTION - RESIDENTIAL | ¤1,705.00 | 10/22/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤483.60 | 10/22/2024 |
| CONNECTION FEES | ¤25.00 | 10/22/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 10/22/2024 |
| IMPACT FEE FIRE | ¤434.51 | 10/22/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/22/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/22/2024 |
| IMPACT FEE PARKS | ¤1,828.01 | 10/22/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/22/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 10/22/2024 |
| SURCHARGE FS 533.721 | ¤19.97 | 10/22/2024 |
| SURCHARGE - FS 468.631 | ¤29.95 | 10/22/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/22/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/22/2024 |
| SW ENG PRE APRON | ¤30.00 | 10/22/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/22/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/22/2024 |
| SEWER INSPECTION | ¤25.00 | 10/22/2024 |
| SITE PLAN 30 | ¤30.00 | 10/22/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,655.67 |