I want to search for...
Permit #2024100322
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00040-0030 |
| GARAGE: 602 sqft |
| OPENED PORCH (WITH ROOF) : 237 sqft |
| CONDITIONED SPACE: 2336 sqft |
| Total Square Footage: 3175 sqft |
| Block: 00040 |
| Subdivision: - |
| Job Phone: 844-885-8913 |
| Location Address: 33 FERBER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/28/2024 |
| NOC: RECORDED |
| Applicant name: SIMON DALE VANWAGENEN |
| Owner: LGI HOMES - FLORIDA LLC |
|
Address 1450 LAKE ROBBINS DRIVE THE WOODLANDS, TX 77380 |
|
Address STE 430 THE WOODLANDS, TX 77380 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤225,243.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
LGI HOMES-FLORIDA LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2304 SPRING HILL CT TAMPA, FL 33602 |
CBC1257972 (Exp: 08/31/2026) | 904-451-8258 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
CHRISTOPHER DENNIS O'CONNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
240 N LAKE CUNNINGHAM AVE JACKSONVILLE, FL 32257 |
ER13015361 (Exp: 08/31/2026) | 904-540-0858 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/31/2025 | FINAL APPROVED | HCAMACHO |
| BLD - BUILDING FINAL | 03/27/2025 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-6. Heat strips not marked for AH FBCR M1303.1 #2-refrigerator and microwave need a GFCI breaker | |||
| ROW - FINAL APRON (AFTER POUR) | 03/25/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 03/25/2025 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE ---------------------------------------------------------------- THE SOD ON THE RIGHT NEEDS TO MATCH ADJACENT LOT GRADE TALKED WITH PHIL AND HE STATED IT WILL BE DONE BEFORE ROW FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 03/24/2025 | FINAL APPROVED | LFITZGERALD |
| U-CROSS CONNECTION | 03/24/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: irr meter with PVB-no cc | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/20/2025 | APPROVED | PFLANAGAN |
| Note: FINAL SURVEY MEETS CITYS STANDARDS | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/20/2025 | APPROVED - AS NOTED | PFLANAGAN |
| Note: THE SOD ON THE RIGHT NEEDS TO MATCH ADJACENT LOT GRADE TALKED WITH PHIL AND HE STATED IT WILL BE DONE BEFORE ROW FINAL INSPECTION | |||
| ELECTRIC - EARLY POWER | 03/07/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 3/7/2025 10:25:45 AM *** Please relocate surge Protection to the service equipment (Main disconnect) prior to Final. NEC 230.67 | |||
| ROW- PRE-APRON (PRE-POUR) | 02/13/2025 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| INSULATION | 01/30/2025 | APPROVED | HCAMACHO |
| Note: 1/29/2025 - PREVIOUS INSPECTION NOTES A/C Registers missing seal. | |||
| GRAVITY SEWER TEST | 01/29/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 NEED REVISION FOR FLLORR PLAN. SHOWS GARAGE LEFT AND WHAT IS ON SITE IS GARAGE LEFT THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 01/29/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2075 Inspector Notes from Inspection 2060 NEED REVISION FOR FLLORR PLAN. SHOWS GARAGE LEFT AND WHAT IS ON SITE IS GARAGE LEFT THIS WAS A VIRTUAL INSPECTION Inspector Notes from Inspection 2060 NEED REVISION FOR FLLORR PLAN. SHOWS GARAGE LEFT AND WHAT IS ON SITE IS GARAGE LEFT THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 01/29/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: A/C Registers missing seal. | |||
| INSULATION | 01/28/2025 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 01/27/2025 | APPROVED | HCAMACHO |
| ALL ROUGH | 01/24/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Bath fans need 2nd mechanical attacment. FBCR M1604.4.1 2. Swing door in the rear has more then 1/4" gap on top and missing screws. FBCR 609.1 3. A/C Registers missing seal.R402.4.1.1 4. Attic light/service outlet needs to be moved do to A/C being in the way. 5. Need new attic access location due to A/C being in the way.FBC [A]107.4 6. Revise Product approval sheet for windows and Slider. FBC [A]107.4 *Will check at Insualtion* | |||
| ELECTRIC-TUG | 01/15/2025 | APPROVED | HCAMACHO |
| ROOF VALLEY & METAL | 01/06/2025 | APPROVED | HCAMACHO |
| WALL SHEATHING | 01/02/2025 | APPROVED | HCAMACHO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/02/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Header beam in the rear porch is missing the straps for tied down. 2. Header in the front porch is missing straps for tie down and missing load path from knee wall to bearing posts. | |||
| ROOF VALLEY & METAL | 01/02/2025 | CANCELLED BY APPLICANT | HCAMACHO |
| Note: Not ready | |||
| TIE BEAM / LINTEL | 12/18/2024 | CANCELLED BY INSPECTOR | MCONTRYMAN |
| FOUND SURVEY APPROVED (OFFICE) | 12/17/2024 | APPROVED | LSALYERDS |
| MONOLITHIC SLAB | 12/09/2024 | APPROVED | HCAMACHO |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/06/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: NEED REVISION FOR FLLORR PLAN. SHOWS GARAGE LEFT AND WHT IS ON SITE IS GARAGE LEFT | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 12/05/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 11/01/2024 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 10/08/2024 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/12/2025 | 03/13/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/28/2025 | 01/29/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/27/2025 | 01/28/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/22/2025 | 01/27/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| ENGIN1 | COMPLETE | 12/13/2024 | 12/17/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM After careful consideration, City Administration has waived the 0.2’ tolerance for this permit. No other requirements have been exceeded or waived. | |||
| ZON | COMPLETE | 12/13/2024 | 12/13/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/06/2024 | 12/10/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/06/2024 | 12/06/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/02/2024 | 12/05/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/23/2024 | 10/23/2024 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/23/2024 | 10/23/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ENGIN1 | COMPLETE | 10/23/2024 | 10/23/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 10/15/2024 | 12/04/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 10/08/2024 | 10/14/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/08/2024 | 10/14/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/08/2024 | 10/15/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/08/2024 | 10/14/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/08/2024 | 10/15/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 10/08/2024 | 10/09/2024 |
| LOCATE | COMPLETE | 10/08/2024 | 10/09/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/08/2024 | 10/09/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/08/2024 | 10/08/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | HOLD | 10/08/2024 | 10/09/2024 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Site plan legal description missing map book #. | |||
| PLENV | COMPLETE | 10/08/2024 | 10/08/2024 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM After action report was submitted and accepted by FWC meeting the requirements for 10.04.01 of the LDC. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. In future submittals, acceptance email for after action report is required to be submitted (GTT-24-01394). |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 04/01/2025 |
| CONNECTION FEES | ¤1,187.26 | 10/28/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 10/28/2024 |
| IMPACT FEE FIRE | ¤434.51 | 10/28/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/28/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/28/2024 |
| IMPACT FEE PARKS | ¤1,828.01 | 10/28/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/28/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 10/28/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/28/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/28/2024 |
| SURCHARGE FS 533.721 | ¤14.28 | 10/28/2024 |
| SURCHARGE - FS 468.631 | ¤21.42 | 10/28/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/28/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/28/2024 |
| SW ENG PRE APRON | ¤30.00 | 10/28/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/28/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/28/2024 |
| SEWER INSPECTION | ¤25.00 | 10/28/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 10/28/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 10/28/2024 |
| SITE PLAN 30 | ¤30.00 | 10/28/2024 |
| WATER-METER | ¤514.49 | 10/28/2024 |
| WATER- TURN ON | ¤25.00 | 10/28/2024 |
| WATER- TURN ON | ¤25.00 | 10/28/2024 |
| ADJUSTMENT 10% | (¤158.67) | 10/28/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/28/2024 |
| INSPECTION - RESIDENTIAL | ¤1,212.75 | 10/28/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤343.98 | 10/28/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤24,297.19 |